1 POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Southern Oil Refining Pty Ltd 42 Lewington St. Bomen. NSW. 2650
2 Table of Contents 1 INTRODUCTION 1.1 Facility details 1.2 Overview of Operations 1.3 Plan Objectives 1.4 Additional Information 2 HAZARD/POLLUTION IDENTIFICATION 2.1 Pollutant Inventory 2.2 Hazard Identification & Assessment 3 INCIDENT RESPONSE PROTOCOLS 3.1 Communication 3.2 On site Incident Management 4 ADMINISTRATION 4.1 Staff Awareness/Training 4.2 Plan Availability 4.3 Testing of Plan 1
3 1 INTRODUCTION 1.1 Facility Details The facility details, as defined in Environmental Protection Licence 11408, are summarised in Table 1 Table 1 Company Environmental Protection Licence (EPL) Number Scheduled Activities Facility Name & Address Southern Oil Refining Pty. Ltd Re-refining of waste oil Southern Oil Refining Pty. Ltd. 42 Lewington Street Bomen, NSW Overview of Operations The premises and facilities associated with EPL are owned and operated by Southern Oil Refining Pty. Ltd. Southern Oil is a wholly Australian owned company which collects and re-refines waste lubricating oils from engines, hydraulics, and gear oils. Southern Oil manufactures several grades of base oil for a wide range of hydraulic and lubrication oilblending applications primarily: SORBO 32 (light base oil), and SORBO 52 (heavy base oil). Southern Oil also manufactures multiple grades of fuel oil for a wide range of applications including agricultural product drying and industrial boilers. Using standard chemical engineering processes, Southern Oil employs a range of separation and extraction processes to manufacture base oil from used oils. The re-refined base oil is then sold to third parties to blend with additives for engine, hydraulic, gear and transmission oils. The production process at this site involves the importation of waste lubricating oils and raw materials, which are then re-refined to produce a finished product. The refined products are stored onsite in bulk tanks before being distributed across the country by third party freight contractors. 2
4 1.3 Plan Objectives This Pollution Incident Response Management Plan (PIRMP), ENV 228, has been developed in accordance with the requirements of the Protection of the Environment Operations (General) Amendment (Pollution Incident Response Management Plans) Regulations Southern Oil Pty Ltd has developed a PIRMP to meet legislative requirements. This abridged version of the PIRMP has been developed to meet the requirements for public availability of the plan. The objectives of the plan and the abridged version of the PIRMP (as in EPA s Environmental guidelines for the preparation of pollution incident response management plans) are to: Ensure timely and comprehensive communication about a pollution incident on site to all staff at the premises, the Environmental Protection Authority (EPA), other authorities and the community who may be affected by the impacts of the incident; Minimise and control the risk of a pollution incident at the facility by identifying any environmental risks that are present and develop action plans to minimize and manage those identified risks. Ensure the plan is implemented by trained employees, identify and train employees responsible for its implementation, and ensure the plan is regularly tested and modified where required to its effectiveness. 1.4 Additional Information Effective Date: 31 st June 2015 Review Date: 1 st July
5 2 HAZARD/POLLUTION IDENTIFICATION 2.1 Pollutant Inventory Southern Oil undertakes the re-refining of waste oils and as such the most likely environmental emergencies encountered are: Water pollution from solvents, oil slurries or other chemicals. Gas leak(s) and/or fire. Air Pollution from process and storage emissions Fire in the production plant. This Plan considers both air and water based pollution incident impacts. Overall well designed and documented environmental management systems are in place to effectively minimise the likelihood and impact of any of these potential pollution incidents. 2.2 Hazard Identification & Assessment The definition of a pollution incident is: pollution incident means an incident or set of circumstances during or as a consequence of which there is a likely to be a leak, spill or other escape or deposit of a substance, as a result of which pollution has occurred, is occurring or is likely to occur. It inc ludes an i n c i d e n t or set of circumstances in which a substance has been placed or disposed of on a premise, but it does not include an incident of circumstances involving the emission of any noise A pollution incident is required to be notified if there is a risk of material harm to the environment, which is defined in section 147 of the Protection of the Environment Operations Act (PEOA) as: a) Harm to the environment is material if: i) It involves actual or potential harm to the health & safety of human beings or to the ecosystems that is not trivial, or ii) It results in actual or loss of property damage of an amount, or amounts in aggregate, exceeding $10,000 (or such amount as is prescribed by the regulations), and b) Loss includes the reasonable costs and expenses that would be incurred in taking all reasonable and practicable measures to prevent, mitigate or make good harm to the environment. 4
