BAT PRACTICE AT OVACIK GOLD MINE G. ÖNAL

Similar documents
NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY

WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE

Temporary Batch Plants

Environmental risk managements of mine wastes (from planning to aftercare) Marja Liisa Räisänen ELY-centre for Kainuu

Water remediation: Passive Treatment Technologies

UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA

Use of Corrugated HDPE Products

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

Technological Processes

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

MINING AND WATER POLLUTION

Iron and Steel Manufacturing

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES

Applications of Bauxsol in Reclamation, Remediation, and Water Treatment. James M. Castro, Ph.D.

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

SoCo: European Overview on soil degradation processes related to agriculture

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

SURFACE REMEDIATION AND MANAGEMENT OVERVIEW

Coal ash utilisation over the world and in Europe

Mine Plan of Operations Reclamation Bond Checklist

Laboratory and Field Performance Assessment of Geocomposite Alternative to Gravel Drainage Overliner in Heap Leach Pads

Research and Development Information

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

Title 27A. Environment and Natural Resources Chapter 1 - Oklahoma Environmental Quality Act Article III - Jurisdiction of Environmental Agencies

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

The formation of polluted mine water

VACUUM EXCAVATION WHAT WE CAN DO THE VACIT DIFFERENCE

Outotec Gold Processing Solutions

INFORMATION SHEET ORDER NO. R XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

THE ENVIRONMENT. NLMK EFFICIENCY LEADERSHIP Report 2014

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section Summary of Commitments

A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour.

Mine Water Treatment Solutions for Discharge and Re-Use

Coke Manufacturing. Industry Description and Practices. Waste Characteristics

Use of Fly ash from KKAB, for sealing of landfills

Tailings Management at Porgera

LIFE-CYCLE IMPACTS AND COSTS OF MANGANESE LOSSES AND RECOVERY DURING FERROMANGANESE PRODUCTION

Basements and Deep Building Construction Policy 2014

The Engebøfjellet Rutile project, a new high grade source in Europe

Multi-pollutant control solutions for coal based power plants

Types of Mining - Expert Table

DAMANG MINE: SWINGING BACK TO PROFITABILITY ALFRED BAKU EVP & Head of West Africa NG Mining Summit, Cape Town, June 2015

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003

Radioactive Waste Storage Facility and Tank System Design Criteria Standards

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Proposed (Concrete Cutting And Drilling) Environmental Management Plan

For personal use only

WASTEWATER TREATMENT OBJECTIVES

Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills

Upper Workings. Waste Rock. Adit. Millsite

Guidebook for Evaluating Mining Project EIAs. 1st Edition

Iron Ore Processing for the Blast Furnace (Courtesy of the National Steel Pellet Company)

COMPANY PROFILE. AES Company, Head Quarter

Environmental, Health and Safety Guidelines for Mining

ENVIRONMENTAL MANAGEMENT: CLEAN WATER RESEARCH AS RELATED TO ACID MINE DRAINAGE

Ontario Mining Act Fact Sheet Mine Closure Plans Your Right to Know!

Environmental Technology March/April 1998

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

NAPCS Product List for NAICS 54162: Environmental Consulting Services

AGREGADOS RECICLADOS MITOS Y REALIDADES

Mizuho Bank. Environmental and Social Checklist (Mining)

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

CNSolution TM 9310 On-line Cyanide Analyzer. Product Release Synopsis. I Product Description/Function. 1 3 Cyanide Recycle

Environmental Construction Operations Plan (ECO Plan) Framework

MLD: Domestic Maritime Transport Project

GUIDELINES FOR LEACHATE CONTROL

GUIDELINES SAFE DESIGN

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh

Optimize Your Process

Yu. F. Vasyuchkov*, M. Yu. Bykova* NEW TECHNOLOGY OF GAS EXTRACTION ON THE BASE OF A COAL TO A HYDROGEN TRANSFER

Swamp Area Passive Treatment System Kettle Creek Watershed, Clinton County, PA

Casino Mining Corporation. Casino Project TABLE OF CONTENTS

Minerals Regulatory Guidelines MG5. Guidelines for miners: tailings and tailings storage facilities in South Australia

A case study of CIP tails slurry treatment: comparison of cyanide recovery to cyanide destruction

SEBENICO ATSI COMPANY OVERVIEW

Section 25.2 provides an overview of the area of influence and reviews legal and other requirements relevant to closure (1).

Self Assessment Exercise

POLLUTED EMISSION TREATMENTS FROM INCINERATOR GASES

Mako Project, Eastern Senegal Completion of Scoping Study

Health & Safety Management System Manual

Trevor Lloyd Director

NETL Life Cycle Inventory Data Process Documentation File

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE

Unit 6: Homework Questions

Pollution Incident Response Plan

Land Application of Drilling Fluids: Landowner Considerations

Transcription:

BAT PRACTICE AT OVACIK GOLD MINE G. ÖNAL Istanbul Technical University Faculty of Mines Mineral Processing Engineering Dept. 34469 Istanbul-TURKEY E-mail onalg@itu.edu.tr 1. Introduction In this presentation, the BAT application has been outlined in Ovacık Gold- Silver mine in Turkey. This BAT application was accepted as best one in Europe by Euro mines. 2. Location And Project Futures of Mine Mine is located in Western Anatolia near the antique city Pergamon. Fig. 1, fig. 2. Ovacık Mine s project features Ore type : Epithermal low sulphidation quartz + breccia veins Host rock : Andesite Reserve : 13 million tons @ 4.36 gr/ton Au) & 4.5 g/ton Ag Resource : 21.55 million tons @ 5.01 gr/ton Au & 2.20 g/ton Ag Mining : Open Pit & Underground Process : CIP cyanide leach Plant capacity : 900,000 t/y ore Gold & silver output : 5 t/y Au & 4.5 t/y Ag Mine life : min 15 years Tailings treatment :Chemical destruction (INCO SO 2 /Air + Ferric sulphate) + natural degradation 1

