Moisture Related Flooring Problems with Concrete Sub-floors

Similar documents
Moisture Testing of Concrete Slabs

Moisture and Resilient Floor Covering

Moisture Mitigation for Concrete Slabs

CHAPTER 3 MOISTURE TESTING

APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING

Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)

BENTLEY ELEMENTS COLLECTION LVT

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Product Guide Specification

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Chapter 2 Basis of design and materials

CONDENSATION. Section Break (Next Page)

Carpet Tile Installation Guidelines

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

High Performance PSA in Sheet Membrane in Water Protection

Datasheet. moisture in Concrete and. of moisture-sensitive finishes. and Coatings. apr. The successful application

Renovating Your Basement

12 POLYURETHANE ADHESIVE (PU 105)

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

AC Tech Project Survey

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

T R A N S F E R A B L E F U L LY

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Example Specification for Concrete using Current Building Code Requirements

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Fiberglas, Exterior Wall Thermal Insulation

Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

Avoiding Air Barrier Pitfalls

DryWeight BulkVolume

Vinyl Composition Tile Installation System

Mold Preventing I nterior System

INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING

Spandrel Glass Types and Recommendations

INDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA

Water Vapor Permeance of Wood Structural Panels and Wood Wall Construction

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

Division 9. SignaFlor Pad and Pour Flooring System

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

Technical Data Sheet Art. No Kiesol. applications. Shelf-life. rate depending on application. Characteristic data of the product

State of Connecticut Department of Public Health RADON PROGRAM

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation

DAMAGE TO FOUNDATIONS FROM EXPANSIVE SOILS

Condensation Fact Sheet METAL BUILDING MANUFACTURERS ASSOCIATION

Roof Inspection. Summary Report

How to Install Hardwood Flooring Over a Sub Floor

SCENIC VIEW SV 10 SECTION SOLAR CONTROL FILMS

Essential Performance Attributes of Preapplied waterproofing

PROPERTIES AND MIX DESIGNATIONS

The Optimum Basement Wall

LAYING BLOCK AND BRICK

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

R E S I D E N T I A L H O U S I N G

Foundation Water Problems. An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures

Bella Cera Engineered Hardwood Flooring Installation Instructions. Check for Proper Color Selection Prior to Installation

PERFORMANCE GUIDELINES

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Rehabilitation of an Aging Concrete Reservoir Adit Tower

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

SECTION POLISHED CONCRETE FINISHING

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

SC2000 CEMENT BONDING PROCEDURES

Minor Cracks in Horizontal Surfaces

CONDENSATION IN REFRIDGERATED BUILDINGS

CHAPTER 7: Building Systems ROOFING SYSTEMS

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

Wastewater Capital Projects Management Standard Construction Specification

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

Guide Specifications for Maple Flooring Systems

Comment Form on Proposed Gut Rehabilitation Alternatives

Presented by: Jennifer Doyle, P.E., RRC, LEED AP

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R Lecturer: Jim Cahill

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

SECTION HVAC INSULATION. A. All work specified in this Section is subject to the provisions of Section

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

pdi PLASTIC DRUM INSTITUTE Plastic Drum Paneling Issues

Refrigeration Installation 101

Article. Protecting the Building Envelope from Water Damage. MemBrain Smart Vapor Retarder & Air Barrier Film

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.

Grand Mesa Plus LAMINATE - WIRE BRUSHED. GAGVGM81012A Prairie. GAGVGM80012NA Colorado. GAGVGM84012A Pecan Rustic. GAGVGM85012A Saddle Walnut

WATERPROOFING OF WET ROOMS

Manufactured Stone Veneer Installation Instructions

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

Laminate Flooring T-Lock Angle-Drop Installation Instructions

E. CONCRETE. Chapter III Subfloors and Underlayments

Question: Can a gymnasium floor be restored after being exposed to water damage?

