E A S T - W E S T E L E C T R I C I T Y I N T E R C O N N E C T O R



Similar documents
IFIEC Europe Brussels, 30 April 2008

Investing in the Infrastructure for Energy Markets

A new electricity market for Northern Ireland and Ireland from Integrated Single Electricity Market (I-SEM)

Ofgem s Consultation Gas transmission charging review: Part II our assessment of potential impact

ERGEG Gas Focus Group/Storage TF. Guidelines for Good Practice for Gas Storage System Operators (GGPSSO) Questionnaire for SSOs

EFET Gas Committee. ELEVENTH MEETING OF THE EUROPEAN GAS REGULATORY FORUM Comisión Nacional de la Energía, Madrid May

Network Code on Harmonised Transmission Tariff Structures for Gas

ESRI Research Note. The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch

How To Understand The Energy Market In The Britain

Gas Storage in Europe. Adding security through flexibility

ACER scoping document for Rules for Trading

Eni Gas &Power s response to ERGEG s consultation - ERGEG principles: Capacity allocation and congestion management in natural gas transmission

Viking Link Interconnector

NIRIG response to EMR: Consultation on Proposals for Implementation

Overview of points that must be included to get a useful Guidelines for. Good TPA Practice

ACER. oj L 211, , p J L 211, , p RECOMMENDATION Of THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS No 02/2014

Third Party Access to LNG terminals

ESB NATIONAL GRID RESPONSE TO CER/03/266 INTERCONNECTOR TRADING PRINCIPLES IN THE MAE

The Netherlands response to the public consultation on the revision of the European Commission s Impact Assessment guidelines

Vision Paper LT UIOLI

Competition in EU Electricity Markets The Role of Antitrust Policy

European Distribution System Operators for Smart Grids

Regulatory Issues for Gas and Electricity. Dr. Burckhard Bergmann Member of the E.ON Board of Management and CEO of Ruhrgas AG

National Report 2014 to the Agency for the Cooperation of Energy Regulators and to the European Commission

Regulation and development of natural gas interconnection facilities in Europe

Industry Example: The European Market for Gas

Greece s Role as the Emerging Energy Hub of South- Eastern Europe: DESFA s Role and Perspectives

National Report 2015 to the Agency for the Cooperation of Energy Regulators and to the European Commission

EURELECTRIC presentation. EURELECTRIC contribution to a reference model for European capacity markets. DG COMP workshop 30 June 2015

TAP AG Regulatory Compliance Programme

Below are our responses to the questions included in Appendix 4 of the consultation document.

Natural Gas Industry in Brazil: Regulatory Evolution, Market Development and Investment Opportunities

REGIONAL COOPERATION FOR GAS SUPPLY A new, value creating, cross-border business Initiative. Budapest, December 5, 2007

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Merchant Interconnectors

Feedback from Nordenergi on PCG target model and roadmap propositions

UK: Energy Briefing. February 2013

Energy Prices: Is a Price Freeze a Sensible Way to Restore Trust in the Market?

Access to gas transportation

Secondary and short term natural gas markets International experiences

Government response: EMR consultation on industry code and licence modifications

The role of independent producers and independent production quotas in local TV

Domestic Customer Tariff Breakdown - RoI Note this is approximate due to tariff and consumption variations

Contract for Difference for non-uk Renewable Electricity Projects

Getting more connected

International Experience in Pipeline Capacity Trading

Making CfDs work for renewable generators

Licensing Options for Internet Service Providers June 23, 2001 Updated September 25, 2002

Specific amendments to the Capacity Allocation and Congestion Management Network Code

The pivotal role of TSOs in European energy market integration

Consultation on Forward Risk-Hedging Products and Harmonisation of Long-Term Capacity Allocation Rules

Telephone Numbering Safeguarding the Future of Numbers

POLICYbrief. A Gas Target Model for the European Union: Contrasting MECOS and EURAM Proposal. Highlights

Joint European Standing Group (JESG) This note sets out the headlines of the most recent meeting of the Joint European Standing Group (JESG).

