Ayeyarwady Integrated River Basin Management Project



Similar documents
United Nations Core Values: Integrity, Professionalism, Respect for Diversity

CONTENTS. 1. Introduction: Rationale of the Project within the context of this Forum. 2. Integrated Planning of Waterborne Transport in Cambodia

Nile Basin Initiative (NBI) Water Resources Management. Ephrem Getahun October 21, 2013 Tunis

International Training Program 2010 Management of Flood Control and Disaster Mitigation LOGO

Livelihoods and Food Security Trust Fund (LIFT) Skills and Vocational Training in Rakhine State

Flood Incident Management - the next ten years

First Technical Working Group Meeting and Training Workshop on Integrated River Basin Management in Key River Basins in Lao PDR

Building Drought Resilience through Land and Water Management

Inland Waterway Infrastructure - Mekong River cruise promoting factor. Tokyo September 2010

USING PROBABILISTIC FORECASTS TO IMPROVE PLANNING AND OPERATIONS FOR WATER RESOURCES SYSTEMS

Lead Provider Framework Draft Scope. NHS England / 13/12/13 Gateway Ref: 00897

Xayaburi Dam: Timeline of Events (Last updated: July 2013)

Strategic Directions for Integrated Water Resources Management in the Lower Mekong Basin

Sediment and Dredged Material Management - Relevance and Objectives 18 September 2003

Problems and opportunities of integrated basin management in mountains

Africa Adaptation Programme

Address and Reduce Flood Risk in Karlstad. Klas Jansson, Director of Planning, Karlstad Municipality, Sweden

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation

SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE. 1. Sector Performance, Problems, and Opportunities

Analysis One Code Desc. Transaction Amount. Fiscal Period

PPC s Involvement in the Application of the WFD

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

Challenges for Capital Market Development in Asia

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

SUSTAINABLE DEVELOPMENT FOR INDONESIA: NATIONAL CAPITAL INTEGRATED COASTAL DEVELOPMENT

UN VOLUNTEER DESCRIPTION OF ASSIGNMENT

FINAL PROJECT REPORT. "Emergency Preparedness and Response Disaster Risk Management" Content. 1. General Project Information

ROYAL REHAB COLLEGE AND THE ENTOURAGE EDUCATION GROUP. UPDATED SCHEDULE OF VET UNITS OF STUDY AND VET TUITION FEES Course Aug 1/2015

ASPM Calendar Africa School of Project Management (ASPM) Calendar Nairobi Kenya.

Ministry of Foreign Affairs, Republic of Korea Yun Kang-Hyeon

HYDROMETEOROLOGICAL AND MONITORING SERVICE

Training Materials for Scaling-up Climate Change Adaptation and Modified Procedures

The Adaptation Fund (AF) NGO Network: Mapping and Evaluating the AF's funded Projects

INDONESIA - LAW ON WATER RESOURCES,

OUTLINE TERMS OF REFERENCE FOR CONSULTING SERVICES

ANNEX 7. Odra-Vistula Flood Management Project List of priority investments as of January 2015

INSTALLATION OF AN AUTOMATED EARLY WARNING SYSTEM FOR ANNOTTO BAY

Delta development. Teunis Louters Delta Development, the Netherlands

National Policy on Water Resources Restoration in Thailand

REQUEST FOR QUALIFICATIONS for SURREY PRETRIAL SERVICES CENTRE EXPANSION PROJECT RFQ #3225 VOLUME 1 PROJECT BRIEF

Towards a pan-african Flood Early Warning System: Experiences from the European Flood Alert System (EFAS) and pilot-testing in Africa

Myanmar Integrated Water Resources Management Strategic Study

Climate Change Activities in Mauritius

Summary of the Government s Relief and Recovery Plan and Package (as of 25 October 2011)

FRESHWATER COUNTRY PROFILE SERBIA-MONTENEGRO

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPREHENSIVE DEVELOPMENT OF THE BRANTAS RIVER BASIN THE REPUBLIC OF INDONESIA

Share. Tweet. Applications to vacancies must be received before midnight Copenhagen time (CET) on the closing date of the announcement.