MOISTURE CONTROL SYSTEMS

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

Construction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description

Specification Guidelines: Allan Block Modular Retaining Wall Systems

SECTION Formatted Specification for the ULTRAFLOR DIAMATIC Topical Polished Concrete System DRAFT

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Transcription:

Moisture Related Flooring Problems with Concrete Sub-floors Presented by: Peter Craig Concrete Constructives Special Program For:

How Costly are Floor Moisture Problems Today? It is estimated that the direct and indirect costs associated with moisturerelated problems with concrete floor slabs runs between 300 million and one billion dollars each year in the USA.

Types of Moisture Problems with Concrete Slabs

Types of Moisture Problems with Concrete Slabs: Blistering & Delamination of Floor Coverings

Types of Moisture Problems with Concrete Slabs: Adhesive breakdown

Types of Moisture Problems with Concrete Slabs: Expansion of flooring materials

Types of Moisture Problems with Concrete Slabs: Mold leading to indoor air quality issues

Types of Moisture Problems with Concrete Slabs: Blistering of floor coatings

A Classic:

What is the Common Denominator in these Flooring Problems? Moisture Coming from, or Through a Concrete Sub-Floor

Identifying the Source of the Moisture

Sources of Moisture in a Concrete Slab 1. Moisture originating from within the concrete. 2. Water vapor transmission through the slab. 3. Topical & atmospheric moisture 4. Maintenance.

Sources of Moisture in a Concrete Slab: 1. Moisture originating from within the concrete There is always free water (water of convenience) in concrete mixtures with w/c 0.25 or higher.

Moisture originating from within the concrete Typical 4000 psi concrete mixture Water-to-cement ratio: 0.50 Mix water: 275 lbs Only about half of the mix water is needed for hydration Which leaves: 1697 lbs of free water in 1000 sq ft of slab area, 4 thick

Sources of Moisture in a Concrete Slab 2. Water Vapor Transmission:

Somewhere below every building site is water. This water may be near the surface of the earth, or hundreds of feet below. Concrete slab-on-ground Earth Water Table

Water (moisture) can migrate upward through the ground, enter and transmit through an unprotected concrete slab by 3 means: 1. Hydrostatic Pressure 2. Capillary Action 3. Diffusion Concrete slab-on-ground Earth Water Table

Hydrostatic Pressure Concrete Slab-on-Ground Water Table

Capillary Action Narrow Glass Straw Water

Capillary Action

Capillary Action Narrow Glass Straw Water

Capillary Action Wide Glass Straw Water

Diffusion: The passive movement of molecules due to differences in concentration, temperature or pressure. Low concentration - Lower pressure Concrete Slab Soil Water Table High concentration - Higher pressure

Below the surface of the earth, water undergoes phase change from a liquid to a vapor and, if unrestricted, migrates upward by the natural process of diffusion and evaporation. Earth Water Table

When a concrete slab is placed on the ground, the slab will slow down, but not stop the vertical rise of moisture from below the slab. Earth Water Table

For concrete is permeable And its permeability is directly related to is waterto-cement ratio

Lower w/c = Lower Permeability Shorter Drying Time Higher w/c = Higher Permeability Longer Drying Time

When the surface of the slab is covered with a non-breathing material, the relative humidity in the ground below the slab will reach 100%. This will occur regardless of where you are in the country, or how deep the water table is. Flooring Material Earth C: 100% RH Water Table

RH testing of base material below a concrete slab-on-ground PVC pipe 99% RH

As the relative humidity in the ground below the slab increases, so will the moisture level within a covered concrete slab-on-ground that is unprotected from below. Concrete internal relative humidity increased Flooring Material Earth C: 100% RH Water Table

The most effective means of protecting moisture-sensitive flooring materials, and the buildings' interior environment from the damaging affects of moisture migration from the ground is to install a low-permeance vapor retarder in direct contact with the underside of the slab. Vapor Retarder Flooring Material Earth C: 100% RH Water Table

Why does the vapor retarder need to be in direct contact with the underside of the slab? Vapor Retarder Earth C: 100% RH Water Table

