Metro Gold Line Eastside Extension La Extensión al Este del Metro Gold Line



Similar documents
Moving Ahead for Progress in the 21 st Century (MAP-21)

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

Metro Rail Gating Study

LOS ANGELES COUNTY IMMUNIZATION PROGRAM PROVIDER REFERRAL LIST

When is BRT the Best Option? 1:30 2:40 p.m.

Restoration of Historic Streetcar Service in Downtown Los Angeles. Alternatives Analysis (AA) FINAL

COUNTY OF LOS ANGELES DEPARTMENT OF MENTAL COUNTYWIDE CHILDREN S SERVICES TBS PROVIDER DIRECTORY SA PROVIDER NAME CONTACT

Metropolitan Setting l

KOCE-TV CABLE / SATELLITE LIST

Senior Citizens and Special Needs Individuals. Mobility and Transportation Services Guide

Los Angeles Metro Rapid

CUSTOMS BROKER EXAM REVIEW COURSE LOCATION/DIRECTIONS ATLANTA CHARLESTON CHARLOTTE DALLAS LOS ANGELES NEW YORK WASHINGTON, D.C.

Prosecutorial Agencies by Courthouse Location

Would These Keywords Help Your Business? divorce lawyer divorce lawyer divorce lawyer hermosa beach divorce lawyer hermosa beach ca

Downtown Vancouver Full Block For Sale 1.03 Acre Redevelopment Opportunity

to imagine a transportation vision

NOTICE OF THE CLASS DISTRIBUTION PLAN. A court has authorized this notice. This is not a solicitation from a lawyer.

PAPS- LA.

FY16 Budget Public Forum. Saturday, April 25, 2015

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

153 HOSPITALS FOR CHILDREN S HOSPITAL OF ORANGE COUNTY Sorted by City and Name

Lincoln Downtown Master Plan Update

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Light Rail Transit in Phoenix

J. Craig Venter Institute, La Jolla Transportation Demand Management Plan

Transit, Rail, Program, Project & Construction Management Experience

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)

Southern California Avoid DUI Task Force Enforcement Operations Schedule

Capital Action Plan Status Thru Dec 2015

Los Angeles County Health Care Services Community Clinics and DHS Health Facilities

Downtown Tampa Transportation Vision

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY 2008 CONTINUING DISCLOSURE STATEMENT

City of Los Angeles. Department of Transportation. Annual Report Fiscal Year Moving Los Angeles Forward

4.5 TRANSPORTATION, TRAFFIC AND SAFETY

A Review of Transit Technology Specifications

California : Los Angeles County (Central)

Cost Reduction Opportunities

CRENSHAW/LAX TRANSIT CORRIDOR PROJECT

Addendum to the Arterial Transitway Corridors Study

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

Master Plan Update and EIR Amendment

3º ENCONTRO ANUAL DA AACE Implementation of a Project Management Office at LA Metro. Julie Owen PSP, CCP

English in. Los Angeles

Downtown Los Angeles Streetcar Economic Analysis

TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street Market Street 11-14

STOP CONSOLIDATION TRANSIT STRATEGIES

(310) (310) , (310) , (213) , (213) , (562)

City of Santa Ana. FY 2014/2015 Capital Improvement Program. Broadway/Anahurst to 1 st Improvements. First Street Bridge Replacement

Incentives for Historic Preservation

Molina Medical Group Ancillary Roster Los Angeles County Region

TRAIN WRAPS TIMETABLE ADS TICKETS STATION POSTERS METROLINK MATTERS NEWSLETTER STATION SAMPLING WEBSITE: METROLINKTRAINS.COM

CALIFORNIA HOTELS. For courses held in San Diego at:

1 of 17 June 4, 2014

d r a f t Division Street: 15.4 du/a Damen Avenue: 14.1 du/a Western Avenue: 12.8 du/a

Los Angeles San Diego. Coastal Rail Corridor. San Diego Segment. Building Today. Boarding Tomorrow.

