SHELL CANADA UPGRADER. Public Disclosure



Similar documents
The Canada GTL Project

Imperial Oil Limited 237 Fourth Avenue S.W. Calgary, Alberta T2P 3M9 imperialoil.ca

Canada s Oil Sands Overview and Bitumen Blending Primer. US National Academy of Science October 23, 2012

Canadian Oil Sands. Enhancing America s Energy Security

BP Texas City Refinery

Operational Review and Outlook

Wasser Berlin International GWP Forum: Challenges in North America. Alberta s Water Challenges and Opportunities

Shell Scotford 2012 Community Survey Results

Refining of Crude Oil - Process

Suncor Denver Refinery Overview

Directive 042: Measurement, Accounting, and Reporting Plan (MARP) Requirement for Thermal Bitumen Schemes

The Engineering Science of Oil Pipelines

April 24, Dear Mr. Fraser: Ontario Energy Board Energy East consultations

UBS Grass Roots Conference

Inter Pipeline Fund Announces Strong Third Quarter 2009 Results

A STUDY OF ENVIRONMENTAL BENEFITS OF INDUSTRIAL INTEGRATION

GUIDE TO THE MINE APPROVAL PROCESS IN NEW BRUNSWICK

ASimple Guide to Oil Refining

Alberta s Oil Sands 2006

HP SUPPLIER ENVIRONMENTAL PERFORMANCE REVIEW QUESTIONNAIRE

Oil Sands Tailings Research Facility Interacting with Industry David Sego, Civil & Environmental Engineering University of Alberta

********** An short and simple explanation of how oil is converted into gasoline and then brought to you, the consumer.

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Introduction to our Business in Valmet. Marita Niemelä VP, Strategy Pulp & Energy 20 August 2014

Our Environmental Protection Plan RECYCLING CAPABILITIES AND ENVIRONMENTAL ACCOMPLISHMENTS

Industry Description and Practices. Waste Characteristics

Refinery Equipment of Texas. Mini - Refinery Feasibility Overview

TD Securities Calgary Energy Conference July 2014

CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach

An Introduction to Development in Alberta s Oil Sands

Executive Summary. (Edited for RFP) A-1

Modular chemical conversions delivering clean energy

Canadian Natural Resources Limited Suite 2100, 855 2nd Street SW, Calgary, Alberta, T2P 4J8 T F

Allocation of Costs, and Non Arm s Length Valuation of Shared Goods, on Oil Sands Projects

NEWS RELEASE QUESTOR TECHNOLOGY INC. ANNOUNCES FIRST QUARTER 2014 FINANCIAL RESULTS

FLEXICOKING technology for upgrading heavy oil and utilization of by-products

action plan water for life water for life action plan 1

CRG CONSERVE RESOURCES GROUP ECO ENVIRONMENTAL ENGINEERING TECHNOLOGIES. NEW State of the Art. Advanced OIL REFINERY TECHNOLOGY & PROCESSES

Energy BUSINESS PLAN ACCOUNTABILITY STATEMENT THE MINISTRY LINK TO GOVERNMENT OF ALBERTA STRATEGIC DIRECTION

Recommended Practices Associated with Hydraulic Fracturing Operations

Sustainable Plastics with Reduced Carbon Footprint & Reduced Waste

Natural Gas Information Contents

Information Technology Solutions

FOURTH QUARTER 2015 Report to Shareholders for the period ended December 31, 2015

SUBDIVISION AND DEVELOPMENT REGULATION

Network Monitoring Plan. Executive Summary

GE Power & Water Water & Process Technologies. Water and Process Solutions for the Refining Industry

Too Good to Waste MAKING CONSERVATION A PRIORITY

Enhancing Nitrification in an Oil Refinery WWTP with IFAS

ENVIRONMENTAL STANDARDS FOR PETROLEUM OIL REFINERIES EMISSIONS. Standards for emissions from furnaces, boilers and Power Plant

Renewable Choice Energy

Mercedes-Benz Biodiesel Brochure

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology

OIL SANDS CONSERVATION RULES

RENEWABLE ENERGY. The Sustainable Energy Plant.