Transmission Price Control Review: Updated Proposals and Smithers & Co. Ltd.: Report on the Cost of Capital. Response to consultation

Note No. 137 March Countries in Asia, Europe, and North and South America are introducing reforms to boost

Gas Transmission Charging Methodologies Forum Draft Meeting Report: 11 June 2008

PRINCIPLES OF REGULATION ON HARMONIZED RULES FOR CROSS-BORDER TRADE AND REGULATORY COOPERATION FOR MARKET INTEGRATION IN THE BLACK SEA

Committee on Industry, Research and Energy. on EU strategy for liquefied natural gas and gas storage (2016/2059(INI))

SCOPING TOWARDS POTENTIAL HARMONISATION OF ELECTRICITY

August A Review of the Development of Competition in the Industrial and Commercial Gas Supply Market

We appreciate your feedback

paragraph 3(e) introduces a new requirement upon the information licensee to provide the licensee s best view of the capacity, about the

Gas Transmission Charging Methodology Statement. Gas Year 2015/16

Which? works for you March Which? response to Ofcom consultation on price rises in fixed term contracts

How To Mitigate Market Power

MasterCard response to the Department of Finance public consultation Regulation (EU) 2015/751 on Interchange Fees for Card-based payment transactions

Markets Infrastructure Team, Markets Policy Division, Central Bank of Ireland, Block D, Iveagh Court, Harcourt Road, Dublin 2

Press release. Contents. Net result: 22 million (down 6 million)

Designation of payment systems: response to the consultation

Buy-ins, how they work, and the challenge of CSDR An ICMA briefing note July 2015 (updated) Introduction. How this paper is organized

An introduction to European employment law for Japanese companies

Finnish Energy Industries draft answer to CEER public consultation The future role of DSOs

Market Leader in Power & Gas Downstream. Konrad Kreuzer. Chairman of the Board of Directors of E.ON Hungária

Industry Example: The European Market for Electricity

Case Study: The Accomplishments and Shortcomings of Australia s Renewable Energy Target: A Pure Market-Based Support Mechanism

ING Europe Invest Autocall 2020

AGCS Gas Clearing and Settlement AG

CER Response to Government Consultation on Green Paper on Energy Policy in Ireland

Generator Optional. Timeline including the next steps. A practical example. Potential benefits of OFA? Key implications. How might OFA work?

Electricity Prices & Competition

ESB Input to consultation by the Northern Ireland Authority for Utility Regulation (NIAUR) on the NI Energy Efficiency Levy

Progress on market reform: EMR, the I-SEM and the TEM

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2

A report to the Commission for Energy Regulation and the Utility Regulator. February 2011 DAY-AHEAD MARKET COUPLING OPTIONS FOR THE SEM

Future Trading Arrangements 3 rd Forum. Giuseppina Squicciarini 18/11/13

EDISON S POSITION ON THE CESR/ERGEG CONSULTATION ON MARKET ABUSE INTO ELECTRICITY AND GAS SECTOR

Electricity market reform: policy overview

Response by NIE Energy (PPB)

MEMO/09/143. General What are interchange fees? Brussels, 1 st April 2009

ESB EI response: Gas Security of Supply Significant Code Review (SCR)

UNITED STATES OF AMERICA 91 FERC 61,230 FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING PROPOSAL SUBJECT TO CONDITIONS. (Issued June 1, 2000)

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

REFORM OF STATUTORY AUDIT

Electricity & Gas Retail Markets Annual Report 2014

An introduction to European employment law for Korean companies

VALUING FLEXIBILITY 20 May 2014 Florence Forum Stephen Woodhouse, Director, Pöyry Management Consulting

The Aegean LNG and the IGB Pipeline

DELEGATED REGULATION (EU)

A NEW BROADBAND UNIVERSAL SERVICE OBLIGATION CONSULTATION

Transcription:

