Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM A.Ş. Name of Project Owner Address Telephone and Fax Numbers NAME OF PROJECT NAME OF THE PLACE SELECTED FOR THE PROJECT, (PROVINCE, COUNTY, CITY) LOCATION NAME OF INSTITUTION / WORKING GROUP THAT HAS PREPARED THE FILE Address KAPIDAĞ WIND POWER PLANT ENVIRONMENTAL MANAGEMENT PLAN KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ Gülbahar Cad. 1. Sok No:2 Güneşli/İSTANBUL Tel : (0 212) 478 66 66 Fax : (0 212) 657 55 51-550 53 38 KAPIDAĞ WIND POWER PLANT BALIKESİR PROVINCE ERDEK COUNTY NARLIKÖY ZONE Mahatma Gandi Cad. No:92/2 06680 G.O. P. /ANKARA Telephone and Fax Numbers Tel : (312) 4472622 Fax: (312) 4463810 Date of Report Preparation AUGUST 2010 ENERJİ ÇEVRE YATIRIMLARI ve DANIŞMANLIĞI LTD.ŞTİ. 1
TABLE OF CONTENTS FIGURES 3 SECTION I DESCRIPTION OF THE PROJECT 4 1.1. Description and Objective of the Project 4 1.2. Location of The Place Selected For The Project 4 1.2.1. Project Place 6 1.2.2. Usage and Quality of the Present Land 7 1.2.3. The Places Having High Landscape Value, Recreation and Protected Areas 7 SECTION II LEGAL FRAMEWORK 8 SECTION III MITIGATION MEASURES 10 SECTION IV MONITORING PLAN 17 SECTION V PROGRAM 24 SECTION VI INSTITUTIONAL ARRANGEMENTS 26 SECTION VII PUBLIC CONSULTATION 28 RESOURCES 31 2
TABLES Table 1 Coordinates of the Kapıdağ WPP (Wind power plant)... 5 Tablo 2 Closest Settlement Units to Turbines and their Distances... 5 Table 3 Mitigation Measures... 11 Table 4 Monitoring Plan... 18 Table 5 Program... 25 FIGURES Figure 1 Location Indication Map... 6 Figure 2 Flow Diagram of Phase... 27 ANNEXES Annex-1 Topographical Map Annex-2 Photos, Participant List and Newspaper Announcement of Public Participation Meeting 3
SECTION I DESCRIPTION OF THE PROJECT 1.1. Description and Objective of the Project The planned to be implemented is located in Balıkesir Province, Erdek County, Narlı Village district. The Erdek district is located to the west of Balıkesir province and there is about 13 km northwest of Erdek the Narlı Village and about 18 km the İlhan Village. In air distance, the area is 11 km northwest of Erdek, about 1.0 km northwest of Narlı Village and 300 m northwest of İlhan Village. Access to the area is provided by village roads. The Kapıdağ RES is spread over an area that is 2.5 km long and 2.5 km wide. The Kapıdağ Wind Power Plant that is planning to be implemented will consist of 17 turbines and each with a power of 2 MW. The electrical energy to be obtained from the wind turbines will be converted into medium voltage by means of transformers to be installed for each unit. The underground cables of the turbines and the Wind Plant Control Planning is planned to be connected to the switch center. The Switchgear will have a very short transmission line to the network, of about 300m parallel to an existing line. The mentioned cables will be 1.5m from the upper layer with a channel and the widths of the upper layer and soffit will be 1m and 0.8m respectively. Based on the total installed power of 34 MW the annual energy generated is expected to be as 109.5 MWh/year. A 1/25.000 scale topographic map that is showing the area and its surrounding is given in Annex-1. 1.2. Location of The Place Selected For The Project Balıkesir is located northwest of Anatolia as the majority is located in the Marmara Region and the rest is located in the Aegean Region. The province is surrounded with Manisa and İzmir provinces to the south, the Aegean Sea and Dardalles to the West, Kütahya and Bursa provinces to the east and the Marmara Sea to the north. The province Balikesir is located northwest of Turkey between 39 06 and 40 39 north latitudes and 26 39 and 28 58 east longitudes. The province Balıkesir has a surface area of 14.299.000 km². The area is located on G19-D3 and H19-A2 sections. The coordinates of the turbines planned to be installed are given in Table 1. 4
Table 1 Coordinates of the Kapıdağ WPP (Wind power plant) POINT NO TO THE RIGHT (Y) UPWARDS (X) T01 558067 4483887 T02 558190 4483573 T03 558383 4483439 T04 559067 4483510 T05 559288 4483429 T06 559489 4483310 T07 559709 4483220 T08 558504 4483057 T09 558736 4482692 T10 558906 4482524 T11 559059 4482350 T12 559252 4482230 T13 559450 4482112 T14 559685 4482067 T15 559768 4481116 T16 560039 4481127 T17 560306 4481128 The Project is in Balıkesir province within the borders of Erdek district, about 11 km northwest of county center, located in Narlı Village region. Access to the area is provided by village roads in surrounding. Environmental impact assessment has been conducted in consideration with closest settlement units regarding the 17 turbines planned to be installed within the area. The turbines to be installed under the scope of the are spread on area that is 2.5 km long and 2.5 km wide. The closest settlement to the area is the İlhan Village of which the distance is about 1750 meters. Tablo 2 Closest Settlement Units to Turbines and their Distances Turbine Number Settlement Unit Position According to Turbine Distance (m) T01 İlhan Köyü Northeast 1750 T13 Narlı Köyü Southwest 2250 5
KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ 1.2.1. Project Place Figure 1 Location Indication Map 6