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

Forecasting the impacts of oilsands expansion

Physical flow accounts: principles and general concepts

INFORMATION SHEET ORDER NO. R XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links

Trottier Energy Futures Project Greenhouse Gas Emissions from the Canadian Oil and Gas Sector. R.L. Evans & T. Bryant

[]n. Craving energy. Oil and gas formation. Oil and gas formation. Resources: Fossil Fuels. Supplying our energy needs: Source of energy in the US

Alberta s Oil Sands. Resourceful. Responsible.

Avoiding co-product allocation in a simplified hypothetical refinery 1

Kearl oil sands project

TRANS MOUNTAIN PIPELINE ULC

Good afternoon. It's a pleasure for me to be here today, and I want to thank Raymond James for this opportunity.

Metsä Fibre s Bioproduct mill

Naturally Occurring Radioactive Material (NORM)

the potential employerofchoices

CRUDE OIL BY RAIL: PART I POTENTIAL FOR THE MOVEMENT OF ALBERTA OIL SANDS CRUDE OIL AND RELATED PRODUCTS BY CANADIAN RAILWAYS

Department Business Plan. Utilities

ILLINOIS DEPARTMENT OF CENTRAL MANAGEMENT SERVICES CLASS SPECIFICATION ENERGY AND NATURAL RESOURCES SPECIALIST SERIES

PRAXAIR, INC. Hydrogen: The Growth Story Continues. Charles Miller, Vice President Dan Yankowski, Vice President. February 9, 2005

AGRICULTURAL WASTE REDUCTION

FORM 10-Q UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C

Wastewater Regulation and Designing Changes in South East Asia

A NEW BEGINNING STARTS WITH ONE S TEP. CAPABILITIES BROCHURE

Setting the Record Straight: Lifecycle Emissions of Tar Sands

Canadian Oil Sands' Second Quarter Results Reflect Continued Progress on Syncrude's Cost Reduction Efforts

Drill-Right. best Oil & Gas Development Practices for Texas

GUIDELINES FOR THE LOCATION OF STATIONARY BULK AMMONIA STORAGE FACILITIES

Aquatera 2015/16 Business Plan Highlights

Nitrogen Blanketing for Methanol Storage and Transportation

Heavy Oil. Canadian Heavy Oil Association.

PIPELINE FUNDAMENTALS. texaspipelines.com

Incident Reporting Requirements

Did you know that. NEXBTL renewable diesel. Premium quality renewable diesel. As a drop-in biofuel, NEXBTL diesel behaves exactly like fossil diesel.

Department Business Plan. Utilities

Trilogy completed the sale of its Dunvegan oil assets in the Kaybob area for net proceeds of $45 million.

Sandhurst Consulting

STRATEGIC CONSULTING AND INDUSTRY ADVISORY SERVICES Performance Improvement

The future is our most important market Refining with a sustainable vision. Sören Eriksson

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency

Alberta oil-sands and climate: Warming from well-to-wheel emissions

AUTOMOTIVE GAS OIL. Robert Shisoka Hydrocarbon Management Consultancy

Garry Kaufman Colorado Air Pollution Control Division May 14, 2014

CENTURY ENERGY LTD. FORM F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014

Assignment 8: Comparison of gasification, pyrolysis and combustion

Problem Solving answer guidance WJEC B GCSE Geography Higher Tier. Question Mark scheme Comments Part A ai

Transcription:

SHELL CANADA UPGRADER Public Disclosure

SHELL CANADA UPGRADER SHELL CANADA UPGRADER Public Disclosure TABLE OF CONTENTS Summary...01 Project Overview...04 Process Description...05 Regulatory Review and Project Schedule...09 Environment...11 Stakeholder Engagement...13 Contact Information...15 This Public Disclosure document describes Shell Canada s general plans for bitumen processing facility development in the Scotford area. Shell is committed to working with stakeholders in Scotford area communities to ensure that development is responsibly and professionally conducted, and benefits the local communities, as well as Albertans and the Canadian economy through employment, contracting and service and supply opportunities. Shell Canada s Oil Sands business is held by a wholly owned partnership, Shell Canada Energy, which holds a 60 per cent interest in the Athabasca Oil Sands Project (AOSP), a joint venture that consists of the Muskeg River Mine located north of Fort McMurray in northern Alberta, the Scotford Upgrader near Edmonton, Alberta. Shell Canada Energy also has in situ bitumen operations at Peace River and Hilda Lake in Alberta.