California State Department of Fair Employment and Housing 611 West Sixth Street, 15th Floor Los Angeles, CA

2012 King County Metro Transit Peer Agency Comparison on Performance Measures

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

TRUCK ROUTES IN THE REGION MAKE UP AN EXTENSIVE ROAD NETWORK. IN LOS ANGELES COUNTY ALONE, TRUCK ROUTES INCLUDE 892 MILES OF

BUILDING FEATURES. PROPERTY DETAILS +61,121 Square Feet > Lease Rate: $0.49 SF / NNN > Sale Price: $4,828, ($79/SF) AREA AMENITIES

Corvel Medical Provider Network. Initital Treatment Centers. Health Services Administration #110

Econ 137 Urban Economics Lecture Notes III

2016 SCHEDULED ELECTIONS (As of August 17, 2016)

Public Transportation Advertising Throughout San Diego County MTS San Diego Trolley NCTD Coaster NCTD Sprinter

OVERVIEW PROJECT SUMMARY

Appendix B Billboard Photos and Sign SUD Site View Simulation

Metro Met..,.u... T,...,...,...,

3.0 Project Description

Q. What do you think the most important transportation issues are in this area with regard to east-west travel?

Wilmington to Newark Commuter Rail Improvement Project

All questions in this survey were voluntary; all results are based on number of respondents who answered the relevant question.

Claret Consulting 18 December 2015

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)

How To Serve An Enormous Organization

Nursing ADN Program Graduate Employment Survey

Is Encouraging More Bike Ridership On El Camino Real A Good Idea?

LOS ANGELES COUNTY IMMUNIZATION PROGRAM PROVIDERS REFERAL LIST

Pompano Education Corridor Transit Study - Existing Conditions Technical Memorandum #1. Figure 59 Total Number of Employees (2040)

Taylorsville City. contact information Keith Snarr Economic Development Director P (801) C (801)

The Mabel Wilson Richards Scholarship Fund. Scholarship Application and Information

Jess Linn Principal Planner, Development Services Division Miami-Dade Regulatory and Economic Resources

MANAGEMENT PLAN. Fiscal Year


Los Angeles Match Initiation Form

Seattle Streetcar Center City Connector Seattle, Washington Small Starts Project Development (Rating Assigned November 2015)

GIS Analysis of Population and Employment Centers in Metro Denver Served by RTD s FasTracks

Fuel surcharge may apply. Check for current rates or for updates and/or changes to rates and cites serviced.

Spatial / GIS Resources Brown Bag Discussion: Metro LAR-IAC4 Pictometry Tool

Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD

Available for Lease or Sale

Transportation. Alzheimer's Orange County 2515 McCabe Way, Suite 200 Irvine, CA Transportation Services Referral List

30 Years of Smart Growth

Transit Technology Alternatives

6 REGIONAL COMMUTE PATTERNS

Project Management Oversight Services

GET URBAN GET DOWNTOWN

RESTAURANT MEALS PARTICIPATING RESTAURANTS March 2015

RAdaptive. Reuse Program. City of Los Angeles. Creates new housing opportunities. Revitalizes neighborhoods. Preserves historic architecture

4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP ESTIMATION OF TRIP REDUCTIONS WITH TIMP TRANSIT AND TDM PROGRAMS

Week One: Summer Vacation Program - LOS ANGELES Wednesday Thursday Friday Saturday Sunday Monday Tuesday

Transcription:

Metro Gold Line Eastside Extension La Extensión al Este del Metro Gold Line August 2003/Agosto de 2003 Project Update Actualización del Proyecto

Metro Rail s Gold Line continues through East LA. Another six miles of train tracks will be added from Union Station to Pomona and Atlantic offering the Eastside faster travel times and improved access to destinations throughout Los Angeles County. Construction Begins Early 2004 Los Angeles has been described as the city of this century, an American melting pot where people have gathered from every country and corner of the earth to pursue their dreams. Those dreamers need access and connections to business, to culture, to other dreamers. A vital city offers that access and connectivity. Transportation supports that connectivity. For East Los Angeles, an historic thriving community for many generations and many ethnicities, the time has come for a new and vital transportation link to bring a new age of access. Now, after years of deliberation to define and refine the method of connectivity, construction will soon begin on that vital link the Metro Gold Line Eastside Extension light rail project. The project contracts are out to bid and will be evaluated. Construction should begin in early 2004 once the contractor(s) are chosen. Project at a Glance >Eight stations (two underground) >Estimated ride time of 17 minutes between Union Station and the Atlantic station > Faster, easier access to 73 miles of Metro Rail system >Capacity for 22,000 daily boardings >Operating hours from 4:30 am to 12:30 am > Twin tunnels (1.8 miles long) under Boyle Heights > Budget of $880 million > Forecasted to open 2009 Contractors to Bid on Three Contracts C0800 Includes the excavation of two underground stations at 1st/Boyle and 1st/Soto and twin-bored tunnels with portals near 1st/Utah and 1st/Lorena. C0801 Includes design and construction of street-level and underground stations, yards and shops, substations, trackwork, systems, systems integration and testing. C0802 Includes a new bridge to be constructed over the 101 freeway connecting the Eastside Extension to the Metro Gold Line at Union Station. For questions concerning construction of the Metro Gold Line Eastside Extension, please contact Yvette Robles, Community Relations Team Contact, at 213.922.2259 or visit metro.net/eastside.

