Lower Tier Project Office Overview Tactical Missiles Conference Presented By Mr. Darryl Colvin PM, Lower Tier Project Office May 2010 Distribution A: Approved for public release; distribution unlimited. SS 3089 (1) 1/11/2006 2:58 AM
LTPO FOCUS Readiness Sustainment Against Threat Synchronization with IBCS SS 3089 (2) 1/11/2006 2:58 AM
BOTTOM LINE UP FRONT US PATRIOT Will Remain in the Field Through at Least 2034 While Transitioning to Net Centric Capability Warfighter Vulnerable to Evolving Threat Coordinate Detailed Execution Plans With IAMD and MEADS LTPO Will Continue to Leverage FMS Sales to Mitigate Obsolescence Additional Government Funds Required to Implement Into US Fleet Continue Development of Overarching Air Defense Plan Army Leadership Recognizes the Need for PATRIOT to Evolve PATRIOT Needs to Evolve SS 3089 (3) 1/11/2006 2:58 AM
LOWER TIER PROGRAM SPANS THE ACQUISITION LIFE CYCLE Technology Dev Phase Advanced Component Development & Prototype Evolutionary Development Plan (EDP) Growth Potential Performance Improvements IAMD Software PDB-8 Integrated System Design Engineering & Manufacturing Development Phase Upper Tier Interoperability MEADS US Unique Capability Sys Capability & Mfg, Process Demonstration PAC-3 MSE LRIP MS-B CDR MS-C FRP Software PDB-7 RDP Full Mode 5/S IFF Integration GEM-T Pre-Production GSE Pre-Production MAP Software PDB-6.5 Production and Deployment PAC-3 (Missile Segment) ELES FSC Canister CRI Config-3 (Mod Kit) REP-III CDI-3 RLCEU Software PDB-6.2 Full Rate Production & Deployment BCP (Enhanced) Sweep-down Synch Pure Fleet GTA (+2 BNs) CRG Software PDB-5.5.3 RS Operations and Support Phase BCP (Basic) RECAP (13 BNs) Life Cycle Sustainment 11 International Partners International Engineering Services Field Surveillance Program Case Development Config-3 (Kit Installation) TCS PAC-2 PAC-3 JTAGS Disposal / Salvage CDI-3 (Classification Discrimination Identification 3) CDR (Critical Design Review) CRG (Communication Relay Group) CRI (Cost Reduction Initiative) ECS (Engagement Control Station) ELES (Enhanced Launcher Electronics System) FMS (Foreign Military Sales) FRP (Full Rate Production) GEM (Guidance Enhanced Missile) GSE (Ground Support Equipment) IAMD (Integrated Air & Missile Defense) ICC (Information Coordination Central) LRIP (Low Rate Initial Production) LS (Launcher Station) MAP (Modern Adjunct Processor) PAC-2 (PATRIOT Advanced Capability 2) PAC-3 (PATRIOT Advanced Capability 3) PDB-X (Post Deployment Build Number) REP-III (Radar Enhancement Phase 3) RLCEU (Remote Launch Communications Equipment Upgrade) RS (Radar Set) TCS (Tactical Command Station) JTAGS (Joint Tactical Ground Station) ECS Mod Kits Retrofit ICC LS EPP III Pre-PAC-2 CAS(10)LWDH_01-17-05 (U) Ver 16 (18 Jun 09) SS 3089 (4) 1/11/2006 2:58 AM
LTPO STRATEGIC CALENDAR As of 6 Apr 10 SS 3089 (5) 1/11/2006 2:58 AM