1.2.2. Usage and Quality of the Present Land Access to the area is provided by surrounding village roads. The area is located between Bandırma H19-A2 and G19-D3 sections. A 1/25.000 scale topographic map that is showing the area and its surrounding is given in Annex-1. The area and its close surrounding are located within a forest area and there is no agricultural area to be affected by the. 1.2.3. The Places Having High Landscape Value, Recreation and Protected Areas If the area and its surrounding are examined according to Annex V List of Sensitive Areas based on the EIA Regulation, the area is located under the scope of paragraph ğ of article 1 in the list Areas to be protected under the legislation of Turkey, within a forest area. The proposed doesn't exists in an area that is to be protected with regard to the national or international protected zones. 7
SECTION II LEGAL FRAMEWORK Turkish legal regulations and international standards have been taken into consideration while preparing the Environment Management Plan and while analyzing the activities of the during both the construction and operation process. Turkish Legal Regulations Under the scope of the ; Industrial Air Pollution Control Regulation which came into effect after being issued in the official gazette number 27537, dated 30.03.2010 Air Quality Assessment and Management which came into effect after being issued in the official gazette number 26898, dated 06.06.2008 Environmental Noise Assessment and Management which came into effect after being issued in the official gazette number 27601, dated 04.06.2010 Water Pollution Control Regulation which came into effect after being issued in the official gazette number 25687, dated 31.12.2004. Solid Wastes Control Regulation which came into effect after being issued in the official gazette number 20814, dated 14.03.1991 Medical Wastes Control Regulation which came into effect after being issued in the official gazette number 25883, dated 22.07.2005. Hazardous Waste Control Regulation which came into effect after being issued in the official gazette number 25755, dated 14.03.2005. Regulation on Business and Work Permits which came into effect after being issued in the official gazette number 25902, dated 10.08.2005. Regulation on Environmental Impact Assessment which came into effect after being issued in the official gazette number 26939, dated 17.07.2008 Regulation and Legislation on Occupational Health and Safety, issued under the Labour Law 4857 and according to regulation based on this. Excavation, and Demolition Waste Control Regulation number 25406, dated 18.03.2004. Regulation on Waste Oils Control number 26952, dated 30.07.2008 Regulation on the Protection of Wetlands which came into effect after being issued in the official gazette number 25818, dated 17.05.2005 Water Products Legislation, number 1380 Soil Conservation and Land Use Law number 5403, which came into effect after being issued in the official gazette number 25880, dated 19/07/2005 Pasture Law number 4342, which came into effect after being issued in the official gazette number 23272, dated 28/02/1998 8
International Criteria As the can also be financed by international loan lending institutions such as the IFC, the requirements of loan institutions were also considered while preparing this ÇYP (Environment Management Planning) and IFC performance standards (PS) were considered accordingly. The following PS s of IFC are applicable for the : PS2: Labour and Working Conditions The will contribute to the local economy by employing people for both construction and operation phases. During both phases, The provides workers with a safe and healthy work environment and the will not complicit in exposing workers to unsafe or unhealthy work environments. Besides necessary measures will be taken in order the prevent workers from any kind of accidents(refer to Mitigation Measures Section). PS3: Pollution Prevention and Abatement Since the is a renewable energy, there will be no emissions of Green House Gases, therefore by implementing this, approximately 75.000t/CO2 will be captured compared to the fossil-fuel power plants. The necessary measures will be taken against any pollution during construction phase(refer to Mitigation measures Section). PS4: Community Health and Safety and Protection Necessary measures will be taken (Refer to Mitigation Measures to see the relevant measures) to protect the health and safety of the community. PS5: Land acquisition and Resettlement The necessary expropriations will be implemented in accordance with the EMRA (Energy Market Regulatory Authority) and there will not be any involuntary resettlement due to the implementation of the proposed. 9
SECTION III MITIGATION MEASURES Under the headline of the Report, the said phases are given as the Tables of Mitigation Measures Plan constituted for the intention to have assuring the conformity of the activities are to be executed during planning / designing, construction and operation phases of the with the basis and procedures specified in the national environment legislations. Some impacts on environment may arise during both construction and operation phases. However, the impacts will be temporary and/or easily mitigated since Kapıdağ WPP is a renewable energy. Some possible impacts are indicated below seperately for construction and operation phases. Impacts in Phase: The major impacts on the environment in construction phase will be the domestic wastes of the stuff, the solid and hazardous wastes of the construction machines, the noise and dust originating from those machines and some impacts on landscape due to placing of the turbines. Besides, the fauna elements of the region may be affected temporarily, owing to the construction works. Impacts in the Operation Phase: The renewable energy s, especially the Wind Power Plants offers minimal environmental impacts