Underground Travel Means Faster Commutes Although the Metro Gold Line Eastside Extension light rail project travels most of its total six-mile length at street level, the trains will travel underground for 1.8 miles beneath 1st Street between Gless and Lorena. The narrowness of 1st Street and the density of its buildings meant tunneling underground was our best option, explains Ray Sosa, Planning Deputy Project Manager of the Metro Gold Line Eastside Extension. Running the trains through tunnels means they can travel safely at a higher speed, which allows us to reduce travel time for all riders using the Eastside Extension. MTA will build a park/ride structure for Metro Gold Line Eastside Extension riders at Atlantic and Pomona boulevards. MTA Aggressively Seeking State and Federal Funding MTA is now aggressively working to finalize the Federal Full Funding Grant Agreement of $490 million in federal discretionary funds for the Metro Gold Line Eastside Extension light rail project. Traffic/ing Concerns Eased Working with residents to solve an important community issue, MTA recently proposed a solution to address traffic concerns near the park/ride structure to be built at Pomona and Atlantic Boulevards. The rail cars traveling through the twin-tunnel portion of the Eastside Extension will travel at up to 55 miles per hour. In comparison, the speed on the most heavily used Metro Bus lines in the Eastside area averages 12 to 14 miles per hour. Amazing Machines Bore Under the City Used widely throughout Europe as well as for East Central Interceptor Sewer project in Los Angeles, earth pressure balance (EPB) machines will bore two 25-foot-diameter tunnels. EPBs couple boring with a solution of water and polymers to turn soil into the consistency of toothpaste. EPBs were used in boring the tunnel under the English Channel, connecting France to England. The EPBs offer greater stability when digging tunnels than other types of tunneling machines. An important element in gaining approval for the federal funds is to obtain State of California funding for the Eastside Extension project. The Eastside Extension project was previously designated by law to receive $191 million from California s Traffic Congestion Relief Program. Due to the state s current financial deficit, these funds are no longer available. To preserve the federal funds for the project, MTA has reached an unprecedented agreement with the California Transportation Commission to organize financing for the project. MTA will absorb the state s present share of cost for the project and will be reimbursed by the state in a future year. Reimbursement will come through the state s federal gas tax funds. This agreement between the state and MTA has removed a major obstacle, bringing MTA much closer to award of the Full Funding Grant Agreement funds for this vital Eastside Extension project. The nearby community raised concerns regarding the site s driveway. Residents were concerned that the driveway would increase traffic in their neighborhoods. MTA agreed to relocate the exit/entrance to the parking structure away from Telford Street. MTA is also working with the community and Kaiser Permanente to address concerns regarding lighting, security and traffic. Improved Lanes Improve Travel Over the last year, MTA and Los Angeles County have been developing the final traffic lane configurations for 3rd Street to take effect after the Metro Gold Line Eastside Extension is built. MTA has arranged several meetings with community members who live or own businesses along 3rd Street. Although the County of Los Angeles Department of Public Works ultimately approves the County s traffic lane configurations, MTA will implement the approved configuration.