FMS PROGRAMS Country Status Amount UAE LOA Signed Nov 08 $6.5B 11 Current US Partners PATRIOT MEI / GEM-T Missile (Contract Awarded Dec08) PAC-3 Missile Segment (Contract Awarded Dec 08) PATRIOT MEI Spares (Contract Awarded Jan 09) Taiwan LOA Amended Jul 09 $3.2B (Added 4 FU and PAC-3 MSLs) PATRIOT MEI (Contract Award Dec 09) Germany Netherlands Spain Israel Saudi Arabia Greece Kuwait UAE South Korea Taiwan Japan PAC-3 Missile Segment (Contract Awarded Dec 09) PATRIOT MEI Spares (Contract Awarded Dec 09) Current Partners Turkey LOA Projected Oct 10 $4.2B Taiwan LOA Projected Oct 10 $2.8B Kuwait LOA Projected Oct 11 $3.4B Qatar LOA Projected Oct 11 $7.0B Additional Partners Will Continue to Maintain and Strengthen PATRIOT Worldwide SS 3089 (6) 1/11/2006 2:58 AM
PATRIOT MODERNIZATION Produce single, evolvable PATRIOT configuration Provide technology refresh, product development and services that meet US and International acquisition requirements Modernize with comprehensive low risk options Maintain Single Software Baseline for US and International Reduce Life Cycle Costs and increase system reliability Provide ECP s to upgrade current force and new production PATRIOT (Developed as part of US RDT&E, Fair Share and New Build Programs) Enable future capabilities in BMC4I, Radar and Missile Adapt to emerging threats Host technology insertion Align with modern communication infrastructure/protocols Why?...converge on similar capabilities and configurations, mitigate obsolescence, and reduce total ownership costs. SS 3089 (7) 1/11/2006 2:58 AM
Software Upgrades MODERNIZATION ENABLES FUTURE CAPABILITY IMPROVEMENTS Modernized components/subsystems are designed to mitigate obsolescence - Same capability as current system - Provides platform to enable improved capabilities MAP and RDP are key modernization items - Provide the foundation for system improvements beyond PDB-7 Multifunction Improvements Mode 5 Level 1 & 2 Geodetic Registration Mode 5 Single Bit Expanded Battlespace Improved Detection on Small Targets in Clutter TPX-57 MAP RDP PAC-3 MSE - Support High Altitude Intercept Improved Search and Track Flexibility 2010 2011-12... Future Improvements PDB-6.5 PDB-7 PDBx SS 3089 (8) 1/11/2006 2:58 AM
RECAPITALIZATION GROUND SUPPORT EQUIPMENT CONFIGURATION -3 HEMTT TRUCKS FROM UNITS TACOM EPP TRUCKS EXCHANGE WITH UNITS (System Integration and Check-Out) ECS, ICC, CRG, LS, AMG, EPP, SRPT, BMC, BME, GEN CONFIGURATION -3 ANDOVER FOR REP III RAYTHEON START PRIOR INSPECTIONS 45 DAYS -10 / -20 STANDARDS CLEAN BASELINE CONFIGURATION -2 LEAD FOR RADAR RECAP Radar SS 3089 (9) 1/11/2006 2:58 AM
AIR AND MISSILE DEFENSE CAPABILITY DEVELOPMENT 2009 2010 IAMD ICD 2011 MEADS Int l CDR MEADS Prog. Rev. 2012 GTA 2013 2014 2016 IAMD MS C SLAMRAAM IFC IOC IAMD MS B GSE Tech Refresh CDR 2015 MSE FUE MSE Prod. Dec. TRR 2018 & Beyond Delta OTE IAMD Inc. 3 Recap Review IAMD Inc. 2 IOC US MEADS FUE Force Modernization Commo Etc. Air & Missile Defense Transition Crypto Baseline (2009) Leverage Pre-PAC-3 Missile Inventory PAC-3 CRI Missile PAC-3 HTK NL HADM Sync 1 (2014) ECS MSE Missile Communications Modernization Joint IFC Joint IFC NL BCP RS LS Increased HTK Range and Altitude SLAMRAAM Sentinel Limited Netted Operations Battalions MSE JLENS Joint IFC Sync 2 (2015) Army IFC Net IBCS NL LS ECS JLENS RS SLAMRAAM Sentinel Improved Combat ID Management Air & ofmissile Defense Transition Multiple 18 16 Configurations 18 16 14 12 10 8 6 4 2 0 Battalions OIF