Figure 1. Location of Ovacık Gold Mine Figure 2. View of Ovacık Gold Plant 2

In the mine was produced 53 tons gold and 50 tons silver between May 2001 and December 2012. The flow-sheet of processing plant is shown in Fig 3. The recovery of gold is 93-93% and silver is 70-75%. Figure 3. Flow sheet of Ovacık Gold Plant 3. Best Practice in Environmental Management System and Best Available Technology Environmental Management System General Management Plan Environmental Management System Occupational Safety and Health Plan Tailings Pond Management Plan Mine Closure & Rehabilitation Plan Emergency Action Plan Rapid Response System BAT Practice Measures Mining Drilling - Machines equipped with dust collectors 3

Blasting -Controlled blasting: -Preventing dust and rock-fly -Reduced blast noise down to 115 db on the average as opposed to 130 db permissible level -Reduced vibration down to 2 mm/sec as opposed to permissible 13 mm/sec. (Measurement nearest residence) Loading -Ore water sprayed before loading Hauling -Water sprayed hauling roads Mine water -Non. Rainwater pumped to the tailings pond. -Run-off water around the mine is collected into a water pond for settling and used as surface-spraying agent. Crushing & Screening -Water spraying at Primary Crushing -Total dust collection system -2 x wet scrubbers (dust emission is reduced to 1/10 of permissible long and short term particulate levels of 150 and 300 g/m 3 air respectively) -Bag Filter on lime silo (~ zero dust particulate emission) -Computer control operation and lock system. -Camera control of critical locations. Milling -Computerized fail-safe process control and sequential activation. -Machine operation lock system -Process parameters (ph, active capacity, levels in tanks, chemical concentration, emission level) -Chemical destruction of sodium cyanide (INCO SO 2 / AIR) -Chemical treatment for spills (HYPOCHLORITE) -Heavy metal stabilization (FERRIC SULPHATE) -Gas scrubber for carbon activation furnace fume -HCN detection devices -Cyanide storage in closed building. -Fail-safe cyanide solution preparation -Hourly manual monitoring along with computerized control Waste rock -Used as embankment building material 4

Tailings Dam -Built to ICOLD standards -Equipped with a composite liner system: -70 cm clay -1,5 mm HDPE geomembrane -20 cm gravel-sealing the drainage system draining water to the collection tower -Decant water collection tower circulating water back to the mill -Run-off water collection channel around the pond -Downstream monitoring wells Figure 4. Tailing Pond Figure 5. Chemical Destruction at Plant 5

Other measures -5 Units of precipitated dust monitoring devices located around the mine -3 Units of particulate dust monitoring devices around the mine. -Vibration & noise monitoring devices 4. Risk Assessment And Audit Risk Assessment Before operation Ovacık Mine Tailings Dam risk assessment Ovacık Mine Cyanide Cycle risk assessment Ovacık Gold Mine Assessment Report During operation Ovacık Mine Tailings Dam risk assessment (Golder Associates Ltd.) Ovacık Mine Cyanide Cycle risk assessment (Golder Associates Ltd.) In house risk mitigation plan Audit İzmir Governorship Monitoring & Auditing Committee Ministry of Health- İzmir Health Directorate Ministry of Environment General Directorate of Preventing & Controlling Environmental Pollution Turkish Mining Affair Euromines European Miners Association audit Quarterly internal audit Annual external audit of the international independent audit firms 5. Rehabilitation The mining sites are rehabilitated prior to the final CLOSURE of the mining operations as per commitments to the Authorities Open pits are filled with extractive waste material and reclaimed following the expiration of the operation, e.g. Ovacık and Küçükdere. All concrete and steel structures at the plant will be removed and those areas will be arranged Tailings Pond will be dewatered and a revegetated top cover will be emplaced. Forest area will be reforested Other areas will be used for agriculture and cattle-dealing Surface and Groundwater Quality will be monitored for a minimum of 10 years. 6

6. Transparency Open door policy for all stakeholders Community access to relevant and accurate information Publishing the results of the environmental measurements Addressing to the civil society the environmental & health impacts and economic & social benefits of the Ovacik mine Encouraging representatives of the local community participating the audit team Written commitment to the government about the mining activities on site Informing immediately the government about the developments at the mine site 7. Conclusion Ovacık gold mine is in operation since 12 years. Their applications have been inspected by national and international authorities. Turkish ministry of Environment, Euromines, Golden Associates Turkish Scientific Counsel appreciated their application for BAT and Environmental management. Ovacık gold mine was the first gold mine in Turkey. This mine has been an example for the other gold and silver mines in Turkey. Sources 1. Turkish Scientific Counsel Report, 2000 2. Golder Associates Ltd., 2003 3. Golder Associates Ltd., 2005 4. Güven Önal presentation in EU Brussels, 2007 5. Annual report of Koza Company, 2012 7