E A S T - W E S T E L E C T R I C I T Y I N T E R C O N N E C T O R Memo to CER Regarding: Interconnector Capacity Allocation and ESB / Market Dominance ~ 9th May 2007 ~ At our meeting on May 3rd, we spoke at length about the issue of dominance and the availability of capacity on our planned East-West Interconnection. At that meeting we outlined our position in relation to ESB as the dominant market player and our views on dominance. For the sake of clarity we have prepared this memo to again outline our position and it examine the issue in a little more detail. We do recognise that there is a dominance issue that is already being addressed in the market, the introduction of interconnector capacity in to the market may assist in solving the dominance issue but it is a wider market problem. Imera Powers East West Interconnector is as you know a merchant project taking on full market risk. We are seeking EU exemptions to ensure that there is an adequate risk/reward balance for the investment and to ensure that we can operate the assets on a commercially viable basis. Given the risks that are already present in the development of this project, we do feel that any unnecessarily onerous restrictions placed upon us could undermine the project. There are other market mechanisms being put in place to address ESB dominance that will be far more effective than placing restrictions on the use of capacity on our interconnector. As we have already demonstrated we intend to allocate capacity in an open and transparent way fully compliant with the draft congestion management guidelines and to implement effective Use it or Lose it mechanisms to prevent capacity hoarding, we are also committed to facilitating secondary trading of capacity. The introduction of interconnector capacity in the short-term will Increase competitive pressure and Interconnection will help to rectify problems of the ESB setting prices outside the competitive range. At our meeting we discussed the existing arrangements for the North/South and Moyle interconnectors, as we understood it there was a notional threshold of 40% of total capacity could be acquired by any one party should that party wish to access more capacity above this threshold it would trigger a competitive review by the Northern Ireland Regulator. It is unclear if this also applies to the North South Link. As we pointed out, it is possible under the existing arrangements for ESB to acquire up to 40% of Moyle capacity without any restriction and as no additional capacity is being brought in to the market this could be used to increase its dominant position. On May 4th Moyle Interconnector Limited published a public consultation paper on its Post SEM Trading arrangements. From November 1st 2007, all Moyle Interconnector capacity will become available to the market. The proposed Moyle access arrangements Post SEM are as follows: 1 Paragraph 2.3. There is no set fixed level of maximum capacity which any bidder may acquire. However in the event of an over subscribed annual auction (held for capacity for periods of one or more years) a notional 40% cap figure for capacity gained at auction does exist. If this 40% cap figure is reached by any bidder at the annual auctions then this is expected to trigger an analysis of the impact on the market environment of the auction outcomes in relation to proportions held by each bidder. This analysis will be carried out by Moyle in consultation with the Utility Regulator. This does not mean that any one participant s holding would be limited to 40%. The Utility Regulator did not need to place caps on capacity sold at the last annual auctions. It is proposed that the Utility Regulator will not restrict the total level of capacity allocated to one bidder at any monthly or weekly auctions. 1 Moyle Interconnector Trading From - 1 November 2007 : A Consultation Paper by Moyle Interconnector Limited May 2007 http://www.nienergyholdings.com/download/consultation/post%20sem%20proposed%20trading%20arrangements%20consultation% 20070504.pdf 1

