MIA Training Example (Swank 4H)



Similar documents
Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1

TITLE 12. NATURAL RESOURCES. CHAPTER 7. OIL AND GAS CONSERVATION COMMISSION (Authority: A.R.S et seq.)

Plug and Abandonment Forum

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009

Code of Practice for Coal Seam Gas

Rigorous Qualification and Development Program

Oil and Gas Terms. Anticline: An arch of stratified rock layers that may form a trap for hydrocarbons.

Sample Confined Space Entry Permits

Chapter 19 Purging Air from Piping and Vessels in Hydrocarbon Service

BASELINE WATER QUALITY SAMPLING IN SHALE GAS EXPLORATION AND PRODUCTION AREAS

COMPARISON OF WELL COMPLETIONS USED IN OIL/GAS PRODUCTION AND GEOTHERMAL OPERATIONS: A NEW APPROACH TO TECHNOLOGY TRANSFER C.Teodoriu, G.

OIL & GAS PRODUCTION AUDITING

Installing a Probe. Typical Installation

Rubber Lining Application Manual Revision Date: September 1, Section 10: Pipe Lining Procedures Page: 10-1

Economic and Environmental Benefits. Value of Natural Gas Savings and Additional Production (Mcf/well/year) $2,500 - $46,800 $3,500 - $65,520

DecisionSpace Well Engineering Software

Office of Oil and Gas Management

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin*

Grounding and Bonding Against Static Electricity. Jon Koppari, CSP, MS Occupational Safety and Health Instructor OSHA Training Institute

Adjusted Estimates of Texas Natural Gas Production

Automatic Self-Cleaning Strainers

Tubular Design and Downhole Equipment

Plug and Abandonment Producing Well. Slides for very basic education only!

be required at least five business days prior to the beginning of drilling

Well Integrity Basics, Prevention, Monitoring, Red Flags & Repair Options

How To Learn How To Build A Class Vi Well

E-Line and Braided Line. E-Line Open Hole wireline

Final Regulations for Oil and Gas Surface Activities (Amendments to 25 Pa. Code Chapters 78 and 78a, Subchapter C)

ENVIRONMENTAL COMPLIANCE PROGRAM

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.

Tax Executives Institute

FLUID MIGRATION MECHANISMS DUE TO FAULTY WELL DESIGN AND/OR CONSTRUCTION: AN OVERVIEW AND RECENT EXPERIENCES IN THE PENNSYLVANIA MARCELLUS PLAY

NFPA31FuelOilPiping 1 Revised

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Ensuring Asset Integrity through Risk Assessment.

Example Confined Space Entry Programs

SERIES SAFETY REGULATIONS

Evaluering av risiko forbundet med løftegass i ringrom og forskellige gassløft barrierer

Some Criteria for Choosing a Steam Boiler for a Microbrewery

Havbunnsproduksjon. NTNU, 15 april 2013 Eldar Lundanes System Responsible for Controls and Data Management, Eastern Region.

Natural Gas Made Simple

number 2) proposed well's type, location, elevation, total depth, etc. 3) site inspection, 2) assess the adequacy of the proposed engineering

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems

Directive 059: Well Drilling and Completion Data Filing Requirements

RECON-4 Portable Multi-gas Detector Software Manual

CONTAMINANT REMOVAL FROM CENTRIFUGAL SYSTEMS

Selection and Determination of Tubing and Production Casing Sizes

INDOOR COILS. RCFN- featuring Industry Standard R-410A Refrigerant CASED/UNCASED COILS FOR GAS AND OIL FURNACES

Summary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

Case Study of Emergency Disconnect Sequence in the Gulf of Mexico

The Basics of Natural Gas

NORSOK Standard D-010 Rev. 4, August 2012

N O T E S. Environmental Forensics. Identification of Natural Gas Sources using Geochemical Forensic Tools. Dispute Scenarios

Ammonia Detection System Codes and Design Specifications

INDOOR COILS. RCFM- featuring Earth-Friendly R-410A Refrigerant CASED/UNCASED COILS FOR GAS AND OIL FURNACES

Understanding Well Construction and Surface Footprint

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

EuroFID Total Hydrocarbon Analyzer. Precise Determination of Total Hydrocarbons in Air for Corrosive as well as Condensing Gases

Instrument Gas to Instrument Air Conversion Protocol October 2009 SPECIFIED GAS EMITTERS REGULATION OCTOBER Version 1.0.