If a small hole or tear is present in a vapor retarder that is in direct contact with the underside of the slab, the affected area is very small. Vapor Retarder Earth Puncture C: 100% RH Water Table

However if the vapor retarder is placed below a layer of sand or granular fill, and a tear or puncture exists, water vapor will enter the fill layer and is free to travel anywhere beneath the slab. Gradually the fill layer will reach a state of very high relative humidity which in turn can increase the moisture level in the concrete slab above. Vapor Retarder Fill layer RH% increases High RH % Earth Puncture C: 100% RH Water Table

Sources of Moisture in a Concrete Slab 3. Topical & Atmospheric Moisture:

Rainfall

In addition to being a conduit for moisture, placing any type of fill material over the vapor Fill retarder Course places the Over fill layer Vapor at risk of Barrier/Retarder taking on water from topical sources Rainfall

Fill Course Wet, saturated Over fill layer Vapor above Barrier/Retarder the vapor retarder Wet fill

Water tightness of structure

Concrete will lose, or take on moisture based on its ambient surroundings. Therefore, ambient conditions significantly affect the drying time of conventional concrete slab mixtures. Which means that natural drying of slabs in many parts of the country, or times of year, can be a real challenge. For damp clothes on a damp day don t dry

Sources of Moisture in a Concrete Slab 4. Maintenance

Other Potential Sources of Moisture in a Concrete Floor Slab. Irrigation: Broken Pipes: Condensation:

Dew Point Condensation Relative Humidity 90 % 80 77

Data Logging of Concrete Surface Temperature and Ambient Conditions

Moisture Testing of Concrete Sub-floors

Moisture Testing Methods Qualitative Quantitative - Plastic Sheet - Mat Bond Test - Electrical Resistance - Electrical Impedance - Moisture Vapor Emission Rate - In-situ Relative Humidity - Surface Relative Humidity

Qualitative Techniques

18 18 Up to 8 lbs

How many pounds of water does it take to show up as droplets beneath the poly? Up Up to to 138 lbs lbs

Electrical Resistance Relative Scale Readings affected by presence of alkali, carbonation & chlorides

Electrical Impedance - ASTM F2659 Useful for relative comparisons, mapping, selecting sites for further tests

Quantitative Techniques

ASTM F1869: MVER Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride

ASTM F2170: Slab Humidity Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes

ASTM F2420: Surface Humidity Standard Test Method for Determining Relative Humidity on the Surface of Concrete Floor Slabs Using Relative Humidity Probe Measurement and Insulated Hood

What MVER moisture tests tell you: Determines the amount of moisture emitting from the top ½ to ¾ of the concrete

MVER comes from how deep in the concrete? CTL MVER Uptake Study CaCl2 kit, dish on balance pan 4 in. concrete slab (0.4 w/c) with sealed surfaces RH probes to datalogger Balance weighs CaCl2 dish Courtesy of CTL

MVER comes from how deep in the concrete? CTL MVER Uptake Study CaCl2 kit, dish on balance pan 4 in. concrete slab (0.4 w/c) with sealed surfaces RH probes to datalogger Balance weighs CaCl2 dish Courtesy of CTL

MVER comes from how deep in the concrete? 0 10 Depth from Top of Slab, mm 20 30 40 50 60 70 80 90 90% of the measured MVE comes from the top 12 mm (1/2 in.) of concrete CaCl 2 kit does not detect moisture below 20 mm (3/4 in.) deep 100 65 70 75 80 85 90 95 100 105 Courtesy of CTL Percent of Total Measured MVER

Calcium Chloride MVER Testing is an indicator of moisture in the top ½ to ¾ of the concrete only..

Properly conducted, the test does provide useful information, however the results do not tell the whole story

Unmeasured source of moisture

MVER Testing Procedure Concrete surface must be dry vacuum ground prior to installed of the test kit.