As with the current arrangements there does not appear to be any restrictions going forward on ESB accessing significant amounts of capacity on Moyle. Our Proposal Our proposal which we consider to be fair and balanced is that in the case of ESB should they wish to consider accessing capacity on the East West Interconnector they would be limited to a maximum of 40% of total capacity on contracts longer than one months duration. We think that this is sensible as 60% of the capacity would be available to other market participants in the event that ESB fully subscribed to the 40% cap, even in that scenario with the additional capacity being introduced by the interconnector ESB s market share would still be incrementally reduced. However, we feel that this mechanism for reducing ESB s ability to procure capacity would be better served through other means rather than making it a condition imposed through the EU Exemption or licensing process. We also think that it is important to precisely define ESB so that other parts of the ESB Group such as ESBIE, Hibernian Wind and ESB International who may wish to access capacity for commercially sound reasons are not commercially disadvantaged by being unable to access it, Finally, as we have mentioned above we are proposing to implement a non-discriminatory, market-based and efficient methods of allocating transmission capacity, we do recognise the dominance issue and we think we have offered a fair proposal, as a merchant project we must ensure that we minimise any risk of restrictions on the use of capacity and are concerned that any restrictions could harm the commercial viability of the project. We think that it is import for the CER to examine the Moyle proposals as it would be grossly unfair to impose onerous restrictions on a merchant project that carries all the risk, when a competing interconnector that has a regulated revenue safety net does not have any cap on capacity held. Rory O Neill - 9th May 2007 ***For your information*** We have been working very closely with Dr. Leonardo Meeus of Leuven University in Belgium, Leonard is also the scientific coordinator of the KU Leuven Energy Institute (EI) and the European Energy Institute (EEI). Since 2006, he is the chairman of the CIGRE Task Force C5-7.1 on generation and network capacity investment incentives in electricity markets. Leonardo has been assisting and advising on interconnection trading, capacity allocation and exemptions etc. He has recently prepared a paper for us examining Eu exemptions. This paper is attached below. 2

Exemptions based on the Gas and Electricity Directives Case Law Exemption track record Eight exemptions have been granted by national regulators and are accepted by the European Commission. Seven exemptions have been granted for gas infrastructure; only one exemption for electricity infrastructure has received authorization yet. One application (BritNed) is still under consideration. Name Sector Involved countries Type of infrastructure Date Gate Terminal Gas Netherlands LNG terminal 22-12-2006 Brindisi LNG Terminal Gas Italy LNG terminal 3-5-2005 BBL: Bacton-Balgzand Gas UK, Netherlands Pipeline 21-4-2005 Estlink Electricity Estland, Finland Interconnector 3-3-2005 Dragon LNG Terminal Gas UK LNG terminal 14-2-2005 Gas UK LNG terminal 10-12-2004 Gas UK LNG terminal 10-12-2004 North Adriatic LNG Gas Italy LNG terminal 10-12-2004 Terminal BritNed Electricity UK, Netherlands Interconnector Pending Access regimes Basically, there are two systems to develop an exempted facility: negotiated Third Party Access (ntpa) and own use. These are in contrast with the regulated Third Party Access (rtpa) regime. In an ntpa system the owners don t use the facility for their own activities, they just own it. In an own use system, the owners have primary capacity rights. However, a combination of systems within one exempted facility is possible. For instance, a facility can be owned by different parties. Some of them can have primary capacity rights (own use), while others don t and only own a part of it (ntpa). Furthermore, it is possible that only a part of a facility is exempted. For instance, 80% of the capacity is exempted and the remaining 20% is developed in an rtpa regime. In case of own use infrastructure an exemption gives the possibility to reserve capacity for own use, which is not possible for regulated infrastructure. In an ntpa regime, the exemption allows long-term contracts to underpin the investment and thereby lower the risk. Note that the BritNed application is exceptional. The interconnector is not meant for own use and there is currently no aim for long-term contracts. The developers main concern is the regulatory risk associated with the project. They expect the income from the interconnector to be volatile with good and bad years. They fear regulatory actions to limit profits in the good years, thereby limiting the possibility to make up the bad years. This would detrimental to the life time profitability of the cable. An exemption guarantees the income to be unregulated. The developers believe that rtpa compliant access to the interconnector will enable them to recover the investment cost. LNG terminals are often constructed in phases. The timing of the capacity allocation often follows the construction schedule. It is therefore possible that not all the capacity has been allocated yet, like in the Grain project. For the Gate Terminal the final results of the open season have not been published yet. Name Access Regime Gate Terminal Own use (*) Brindisi LNG Terminal BBL: Bacton-Balgzand Estlink Own use, rtpa ntpa Own use 3