Fiber Optics in a Bakken Multi-Stage Fractured Well. Montana Tech 2011 SPE Drilling Symposium Presented by: Chelsea Kadler

Wireline Operations - Slickline Calculations

Fiberstars Mini Lighted Laminar Flow Fountains

Calculating Volatile Organic Compounds (VOC) Flash Emissions from Crude Oil and Condensate Tanks at Oil and Gas Production Sites

Ultrasonic Gas Leak Detection

Petroleum Storage Tank Compliance 101

Petroleum and natural gas industries Well integrity standard

Introducing OXAND. ~ 850 projects > 1,250bn OF CAPEX CAPITALISED IN SIMEO TM

Petroleum Storage Tank Spill and Overfill Prevention

University of Colorado Denver Anschutz Medical Campus Online Chemical Inventory System User s Manual

Recommended Practices Associated with Hydraulic Fracturing Operations

Alabama Air and Waste Regulatory Update

Air Eliminators and Combination Air Eliminators Strainers

Examples of Confined Spaces: What is the 2012 Confined Space Emphasis Program?

INDOOR COILS. RCFA- featuring R-22 Refrigerant RCFL- featuring Earth-Friendly R-410A Refrigerant CASED/UNCASED COILS FOR GAS AND OIL FURNACES

INDOOR COILS. RCFL- featuring Industry Standard R-410A Refrigerant CASED/UNCASED COILS FOR GAS AND OIL FURNACES

Schedule of. Onshore Petroleum Exploration. and. Production Safety Requirements. August 1992

DIRECT PUSH DRILLING.

Oil and Gas Industry. Present. Presenter Connie Brown Assistant Area Director Charleston Area Office

ENGINEERED DRAWINGS FOR PETROLEUM STORAGE TANKS

66 National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling

Fiscal Measurement Natural Gas

1 What is the purpose of this document?

EPRI Global Climate Change Research Seminar. Natural Gas Supply. Francis O Sullivan, Ph.D. May 25 th, 2011

EFFECT OF BELT AIR ON DUST LEVELS IN UNDERGROUND COAL MINES. Robert A. Haney Mine Safety and Health Administration Pittsburgh, PA ABSTRACT

HTHP High-sulfur Gas Drilling and Completion Technology

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

SEWER LINE CLEANING, DEBRIS AND GREASE REMOVAL, DEBRIS AND GREASE DISPOSAL

APPENDIX 2-3 PCAPP EDS INSPECTION LOG SHEETS

Cased/Uncased Coils For Gas And Oil Furnaces

RULE ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS

Frequently Asked Questions

COMBUSTIBLE GAS AND HC REFRIGERANT LEAK DETECTOR OPERATING INSTRUCTIONS DETECTS ALL HYDROCARBON & OTHER COMBUSTIBLE GASES JB INDUSTRIES

American Petroleum Institute Purchasing Guidelines Purchase API Spec 5CT online at

[[ ;/LON/P&M/896/8/09 Date: Notice inviting quotation for Repairing heating system

Subsea Drilling Systems

Transcription:

MIA Training Example (Swank 4H) The Swank 4H is a 3-string gas well equipped with surface, intermediate, and production strings. It is a cased hole completion and the cement top on the production string is below the depth of the intermediate casing shoe. Primary gas production is through a tubing assembly and annular gas is produced inside the intermediate casing. In this example, inspections began in the first quarter of 2013 and reveal that the well is functioning free from significant integrity issues throughout the year. Page 1