Brief on Climate Change Finance

WMO Activities on Water and Climate Change

Regional cooperation in the IGAD sub-region: of transboundary water resources

Elbe flood in 2002 and 2006 in terms of emergency management

Water Environmental Management in Cambodia

Preliminary advances in Climate Risk Management in China Meteorological Administration

How To Write The Who Disability And Rehabilitation Guidelines

JOINT MDB CLIMATE FINANCE TRACKING

CONSTRUCTION GENERAL PERMIT RISK ASSESSMENT R-FACTOR CALCULATION NOTIFICATION

BEST PRACTICE GUIDELINES FOR FLOOD RISK ASSESSMENT IN THE LOWER MEKONG RIVER BASIN

Implementation Plan: Development of an asset and financial planning management. Australian Capital Territory

River Basin Management in Croatia

4 th WORLD WATER FORUM. Risk Management in the Iullemeden Aquifer System. 4th World Water Forum, Mexico 2006

Third Session: Small Island Developing States: Transport and Trade Logistics Challenges

Presentation by Michael Wade. Crown Representative for Insurance at the Cabinet Office of the UK Government. National Flood Conference Washington DC

Overview of food security projects funded by EKN Addis Ababa in 2016

Master Plan on Water Resource Management

Addressing Declining Elevations in Lake Mead

Matrix of Strategic Plan of Action on Food Security in the ASEAN Region (SPA-FS)

The World Bank DRC - Agriculture Rehabilitation and Recovery Support (P092724)

Associated Programme on Flood Management: IFM HelpDesk, activities and outcomes

Directive 2007/60/EC. Transposition and implementation in the Netherlands. Ms. Ellen Koopmans, LLM, ML

LOCAL GOVERNMENT NEW ZEALAND TECHNICAL ASSISTANCE FACILITY

DISASTER RISK MANAGEMENT IN CAMBODIA

Mr. Chairman, Mr. President, distinguished Governors, ladies and gentlemen,

2015 Ohio MemberSource Newsletter Targeted Production Schedule (Laura Huff/Courtney Stewart)

How To Write A New Bill On Flood Management In Scotland

How To Manage A Flood In Mozambique

Public Disclosure Copy

A flexible structure and global reach means that we can quickly respond to our partners' needs, while offering the benefits of economies of scale.

Term Sheet for Lease in Cambridge, Massachusetts

Myanmar Integrated Water Resources Management Strategic Study

Singapore: Our Unique Circumstances

Building Capacity to Make Transport Work for Women and Men in Vietnam

The Pantanal ---- People, Places, Priorities. Can integrated water management serve society and ecosystems?

Action Plans of Water Management and Infrastructure Development

Brazil s Port Sector. Brazil Port s Sector. Fernando Antonio Brito Fialho National Agency for Waterway Transportation Director-General

May 14, 2015 Our Ref: 99816

The National Development Plan 2030: Implications for Project Managers. 16 September 2013 Dr. Bridgette Gasa

Dar es Salaam Masterplan Ministry of Lands, Housing and Human Settlements Development

Operating Performance For Annual Results Briefing

Joint UN Statement 1 st Preparatory Committee Meeting (PREPCOM) for the Third UN World Conference on Disaster Risk Reduction, July 2014, Geneva

The National Integrated Drought Information System. The NIDIS Implementation Team

FEMA Takes Action to Implement National Flood Insurance Reform Act

ALBANIAN ROAD AUTHORITY TERMS OF REFERENCE FOR CONSULTANT PROJECT MANAGER RESULTS BASED ROAD MAINTENANCE AND SAFETY PROJECT

EU China River Basin Management Programme

SCOTTISH BORDERS LOW CARBON ECONOMIC STRATEGY ACTION PLAN

Legislative Brief: PAY OR PLAY PENALTIES LOOK BACK MEASUREMENT METHOD EXAMPLES. EmPowerHR

WEATHER INSURANCE DERIVATIVES TO PROTECT RURAL LIVELIHOODS

Transcription:

The Republic of The Union of Myanmar Ministry of Transport Directorate Of Water Resources and Improvement of River Systems Ayeyarwady Integrated River Basin Management Project ZAW LWIN Deputy Director 16-10-2014