Dragon LNG Terminal Own use (*) North Adriatic LNG Terminal BritNed Own use ntpa Own use (*), rtpa rtpa (*) Not all owners of Gate Terminal and Dragon will be primary capacity owners. Name Facility Owners Primary Capacity Rights Gate Terminal Koninklijke Vopak (? %), Nederlandse Gasunie (? %), RWE (10%), others possible after open season RWE (± 20%), others under negotiation Brindisi LNG Terminal BG Italia (100%) BG (80%), rtpa (20%) BBL: Bacton-Balgzand Gasunie BBL (60%), E.ON Ruhrgas BBL (20%), Fluxys BBL (20%) Ruhrgas (? %), Gasunie Trade& Supply(? %), Wingas (? %) Estlink Eesti Energia (39.9%), Latvenergo (25%), Lietuvos Energija (25%), Pohjolan Voima (6.06%), Helsingin Energia (4.04%) Dragon LNG Terminal 4Gas (20%), Petrogas (30%), BG (50%) Qatar Petroleum (70%), Exxon Mobil Eesti Energia (? %), Latvenergo (? %), Lietuvos Energija (? %), Pohjolan Voima (? %), Helsingin Energia (? %) Petrogas (50%), BG (50%) Phase 1: South Hook Gas Company (100%) (30%) Grain LNG Phase 1: BP/Sonatrach (100%) Phase 2: Centrica, Gaz de France, Sonatrach Phase 3: open season North Adriatic LNG Terminal BritNed Qatar Petroleum (45%), Exxen Mobil Edison (80%), (45%), rtpa (20%) Edison Gas (10%) National Grid, TenneT Although exempted, rtpa access regime It is important to differentiate between primary capacity rights and the secondary market for capacity. Although third party access for primary capacity conditions can be organized differently between the various facilities, the secondary market for capacity is in all the cases based on a Use-it-or-lose-it principle. Holders of primary capacity are not allowed to hoard capacity. Everyone can participate in the secondary market. Primary Capacity Allocation: open season As mentioned above, there are different ways to allocate the primary capacity. The most common system is an open season, a tailor-made auction system. The exemption cases without open season are facilities built for own use. Name Gate Terminal Brindisi LNG Terminal BBL: Bacton-Balgzand Open Season? No Estlink Unknown (*) Dragon LNG Terminal No 4

North Adriatic LNG Terminal No (**) Britned No (*) Not to our knowledge. There might however been an open season to attract interested parties. (**)As only the owner holds the capacity rights, we assume no open season. Although an open season is believed to be a good way to allocate primary capacity, there is no such thing as the one and only way to run an open season. There are, however, general guidelines in the way open seasons are run in this context. In what follows the ERGEG 2 view is presented. Next, several aspects from previous cases are discussed. ERGEG s view ERGEG has started a public consultation on open season procedures. Although the consultation document is mainly focused on the gas market, the content can also apply on the electricity market. ERGEG s scope is broader than only possible exempted infrastructure. Also regulated infrastructure can use an open season procedure, for instance in exploring the market need for more infrastructures. In their draft guidelines ERGEG broadly defines an open season as a two step process; an open assessment of market demand for a specific proposal (first step) and a subsequent phase of capacity allocation (second step). The main concern for ERGEG is that an open season procedure is non-discriminatory and transparent and that the result is efficient. If these criteria are met an open season can be seen as a competitive tool used for the long-term allocation of capacity and can be accepted as a market-based allocation mechanism. The first step of an open season consists of a proposal to the market. The proposal should give an idea of the intended capacity available for the market and for the cost associated with the project. This notice to the market should allow potential bidders to analyze the proposal. This first step should inform potential bidders about how the open season will continue, especially how in the end capacity will be allocated. The project developer has the possibility to express the conditions for later bids, e.g. minimum lot size. In this first phase the open season can be tailored to the situation. The procedure is really open in the sense that bidders can do proposals to enhance the project to better fulfill their needs. This first step is not binding to the developer. He can amend the capacity of the project and he can continue with the project even if not enough demand showed up in this first phase. The first step can conclude with the signing of non-binding Letters of Intent with interested parties. After the market test in the first step, the second step of an open season allocates the capacity. The allocation mechanism is not subject to the result in the first step (however, this should be explained in the first step). Both a pro rata allocation and an auction are possible. The former will be used when the first step resulted in an oversubscribed capacity. National legislation can add extra requirements. Not only long-term but also shorter capacity can be booked. Existing and future users should be treated equally. After the allocation, pro-forma agreements should be signed. The level of detail depends on the project development. ERGEG believes regulators have to oversee any open season procedure in order to guarantee the goals of the procedure will be met. According to ERGEG several elements should be published in public: - the investment decision (capacity, route, timing, ) - names of the shippers and their percentage of the capacity - tariff - contract duration. Regulators can request more information to be made public. Open season: analysis of real cases 1. An open season procedure is used to allocate capacity. However, it is possible for parties who obtained long-term contracts to join in the ownership of the infrastructure. For instance, the Gate Terminal project was originally owned by Koninklijke Vopak and Nederlandse Gasunie. RWE took a participation in the project of 10% after getting longterm contracts in the open season. This option was also available in the Dragon project. 2. Open seasons are used to allocate capacity. However, the capacity available has not to be fixed in advance of the open season. Open seasons allow to gauge the market and to determine the capacity by using the open season results. 3. After the first stage an open season results (probably) in several interested parties, who might sign a Letter of Intent. It is not necessarily true that all these parties in the end sign a long-term contract. For instance, the first announcement of the BBL projected resulted in 18 interested parties. Only 6 signed a Letter of Intent to commit capacity. Finally, 3 companies agreed on contracting long-term capacity. A similar process is found in the Dragon project, starting with 28 parties in the first round and ending up with 2 long-term contracts signed. 2 European Regulators Group for Electricity and Gas 5