in the construction phases since they have no emissions, no discharges and no other major environmental impacts like conventional power plants. The main environmental impacts of the Kapıdağ WPP will be on fauna elements although they can easily mitigated. Anyway, a detailed "Ornithology Report" has been prepared in order to assess the possible negative impacts on birds and to determine the necessary mitigation measures. Consequently, by becoming definite within the scope of the Project of the measures to be taken in order to minimize the environmental impacts are to be originated from the foregoing mentioned Project, it is thought that the environmental impacts of the activities to be realized within the scope of proposed, shall not reach to a critical level. The mitigation measures plan that has been prepared for this purpose is given in the Table 3. 10
Table 3 Mitigation Measures phase subject MEASURES TO BE TAKEN (***) cost Forming of Final Project It was discussed with the Ministry of Culture and Tourism that there is no any cultural heritage existing in the area. Within the RESPONSIBLE ORGANISATION (**) KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş. STARTING DATE Together with starting of Studies COMPLETION DATE Completion of final s Landscape Impact - During landscaping studies that will be conducted in the region easy-care kind of plants will be preferred, care of the planted trees will be made periodically and orderly by the staff, and it will be tried to keep the plants medium alive by means of care and renewal procedures. - It will be ensured that the landscaping elements formed around the plant would be in harmony in terms of colour, shape and position. Within the KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş Together with starting of Studies Completion of works Cultural and Historical Values Dust Particle Substance Emission (the dust is to be originated from opening of foundation pits as well as from the activities of equipment) - Where meeting the cultural assets have to be protected, the works will be stopped and the closest civilian authority or museum directorate will be informed. - When required, dust mask and eyeglasses will be used. - Watering will be made during arid seasons. - Top of trucks will be covered and the speed limit will not be exceeded. - The new and/or overhauled equipments will be preferred for the construction activities. No additional cost Within the KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. Together with starting of Studies Together with starting of Studies Completion of works Completion of works 11
phase subject MEASURES TO BE TAKEN (***) cost RESPONSIBLE ORGANISATION (**) STARTING DATE COMPLETION DATE Noise to be originated from Equipment at construction Phase - The construction site noise level will not exceed 70 dba. - will be conducted during day times (7 am to 7 pm) - If construction will be conducted during evening hours then necessary permits will be taken from municipality or relevant authority - If considered that the drinking water and waste water to be consumed by the personnel will be returned completely by wastewater, the domestic wastewater amount that will emerge during the construction phase will be 2,25m³/day and 0,75m³ during the operation phase. Within the KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. starting of works Completion of PHASE Waste water to be constituted by the Site -The domestic qualified wastewater that will emerge during the construction phase will be collected in the impermeable cesspool which will be conducted in accordance with the Regulation on the of Pits Where Sewer Duct is not Possible which came into force after being issued in the official gazette number 13783, dated 19.03.1971. The wastewater that will accumulate in the cesspool will be disposed by the nearest municipality -The provisions of the Water Pollution Control Regulation which came into force after being issued in the official gazette number 25687, dated 31.12.2004, shall be complied accordingly. Furthermore, provisions of Regulation Amendment Based on the Water Pollution Control Regulation which came into force after being issued in the official gazette number 26786, dated 13.02.2008 shall be complied and discharging of any wastewater to receiving bodies will be prevented. Within the KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. starting of works Completion of PHASE 12
Solid and hazardous waste originated from construction sites and construction areas The solid waste shall not be shed on areas where the environment could be adversely affected and shall be collected by being protected in closed standard waste containers according to Article 18 in the fourth section of the Regulation on Solid Waste Control. Collected solid waste will be disposed by the nearest municipality Within the EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. starting of works Completion of PHASE Spoiling and / or loss of Habitat MEASURES TO BE TAKEN (***) The excavation waste will be stored in the temporary storage area. The height of this storage will not exceed 1.5m and the slope will be under %5, in addition, the storage area will be design as it will not be affected by the wind and/or rain. After the finalisation of the construction, the excavation waste will be used for landscaping purpose. - By no means solid waste and liquid waste will be discharged onto the earth. cost Within the RESPONSIBLE ORGANISATION (**) KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. STARTING DATE Starting of works COMPLETION DATE Completion of works Protection of Fauna elements - During construction works, it is possible the fauna would be temporarily affected from the works. However, in the light of conducted research, the will not give harm to bird species. - In neither stage of the works, pesticide will be used. - Necessary warnings will be made to the working people against illegal hunting. Briefings will be organized - Necessary warnings will be made to the working people against illegal hunting. Within the KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. Starting of works Completion of works Grounding Health, security and Required protective outfit will be provided for Personnel. Within the KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ Starting of Completion of 13