6 3 INCIDENT RESPONSE This section provides details on the incident response, including the communication and on site emergency response actions for responding to an incident that has resulted in a material impact to human health or the environment. Incident occurs Assess if potential pollutant i.e.is there a risk of harm to the environment or human health Yes No Report incident and investigate as per emergency response procedure. Notify relevant agencies: Activate Emergency Response Procedures Assess potential for off site impacts to community & environment EPA Fire & Rescue NSW: if warranted call 000 Work Cover Authority: Wagga Wagga City Council: Manage incident as per emergency response procedure If, required notify community as per section Provide regular updates to relevant government agencies and community 5
7 3.1 Communication Internal Communication (i.e. Employee/Contractors/Visitors) All incidents are to be reported immediately to the onsite Duty Controller Government Agencies The key external contacts that are required to be notified are listed below. If a pollution incident occurs where material harm to the environment is caused or threatened the notification protocol set out in the flow diagram is followed. If the incident presents an immediate threat to human health or property call 000. If the incident does not require an immediate attention notify the authorities in the order listed in section below. Table 1 External Agencies External Agencies Fire & Rescue NSW 000 Environment Protection Agency Work Cover Authority Wagga Wagga City Council and/or (02) Local community Community stakeholders that are potentially affected by an incident will be notified immediately by phone call after being instructed by one of the key site contacts. As detailed in the emergency response procedure any incident is communicated to immediate neighbours. Table 2 List of Immediate Neighbours and their Contact Details Business Name Property Address Contact Details NuFarm Ltd. 53 Lewington Street (02) CHEP 52 Lewington Street (02) Fulton Hogan Bitumen 30 Webb Street (02) VetaFarm 50 Webb Street (02) Bomen Produce Co. 52 Webb Street (02) Land Transport Services 45 Lewington Street (02) Rambler Welding 39 Lewington Street (02)
8 Figure 1. Map of Immediate Neighbours of Southern Oil Refinery The communication method may change depending on the nature of the event or as directed by the relevant agency. Regular updates if required will be provided to the affected community throughout the course of event by one of the key contacts. 3.2 On site Incident Management An emergency response procedure is in place for the site. This procedure outlines the actions required to be taken when there is an incident on site which may result in a material impact to human health and/or the environment. This procedure and this plan will be used in conjunction with each other to ensure that the impacts of pollution incidents are minimised as much possible to through early intervention. 7
9 4 ADMINISTRATION This section of the plan provides details on the processes that will be used by employees onsite and offsite to make them aware of the plan requirements and document the process for regular testing of the plan. 4.1 Staff Awareness/Training All new employees will be made aware of the requirements of the plan as part of their induction process. All employees are required to complete refresher training on a biannual basis. In addition to the above induction and training, details of the plan will be provided to the key contacts and members of the emergency response team on site and off site. Training requirements will be identified and records of training will be maintained in the company offices. 4.2 Plan Availability In accordance with Section 153D of the POEO Act, the plan is available to all site employees via the intranet. This plan has also been placed on the internet. A hard copy of the plan will also be available at the site. 4.3 Testing of Plan This plan will be tested once a year to ensure that the information contained within the plan is accurate and up-to-date. 8
POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN
FUCHS LUBRICANTS (AUSTRALASIA) PTY LTD 2 HOLLAND STREET WICKHAM NSW POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN ENVIRONMENTAL PROTECTION LICENCE No.10181 Pubic Version DOC REF:ENV228 ISSUE:1 DATE:21.11.13
POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN
POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Pentarch PTY LTD Answerth Drive Oaklands, NSW Table of Contents 1. Description and Intended Use... 4 1.1. Overview... 4 1.2. Objectives... 4 1.3. Criteria...
Ingredion ANZ Pty Ltd
Ingredion ANZ Pty Ltd 170 Epping Road, Lane Cove, NSW 2066 EPL: 518 Page 1 of 8 1. Purpose and Background POLLUTION INCIDENT RESPONSE The purpose of this Pollution Incident Response Management Plan (PIRMP)
Pollution Incident Response Management Plan (PIRMP) Newcastle Grain Terminal
Pollution Incident Response Management Plan (PIRMP) Newcastle Grain Terminal en-3-00844/v2/3 Jul 14 UNCONTROLLED WHEN PRINTED Page 1 Table of Contents 1.0 Purpose and Background... 3 2.0 Scope... 3 3.0
Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. For [site name] [EPL number]
Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN For [site name] [EPL number] Pollution Incident Response Management Plan for [insert site name] Contents [need to check correct page numbers]
Pollution Incident Response Plan
Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution
Pollution Incident Response Management Plan
Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes
Pollution Incident Response Management Plan (PIRMP)
Pollution Incident Response Management Plan (PIRMP) For NSW Ports For Construction of Berth 103 Stage 2 Extension WATERWAY CONSTRUCTIONS PTY LTD ABN 74 061 311 395 Po Box 290, Annandale NSW 2038 TELEPHONE:
Narellan Field Service Centre. Pollution Incident Response Management Plan. Prepared by Endeavour Energy Safety and Environmental Services.
Narellan Field Service Centre Pollution Incident Response Management Plan Prepared by Endeavour Energy Safety and Environmental Services Version 3 Version Date 1 30 August 2012 2 30 September 2013 3 9
Environmental Incident Response Procedure. Newcastle Gas Storage Facility Document Number: NGSF-PSV-NAS-EN-PLN-0024
Environmental Incident Response Procedure Newcastle Gas Storage Facility Document Number: NGSF-PSV-NAS-EN-PLN-0024 Environmental Incident Response Procedure Document Number: NGSF-PSV-NAS-EN-PLN-0024 Version:
EPA PRIMP Pollution Incident Response Management Plan
EPA PRIMP Pollution Incident Response Management Plan QA Department: QA Documents\EPA\Pollution Incident Response Management Plan Page 1 AMENDMENT REGISTER Version Number Page Numbers Subject Date QA Department:
Pollution Incident Response Management Plan
Pollution Incident Response Management Plan DOCUMENT CONTROL DOCUMENT DETAILS Title Pollution Incident Response Management Plan Reference Document Status ENV 002 12 Pollution Incident Response Management
Jemalong Irrigation Limited. Pollution Incident Response Management Plan
Jemalong Irrigation Limited Pollution Incident Response Management Plan Pollution incidents must be reported immediately A pollution incident can be any of the following: An accident which involves any
Management of Environmental Risks and Emergencies. Compliance Audit Program
Management of Environmental Risks and Emergencies Compliance Audit Program 2012 State of NSW and Environment Protection Authority The State of NSW and the Environment Protection Authority (EPA) are pleased
ANNEX 2 Emergency / Pollution Incident Response Plan
ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...
Protection of the Environment Operations Act 1997
New South Wales Protection of the Environment Operations (General) Amendment (Pollution Incident Response Management Plans) Regulation 2012 under the Protection of the Environment Operations Act 1997 Her
SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA
SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA Regulated Substance Management: All Regulated Substances, including chemical wastes, are to be managed
INCIDENT RESPONSE MANAGEMENT PLAN DECEMBER 2015
INCIDENT RESPONSE MANAGEMENT PLAN DECEMBER 2015 DOCUMENT CONTROL Document Controller: Resilience Coordinator Date of last update: December 2015 Date of next update: December 2016 HPRM reference: HW2007-900/27/9.009
Environmental Incident Classification and Reporting
Environmental Incident Classification and Reporting 9TP-PR-105/13.0 Procedure Applicable to Transport Projects Quality Management System Status: Approved Version: 13.0 Branch: Business unit: Planning and
Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702
Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 November 2011 TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 RESPONSIBILITY
Chemical Storage and Spill Response Guidelines
Chemical Storage and Spill Response Guidelines 9TP-SD-066/3.0 Supporting Document Applicable to Transport Projects Delivery Office Quality Management System Status: Approved Version: 3.0 Branch: Business
R8000 NEW AIR COMBAT CAPABILITY (NACC) FACILITIES PROJECT, RAAF BASE WILLIAMTOWN
LEND LEASE BUILDING PTY LIMITED ABN 97 000 098 162 R8000 NEW AIR COMBAT CAPABILITY (NACC) FACILITIES PROJECT, RAAF BASE WILLIAMTOWN HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN 3/12/2015 Revision
Environmental Health & Safety
Environmental Health & Safety Title: Oil Spill Notification, Reporting, and Response Effective Date: 04/01/2008 Document #: PBS-007-001.JPB Revision Date: Rev. 0 I. Purpose of the Policy: To ensure Oil
Pollution Incident Response Plan (PIRP)
1.0 Purpose... 2 2.0 Scope... 2 3.0 Responsibilities... 2 4.0 Definitions... 3 5.0 Procedure... 4 6.0 Records... 15 7.0 References... 16 8.0 Revision History... 16 9.0 Review and Approval... 16 10.0 Compliance
Environmental Management Plan
Environmental Management Plan This environmental management plan outlines Red Bus Services objectives and strategies for protecting the environment. This plan sets out how Red Bus Services intends to comply
Appendix A1. Register of legal and other requirements
Appendix A1 Register of legal and other requirements 1 Table 1 Legal register Act Activity / General Environmental Planning and Assessment Act 1979 All Comply with the terms Minister for Planning and Infrastructure
Identifying Environmental Aspects
Identifying Environmental Aspects How an organization interfaces with the environment Environmental Aspect: Element of an organization s activities, products, or services that can interact with the environment.
Bulga Complex Pollution Incident Response Management Plan
for Bulga Complex Pollution Incident Response Management Document Table of Contents 1 Heading 1... Error! Bookmark not defined.3 1.1 Heading 2... 6 1.1.1 Heading 3... Error! Bookmark not defined.3 1.1.1.1
Hazard/Incident Recording, Reporting and Investigation
Hazard/Incident Recording, Reporting and Investigation Power and Water Corporation Procedure 1 Purpose... 1 2 Scope... 1 3 References... 2 4 Roles and Responsibilities... 2 5 Definitions... 6 6 Records...
APPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description
Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed
A Guide to the SPILL CONTINGENCY PLANNING AND REPORTING REGULATIONS
A Guide to the SPILL CONTINGENCY PLANNING AND REPORTING REGULATIONS Environment and Natural Resources Updated March 2011 INTRODUCTION This guide has been developed to assist individuals or companies in
Contractor Environment, Health and Safety Management Plan
EHSMS10 Contractor and Supplier EHS Management Contractor Environment, Health and Safety Management Plan Purpose Guidelines Record Keeping This template provides an example to Santos Contractors of the
Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public
Appendix J3 - Outline Fuel Spill Contingency Response Plan Control room receives call on fuel spill from staff or public Initial Actions to be taken after Fuel Spill reported Identification of the source
WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES
WHS UNIT WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES Contents 1 Purpose... 1 2 Scope... 1 3 Definitions... 1 4 Responsibilities... 1 4.1 WHS Unit... 1 4.2 Auditor(s)... 1 4.3 Managers of Faculties
ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas
ACTIVITY NAME Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas CY 2014 BOTTOM LINE UP FRONT To prevent oil discharges
PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan
PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client
PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG 21. 1. Introduction
PPG21 February 2004 Environmental Alliance working together Pollution Prevention Guidelines pollution incident response planning: PPG 21 These guidance notes have been drawn up to assist those developing
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES February 2014 The plan contained in the following pages was developed in part from UDOT Construction Division s Safety and Health Manual,
A Guide to developing BROTHEL OPERATIONAL PLANS POLICIES AND PROCEDURES
A Guide to developing BROTHEL OPERATIONAL PLANS POLICIES AND PROCEDURES Scope and Purpose of this Guide The purpose of this guide is to provide licensees with the key that may be addressed when developing
Sustainable Resource Management Ltd
6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects
SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC)
SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC) UNIVERSITY RISK MANAGEMENT Occupational and Health Programs 19 Hagood Avenue, Suite 908 Charleston SC 29425 843-792-3604 Revised: June 2015 Spill
Dangerous Goods Safety Guidance Note. Dangerous goods emergency plans for small businesses
Dangerous Goods Safety Guidance Note Dangerous goods emergency plans for small businesses January 2014 Level 1, 303 Sevenoaks Street (cnr Grose Ave), Cannington WA 6107 Postal address: Mineral House, 100
Compliance Audit Handbook
Compliance Audit Handbook This Compliance Audit Handbook has been produced by the Compliance and Assurance Section of the Department of Environment and Conservation NSW (DEC). For technical information
APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O
APPENDIX O Spill Prevention and Emergency Response Plan APPENDIX O G3 Terminal Vancouver Port Metro Vancouver Project Permit Application G3 TERMINAL VANCOUVER: PORT METRO VANCOUVER SPILL PREVENTION AND
Environmental Compliance Report Liquid Chemical Storage, Handling and Spill Management
Environmental Compliance Report Liquid Chemical Storage, Handling and Spill Management Part B Review of Best Practice and Regulation The Liquid Chemical Storage, Handling and Spill Management Environmental
Social Guidelines: Leasing Machinery and Equipment
PROCESS DESCRIPTION Environmental product standards Companies in this sector may be leasing a wide range of machinery and equipment. Some of the more commonly leased items include: industrial equipment
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
APPENDIX 2A. Shah Deniz Production Sharing Agreement Extract
APPENDIX 2A Shah Deniz Production Sharing Agreement Extract Shah Deniz Production Sharing Agreement Extract ARTICLE 26 - Environmental Protection and Safety 26.1 Environmental Standards Contractor shall
Waste Management Policy
University of Sussex Waste Management Policy May 2007 1 University of Sussex Waste Management Policy Contents 1. Introduction 2. Policy Statement 3. Policy Objectives 4. Application 5. Organisation and
Guideline for preparing an Environmental and Social Management Plan
Guideline for preparing an Environmental and Social Management Plan NZ Transport Agency www.nzta.govt.nz Version 1: April 2014 ISBN 978-0-478-41934-4 (online) Copyright information This publication is
Pollution Incident Response Management Plan
TES-AMM Australia Pty Limited 07-May-05 Pollution Incident Response Management Plan TES-AMM Australia Pty Limited, Marple Avenue, Villawood, NSW 63 AECOM Pollution Incident Response Management Plan Pollution
ENVIRONMENTAL MANAGEMENT PLAN 2013 2018
ENVIRONMENTAL MANAGEMENT PLAN 2013 2018 INTRODUCTION SYDNEY METROPOLITAN BUS SERVICE CONTRACT (SMBSC) 1 Busways has been awarded the contract to provide bus services in the Sydney Metropolitan Bus Service
Illegally Dumped Asbestos Clean Up Program Guidelines
Illegally Dumped Asbestos Clean Up Program Guidelines October 2013 Contents Introduction... 1 Assessment criteria... 2 Eligibility... 3 Application process... 5 Further information... 8 Glossary... 10
HAZARDOUS MATERIALS MANAGEMENT ISSUE 2
CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASON FOR INCLUSION 2 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM AND PROCEDURAL REQUIREMENTS 5 8 PEOPLE REQUIREMENTS 7 APPENDIX
The Control of Major Accident Hazards Regulations (Northern Ireland) 2015
STATUTORY RULES OF NORTHERN IRELAND 2015 No. 325 HEALTH AND SAFETY The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 Made - - - - 26th August 2015 Coming into operation - 28th September
Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa
Environmental Law Enforcement in Zimbabwe By Farai Michael Nyahwa Presentation Breakdown Institutional Arrangement for Environmental Law Enforcement in Zimbabwe Major Environmental Issues of Concern In
TITLE 29: EMERGENCY SERVICES, DISASTERS, AND CIVIL DEFENSE CHAPTER I: EMERGENCY MANAGEMENT AGENCY SUBCHAPTER d: STATE EMERGENCY RESPONSE
TITLE 29: EMERGENCY SERVICES, DISASTERS, AND CIVIL DEFENSE CHAPTER I: EMERGENCY MANAGEMENT AGENCY SUBCHAPTER d: STATE EMERGENCY RESPONSE PART 430 EMERGENCY AND WRITTEN NOTIFICATION OF AN INCIDENT OR ACCIDENT
EMERGENCY ACTION AND FIRE PREVENTION PLAN
Sample Written Safety Program For EMERGENCY ACTION AND FIRE PREVENTION PLAN Page 1 EMERGENCY ACTION AND FIRE PREVENTION PLAN (YOUR COMPANY NAME) EMPLOYEE EMERGENCY AND FIRE PREVENTION PLANS Emergencies
Wide Bay Respite Services Supporting the caring role of families. Service Management Policy
Service Management Policy Organisation Structure Flowchart Legislation / Industry Standards Department of Communities, Child Safety & Disability Services (Funding Body) Board of Management Other Agencies
WORKING IN CONFINED SPACES GUIDELINES
WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...
Work Health and Safety. Seven Steps for Small Business
Work Health and Safety Seven Steps for Small Business Work health and safety (WHS) is a key management responsibility for every small business. South Australia s WHS laws took effect on 1 January 2013.
2.0 Land Quality Programme
2.0 Land Quality Programme The Sellafield site has a legacy of ground contamination from its historical use as a Royal Ordnance factory and its subsequent development as a nuclear facility. The ground
Proposed (Concrete Cutting And Drilling) Environmental Management Plan
SAMPLE ENVIRONMENTAL MANAGEMENT PLAN This EMP is designed for (Concrete Cutting and drilling), however you may insert your business activities with only minor changes needed. This EMP should become part
The Comprehensive Environmental Response,
Purpose and Applicability of Regulations Chapter 7 The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980 to clean up the nation s hazardous
Incident Reporting Requirements
Incident Reporting Requirements Directive PNG014 February 2016 Revision 1.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation
SAFETY MANAGEMENT SYSTEM FOR MAJOR HAZARD FACILITIES - BOOKLET 3: Part 7.17
EMERGENCY PLANNING EXTRACTION FROM: SAFETY MANAGEMENT SYSTEM FOR MAJOR HAZARD FACILITIES - BOOKLET 3: Part 7.17 An extraction from: Safety Management System for Major Hazard page 1 of 14 7.17 Emergency
MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN
MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN SCOPE: This guidance sets out best practice for producing a Pollution Incident Response Plan to deal with an environmental incident