Myanmar Rivers Khamti Kaladan River Chindwin River Ayeyarwaddy River Confluence Bhamo Thanlwin River Ayeyarwaddy River - 1534 km Chindwin River - 730 km Thanlwin and rivers - 380 km in Mon State Rivers in Ayeyarwaddy - 2404 km Delta Ayeyarwaddy River Sittaung River Rivers in Rakhine State - 1602 km Total - 6650 km Yangon Name of river Catchment (sq-km) Discharge (million cum) Sediment Transport (million ton) Ayeyarwaddy 288900 313720 278 Chindwin 115300 141290 131

Background Information of Ayeyarwady River Length - 2100 km Average width - 1200 m Catchment area - 288900 Sq-km Average discharge - 313720 mil-cubic m Navigable length - 1534 km -Five defines -Delta (35,000 square kilometer) ( Rice bowl of Myanmar)

Background Information for Waterways Improvement Master Plan for waterways improvement in Ayeyarwady river was developed by Royal Haskoning Co.,Ltd from the Netherlands and by world bank fund in 1986. To improve the navigation channel of Ayeyarwaddy river between Bhamo and Yangon, 46 constraint locations are necessary to maintain by means of river training works. Braided channels and widen channels in low water season with insufficient depth make challenges for navigation. Erosion in high water season that can be change river pattern, lost of agriculture land and dwellings.

Way Forward to AIRBM Myanmar has high potential for social economic development owing to its abundant water resources. Several agencies and departments under different ministries are involved independently in water sector. Those agencies implement their main duties according to their segregated and sometimes even conflicting mandates. Sustainable Water Resources Development Standing Committee was formed on 19 th Nov 2012 for the special economic zones. National Water Resources Committee(apex body in Myanmar) has been established by the Presidential decree in July 2013, to maximize the benefit of water resources with equality, integrity, sustainability and inclusiveness.

Ayeyarwaddy Integrated River Basin Management Project - Funded by the World Bank through a Loan. - Implementing Agency Directorate of Water Resources and Improvement of River Systems (DWIR) - Concerned Sectors 1. General Water, Sanitation and flood protection 2. Ports, Waterways and shipping 3. Public administration water, sanitation and flood protection

Objectives of AIRBM Project 1. To strengthen integrated, climate resilient management 2. To develop the Ayeyarwaddy river basin and national water resources 3. To develop the institutions and tools needed to implement integrated river basin management 4. To deliver related livelihoods benefits from enhanced navigation and hydromet warning and advisory services

AIRBM Project Design 1. Water Resources Management Institutions, Decision Support System and Capacity Building 2. Hydromet Observation and Information Systems Modernization 3. Navigation Enhancement on Ayeyarwady river

The Project Cycle of World Bank Strategic Country Diagnosis Project Identification (7-18 Oct, 2013) Evaluation Preparation (Jan 29 -Feb 7, 2014) Pre-appraisal (12-23 May,2014) Implementation Completion Draft ESMF Consultation (18 & 20 Sept, 2014) Appraisal (Sept,2014) Negotiation (Oct, 2014) Board Approval (Dec, 2014)

Loan program of World Bank According to the discussion between NWRC and represents from World Bank, The WB has to provide US$ 100 million loan program as follows 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 10 US$(million) 25US$ (million) 25US$(million) 25US$(million) 15US$(million)

Component Component 1 Funding for AIRBM Sub project name Water Resources Management Institutions, Decision Support System and Capacity Building Amount (US$ in million) 32,000,000 Component 2 Hydromet Observation and Information Systems 30,150,000 Modernization Component 3 Ayeyarwady river Navigation Enhancements 37,850,000 Total 100,000,000

Detail of Budget Allocation Component 1 (1) - Water Resources Institutions, Information and Capacity Building 32,000,000 (USD) 1.1 Institutional Development 10,500,000 1.1a NWRC building, refurbishments and equipment 6,000,000 1.1b Institutional development and operations of the NWRC secretariat, HIC and EG 3,500,000 1.1c Capacity Building 1,000,000 1.2 Ayeyarwady River Basin Master Plan and Decision Support System 10,000,000 1.2a Ayeyarwady Integrated River Basin Master Plans and Decision Support System 6,000,000 1.2b Surveys and equipment 3,000,000