Operation training Health and security Fire Risk -Appropriate sign plates will be installed at required places. The personnel will be trained on fire fighting, over work, first aid, etc. The provisions of labor law No. 4857 and the regulations and bylaws issued related with the said law will be respected and required all precautions will be taken to minimize possible risks and accidents. -Using personal protective equipment will be enforced. - Fire extinguishers and fire extinguishing system will be available and all required measures will be taken against a possible fire hazard. - In order to the prevent the staff to not to face any fire risk, the fire fighting systems have been already designed as they automatically activate in case of fire. The fire protection system of the mentioned will be made according to the national and international standards. The staff to be in charge in the plant will take required training and has them conscious in this regard. - In case of a possible fire, related intervention measures will be taken and will be worked in coordination with the concerning organizations by having them informed. Within the Within the ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. works Commissioning of plant Commissioning of plant works Expiring of economic life of the plant Expiring of economic life of the plant Operation Waste water -There won't be any discharge to receiving environment. -The domestic qualified wastewater will be collected in impermeable septic tanks and will be taken by the relevant municipality. Within the KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş Commissioning of plant Expiring of economic life of the plant EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. 14
phase Operation subject MEASURES TO BE TAKEN (***) cost Forestry Areas Protection Of Fauna Elements -The said is spread on an area that is 2.5 km long and 2.5 km wide. The area consists of forest lands. Necessary permissions shall be obtained from the General Directorate of Forestry for the works to be carried out on the forest area. -Necessary lands will be expropriated in accordance with the relevant law. - Illumination of the turbines will be canceled in the daylight. - The tips of the blades will be painted red, and fitted with day and night lighting; - To make the turbines and the blades more recognizable, they will be painted with reflecting lines absorbing the UV rays. - The 6 th Article of BERNE Convention will be complied during the whole operation phase. - The underground cables will be used in order to prevent the negative impacts of the cables. - The decisions of Hunting Central Committee (Ministry of Environment) will be complied. In addition, the survey to be done in the site (according to the Ornithology Report (Annex 1.) will provide information on; -Which of the possible flyways over the site are used by the migratory soaring birds. -How many migratory soaring birds might use the airspace over the wind farm. -What is the expected amount of mortality rate among birds. -If there is a very high mortality rate, that can be address to one of several turbines, which turbine has the highest risk of collision. -The relation of wind strength, wind direction and bird passage. -If any shutdown order is necessary and if so, for which turbines, for which periods of day and time. Within the Within the RESPONSIBLE ORGANISATION (**) KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ.. KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ.. STARTING DATE Commissioning of plant Commissioning of plant COMPLETION DATE Expiring of economic life of the plant Expiring of economic life of the plant 15
After the survey in spring and autumn the complete assessment of the wind farm regarding migratory soaring and other birds could be done and if deemed necessary, further mitigation measures will be decided. phase Closedown (*) subject MEASURES TO BE TAKEN (***) cost Land reclamation Considering the instructions of the Directorate of Forest Management, the dominant vegetation of the region shall be taken into consideration during planting operations and tree species shall be selected accordingly. Further to tree species, surface coating of herbaceous tissue shall be provided by seeding efforts in order to enable their spreading on surface in less time and in order to keep the soil surface. Within the RESPONSIBLE ORGANISATION (**) KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. STARTING DATE After Expiring of economic life of the plant COMPLETION DATE Until completion of closure works (*)Closedown phase is evaluated under the conditions where the activity has completed its economic life and the dismounting of the plant being brought to agenda. Subsequent to expiring of economic