Fixes PDB-6.5 Software 14 12 10 8 6 4 2 0 MEADS Sync3 MEADS Sync Sync3 3PATRIOT PAT Sync Sync2 2PAT PAT Sync Sync1 1PAT PAT FY 14 FY12 FY 15 FY13 FY 16 FY14 FY 17 FY15 FY 18 FY16 FY 19 FY17 FY18 FY 20 FY19 FY 21 FY20 FY 22 FY 23 FY21 FY 24 FY22 FY 25 FY23 FY24 FY 26 FY12 FY 14 FY25 FY 27 FY13 FY 15 FY26 FY 28 FY14 FY 16 FY27 FY 29 FY15 FY 17 FY 30 FY16 FY28 FY 18 FY29 FY 31 FY17 FY 19 FY30 FY 32 FY18 FY 20 FY31 FY 33 FY19 FY 21 FY32 FY 34 FY20 FY 22 FY33 FY 35 FY21 FY 23 FY34 FY 36 FY22 FY 24 Configuration 3 GSE GEM-T Missile FOC PDB 9.0 IOT&E TRR PDB 7.0 PDB 8.0 2017 Unit Set Fielding for Netted Operation FY 25 FY23 FY24 FY 26 FY25 FY 27 FY26 FY 28 FY27 FY 29 FY 30 FY28 FY29 FY 31 FY30 FY 32 FY31 FY 33 FY32 FY 34 FY33 FY 35 FY34 FY 36 FY08 PATRIOT IAMD Incr 3 R&D Cost is $1B - Production & Fielding Cost Unknown PATRIOT IAMD Incr 3 R&D Cost is $1B - Production & Fielding Cost Unknown MEADS IAMD Fielding TBD MEADS IAMD Fielding TBD Counter the Evolving Threat IBCS Threat New Integration / Coordination Capability Capability Sync 3 (2018) FY2000 Army IFC Net Acronyms ALTBMD - JLENS Sensor and Shooter on the Net IBCS LS SLAMRAAM Sentinel IBCS MEADS RS Fully Netted & Distributed Reduced Logistics Footprint Improved Mobility Improved MTBOMF Automated Diagnostics / Prognostics Provide Increased Performance With Each Fielding CASLWDH(06)_03-25-09 (U) Ver 5 SS 3089 (10) 1/11/2006 2:58 AM CRI ECP-24 GEM GSE HADM HTK IAMD ICD IFC IOC IOT MAP MSE MTBOMF - OIF RDP SIAP TRR - Active Layer Tactical Ballistic Missile Defense Cost Reduction Initiative Guidance Enhanced Missile Ground Support Equipment High Altitude Debris Mitigation Hit to Kill Integrated Air & Missile Defense Interface Control Document Integrated Fire Control Initial Operation Capability Initial Operational Test Modern Adjunct Processor Missile Segment Enhancement Meantime Between Operational Mission Failure Operation Iraqi Freedom Radar Digital Processor Single Integrated Air Picture Test Readiness Review
Medium Extended Air Defense System (MEADS) Overview SS 3089 (11) 1/11/2006 2:58 AM
MEADS OVERVIEW The Medium Extended Air Defense System (MEADS) is a Tri-National Co-Development Program to Meet the Future Air and Missile Defense Needs for the US, Germany, and Italy Replacement for PATRIOT, Hawk and Nike Hercules Management Directed and Administered by a Tri-National Steering Committee (SC) US MEADS NPO Executes Day-to-Day Management on Behalf of US SC Member NATO Agency Chartered by the Steering Committee for Tri-National Execution Design and Development Contract $4.0B Program (Cost / Work Share: $2.324B US, $1.008B GE, $0.668B IT) Awarded in Sep 04, Currently in Month 67 of a 128 Month Effort Initial Operational Capability (IOC) in 2018 SS 3089 (12) 1/11/2006 2:58 AM