MVER Testing Procedure Calibrate gram scale Weigh test dish of calcium chloride with tape on and record weight

MVER Testing Procedure Remove sealing tape on dish and tape to underside of dome Twist and remove lid, invert, and place below dish Do not spill any calcium chloride! Place dish in the center of test area Immediately place plastic cover over dish Make sure seal is air tight Record date, start time & ambient conditions

MVER Testing Procedure Wait 60 to 72 hours Check calibration of scale Open plastic cover by cutting Don t t spill any calcium chloride Replace lid on dish and reseal with original tape Reweigh immediately Record new weight, date, time and ambient conditions

MVER Testing Procedure Calculation of MVER 1. Determine weight gain of dish 2. Multiply weight gain by the area beneath the dome less the surface area of the dish 3. Divide by the number of exposure hours Example: Starting weight 31.0 grams, ending weight 35.0g, = 4.0 grams 4.0 x 121.045 72 hours = 6.7 lbs/1000sf/24 hrs

Significance and use: Provides an MVER value expressed in pounds/1000 square feet/24 hours Limitations: MVER Testing Procedure Only reflects condition at time of test Only reflects condition in upper ½ to ¾ inch of the slab

Concrete Internal Relative Humidity Testing ASTM F 2170

What in-situ RH moisture tests tell you: Determines, or predicts the moisture level throughout the slab, top to bottom 40% of slab thickness Concrete slab-on-ground

ASTM F2170: Concrete internal relative humidity RH% Ambient Conditions 70 F - 50% RH RH% Concrete Placement

ASTM F2170: Concrete internal relative humidity RH% Ambient Conditions 70 F - 50% RH RH% Concrete Drying Profile Over Time

ASTM F2170: Concrete internal relative humidity RH% Ambient Conditions 70 F - 50% RH RH% Floor Covering Installed

ASTM F2170: Concrete internal relative humidity RH% Ambient Conditions 70 F - 50% RH % 40% of slab thickness Moisture Redistributes Within Slab

In-situ RH Testing Procedure Apparatus: Humidity probe and digital meter

In-situ RH Testing Procedure Apparatus: Humidity probe and digital meter Hole liner

In-situ RH Testing Procedure Apparatus: Humidity probe and digital meter Hole liner Rotary hammerdrill

In-situ RH Testing Procedure Apparatus: Humidity probe and digital meter Hole liner Rotary hammerdrill Vacuum cleaner

In-situ RH Testing Procedure Apparatus: Humidity probe and digital meter Hole liner Rotary hammerdrill Vacuum cleaner Brushes

In-situ RH Testing Procedure Calibration of equipment: Calibration of the probes should be checked before and after every investigation.

In-situ RH Testing Procedure Calibration of equipment: Calibration of the probes should be checked before and after every investigation. Recording instrument should be checked by the manufacturer at least on an annual basis.

In-situ RH Testing Procedure Test depth: Drying from top only: 40% of slab thickness

In-situ RH Testing Procedure Test depth: Drying from top only: 40% of slab thickness Drying from top and bottom: 20%

In-situ RH Testing Procedure First locate embedded items Drill dry to required depth assure that hole is vertical

In-situ RH Testing Procedure First locate embedded items Drill dry to required depth assure that hole is vertical Remove dust from hole

In-situ RH Testing Procedure First locate embedded items Drill dry to required depth assure that hole is vertical Remove dust from hole Insert hole liner

In-situ RH Testing Procedure First locate embedded items Drill dry to required depth assure that hole is vertical Remove dust from hole Insert hole liner Wait 72 hours

In-situ RH Testing Procedure First locate embedded items Drill dry to required depth assure that hole is vertical Remove dust from hole Insert hole liner Wait 72 hours Insert probe

In-situ RH Testing Procedure Measurement: Allow to reach equilibrium, <1% drift in 5 min

In-situ RH Testing Procedure Measurement: Allow to reach equilibrium, <1% drift in 5 min Take measurement

In-situ RH Testing Procedure Measurement: Allow to reach equilibrium, <1% drift in 5 min Take measurement Remove liner and patch hole

In-situ Concrete RH Equipment Study Location: W.R. Grace Labs Cambridge, Massachusetts

ASTM F 2170: Slab Humidity Hole Liners

Test Series III Universal Hole Liner Universal Sleeve

Universal Hole Liner Universal Sleeve / Volume Test 1 in. OD PVC pipe Sensor Series III 3/4 in. ID Epoxy seal 1.6 in. 5/8 in.