life of the plant, if a decision is taken that the plant would continue to its economical life by renewal, then the studies would be continued in the directions of specified matters and within the scope of the EIA Regulation for new plant. (**) It denotes who will be responsible for the said works. (***) While taking mentioned measures, all of the following Regulations will be followed: The Control Regulation of Industrial Sourced Air Pollution, the : Control Regulation of water Pollution, the Regulation of Assessment and management of Environmental Noise, the Regulation for the Pits to be Constructed where the construction of the Sewage duct / piping is not Possible, The Control Regulation of Solid Wastes, The Control Regulation of Soil Pollution, The Control Regulation of Excavation Soil, Building and wreckage wastes, The Control Regulation of Packing and Packing Wastes, and The Control Regulation of Dangerous Wastes, The Control Regulation of the Tires Completed their Economical Lives, The Control Regulation of Vegetal Waste Oils, The Control Regulation of Groundings in Electrical Wiring, The Control Regulation of the Regulation of occupational health and safety, the Regulation of Security and Health Signs, the Regulation of Personnel Protective Outfits at work places., the Regulation of health and Safety Conditions at the usage of Work equipment., etc. 16
SECTION IV MONITORING PLAN According to the provisions of the Clause no. 18.3 of the Regulation for Environmental Impact Assessment that was published in the Official Gazette on 17.07.2008 with no. 26939 and came into force thereafter, the owner or its authorized representative, after getting the Environmental Impact Assessment is Positive or the Environmental Impact Assessment is not required resolution by Project Owner, is obliged to submit the monitoring reports pertain to the commencement, construction, operation and post operation periods of investment, to the Ministry of Governorship. The monitoring reports planned and tracing has been made by the EN-ÇEV ENERGY ENVIRONMENTAL INVESTMENTS CONSULTANCY L. C. Firm and will be submitted to the Ministry of Environment and Forestry as specified quarterly periods. The monitoring reports drawn up for the activity to be made is given in the Table 4. 17
Table 4 Monitoring Plan Phase Subject Parameters To Be Monitored Places On Where Parameters Would Be Monitored Tracing Method Of Parameters Measurement Interval Of The Parameters To Be Monitored Reasons Of Parameter Monitoring Cost Controlling Institute Date Of Commencement Date Of Completion Preconstruction Landscaping Impact Impact from Visual Standpoint At Plant Area & construction site Visual Analysis At the selection of construction site place along Study works Protection of Areas having natural or cultural property Within the KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. By starting of study & works Starting of Studies Phase Subject Cultural and Historical values Parameters To Be Monitored Informing the Authorities in case of discovering any cultural item Places On Where Parameters Would Be Monitored in plant area and vicinity Tracing Method Of Parameters As Visual Measurement Interval Of The Parameters To Be Monitored When it is encountered to cultural asset Reasons Of Parameter Monitoring For the intention to protect cultural assets and being in harmony with the Law on protection of cultural & Cost Not much (provid ed not harm cultural assets) Controlling Institute Museum Directorate, cultural and natural heritage preservation board, provincial culture and tourism directorate Date Of Commencement Starting of Studies Date Of Completion Completion of Works 18
nature assets Dust particle substance Noise Waste water to be originated from constructio n sites Emission of Dust particle substance (to be met from digging of foundation pits and from the activities of equipment) Level of formed noise Handling of Waste water At construction site At nearest buildings and construction site At construction site As Visual and negotiations with close settlements Measuring Device and conversations with the people from vicinity As Visual When arisen of any complain from public during construction Monthly at construction area and upon any complaint Continuously the Control Regulation of Industrial Sourced Air Pollution Ensuring to have the Regulation of Assessment and management of Environmental Noise the Regulation of occupational health and safety are followed The wastewater will be collected in the impermeable septic tanks and will be disposed by the relevant municipality. Within the Within the Within the Province Environment and Forest Directorate Province Environment and Forest Directorate provincial department of environment and forestry Starting of Studies Starting of Studies Starting of Studies Completion of Works Completion of Works Completion of Works 19