SHELL CANADA UPGRADER 01 SUMMARY With significant lease holdings in the Athabasca, Cold Lake and Peace River oil sands deposits, Shell Canada (Shell) plans to increase its upgrading capacity by 400,000 barrels per day (bbl/d) over the long term. SHELL S CURRENT SCOTFORD UPGRADER The current Scotford Upgrader is a 155,000 bbl/d bitumen upgrading facility located in Strathcona County, near Fort Saskatchewan, Alberta. The Alberta Energy and Utilities Board has recently approved this facility for expansion up to 290,000 bbl/d. In 2006, the Athabasca Oil Sands Project (AOSP) Joint Venture owners (Shell Canada, Chevron Canada Limited and Western Oil Sands L.P.) approved Scotford Upgrader Expansion 1, a 100,000 barrel-a-day expansion of the Scotford Upgrader. The current Scotford Upgrader uses hydrogen-addition technology to upgrade the bitumen from the Muskeg River Mine into a wide range of synthetic crude oils. A significant portion of the current Scotford Upgrader output is sold to the Scotford Refinery with the balance of the synthetic crude being sold to the general marketplace.

02 SHELL CANADA UPGRADER SCOTFORD UPGRADER The current Scotford Upgrader uses hydrogen-addition technology to upgrade bitumen into a wide range of synthetic crude oil products.

SHELL CANADA UPGRADER 03 PLANNING FOR THE FUTURE This Public Disclosure document provides information regarding Shell s general plans for future development in the Scotford area. In addition to its Scotford area plans, Shell is also evaluating other heavy oil upgrading and refining options. Shell s plans include two elements: AOSP Diluent Recovery Units (DRU) facilities recovering the light hydrocarbon process diluent associated with AOSP Joint Venture bitumen production. These facilities will provide any participating Joint Venture Owner with their share of a clean bitumen product in the Scotford area. The recovered diluent will be returned via pipeline to the mining operations. Shell Upgrading Shell plans to increase its upgrading capability in the Scotford area by 400,000 barrels per day through a series of phases or building blocks. Future upgrading facilities will focus on processing Shell s share of future AOSP bitumen production as well as bitumen from Shell s in situ oil sands developments. While the utmost care has been taken to detail Shell s expansion plans for upgrading facilities in the Scotford area, the information presented in this document is subject to change. The development plans and exact timing for these upgrading projects depends on the timing and outcome of respective regulatory processes, the ability to meet sustainable development criteria, market conditions and economic feasibility, final project costs, and ongoing consultation with key stakeholders.

02 04 SCOTFORD SHELL CANADA UPGRADER UPGRADER PROJECT OVERVIEW In April 2005 Shell Canada outlined plans to expand upgrading capacity in a series of phases or building blocks, each sized at approximately 100,000 barrels a day. In addition to the previously approved Scotford Upgrader Expansion 1, Shell is proposing four additional 100,000 barrel-per-day upgrader project phases. Each of the new upgrading phases or building blocks will consist of bitumen processing facilities and other related infrastructure. The bitumen processing facilities will be similar in design to the current Scotford Upgrader. Shell is also evaluating the gasification of heavy oil products for the production of hydrogen and power. In addition to the new Shell upgraders, additional AOSP Joint Venture facilities are also being considered. These facilities would recover the light hydrocarbon process diluent associated with AOSP Joint Venture bitumen production. The product would be a clean bitumen suitable for blending into a variety of market products or for further upgrading. The new Shell upgraders would upgrade Shell s share of AOSP Joint Venture bitumen production along with bitumen from other supply sources, such as Shell in situ development. This Public Disclosure document is the first step in the regulatory review process for Shell s long-term development plans in the Scotford area. The Alberta Energy and Utilities Board is the primary regulatory agency responsible for determining whether these facilities are in the public interest. Alberta Environment determines whether these facilities have been designed in an environmentally acceptable way. The new facilities will be located in Strathcona County, approximately 5 kilometers northeast of Fort Saskatchewan, in the vicinity of the existing Scotford Refinery and the current Scotford Upgrader. The site is located within Alberta s Industrial Heartland, an area already designated for heavy industrial use. The projects will leverage existing external infrastructure, such as roads, water supply, facilities, pipelines and rail links. As required, Alberta Environment will seek public input on Shell s draft Terms of Reference (TOR) for an Environmental Impact Assessment (EIA), which will be included with the application filed with the Alberta Energy and Utilities Board in 2007. Shell will continue to work with regulators and the community in the coming months to ensure that its plans are incorporated into regional and local infrastructure planning.