MEADS OVERVIEW MEADS KEY CAPABILITIES / KEY BENEFITS Key Capabilities UHF-Band Surveillance Radar X-Band Fire Control Radar Near Vertical Launcher MSE Missile Reliability, Availability, & Maintainability Netted, Distributed or Site Centered Architecture Transportability and Mobility Key Benefits 360 Long Range Volume Search / Detection of Challenging Targets Increased Capability Against Very Small RCS Threats Enhanced Capability for Target Resolution / Discrimination / Classification Supports Advanced Measurement Techniques Dedicated Fire Control Radar Supports Higher Engagement Loads Increased Capability Against SRBMs and Slow Moving ABTs 70 Launch Angle Supports 360 Engagements Lethality Driven Hit-to-Kill Design Increased Interceptor Battlespace Higher MTBF and Lower MTTR Two Level Maintenance Reduction in Bn Manpower (Pending User Manpower Assessments) Increased Use of Industry Standard Equipment to Limit Future Obsolescence Issues All Equipment has Prognostics and On-Board Spares Dynamic Force Tailoring with Automatic Initialization and Plug and Fight Capability Common TOC Approach Provides Multi-Level Implementation Networks Sensors to Provide Continuous and Redundant Target Track Battlefield Resiliency Graceful Degradation / Eliminates Single Point of Failure Strategic and Operational Transportability C-5 / C-17 Drive-On / Drive-Off Equipment Configured on FMTV-Class Vehicles Provides Improved Tactical Mobility SS 3089 (13) 1/11/2006 2:58 AM
Joint Tactical Ground Station (JTAGS) Overview SS 3089 (14) 1/11/2006 2:58 AM
JTAGS OPERATIONS S-Band Raw Data Downlink DSP JTAGS Receives a Raw Infrared data stream from DSP Satellites using a dedicated S Band antenna for each Satellite. 1 2 The JTAGS front end Processes DSP data into Representative IR Returns displayed on workstations. JTAGS Operators (3 man crews) further Process (back end) Rep Return data by verifying missile and IR 3event information JTAGS (Front-End) Functions Receive wideband ONIR data Demodulate QPSK Modulated signal Bit Viterbi Decoding De-multiplex L1/L2 Decrypt demultiplexed signal with MYK-7 Signal processing/ detection JTAGS Shelter Detect IR objects Form partial processed data Correct Sat. LOS errors Correct ephemeris Determine: - IR object location/event time Time tag data JTAGS (Back-End) Functions Event Detection Correlation w/ other DSP data Track Formation Fusion with Other sat. tracks Tactical Parameter Estimation Missile Warning (PGIP) Cueing (LP/Azimuth) Voice Nets Link 16 IBS-I IBS-S 4 TBM and IR Event Messages are then Disseminated throughout the Theater via digital and voice networks. SS 3089 (15) 1/11/2006 2:58 AM
SS 3089 (16) 1/11/2006 2:58 AM
SUMMARY US PATRIOT Will Remain in the Field Through at Least 2034 While Transitioning to Net Centric Capability LTPO Priorities Readiness Sustainment Against Evolving Threat Synchronization With IBCS LTPO Will Continue to Leverage FMS Sales to Mitigate Obsolescence Additional Government Funds Required to Implement Into US Fleet Army Leadership Recognizes the Need for PATRIOT to Evolve SS 3089 (17) 1/11/2006 2:58 AM
SS 3089 (18) 1/11/2006 2:58 AM
MEADS OVERVIEW MEADS D&D MASTER SCHEDULE Rev 5C, 28 FEB 10 MEADS INTERNATIONAL (MI) SENSITIVE INFORMATION Re-plan 3 Approved 24 Nov 09 D&D Program Extended 18 Months System Summary CDR in Aug 2010 System Program Review Oct 2010 Post CDR Phase to be Definitized with Post CDR RFP Process 27 Jan 10: RFP to MI Mar/Apr 10: NTE Price From MI 21 Jun 10: Proposal Submission Nov 10: Post-CDR Contract Amendment Ready for Signature SS 3089 (19) 1/11/2006 2:58 AM