Phase Subject Solid and Hazardous wastes sourced from works and to be originated from sites Parameters To Be Monitored Handling of Solid and Hazardous Wastes Places On Where Parameters Would Be Monitored At Area and site Tracing Method Of Parameters Visual Measurement Interval Of The Parameters To Be Monitored This is determined for solid wastes as per the contract to be made with municipality The terms specified for dangerous wastes in the Regulation Reasons Of Parameter Monitoring Ensuring to have the Control Regulation of water solution & Soil Pollution and the Control Regulation of dangerous wastes and the Control Regulation of waste Oils are followed Cost Within the Controlling Institute Closest Municipalities & Province Environment and Forest Directorate Date Of Commencement Starting of Works Date Of Completion Completion of Works Soil & Vegetation - getting lost of - Proper storing of excavation - Storing of vegetal soil - At Area - At terrain Visual Weekly 3-4 Weeks 3-4 Weeks - Prevention the destruction of natural vegetation and compensating of constituted destruction - Excavation earth, the Control Regulation of and wreckage - Prevention of vegetal soil lost Within the Province Environment and Forest Directorate Starting of Works Completion of Works Woodland Areas Impact on vegetation and agricultural products At construction areas As visual Negotiations with farmers Upon public complaint Pruning of plants appropriately, protection of root structure, hence, to rehabilitate the area to have previous form Within the (No additional cost on condition that no harm to agricultural areas) Province / district directorate of agriculture Starting of Works Completion of Works 20
Phase Subject Health and security Parameters To Be Monitored Sustainability of the occupational health and safety Places On Where Parameters Would Be Monitored Maintenance persons / Plant area Tracing Method Of Parameters As visual Measurement Interval Of The Parameters To Be Monitored Semi annually at maintenance works Reasons Of Parameter Monitoring Ensuring to have the All Regulation of occupational health and safety are followed Cost Within the Controlling Institute KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. Date Of Commencement Commissioning of the Plant Date Of Completion Completion the economical life of the plant Operation Fauna Elements Seasonal migration of migratory bird Plant area As Visual Seasonal (Especially Migration Periods which are defined in the Ornithology Report) To see the possible negative impacts on birds if any Within the EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. Commissioning of the Plant Completion the economic life of the plant 21
Fire Risk Preparedness against fire Within plant area By checking with control teams and / or forestry operation chieftaincies, with the technical tests and standard maintenance works Semi-annually Due to fire risk, respecting to fire safety principals specified in the Regulation of Electricity hightension current installation, to reduce accident risk and prevent interruptions for repairing of deteriorated, worn out parts. Within the KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. Commissioning of the Plant Completion the economical life of the plant Phase closedown Subject Solid and Hazardous wastes sourced from works and to be originated from site Parameters To Be Monitored Handling of Solid and Hazardous Wastes Places On Where Parameters Would Be Monitored At construction areas and construction site Tracing Method Of Parameters As visual Measurement Interval Of The Parameters To Be Monitored This is determined for solid wastes as per the contract to be made with municipality The terms specified for dangerous wastes in the regulation Reasons Of Parameter Monitoring Ensuring to have the Control Regulation of water solution & Soil Pollution and the Control Regulation of dangerous wastes and the Control Regulation of waste Oils are followed Cost Within the Controlling Institute Closest Municipalities, provincial department of environment and forestry Date Of Commence ment After Completion the economical life of the plant Date Of Completion Until completion of closure procedures 22
land reclamation Surface cover, Works carried out for land reclamation Plant area Visual Monthly Rehabilitation of used land to its previous condition and land reclamation Within the KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC. A.Ş EN-ÇEV ENERJİ ÇEVRE YATIRIMLARI VE DNŞ. LTD. ŞTİ. After Completion the economical life of the plant Until completion of closure procedures 23
SECTION V PROGRAM At the section with Program headline of the Report, the schedule in respect to commencement and completion dates specified in the Measures and Monitoring Plan that has been drawn up for the planned Kapıdağ Wind Power Plant Project that was planned by the KAPIDAĞ WIND ENERGY PLANT ELECTRIC PRODUCTION INDUSTRIAL TRADING I.C. is submitted on the Table 5. 24
Table 5 Program PRE MONTHS SUBJECT CONSTR UCTION 1 2 3 4 5 6 7 8 9 10 11 12 Historical, Cultural, archaeological assets IN CASE OF ENCOUNTERING WITH CULTURE ASSET Excavation wastes WILL BE MADE MONTHLY Surface waters WILL BE MADE MONTHLY Dust / Air Pollution originated ONCE PER MONTH AT THE TIMES WHERE EXCAVATION FORMATION WOULD BE MADE AND from Material Transportation UPON COMPLAINING OF NEIGHBORHOOD PEOPLE Post Construct ion Dust / Air Pollution originated from machinery and Transportation ONCE PER MONTH AT THE TIMES WHERE EXCAVATION FORMATION WOULD BE MADE AND UPON COMPLAINING OF NEIGHBORHOOD PEOPLE Waste waters WITHIN THE PERIODS SPECIFIED AT DISCHARGE PERMISSION CERTIFICATE Noise Pollution ONCE PER MONTH AT THE TIMES WHERE EXCAVATION FORMATION WOULD BE MADE AND UPON COMPLAINING OF NEIGHBORHOOD PEOPLE Occupational health and safety CONTINUAL Public safety CONTINUAL Solid wastes FOR SOLID WASTES; WITHIN THE PERIODS DETERMİNED IN THE AGREEMENT WITH THE MUNCIPALITY, FOR HAZARDOUS WASTES;WITH A PERIOD OF SIX MONTHS Transportation & Communication DURING ENTRY TO SITE / EXIT FROM SITE OF MATERIALS Waste engine oils originated from Equipment (maintenance WHEN THE WASTE OIL COLLECTION CONTAINER IS FULL / Repair ) Noise Pollution ONCE PER MONTH AND UPON COMPLAINING OF NEIGHBORHOOD PEOPLE 25