Swank 4H Well Schematic and Inspection Components Page 2

MIA Training Example (Swank 4H) Step 1: Enter basic information, including the operator, well ID and abridged API. a. Well Operator/Owner (cell/box 1.): Operator A 1. Only needs to be done once for the entire form b. Operator Assigned ID (cell/box 2.): Swank 4H c. Abridged API # (cell/box 3.): 063-25256 Step 2: Enter well construction information under cells/boxes 4-8. This only needs to be done once for the life of the well, unless a change is made to the construction of that well. a. Well Type (cell/box 4a.): Gas b. Well Construction Information Not Readily Available (cell/box 4b.): N/A c. Water Level Accessible (cell/box 5.): N/A d. Freshwater Casing Only (cell/box 6.): N e. Annular Production (cell/box 7.): Y f. Annular Production Inside Surface or Coal Casing String (cell/box 8.): N Step 3: Enter the number of casing strings and click Customize Data Tables. a. Number of Casings Strings, Excluding Conductor Pipe, Tubing, and Liners (cell/box 9): 3 b. Click (cell/box 9): Customize Data Tables Steps 2 and 3 set up the rest of Form A. Step 4: Enter the Surface or Coal Casing Set Depth in feet (ft), if applicable, and then enter the first quarterly inspection date. a. Surface or Coal Casing Set Depth (ft) (cell/box 10.): N/A b. Q1 Date (cell/box 11.): 2/24/13 Page 3

Step 5: Fill out Section 13 Wellhead Pressure or Water Level for Q1. In this case, leave Section 12 blank for Q1 because this is a new well entry in Form A and, thus, there are no previous data to transfer from either the 4 th quarter of the previous year or previous quarter of the current year. a. Primary Production Gas Pressure (psig) (cell/box 13a.): 65 b. Produced Annular Gas Pressure(psig) (cell/box 13b.): 25 c. Shoe Test Pressure (psig) (cell/box 13c.): 2,000 d. Annulus (cell/box 13d.): P (auto-populated) e. Water Level (ft) (cell/box 13e.): N/A f. Average Daily Pumping Time (hours) or average daily pumping volume (bbls) (If no produced water, Indicate NPW ) (cell/box 13f.): N/A g. Produced Water Quality Specific Conductance (μs or μmhos)/cm) (cell/box 13g.): N/A Step 6: Fill out Section 14 Flow or Pressure in Production Annulus for Q1. a. Production Annulus Status (cell/box 14a.): N/A b. Production Annulus Flow (scfpd) (cell/box 14b.): N/A c. Production Annulus Pressure (psig) (cell/box 14c.): N/A d. Time Since Production Annulus Was Last Blown Down (days) (cell/box 14d.): N/A e. Cement Top in Production Annulus Above Next Outer Casing Shoe (cell/box 14e.): N/A f. Annulus (cell/box 14f.): N/A Page 4

Step 7: Fill out Section 15 Measurement or Best Estimate of Leaking/Venting Gas Quantity for Q1. a. Annulus (cell/box 15a.): I b. Flow (scfpd) (cell/box 15b.): 0 c. Annulus Shut-in (cell/box 15c.): N d. Annulus (cell/box 15d.): S/C e. Flow (scfpd) (cell/box 15e.): 0 f. Annulus Shut-in (cell/box 15f.): N g. Annulus (cell/box 15g.): N/A h. Flow (scfpd) (cell/box 15h.): N/A i. Annulus Shut-in (cell/box 15i.): N/A j. Annulus (cell/box 15j.): N/A k. Flow (scfpd) (cell/box 15k.): N/A l. Annulus Shut-in (cell/box 15l.): N/A m. Surface/Wellhead Equipment/Outside Conductor (cell/box 15m.): N Step 8: Fill out Section 16 Liquid Hydrocarbon Flows for Q1. a. Annulus (cell/box 16a.): P (auto populated) b. Y/N/I (cell/box 16b.): N c. Annulus (cell/box 16c.): I (auto populated) d. Y/N/I (cell/box 16d.): N e. Annulus (cell/box 16e.): S/C (auto populated) f. Y/N/I (cell/box 16f.): N g. Annulus (cell/box 16g.): N/A h. Y/N/I (cell/box 16h.): N/A i. Annulus (cell/box 16i.): N/A j. Y/N/I (cell/box 16j.): N/A k. Surface/Wellhead Equipment/Outside Conductor (cell/box 16k.): N Page 5