A new concept proposed by the County creates left turn pockets and retains parking along 3rd Street wherever possible. This concept improves traffic flow and the level of service at many intersections, while maintaining a safe environment for pedestrians, autos, and light rail trains. Economic Opportunities Abound The Metro Gold Line Eastside Extension will open new economic opportunities to Eastside residents by offering them faster, more convenient access to the 73 miles of Metro Rail stretching across Los Angeles County. But even while the Eastside Extension light rail system is being built, MTA will promote economic growth and job development in communities impacted by Eastside Extension construction. The Metro Jobs Program is a key tool for meeting this commitment Local Jobs Goal of 30% The Metro Jobs Program provides residents in the construction project area with employment opportunities, as well as access to constructionrelated training programs. A major goal of Metro Jobs is to identify and consider all qualified workers who reside within the project community area. The program has established a goal for Eastside project community residents to perform 30 percent of total construction work hours. In addition, the Metro Jobs Program will assist all persons interested in nonconstruction-related employment with job placement or training through a network of communitybased organizations expert in those services. Nonconstruction-related job seekers will have the opportunity to compete for project employment or to be referred to a local job training and placement center. We want to assist everyone who expresses an interest in the Metro Jobs Program, explains Joe Hernandez from MTA s Diversity and Economic Opportunity Department. We will not turn anyone away. We will work with each individual to identify opportunities appropriate for their skills and experience. The Metro Jobs Program is designed to provide local residents an awareness of the opportunities for employment associated with this major project. For more information: 213.922.2600 Soto Street Gets Rapid The Metro Rapid Program has reduced bus passenger travel times by as much as 25 percent. Eastside residents will soon have the opportunity to use this high quality mode of transit as the Soto Metro Rapid begins operating in June 2004. A collaboration of MTA and City of Los Angeles Department of Transportation, the Metro Rapid program brings faster travel choices to bus riders by offering an express bus service based on eight key features. Metro Rapid buses currently travel 96 miles along six corridors throughout Los Angeles County. The Soto and Metro Rapid lines will contribute to the connectivity of the overall Metro Rapid network. When the Soto Metro Rapid joins with the completed Eastside Extension, riders can access a faster, more reliable system for east/west and north/south travel. Features of the Metro Rapid program have improved service frequency and reliability while reducing delays. The result has been that Metro Rapid lines increase bus ridership by nearly 40 percent; nearly one-third of that increase in ridership is from people who are new to public transit. Soto Metro Rapid DOWNTOWN LA VERNON HUNTINGTON PARK SOUTH GATE Broadway State 1st Whittier 720 Gage Santa Ana PACIFIC SOTO AVE 26 Figueroa Cesar E. Chavez 4th Olympic Firestone 711

Wardlow Artesia Compton Boyle Heights Washington Chinatown Chinatown Lincoln Heights/ Cypress Lincoln Heights/ Cypress Southwest Museum Southwest Museum Fillmore Highland Hollywood/Western Del Mar Lake Sierra Madre Villa Allen Memorial orth Hollywood Universal City Hollywood/Highland Hollywood/Vine Highland Del Mar Lake Sierra Madre Villa Allen Fillmore Memorial Metro Rail System Map PASADENA PASADENA Wilshire/ Normandie Metrolink San Bernardino Line Metrolink Riverside Line Metrolink 91 Line Anaheim Pacific 5th Street Metrolink Orange County Line Heritage Square/ Arroyo Vermont/Sunset Vermont/Santa Monica Vermont/Beverly Wilshire/ Western RE CENTER Wilshire/ Westlake/ Vermont MacArthur Pershing Civic Civic Center Square DOWNTOWN LA NORWALK REDONDO BEACH LONG BEACH Del Amo Firestone 103rd Street Imperial/ Wilmington Willow Pacific Coast Highway 1st Street Transit Mall San Pedro Pico Grand 7th/Metro Metro Red Line (A) Metro Blue Line (B) Metro Gold Line (C) Metro Green Line (D) Transfer Station Metro Rapid Transfer ing ing (Paid) Metrolink Transfer Amtrak Transfer Station Eastside Extension Construction Begins 2004 Crenshaw Long Beach Lakewood I-605/I-105 ngeles International Airport Via Free Shuttle Aviation/LAX Mariposa Segundo Douglas Redondo CONSTRUCTION BEGINS 2004 Hawthorne Vermont Avalon Harbor Freeway Indiana East LA Civic Center Soto Maravilla EAST LA Pomona/Atlantic Little Tokyo/Arts District Pico/Aliso Union Station Union Station Heritage Square/ Arroyo 03-1183JL