Universal hole liner test Universal Hole Liner

Test Results

Universal Hole Liner Universal Position / Volume Test Sensor Series III 3/4 in. ID PVC pipe 72 hour edited readings 1. 85% 2. 72%* 3. 83% 4. 84% 5. 82% 6. 83% 7. 82% 5/8 in. *Test directly over coarse aggregate particle

What We Learned 1. In-situ RH measurements become far more consistent when the hole liner/sleeve completely isolates the side walls of the drilled hole from the bottom of the drilled hole. 2. In-situ RH measurements are more consistent when the moisture entrance area of the probe is near the bottom of the drilled hole and captured air is not allowed to escape along the sides of the probe.

What Needs to Happen 1. All hole liners/sleeves must be designed to be truly depth specific. 2. Probes need to be designed such that the measurement of moisture takes place near the bottom of the drilled hole. 3. Inserted probes must be capable of creating a sealed chamber of air at the bottom on the hole liner/sleeve such that air is not free to escape along the exterior sides of the probe.

Sensor Stabilization Time Study Objective: To determine how long it takes the various sensors to reach equilibrium RH within their respective sleeves that have been in place for a minimum of 72 hours

Sensor Stabilization Time Study 1. Sensors removed after 72 hour readings. 2. Sleeves capped 3. Sensors re-installed 3 days later with readings taken every 15 minutes for 3 hours

Sensors removed sleeves capped

Elapsed Time Sensor Stabilization Time after Removal and Re-insertion Slab 1 - Normalweight Control - w/c 0.45 Slab 7 - Normalweight w/admix - w/c 0.50 Slab 13 - Lightweight Control - w/c 0.55 Sensor 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 (minutes) 15 78 81 89 81 79 80 80 85 94 90 83 85 88 87 98 92 84 86 30 79 82 89 81 79 81 81 84 94 90 84 86 90 88 99 92 86 89 45 79 83 88 81 80 82 81 84 94 90 84 86 90 89 98 93 87 90 1 hour 80 84 89 81 80 82 82 85 94 90 85 86 91 90 98 93 87 91 75 80 84 89 81 80 82 83 85 94 90 85 86 91 90 99 93 88 92 90 81 84 88 81 81 83 83 85 94 90 85 86 92 90 99 93 88 92 105 81 84 87 81 81 83 83 85 94 90 86 86 92 90 98 93 88 92 2 Hours 81 84 88 81 81 83 83 85 94 90 86 87 92 90 98 93 89 92 135 81 85 89 81 81 83 84 85 94 90 86 87 92 91 99 93 89 92 150 81 85 88 82 81 83 84 86 94 90 86 87 92 91 98 93 89 93 165 81 85 88 82 81 83 84 86 94 90 86 87 92 91 98 93 89 93 3 Hours 82 85 88 82 82 83 84 86 94 90 86 88 93 91 98 93 89 93 Previous 72 Hour Reading 88 88 90 84 85 88 90 86 95 92 92 90 97 93 98 94 95 97 7 4 1 3 5 6 7 1 1 2 7 4 5 3 0 2 7 5 Sensor #: 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 Point when 3 successive readings are identical - minimum 30 minute span Point where reading is within 1 point of the 3 hour reading if sooner than 3 identical successive readings are reached

Sensor Stabilization Time Study Study conclusion: On average after insertion it will take approximately one hour for sensors to reach a state of equilibrium RH with the drilled hole

MVER & RH are Complementary While there is no direct relationship between MVER and insitu RH both pieces of information can be helpful MVER = moisture near the slab surface %RH = Moisture level within the slab However An MVER measurement alone is insufficient information to base a flooring installation upon!