SHELL CANADA UPGRADER 05 PROCESS DESCRIPTION The new upgraders will use hydrogen-addition technology to upgrade the high viscosity extra heavy crude oil (bitumen) from the oil sands into a wide range of synthetic crude oils. Each 100,000-barrel-per-day project phase includes the following infrastructure and related facilities: SHELL PLANS TO INCREASE UPGRADING CAPACITY BY 400,000 BARRELS A DAY Atmospheric and Vacuum Unit Residual Hydroconversion Unit and Integrated Hydrotreating Hydrogen Manufacturing Unit* Sulphur Recovery and Handling Supporting utilities and infrastructure Some phases may also include a Sulphur Deasphalting Unit and a Gasification* Unit. *CO 2 capture ready see p.12, Environment Section

02 06 SCOTFORD SHELL CANADA UPGRADER UPGRADER PROCESS DESCRIPTION A ATMOSPHERIC & VACUUM UNIT The atmospheric and vacuum unit uses a moderate temperature, low-pressure process to separate the bitumen into its constituent hydrocarbon elements. Distillate products removed from the bitumen are pumped to the residue hydro conversion unit. B RESIDUE HYDROCONVERSION UNIT AND INTEGRATED HYDROTREATING The residue hydroconversion unit operates under high temperature and pressure to improve the quality of the bitumen, converting it to lighter, higher value hydrocarbon components. Sulphur and nitrogen are later removed in the hydrotreating unit to further improve the quality of the product. C HYDROGEN MANUFACTURING UNIT The hydrogen-manufacturing unit produces the high purity hydrogen required as part of the conversion of bitumen to high quality petroleum products. D SUPPORTING UTILITIES AND INFRASTRUCTURE Each upgrader phase will include the required utilities and off-site facilities, including raw water treatment, wastewater treatment, cooling and utility waters, effluent management systems, flares, and tank farm. E SULPHUR RECOVERY & HANDLING Sulphur is recovered from the bitumen in the upgrading process. Recovered sulphur can be converted into liquid sulphur and transported by rail car to market for distribution. Sulphur forming, handling and storage equipment is being considered for the upgrader projects, enabling Shell to process and move the sulphur to broader markets. These facilities will cool the liquid sulphur produced from upgrading and form it into solid pellets. Sufficient on-site sulphur storage at Scotford will be provided to accommodate liquid and solid sulphur, as well as to allow short-term interruptions in the transportation network. F SOLVENT DEASPHALTING UNIT In conjunction with gasification, the solvent deasphalting unit processes atmospheric residue from the residue hydroconversion units or from the bitumen, producing streams of both lighter oil and asphaltenes. The deasphalted oil from the unit can either be further refined or blended directly into Shell s synthetic crude products. Asphaltenes from the unit can be either blended into fuel oil products or sent for gasification (see Gasifier below). G GASIFICATION Shell is also considering including gasification unit(s) in association with the upgrader projects to produce hydrogen and fuel gas. Gasification maximizes the use of the heaviest bitumen components, called asphaltenes, providing a more complete use of the bitumen resource and reducing dependence on natural gas. This will be designed so CO 2 capture facilities can be added without major equipment changes (see p.12 environment). H AOSP DILUENT RECOVERY UNITS In the AOSP bitumen production process light hydrocarbon diluent remains in the bitumen so that the bitumen can be transported by pipeline. This diluent needs to be recovered from the bitumen and recycled. To recover the light hydrocarbon diluent, the diluent recovery unit heats the diluted bitumen mixture, vapourizing the light hydrocarbon diluent product, which is then cooled into a liquid and returned to the mine for reuse. The diluent recovery unit produces a clean bitumen product that is appropriate for either blending or further processing.

SHELL CANADA UPGRADER 07

02 08 SCOTFORD SHELL CANADA UPGRADER UPGRADER

SHELL CANADA UPGRADER 09 REGULATORY REVIEW PROPOSED SHELL UPGRADERS TIMELINE This Public Disclosure document is the first step in the regulatory review process for Shell Canada s long-term developments in the Scotford area. The Alberta Energy and Utilities Board is the primary regulatory agency responsible for determining whether these facilities are in the public interest. Alberta Environment determines whether these facilities have been designed in an environmentally acceptable way. We anticipate that in early 2007 Alberta Environment will ask the public to comment on a Draft Terms of Reference (TOR) for the Environmental Impact Assessment (EIA) of this project. Once finalized, the TOR will identify for the community, for stakeholders and for Shell the information required by regulatory agencies to assess the environmental aspects of the project. While the utmost care has been taken to detail Shell s expansion plans for upgrading facilities in the Scotford area, the information presented in this document is subject to change. The development plans and exact timing for these upgrading projects depends on the timing and outcome of respective regulatory processes, the ability to meet our sustainable development criteria, market conditions and economic feasibility, final project costs, and ongoing consultation with key stakeholders. Shell expects to file regulatory submissions for long-term upgrader development plans in 2007. Subject to Alberta Energy and Utilities Board and Alberta Environment approval, construction could start in late 2009. The timeline for future project phases will depend on a variety of regulatory, project and market factors. Shell is working to prepare regulatory submissions for this project, and public consultations will continue through 2007 and 2008. Shell, the Alberta Energy and Utilities Board, and Alberta Environment will continue to seek public input at various stages throughout the regulatory review process. The timeline for future project phases will depend on a variety of regulatory, project and market factors.

10 SCOTFORD UPGRADER

SHELL CANADA UPGRADER 11 ENVIRONMENT THE WAY WE WORK Shell s commitment to sustainable development is integrated throughout the life of a project - from design and operations through to reclamation. This commitment has resulted in the implementation of several new practices that have reduced overall air emissions, water use and waste production. The first oil sands operation to receive ISO 14001 registration (an internationally recognized standard) for its environmental management practices, Shell continues to look for new ways to improve energy efficiency and the environmental performance of operations, while continuing to evaluate design options for the proposed expansions. ENVIRONMENTAL SETTING AND ASSESSMENT The current Scotford Upgrader is located in an area that has been designated for heavy industrial use. As such, the facility and the synergies that have developed with existing area industry conform to current municipal land use plans. The land being assessed for the upgrader projects and diluent recovery units is located in the immediate vicinity of the current Scotford Upgrader. The majority of the land has been previously used for agricultural and rural residential development. Shell will evaluate possible sources of process water, including supply from the North Saskatchewan River or potentially recycled water from other industrial or municipal facilities. Shell will provide high-efficiency SO 2 emission recovery infrastructure to meet regulatory requirements and guidelines. Shell s commitment to the principles of sustainable development and environmental management is an integral part of these projects. Social and environmental responsibility will be key considerations in the design, construction, and operation. Inherent in our approach to environmental management is our compliance with legislated requirements and our commitment to engage regional communities, the government and the public. The regulatory process and subsequent opportunities for public input begin with the Environmental Impact Assessment (EIA) Draft Terms of Reference. The EIA report is an important document that assists the community, stakeholders, regulators and Shell to understand and assess the environmental effects associated with the proposed expansion construction, operation and reclamation.