SECTION VI INSTITUTIONAL ARRANGEMENTS In this Section, it will be given information on the measures to be taken and monitoring related institutional responsibility and procedures, their connections with environmental management, environmental data flow, and decision making hierarchy regarding environmental management and be talked about how and in what way the tracing data would be used to assure a reliable environmental performance. The measures to be taken and institutional responsibility and procedures and their connections with environmental management: The Monitoring Plan that has been developed for the purpose of being capable to check the performance conditions of the principals and procedures, which is specified in the Preventions Plans Section II that covers the precautions are to be taken in order to be able to demote possible negative effects, which are originated from the activities to be executed during planning / designing, construction, and operation phases of the Project of Kapıdağ Wind Power Plant Project that has been planned by the KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC A.Ş. to minimum. The mentioned plans, at the same time comprise of said institution and organizations as well. Legal Matters In order to constitute and apply a well running environmental management plan, the principals apply to monitoring data has to be specified perfectly. Within this scope, it is adhered to the aspects being designated in the published national regulations and communiqués. In Turkey, on environment management, the provisions of the communiqué of competency, that was published in the Official Gazette dated 08.08.2008 and numbered 26961 is taken as basis. Information Flow for KAPIDAĞ WIND POWER PROJECT : The environmental data flow being composed for the scheduled Project of Kapıdağ Wind Power Plant Project, which has been planned by the KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM SANAYİ VE TİC A.Ş. has been constituted by adhering to the principals specified in the said regulations and communiqués and they are introduced as the construction phase and operation phase in the Figure 2 and Figure 3 respectively. 26
Land Preparing, Digging for Turbines Control Room, Transformer Station and Placing the 17 Turbines Underground Cabling Connection to National System Figure 2 Flow Diagram of Phase 27
SECTION VII PUBLIC CONSULTATION The presentation of information meeting related with Carbon certificate Gold certificate that has been organized on date 08.10.2010 by company at Erdek teacher s lodge has been made by the officials of GAIA Carbonfinance Ltd. Before the mentioned meeting all the stakeholders such as NGOs local authorities and the people from vicinity have been informed accordingly. The aim of that meeting was to give information regarding the renewable energy sources(especially wind power plants), to give information regarding the proposed to get feedbacks and to satisfy stakeholders comments/concerns if any. Such kind of meetings are being so beneficial to create environmental awareness for the region. Moreover those meetings are important for the participant itself since the concerns are taken into account for both construction and operation phases of the. There are some concerns regarding the birds and location of the ( which may be regarded as natural park) in the meeting. After the meeting a detailed ornithology report has been prepared to an expert (which is submitted separately) in order to assess the possible negative impacts on birds and determine the mitigation measures if any. Minutes of Meeting At the meeting that has contained information about approximately 100 persons has participated including Erdek district governor Ismail Kaygısız, Erdek Mayor Huseyin Aysan, Ali Isık Headman of Narlı village, nongovernmental organizations and the community of the region. The information of presence of 4316 plant types, the definition of region a region with protection priority ; the company to commence the investment upon obtaining all legal permits, the environment will be imposed minimum damage from the environment and social point of view, the company have purchased property on the area by consent and in relation with expropriation activities the EPDK(Energy Market Regulatory Authority) process is being traced has been obtained. It has been learnt that the previously mentioned 41 each turbines in has been revised as 19 (and now concluded as17). It has been stated that the 2 bird types (Colombia Livia and Falco Pregrinus) that have been brought into agenda by European investment bank are not present in region. It has been stated that in case of the facility s commission of facility; it will establish 74.000 tons C0 2 emission decrease. The officials of company has stated for the purpose of decreasing the worry of the community they would be able to make visit organization at the RES location that has been made at Manyas. 28