Step 9: Fill out Section 17 Non-Freshwater Flows for Q1. a. Annulus (cell/box 17a.): P (auto populated) b. Y/N/I (cell/box 17b.): N c. Annulus (cell/box 17c.): I (auto populated) d. Y/N/I (cell/box 17d.): N e. Annulus (cell/box 17e.): S/C (auto populated) f. Y/N/I (cell/box 17f.): N g. Annulus (cell/box 17g.): N/A h. Y/N/I (cell/box 17h.): N/A i. Annulus (cell/box 17i.): N/A j. Y/N/I (cell/box 17j.): N/A k. Surface/Wellhead Equipment/Outside Conductor (cell/box 17k.): N Step 10: Fill out Section 18 Safe Venting and check for Corrosion Problems for Q1 in Section 19. a. Gas Leaking or Venting to Atmosphere (cell/box 18a.): N (auto populated) b. Wellhead Hydrogen Sulfide (ppm) (cell/box 18b.): N/A c. Wellhead Methane (%LEL) (cell/box 18c.): N/A d. Corrosion Problems (cell/box 19.): N Page 6

Step 11: Fill out the Comments section, if needed; and check to see if Immediate DEP Reporting is Necessary based on the information entered in Form A for Q1. The option to Reset this portion of Form A is available as well. This function will only reset the four rows associated with this well. a. Comments (cell/box 20.): N/A b. Immediate DEP Reporting Necessary (cell/box 21.): N (auto populated) c. Reset (cell/box 22): N/A Step 12: Once you have finished inputting all data for Q1, return to Section 11 Quarterly Inspection Information and enter the date of the Q2 inspection. Next, fill out Section 12 All Well MIA Conditions Unchanged from Previous Quarter, which will transfer all data from the previous quarter. This function is useful when only a few conditions or no conditions at all change at the well. a. Q2 Date (cell/box 11.): 6/1/13 b. All Well MIA Conditions Unchanged from Previous Quarter (cell/box 12.): Y c. Click: Transfer Previous Quarter s Data Page 7

Step 13: Once all data from the previous quarter have been transferred, make the following changes to Section 13 for this example. Sections 14, 15, 16, 17, 18, 19 and 20 require no changes from the previous quarter. a. Section 13 1) Primary Production Gas Pressure (psig) (cell/box 13a.): 63 2) Produced Annular Gas Pressure(psig) (cell/box 13b.): 30 Step 14: Once you have finished inputting all data for Q2, return to Section 11 Quarterly Inspection Information and enter the date of the Q3 inspection. Next, fill out Section 12 All Well MIA Conditions Unchanged from Previous Quarter, which will transfer all data from the previous quarter. a. Q3 Date (cell/box 11.): 8/1/13 b. All Well MIA Conditions Unchanged from Previous Quarter (cell/box 12.): Y c. Click: Transfer Previous Quarter s Data Page 8

Step 15: Once all data from the previous quarter have been transferred, make the following changes to Section 13 for this example. Sections 14, 15, 16, 17, 18, 19 and 20 require no changes from the previous quarter. a. Section 13 1) Primary Production Gas Pressure (psig) (cell/box 13a.): 65 2) Produced Annular Gas Pressure(psig) (cell/box 13b.): 32 Step 16: Once you have finished inputting all data for Q3, return to Section 11 Quarterly Inspection Information and enter the date of the Q4 inspection. Next, fill out Section 12 All Well MIA Conditions Unchanged from Previous Quarter, which will transfer all data from the previous quarter. a. Q4 Date (cell/box 11.): 12/15/13 b. All Well MIA Conditions Unchanged from Previous Quarter (cell/box 12.): Y c. Click: Transfer Previous Quarter s Data Page 9

Step 17: Once all data from the previous quarter have been transferred, make the following changes to Section 13 for this example. Sections 14, 15, 16, 17, 18, 19 and 20 require no changes from the previous quarter. a. Section 13 1) Primary Production Gas Pressure (psig) (cell/box 13a.): 70 2) Produced Annular Gas Pressure(psig) (cell/box 13b.): 31 Final: This concludes the Swank 4H example. Page 10