EVMS Training Snippet Library: FFP Subcontracting and Prime EVM



Similar documents
This EVMS Training Snippet sponsored by the Office of Acquisition and Project Management (OAPM) covers Firm Fixed Price (or FFP type) subcontracts.

Basic Concepts of Earned Value Management (EVM)

Appendix D Glossary Of Terms

THE APPLICATION OF PERFORMANCE MEASUREMENT TECHNIQUE IN PROJECT MANAGEMENT : THE EARNED VALUE MANAGEMENT (EVM) APPROACH

DATA ITEM DESCRIPTION Title: Integrated Program Management Report (IPMR) Number: DI-MGMT Approval Date:

Accounting System. Page 1 of 9

Contract Cash Flow & Performance Analysis. PERCEPTION Helping The Shipyard Stay On Budget

An introduction to Earned Value Analysis

Earned Value Management Systems Application Guide

FRA s Earned Value Management System Overview for Self Assessment Surveillance March 07-09, 2011

Earned Value Management (EVM) is a technique that is used to track the progress and status of a project and forecast its likely future performance.

AACE International Recommended Practice No. 86R 14

FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT. Head, Office of Project Management Oversight

Estimating Cost at Completion - Judgment & EV Information

A Gentle Introduction to Earned Value Management Systems

Earned Value Management Tutorial Module 8: Reporting. Prepared by:

Earned Value Management System (EVMS) and. Project Analysis Standard Operating Procedure (EPASOP)

Earned Value Management Best Practices

L10: Budgeting and Cost Control. Olivier de Weck

Earned Value Management Systems Application Guide

Government Contracting and Earned Value Management (EVM)

Over Target Baseline and Over Target Schedule Guide

FOREWORD. Page 2 of 88

Earned Value Management System Description

PEP TALK. Policy EVMS - PARS. Department of Energy Acquisition and Project Management Workshop Federal Stewardship Providing the Value Proposition

IS EARNED VALUE + AGILE A MATCH MADE IN HEAVEN?

Project Management Using Earned Value

July 6, (1) CHAPTER 11

Earned Value Formulae

Brainstorm. What is Cost and Project Cost Management?

INSE 6230 Total Quality Project Management

700 Analysis and Reporting

SUCCESSFULLY INTEGRATING AGILE WITH EARNED VALUE MANAGEMENT

Earned Value Management Changes to the Glossary and Chapter 7 of the PMBOK Guide Third Edition.

Project Management System Description (PMSD)

Earned Value Management and the Government Program Office. Blair Alan Knapp Jr. MSPM PMP

technical tips and tricks

Essential Views of the Integrated Program Management Reports. Thomas J. Coonce Glen B. Alleman

EARNED VALUE MANAGEMENT. CASE STUDY USING MICROSOFT PROJECT

CPM -100: Principles of Project Management

EARNED VALUE MANAGEMENT SYSTEM AS A PROJECT MANAGEMENT TOOL FOR MAJOR MULTI-DISCIPLINARY PROJECTS

1200 Project Control System Procedures

EARNED VALUE MANAGEMENT SYSTEMS (EVMS)

IST 302 : Project Cost Management

Project Cost Management

INTERNAL CONTROL MATRIX FOR AUDIT OF BILLING SYSTEM CONTROLS Version No. 4.2 August 2006

PERCEPTION. Tracking Progress & EAC

technical tips and tricks

IT Baseline Management Policy. Table of Contents

Baseline Change Control Procedure

DCMA DCMA-EA PAM October 2012

COINS EVA Earned Value Analysis

Cost Accounting Standards: An M&O s Problematic Five

Introduction to earn value management in Civil Engineering

APPROVED FOR PUBLIC RELEASE DISTRIBUTION UNLIMITED: 16-S-1407, March 3, 2016.

Brief Introduction to Earned Value Management (EVM)

Financial Management and Program Management: Integration and Intersections

Tracking Software Development Progress with Earned Value and Use Case Point

NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Support Services REVISION: 4 APPROVED BY: TITLE SUBJECT: Head, Office of Project Support Services

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and Documentation - Technical Baseline Development and Control Examples

Patricia Mast (LCLS Project Controls Manager) Mark Reichanadter (LCLS Deputy Project Director) Signature Date

Basics of Cost and Schedule Control

Earned Value Management and Professional Services Automation

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June d Page 1 of 7

Head, Office of Project Management Oversight

Earned Value. Valerie Colber, MBA, PMP, SCPM. Not for duplication nor distribution 1

Continuous Cost-Risk Management & EVM Links to Risk Management for NASA Projects

The Changing Government Contractor Environment

Integrating Program Management with. and Critical Thinking

Accounting System Requirements

Improving EVM and Project Management Integration in the Dept. of Energy

A Guide to Managing Programs Using Predictive Measures

Using Earned Value Management for Improving Processes. By Cynthia K. West

Earned Value and Agile Reporting

Project Management: Tracking Progress and Earned Value with MS Project 2003

EVM.01. Earned Value Analysis Why it Doesn't Work

Project Control System Manual. Jefferson Science Associates, LLC. 600 Progress Status. Project Control System Manual Revision

Applied Project Management ( APM )

Earned Value Management Tutorial Module 6: Metrics, Performance Measurements and Forecasting. Prepared by:

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu

DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA

How To Manage A Project

Case Study. An example of a new government contract award to a private sector company required to demonstrate ANSI-748 Compliance

Earned Value Management Guidelines

INVOICE/FINANCING REQUEST AND CONTRACT FINANCIAL REPORTING INSTRUCTIONS FOR NIH COST-REIMBURSEMENT CONTRACTS, NIH(RC)-4

Lecture Slides for Managing and Leading Software Projects. Chapter 8: Measuring and Controlling Work Processes

plans based on actual cost, schedule and technical progress of work [1, 9].