Concrete Surface Humidity ASTM F 2420

ASTM F2420: Surface Humidity Often referred to as the Hood test

What surface RH moisture tests tell you: Surface RH Testing: Non-evasive means of determining slab RH level

When the concrete sub-floor moisture levels are too high How do you fix it?

First establish if the concrete sub- floor is flat and level

Slab Curl Curling Vapor Barrier / Retarder Differential Drying Shrinkage Drying from the Top Down

There however is another side of curl Reverse The other Curl side of Curl

Flooring Installed Moisture Re-Distributes

How do you correct a curled slab Rigid Foam or Polyurea Stabilization

Rigid Foam or Polyurea Stabilization 3/8 or 5/8 dia grout holes Void

Rigid Foam or Polyurea Stabilization 3/8 or 5/8 dia grout holes Rigid foam grout

Rigid Foam or Polyurea Stabilization Re-drill with 5/8 or 3/4 bit Rigid foam grout

Rigid Foam or Polyurea Stabilization Patch drill holes Rigid foam grout

Grind Down Curl

1. Establish if an effective, low-permeance vapor retarder is present directly below the slab. 2. If a vapor retarder is present directly below the slab, identify the material, evaluate its physical condition, and review its physical properties for conformance with the project specifications, flooring manufacturers requirements and ASTM E1745.

How to make the determination: Dry core through the slab Vapor Retarder?

Effective Vapor Retarder Directly Below Slab

Repair of the Vapor Retarder After Coring: Shape a double thickness of aluminum foil to the circumference of cored hole

Repair of the Vapor Retarder After Coring: Install adhesive gasket strip around base of cored hole.

Repair of the Vapor Retarder After Coring: Place preformed aluminum vapor retarder replacement section onto adhesive gasket

Repair of the Vapor Retarder After Coring: Patch core hole with rapid setting concrete patch

Strategies for Correcting Moisture-Related Flooring Problems Moisture Mitigation

What is Moisture Mitigation for a Concrete Slab? Moisture Mitigation for a concrete slab is a treatment or method intended to correct an unacceptable moisture- related slab condition either before or after a flooring or coating problem develops.

What is Moisture Mitigation for a Concrete Slab? Moisture Mitigation is intended to both reduce moisture transfer from the concrete and to protect the flooring material or coating from the effect of long-term exposure to moisture-induced induced high ph levels.

There are Two Levels of Moisture Mitigation Level 1 Level 2

Level 1 Moisture Mitigation: 1. New construction with an effective vapor barrier / retarder Closed Slab System Vapor Emissions Effective Vapor Barrier / Retarder or Metal Decking System need only suppress moisture originating within the concrete.

Level 1 Moisture Mitigation: For level 1 conditions, most corrective options can be considered provided that the MVER levels upon which the warranty is based are determined by testing in the un-vented manner.

Level 2 Moisture Mitigation: 2. Existing structures or new construction without an effective vapor barrier / retarder Open Slab System Moisture Emitting from the concrete No Vapor Barrier Moisture Transmitting through the concrete

Level 2 Moisture Mitigation: For level 2 conditions, only systems that have no moisture or ph limits should be considered. No Vapor Barrier

Corrective Moisture Mitigation Strategies Slab Replacement Slab Capping Accelerated Drying Topical Methods

Corrective Moisture Mitigation Strategies Slab Replacement

Corrective Moisture Mitigation Strategies Slab Capping Low-permeance vapor retarder over concrete sub-floor

Corrective Moisture Mitigation Strategies Accelerated Drying

Corrective Moisture Mitigation Strategies Topical Methods Reactive Chemistries Moisture Suppression Coatings Preformed Systems

Corrective Moisture Mitigation Strategies Reactive Chemistries Sodium Silicate Potassium Silicate Lithium Silicate

Topical Application of Silicate-Based Material

Corrective Moisture Mitigation Strategies Moisture Suppression Coatings Hybrid, two-component epoxy systems

Cementitious Blotter Layer Flooring Adhesive Blotter Layer Mitigation System

Preformed Systems Variety of products Use limited to certain types of floor coverings

Moisture Mitigation Summary A moisture mitigation system must first be capable of reducing moisture at the concrete /adhesive interface. The system must also be capable of withstanding sustained high ph levels that may develop beneath the system once the floor is covered.