Questions and Answers: The questions and the answers given to these questions raised by the participants during the meeting can be summarized as follows: Q1: How many turbines will be there within the borders of Narlı village? A1: ( Mrs Sevinc) All of the 19 turbines included in are remained in the borders of Narlı. Q2: Will road pass from our gardens, land?( I think this question is related with whether or not there will be any damage). A2: ( Mrs Sevinc): This is not the only of AKSA. We have 5 more power plants. Until this time the arrangements have been made to impose minimum damage. The damages caused have been compensated. If we should cause any damage this will be definitely compensated. Q3: Will there be noise in the vicinity of turbines? A3: With respect to noise the border value that has been foreseen by ministry will not be exceeded. The necessary studies related with this have been made. In addition with the old technologies the noise was becoming a problem but the turbines that we use in here belong to Vestas company of Denmark which is one of the best of the world and they use the state of the art technology. In our present power plants there is not any noise problem. Erdek Mayor Huseyin Aysan has obtained promise and has made interpretation related with. He has stated that AKSA is a big company and however it is mandatory to comply with the rules of EPDK(Energy Market Regulatory Authority) and other related institutions. By stating that the aim of this meeting is to inform, to make conscious of community and has concluded that in case of encountering any problem related with they will make the necessary objection as Erdek community. However, he has stated that he is not expecting to encounter any problem and it is necessary to support such a beautiful at this phase. He has pointed out the importance of constructing such clean technologies instead of having contaminated technologies, nuclear power plants in the region. Mrs Sevinc of AKSA has stated that that they were for definitely not to have any problem and they will strive their best to prevent this. At this time one of the participants in relation with noise problem has stated that an acquaintance of his under the name of Abdullah Suteri living in Germany has called him and has stated that they do not suffer any noise problems although there was a wind farm located in their vicinity. Q4: Is this being made to meet the consumption of region or otherwise is it being constructed to meet the need of the industrial facilities being planned to be installed in the future? Has any survey been made related with the energy consumption of region? Why energy power plants in excess of the region s need are being constructed? Or otherwise are the investments are being shifted in here?. 29
A4:( Mrs Sevinc ) We are selling the generated energy to Turkish grid. It is not a matter of question to sell to region. ( Mr Gurkan ) The main thing being made in here is filing of the pool that is meeting the total demand of Turkey. The power plant is being installed the location that we find the wind. The aim is not to increase the energy supply because in the future the demand will increase in here. Q5: (Ali Isık Headman of Narlı village) What is the space to be covered with this? A5: ( Mrs Sevinc )-By showing the site on map) We are taking place over those two hills. I do not know how many km 2 area we cover. However, we will not use all of the land. In addition, we do not take place in any person s property. Q6: Kapıdag is a mountainous land. There are forests in here. As a result of this animals can be harmed due to radiation, electromagnetic field and noise type of reasons. Why do you use an emptier area? A6: ( Mrs Sevinc )We have wind farm located at Samlı/Manyas. The animals can pasture around turbines. We never had any problem related with this. In addition, we have applied to EPDK by making the necessary measurements. The wind in here was perfect. We have obtained our license in this way. For this reason we cannot change this area. On the other hand the countries like Germany, Denmark that has improved the wind energy very well are the countries with intensive agricultural activities. In those countries there are very many wind farms. This does not cause any problem. We can only have a few amount of electromagnetic impact on our energy transmission lines. This will be very few with respect to the impact of present transformer stations. Q7: No power plant can be installed at every place that wind is good. This area is national park land. As far as I know in England the wind farms had been canceled in as they were located within national park area. A 7: ( Mrs Sevinc) In the area that we are present there is not any sit area or national park. 30
RESOURCES Ministry of Environment, July 2008: Environmental Impact Assessment Regulation, Ankara Ministry of Environment, July 2009 Industrial Based Air Pollution Control Regulation Ministry of Environment, June 2010, Evaluation and Management of Environmental Noise, Ministry of Environment, December 2004 Water Pollution Control Regulation, Ministry of Environment, March 1991, Solid Waste Control Regulation Labor Law 4857 and the regulation Worker Health and Safety Related Laws and Regulations being issued according to this Law. TÇV, June 1992: Turkish Environmental Legislation, Önder Printing, Ankara. Research Associate Taşgetiren S., Wind Energy, Pamukkale University Engineering Faculty, Denizli Electricity Generation from Wind Energy and Assessment of Environmental Impacts for the province of Kayseri, C.Ü. University, Faculty of Arts, Science and Technology Journal Volume 29, Issue: 1 31
THE PERSONNEL IN CHARGE OF PREPERATION OF KAPIDAĞ WIND POWER PLANT PROJECT S ENVIRONMENTAL MANAGEMENT PLAN FOR KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM VE TİC. A.Ş. Name Position Profession Birol ÇOBAN Deputy Director General Geology Engineer Huriye ULUSOY EIA Unit Coordinator Biologist Özer Emrah ÖZTÜRK Project Manager International Relations Berkin GÖRGÜN Project Engineer Hydrogeology Engineer Yücel Suat GÜNGÖR Project Engineer Environmental Engineer 32