Selftestengine..PMI-SP.270 questions PMI-SP. PMI Scheduling Professional

Chapter 7: Project Cost Management. Munawar

Chapter 7. (PMBOK Guide)

Types of Contracts. A quick walk through FAR Part 16

300 Scheduling and Budgeting

Project Cost Management through Earned Value Performance Management - EVPM

Post Award Accounting System Audit at Nonmajor Contractors

Integration of Income Management and Cost Management: A Complementary for Financial Analysis of Projects. Abstract. Introduction

Indirect Cost Rates The hidden contract cost driver? Professor Greg Martin Defense Acquisition University gregory.

IQPC IT Project Management Conference Sydney Recent Advances in Project Prediction Techniques

Transcription:

EVMS Training Snippet Library: FFP Subcontracting and Prime EVM Office of Acquisition and Project Management (OAPM) MA-60 U. S. Department of Energy July 2014 Achieving Management and Operational Excellence

FFP Subcontractor Effort in the Prime s EVMS and Data Page 2 Is the FFP work integrated into Prime s EVMS Schedules PMB Invoices / Payments Does the CPR / IPMR include FFP payments without booking lag FFP subcontractor schedule variance

Organizing Subcontracted Effort Page 3 Work Breakdown Structure Prime/subcontractor WBS integration Organization breakdown structure Authorizing identified work

Firm Fixed Price Planning Page 4 With progress payments Expenditure/Billing plan, if realistic for accomplishment Milestones identified in contractual schedules Without progress payments Dollarized milestones tied to deliveries

Prime Subcontract WBS Integration Page 5 Subcontract effort in single WBS element Subcontract

Subcontract Control Account Establishment Page 6 Subcontract as single Control Account or one of several work packages within a Control Account ------------------------------------------------------------- Subcontract C Subcontract A Subcontract B Control Account Level

Subcontract as One of Several WPs Within a Control Account Variance Analysis may be cumbersome depending on data accumulation subsystem Internal performance measurement system must be capable of accumulating actual costs at work package level or lower Page 7

Prime Contract/Subcontract Integration Subcontract effort allocated to multiple WBS elements (Least desirable) Page 8 Subcontract

Subcontractor s Schedule Page 9 Should be in a format that allows ready integration into prime's internal scheduling system For example WBS => WBS Should be directly relatable to Prime's Control Account structure

Baseline Establishment Phases for the Subcontract Initial baseline establishment prior to negotiations Definitized baseline establishment after subcontract negotiations Page 10 11

Post Negotiations Adjustments Page 11 If negotiated subcontractor firm fixed price is more than Prime s subcontract control account BAC Management Reserve Only if the subcontract has NOT incurred actual charges against the negotiated effort Applies only to original negotiation differences; MR will not be used for future scope changes Factoring

Factoring Page 12 Prime s BAC Subcontractor s BAC $190M = =.95 $200M Factor is applied to Budget and Earned Value Actuals and EAC are not factored The factoring may be determined at the total contract level or it may be done for specific WBS/ CLINS/ Control Accounts, as appropriate

Factoring Objectives Page 13 To ensure subcontract factored BCWS equals prime contractor s available budget To ensure prime contractor s factored BCWP is consistent with the subcontract factored BCWS To ensure prime contractor percent complete equals subcontractor percent complete

Factoring Objectives Page 14 $ 100% Complete? No! Subcontractor BCWS/BCWP Subcontractor BAC Prime Contractor BAC Prime Contractor BCWS/BCWP Time NOTE: Actuals AND EAC are not factored.

CAM Responsibilities Page 15 Review subcontractor s schedules, reports and milestone payments Attend subcontractor project status reviews

Determining Earned Value for Firm Fixed Price Subcontracts Page 16 Earned Value Techniques Interim Milestones 50/50 0/100 ACWP = BCWP and must be accrued together by the subcontractor

FFP Subcontracts and Actual Cost of Work Performed Page 17 With Progress Payments Billing Plan Expenditure Plan Control Account Without Progress Payments Delivery Schedule Schedule $ $ $ $ $ Control Account $ $ $ $ $ $

Potential FFP Contract Changes and the Prime s EVM System Subcontract changes or approved Requests for Equitable Adjustment (REA) Page 18 Prime requests effort done differently Prime requests new scope Prime updates control account WADs and CAPs Prime provides budget for new scope or scope changes to the subcontractor either via MR if available and if an internal change UB if scope change was the result of a contract modification to the prime

Subcontractor EAC Special Topic Page 19 Although FFP Schedule Performance and REAs can cause significant concern The prime contractor s CAM must status the schedule consistent with the work completed The prime contractor must have a method of updating the prime EAC for the subcontractor

Summary Page 20 Prime s EVM System must have FFP subcontract schedule, budget, performance, and ACWP integration Prime s CPR/IPMR includes FFP subcontract EV data and applicable SV analysis FFP changes are incorporated in Prime s Change Control subsystem

DOE OAPM EVM Home Page Page 21 http://energy.gov/management/office-management/operational-management/project-management/earned-value-management