Detail of Budget Allocation Component 1 (2) - Water Resources Institutions, Information and Capacity Building 32,000,000 (USD) 1.2c Ayeyarwady Basin Strategic Environmental and Social Assessment 1,000,000 1.3 Preparation of Future Investment 7,000,000 1.3a Financing for Feasibility Studies,EIAs,SIAs 7,000,000 1.4 Implementation Support/Project Management Unit 4,500,000 1.4a Consultant and advisory services to the project Management Unit 2,500,000 1.4b Incremental Operating Costs 1,000,000 1.4c Stakeholder Forum and Communications 1,000,000

Detail of Budget Allocation Component 2 (1) Hydromet Observation and Information Systems Modernization 30,150,000 (USD) 2.1 Institutional and Regulatory Strengthening, Capacity Building and Implementation Support 6,000,000 2.1a Institutional strengthening and development of a legal and regulatory framework 500,000 2.1b Capacity building and training 2,900,000 2.1c Systems design and integration, component management and monitoring 2,600,000 2.2 Modernization of the Observing Infrastructure, Data Management Systems and Forecasting 17,100,000

Detail of Budget Allocation Component 2 (2) Hydromet Observation and Information Systems Modernization 30,150,000 (USD) 2.2a Technical modernization of the observation network 9,250,000 2.2b Modernization of data management, communication, IT and forecasting systems 5,350,000 2.2c Improvement of numerical weather prediction system and hydrological modeling systems 1,900,000 2.2d Reconstruction and refurbishment of offices and facilities 600,000 2.3 Enhancement of Hydromet Service Delivery System 7,050,000

Detail of Budget Allocation Component 2 (3) Hydromet Observation and Information Systems Modernization 30,150,00 0 (USD) 2.3a Creation of a Service Delivery Platform for weather and hydrological services 1,200,000 2.3b Support of DRM operations including introduction of impact forecasting and expansion of "end to end" EWS 1,600,000 2.3c Development of an Agricultural and Climate Advisory Service 2,900,000 2.3d Creation and implementation of a National Framework for Climate Service 1,350,000

Detail of Budget Allocation Component 3 (1) AYEYARWADY RIVER NAVIGATION ENHANCEMENTS 37,850,000 (USD) 3.1 Ayeyarwady River Navigation Study 500,000 3.1a Ayeyarwady River Navigation Study [financed by the Govt of the Netherlands] 0 3.1b Fleet Optimization Study 500,000 3.2 Navigation Improvements 30,350,000 3.2a Navigation Channel Modelling, Detailed design and construction supervision 4,500,000 3.2b Preparation of EIA/ EMP for Navigation Improvement Works 300,000 3.2c Construction of River Navigation Improvement Works 25,550,000

Detail of Budget Allocation Component 3 (2) AYEYARWADY RIVER NAVIGATION ENHANCEMENTS 37,850,000 (USD) 3.3 Navigation Aids 3,400,000 3.3a Purchase and Installation of Navigation Aids 2,200,000 3.3b Survey and pilotage services (survey boats, echosounding equipment, etc) 1,200,000 3.4 Water Quality Monitoring 2,000,000 Design and pilot operation of a water quality monitoring system 2,000,000 3.5 Institutional Strengthening and Implementation Support 1,600,000 3.5a Implementation Support 800,000 3.5b Capacity building, training and awareness raising 800,000 (Ref: AIRBM Aide Mémoire of World Bank, Aug 18,2014)

Project Implementation Arrangement National Water Resources Committee(NWRC) AIRBM Steering Committee (a sub-group of NWRC, headed by Deputy Minister MOT DWIR/NWRC Secretariat Implementing Agency On behalf of the Ministry of Transport Expert Group Stakeholder Forum Project Management Unit Include all project financial management, procurement, monitoring and evaluation Component 1 Water Resources institutions, information and capacity building Component 2 Hydromet Observation & Information Systems Modernization Component 3 Ayeyarwady River Navigation Enhancements 19

Conclusions AIRBM Project is fundamental work not only Ayeyarwaddy river basin management but for improving other river basin and also the first priority project to operate for the navigable management and maintained.

THANK YOU