4. As LNG terminals are often built in phases the capacity is also allocated in phases. It is however possible to agree contracts for the first phase and thereby granting an option for capacity in a next phase. 5. As long as the open season procedure is performed in a non-discriminatory and transparent way and there is no detriment to the competition, the outcome has a chance to be acceptable, even in cases where one party obtains 100% of the available capacity. This was the case in the first phase of the Grain project where BP/Sonatrach received primary capacity rights for the full capacity. 6. As mentioned earlier, BritNed is exceptional in a sense that there is no own use and no ntpa system. The capacity will be made available in a system like for regulated infrastructures. There are no long-term commitments (i.e. > 1 year) what so ever in the application made by BritNed. However, in the public consultation period following on the initial views 3 of the regulator, Centrica suggested longterm allocation as a good way to manage the risks. Centrica proposes an open season process with several restrictions for the resulting contracts: o no more than a certain proportion of the capacity can be made available for long-term contracts (e.g. 1/3 of the capacity) o limits on how much capacity one party can obtain o strong use-it-or-lose-it provisions E.ON reacted in the public consultation period on a reserve price provision in the BritNed application. The reserve price should cover the electrical losses, but there is no confirmation in the application according to E.ON that the reserve price is limited to these losses. Exemption duration There is a difference between electricity and gas cases with respect to the exemption duration. Gas infrastructure is in general exempted for the specific duration of the long-term capacity contracts. For instance, the European Commission amended the decision of the regulators for the BBL pipeline in order to limit the exemption duration to the length of the contracts. This resulted in a shorter exemption period than requested. There are only two electricity cases of which one has not been approved yet. Conclusions about suitable duration can not be made at the moment. Name Duration Comments Gate Terminal 20 years 25 years asked, but amended by the Dutch regulator Brindisi LNG Terminal 20 years (*) BBL: Bacton-Balgzand 10 or 15 years, depending on the part of the capacity considered Estlink 2006-2009/2013 Originally 15 years, but amendment made by the European Commission: duration no longer than the specific duration of the long-term contracts Dragon LNG Terminal 20 years 25 years 20/25/20 years for the three phases North Adriatic LNG Terminal 25 years (*) BritNed 25 years asked Centrica proposes a shorter period (e.g. 10 years) (*) Based on the length of the contracts. 3 Ofgem s final views are not published yet. 6