The 10 Steps To Avoiding Moisture-Related Flooring Failures

Start with Common Sense

Step # 1: Understand the slab moisture requirements for the flooring materials to be used on the project and employ the design and construction considerations that will be needed to achieve those requirements.

Step # 2: Schedule If the project schedule cannot ensure that sufficient time is available for concrete to dry naturally to the required level, a preemptive approach to moisture mitigation should employed.

Step # 3: Below-slab Moisture Protection As it relates to designing a concrete slab-on-ground, the ground must be completely taken out of play!

Step # 3: Below-slab Moisture Protection To take the ground out of play: ASTM E 1745 Class A Vapor Retarder Permeance requirement modified to: 0.01 perm, after conditioning

Compare physical properties after conditioning tests (ASTM E 154)

Step # 3: Below-slab Moisture Protection Vapor Barrier/Retarder must be placed directly below the concrete

Step # 4: Slab Design & Concrete Mixture The slab design and concrete mixture should not only meet the structural requirements, but also be designed to minimize drying time, shrinkage and slab curl without compromising the ability to place and finish the mixture. Rapid-Drying Concrete is today an option

How does Rapid-Drying Concrete differ from conventional concrete?

Rapid-Drying Concrete Standard Concrete Rapid-Drying Concrete Transport X X Pump X X Place X X Finish X X Sets properly X X Reduced MVER Reduced RH Dries within 30 days X X X

Conventional Drying Conventional Concrete Dries from the top down. Drying time is related to ambient conditions. Seldom reaches an acceptable level of dryness within the project schedule.

Rapid-Drying Concrete Self-Desiccation Dries from the surface and consumes water internally through self-desiccation Uniform drying throughout the depth

MVER Testing

Concrete Internal RH Testing

Curling

Continuous reinforcing can help control warping (curling) stresses

Continuous reinforcing can help control warping (curling) stresses

Step # 5: Finishing Concrete sub-floors to receive flooring materials should be finished to a smooth, but non-burnished finish, free of ridges.

Step # 6: Curing Use short-term cover curing methods to hasten slab drying time and provide a concrete surface suitable for the direct application of flooring adhesives. Do not use curing or sealing compounds!

Moisture Retaining Cover Cure Dry Wet-strength Curing Paper Low Permeance Vapor Retarder

Step # 7: Drying Period Create a watertight environment that will protect the slab from re-wetting as soon as possible.

Avoid the use of oil or wax-based sweeping compounds. Sweeping Compound

Step # 8: Pre-installation Moisture Testing Pre-installation moisture testing should be performed by an independent 3 rd party retained by the owner. Testing technician(s) should hold a current ICRI Moisture Testing Technician Grade 1 Certification

Concrete Moisture Testing Certification Program www.icri.org

Test both the Moisture Vapor Emission Rate (MVER) & the Internal Relative Humidity of the Concrete Calcium Chloride Method In-situ Concrete Humidity Test ASTM F 1869 ASTM F 2170 Calcium Chloride MVER Testing Alone Does Not Provide Sufficient Information to Reliably Determine the Moisture-Related Suitability of a Concrete Sub-Floor.

Step # 9: If Necessary Mitigate high Slab Moisture Levels

Step # 10: Proper Flooring installation

A Few Words About Mitigation Warranties Make sure you know what you are getting.

A Few Words About Mitigation Warranties Make sure to read the fine print.

Put it all together and it adds up to: Success

Don t let moisture take a bite out of you, or your business

Seminar Content & Article Download Center www.floorworks3.com

Thank You! Questions?

Moisture Related Flooring Problems with Concrete Sub-floors Presented by: Peter Craig Concrete Constructives Special Program For: