Everybody is talking about it
Originally founded as Tokmo, EcoDomus is the leading provider of COBie certified software for the construction and facilities industries A facility service provider who use innovative software solutions to increase facility functionality while decreasing operational expenditures Headquarters in San Francisco, with regional offices in greater Washington DC, Dallas, Chicago and New York Focus on BIM and Lean for Building Lifecycle Management
You want to utilize the power of Building Information Models (BIM) to improve Energy Efficiency and Facility Management.
How BIM can be used for facilities management for new and existing buildings How BIM can help monitor energy consumption How BIM can drive a better work order management How BIM can help with disaster recovery and aid first responders How BIM can help control/monitor facility assets
BIM Revit, Point Cloud, AutoCAD or other Model STEP 1 - Develop a Plan for BIM for FM STEP You 4 Integrate Can Do model It Today! with other STEP facility 2 Implement systems the and plan GIS by collecting data during design & construction Fully Integrated BIM STEP 3 Port verified data into CMMS application with all Facility Systems Geographical Information System Computerized Maintenance Management System Building Automation System Life Safety System Lifecycle Building Support Provider Energy Management System
The ultimate power of integration will be in giving all members of facility team access to the data. Work order time will decrease as research time is minimized. Preventive and proactive maintenance can not just be developed but can be implemented Time wasted looking for components can be virtually eliminated
Visual Work Orders
Facility Condition Assessment
Emergency Service Request
Emergency Service Request
Space Usage
Visual Inventorying
Model Creation Links 2D and/or 3D objects with FM system data creating an intelligent model
Assets Tagging Using existing identifiers such as RFID tagging and bar coding to aid in the identification fixed and movable assets so that they can be easily located within the facility
Assets Inspections Quickly identify the items required to be inspected in the model on Tablet PC while being in the facility, use extensive data to analyze its performance and compliance factors, update information, later sync new information to FM application to generate compliance report or create work orders.
The Old Way At the financial completion of a project, the construction manager typically delivers a truck-full of boxes (or CD's containing e- paper) to the facility manager. It is assumed that this information can assist the facility manager to maintain, operate, and track assets within the building. More often than not this information is delivered months or years after the building has been occupied and is ultimately placed in a storage room where it is never used.
COBie is methodology for collecting project data once it becomes available and storing it in a common dataset. Provides for open standard delivery of building information to owner. For use in Planning, Design, Construction, and the Operation phases. It is required by: Department of Veterans Affairs NASA Department of State Texas A&M University Indiana University GSA US Army Corps of Engineers University of Southern California, and others US Army Corps of Engineers, Engineering Research and Development Center (c) 2009 EcoDomus was the First Construction Software Company to be COBie certified
1) The Myth COBie is only a spread sheet. We can do it all in Excel. The Reality COBie is a specific set of rules for collecting accurate facility data, which can be represented on a spreadsheet. The data is often too large to implement in real world scenarios, using Excel alone. 2) The Myth Including the words We require COBie within a construction contract, will be enough to get a good COBie formatted dataset. The Reality Ambiguous and often undefined contractual requirements, cause confusion, they are almost never met. Therefore, each project, requires an implementation plan based on defined and detailed owners requirements. 3) The Myth COBie can be exported from BIM authoring software (i.e. Revit) The Reality A significant part of COBie data should be exported from BIM, but much more information is added by other means (documents, field verified parameters, etc.) and carefully updated by various project team members
Virtual Facility Management Learn how to run the facility before you move in: Virtual Facility Management (like Virtual Design & Construction ) Preventive Maintenance jobs created as information about equipment is specified / installed Facility managers are trained to use equipment before they see it Enough time to purchase service parts, materials and tools Enough time to realize wrong equipment is installed Serial Number Manufacturer Other fields: Replacement Cost, Installation Date, Vendor, etc.
GSA's Southeast Sunbelt Region, located in Atlanta, GA, provides value-added products and services to federal agency clients located in Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina and Tennessee. 147 buildings under management Goal of the project: deploy O&M web portal incorporating BIM, connecting to CMMS (IBM Maximo), integrating with esmart (GSA custom app), using Google Maps as GIS, and importing data from BAS (Schneider Electric)
Turnover documents are not tied to the Maximo records. There are no photos (behind-the-wall or below-the-floor) tied to the locations (spaces) in Maximo. The as-built model (BIM) is not linked to Maximo. When either the BIM or Maximo record changes, the other data sources do not reflect the change. As a result, the as-built documents become outdated. The BIM becomes unreliable, so additional verification will be required each time. During the construction process, the model is not updated and accurate info is not available until the end of the project. This delays access to the data for FM, and causes duplicate efforts in construction.
Set up project requirements for data and documentation in the contract. Continuously collect and check quality of entered data and documents throughout the project, in EcoDomus PM (D/B) and FM (GSA). Barcoding (optional). Test-run data exchange between EcoDomus FM and Maximo. Allow for continued use of Form 491, enhanced by EcoDomus. Final acceptance of data handover in Maximo and EcoDomus FM. BIM is linked to Maximo via EcoDomus FM.
Update Implementation Plan based on lessons learned
Exporting and Importing Data (~1% of overall process)
After exporting BIM data from Revit into the EcoDomus desktop database its synced to the web
Assets are marked to be pushed downstream to Maximo. Spaces are exported alongside the assets.
The way to get started is to quit talking and begin doing. Walt Disney Don t wait, the time will never be just right Napoleon Hill Knowing is not enough; we must apply. Willing is not enough; we must do. Johann von Goethe Neil Parker, BSCE Director Of Business Development 847-269-4522 nparker@ecodomus.com