HP SUPPLIER ENVIRONMENTAL PERFORMANCE REVIEW QUESTIONNAIRE
Document Number: HP 5951-1746-1 (CIQC STD 0014) Page 1 of 6 I. INTRODUCTION As supply chain management becomes more complex in today's procurement processes, supplier environmental management has become
History of the SPCC Rule
2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally
Slide 1. Enviros Consulting Ltd
Slide 1 Regulation of Waste Management Activities Past, Present and Future! Steve Bell Technical Manager Waste Management Thursday, 26 July 2007 Presentation Aims An insight of where we have come from
Queensland Parks and Wildlife Service PEST MANAGEMENT PLAN
QPWS Pest Management Plan Queensland Parks and Wildlife Service PEST MANAGEMENT PLAN 2010-2015 A plan to meet obligations under the Land Protection (Pest and Stock Route Management) Act (2002) Version:
Business Continuity Policy and Business Continuity Management System
Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain
The Comprehensive Environmental Response,
Purpose and Applicability of Regulations The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980 to clean up the nation s hazardous waste sites
IMPLEMENTING ISO 14001:2004. www.aecos.co.uk
IMPLEMENTING ISO 14001:2004 www.aecos.co.uk What is an Environmental Management System? A systematic framework to manage the immediate and long term environmental impacts of an organisation s products,
WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE
SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.
Environmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
FIRE PREVENTION PLAN
FIRE PREVENTION PLAN 1 FIRE PREVENTION PLAN OSHA s Fire Prevention Plan regulation, found at 29 CFR 1910.38(b) and 29 CFR 1926.24, requires Northern Clearing, Inc. to have a written fire prevention plan
Contents. Introduction 1. Element-1 Safety policy & organisation 2. Element-2 Safe work procedures 3. Element-3 Safety training 4
GUIDELINES ON THE IMPLEMENTATION OF SAFETY MANAGEMENT SYSTEM FOR THE METALWORKING INDUSTRY Jointly developed by: Metalworking Industry Safety Promotion Committee Occupational Safety Department and Occupational
June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS)
June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS) TABLE OF CONTENTS PAGE PART I INTRODUCTION Corporate Health, Safety and Environment Policy.. 1 Purpose... 2 HSEMS Framework... 3 PART
SCDHSC0032 Promote health, safety and security in the work setting
Promote health, safety and security in the work setting Overview This standard identifies the requirements when you promote the health, safety and security of yourself and others for whom you are responsible
SILICON VALLEY CLEAN WATER. May 2015
SILICON VALLEY CLEAN WATER May 2015 Slug Discharge Control and Spill Containment Guidelines This document was revised and used with the permission of the Los Angeles County Sanitation District, Industrial
The Pipelines Regulations, 2000
PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not
4.05e WHS Guidelines for Incident Investigation Procedures Page 1 of 7
Page 1 of 7 1 Purpose It is a legal requirement under the NSW Work Health and Safety Act 2011 and NSW Work Health and Safety Regulation 2011 to identify hazards, assess the risk of those hazards, implement
An inventory of hazardous materials used in your workplace will prove useful.
Introduction Fire Protection is an organized approach designed to prevent fires. In the event of a fire, a fire protection program will help prevent or minimize personal injuries, losses, and harm to the
Presentation Outline. Introduction Ontario s Spill Legislation Spills Action Centre Ministry Field Response Roles and responsibilities
Spill Response in Ontario Ministry of the Environment June 20, 2012 Presentation Outline Introduction Ontario s Spill Legislation Spills Action Centre Ministry Field Response Roles and responsibilities
AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES
AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES Question1 Read the following article from the Fremont Gazette and answer the questions that follow. (a) Identify and describe TWO water-related environmental
OHS Contractor Management Procedure
The Wudinna District Council will through this procedure seek to ensure that Contractors they engage have an adequate understanding and a commitment to Occupational Health, Safety and Welfare as well as