12 SHELL CANADA UPGRADER ENVIRONMENT (cont d) Shell will prepare a detailed EIA for the planned developments, one that builds on the EIA work completed for Scotford Upgrader projects in 1998 and 2005. The EIA will focus on the areas of: Air quality Human health Surface water and ground water Socio-economics Noise TECHNOLOGY AND SUSTAINABLE DEVELOPMENT The planned Shell upgraders intend to use a number of technologies designed to enhance overall environmental performance, including: Residual Hydroconversion (hydrogen-addition upgrading technology) Shell Claus Offgas Treatment (high efficiency sulphur recovery) Gasification (reducing dependence on natural gas) CO 2 capture readiness Implementation and use of CO 2 capture technologies depends on the establishment of appropriate government policy and supporting framework, as well as project economics.

SHELL CANADA UPGRADER 13 STAKEHOLDER ENGAGMENT Shell remains committed to working with neighbours and community organizations to provide appropriate information about its projects, including information regarding technology and environmental performance, as well as potential impacts, benefits and opportunities resulting from the expansion projects. Throughout this ongoing consultative process, Shell s focus will be to identify and address any concerns and issues that may arise. Shell will continue to involve our neighbours in decisions that affect them, with the objective of finding solutions that all parties view as positive and sustainable over the long term. Shell s consultation principles: Shared process design consultation programs based on public input, taking into consideration local knowledge in areas where Shell operates or plans to operate. Respect respect individual values and act as a good neighbour. Consultation recognizes the legitimacy of peoples concerns and the valuable input they can provide. Timeliness start consultation early. Provide social and environmental information along with resources to ensure that the public and regulators are informed when participating in the consultation process. Communications consult closely with communities and interested parties affected by the project and regulatory process. Gather and listen to feedback and work with people to resolve any concerns that might be identified. Relationships establish and maintain long-term relationships with key stakeholders through interaction, working teams and general involvement in the project. Responsiveness adapt plans based on s takeholder input and provide feedback on how input has affected plans and decisions. Accountability trust that representatives of interest groups are accountable to the organizations they represent. Meetings, community newsletters, a regularly updated website (shell.ca) and a toll-free phone line support Shell s communication and consultation efforts.

14 SCOTFORD UPGRADER ECONOMIC BENEFITS Based on previous developments, Shell estimates that roughly 80 per cent of all money spent on goods and services for the upgrader development will be spent in Canada. At the peak of construction each project phase is expected to employ approximately 3,000 to 4,000 construction workers, and add 350 to 450 highly skilled, full-time permanent positions when it becomes operational.

SHELL CANADA UPGRADER 15 CONTACT INFORMATION For further information about Shell s upgrader projects, please contact 1-800-250-4355, or the following: PROJECT DEVELOPMENT Keith Firmin Manager, Regulatory Affairs & Land Shell Canada Limited 400 4th Avenue SW P.O. Box 100, Station M Calgary, Alberta T2P 2H5 COMMUNITY RELATIONS Margit Phillips Senior Community Affairs Representative Shell Canada Limited 400 4th Avenue SW P.O. Box 100, Station M Calgary, Alberta T2P 2H5 keith.firmin@shell.com Telephone: (403) 691-3682 Fax: (403) 691-2423 margit.phillips@shell.com Telephone: (403) 691-2376 Fax: (403) 691-2423 ENVIRONMENT Jennifer Martin-Konzuk EIA Coordinator Shell Canada Limited 400 4th Avenue SW P.O. Box 100, Station M Calgary, Alberta T2P 2H5 j.martin-konzuk@shell.com Telephone: (403) 691-4408 Fax: (403) 691-2423 PUBLIC AFFAIRS & MEDIA Randy Provencal Senior Public Affairs Representative Shell Canada Limited P.O. Bag 23 Fort Saskatchewan, AB T8L 3T2 randy.provencal@shell.com Telephone: (780) 992-3027 Fax: (780) 992-3765 www.shell.ca/scotford

Cert no. XXX-XXX-000 This booklet was printed in Canada by Sundog Printing, a Forest Stewardship Council certified printer (certification#: SW-COC-1715). Sundog Printing s facility emits nearly zero Volatile Organic Compound (VOC) emissions. This booklet was printed using vegetable based inks. This booklet was printed on Mohawk Via Smooth 100 % PC Cool White which contains 100% post-consumer fiber and is manufactured using wind-generated electricity.