PRE-FILED DIRECT TESTIMONY

Similar documents
OPERATIONS CONTROL CENTER

THE LEADER IN OPERATIONS & MAINTENANCE SERVICES

THE NARRAGANSETT ELECTRIC COMPANY d/b/a NATIONAL GRID INVESTIGATION AS TO THE PROPRIETY OF PROPOSED TARIFF CHANGES RIPUC DOCKET NO.

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION'^^ j E DIRECT TESTIMONY RAJESH GUPTA PROJECT MANAGER, ENTERGY SERVICES, INC.

Pendleton Solar Energy Centre COMMUNITY ENGAGEMENT PLAN

STATE OF VERMONT PUBLIC SERVICE BOARD

Statement of Qualifications

CLEAN LINE ENERGY PARTNERS:

Solar Project Pricing Index

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions. Electric Grid Operations

Energy Systems Integration

The Leader in Wind Energy

SMALL SOLAR Nebraska Wind and Solar Conference and Exhibition. Guy C. Smith October 29, 2014

Tufts Consulting Group: Macedonian Energy

Comanche Trail Pipeline Project. September 2015

Tehachapi Wind Energy Storage Project (TSP)

139 FERC 61,088 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING MARKET-BASED RATE AUTHORIZATION AND REQUEST FOR WAIVERS

Who are we? Jens Lohmueller, Credit Union Central of Ontario 3/9/2005

PUBLIC UTILITIES COMMISSIO~t~ Docket No. DE 15-

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, Electric Grid Operations

Generation and Transmission Interconnection Process

Decades of experience. 47,000 MW. of operational assets. Top-decile performance. It all means more profitability for you.

Expanding Your Business Through Franchising What Steps You Need to Take to Successfully Franchise Your Business. By Robert J.

PREMIER SERVICES MAXIMIZE PERFORMANCE AND REDUCE RISK

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, Electric Grid Operations

100% Renewable Energy in Hawaii: It s No Longer A Matter of When

PREPARED DIRECT TESTIMONY OF MICHAEL R. WOODRUFF ON BEHALF OF SAN DIEGO GAS & ELECTRIC COMPANY AND SOUTHERN CALIFORNIA GAS COMPANY

Morris S. Stover, P.E. Sponsor, Transmission Area

Onshore Wind Services

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE

PROJECT EXPERIENCE Development/Transaction Support United States MANAGING DIRECTOR

142 FERC 62,199 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF JURISDICTIONAL FACILITIES

GE Energy. Solutions

COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011

THOMAS R. JOHNSON SUMMARY EXPERIENCE HIGHLIGHTS

PENNSYLVANIA BACKGROUND INCENTIVES FOR WIND DEVELOPMENT

Integrating Renewable Electricity on the Grid. A Report by the APS Panel on Public Affairs

Trade with Confidence. Trade at MIAX. MIAMI INTERNATIONAL HOLDINGS ANNOUNCES DATA CENTER MIGRATION, DISASTER RECOVERY

NEW JERSEY ANGEL INVESTOR TAX CREDIT FREQUENTLY ASKED QUESTIONS (FAQ)

Solar Deployment and Policy. Justin Baca. Director of Research Solar Energy Industries Association

DG Energy Partners Solar Project Pricing Index. April Advisory Brokerage Research

Two Oil Companies use wind farm tax breaks to shelter their profits from federal and state income tax

Delivering Clean Energy

QUARTERLY FOCUS: NATURAL GAS EXPORTS TO MEXICO

Operations & Maintenance for Maximum Energy Yield

Northern Middlesex Council of Governments

North American Electric Reliability Corporation (NERC) Cyber Security Standard

Smart energy, clean energy, today s energy. The. Mariah. wind power project

Naperville Smart Grid Initiative

Dairyland Power Cooperative Power Through Partnerships. Neil Kennebeck September 27, 2013

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. ) Docket No. ER14-

Banking on Renewables

Advisory Brokerage Research

Deep Dive on Microgrid Technologies

HVDC Transmission Line Project for Moving ERCOT Wind Into SERC

City of Vernon Request for Expressions of Interest and Information (RFI)

Greg Wortham. Mayor Sweetwater Texas Wind Energy Clearinghouse. Pure Energy Expo Clovis, New Mexico October 15, 2013

Position Description: Chief Information Officer Department: Information Technology Information Technology FLSA Status: Exempt. Revised: October, 2014

Water and Natural Resource Management Issues in California

Appendix C-2. Entergy Services, Inc. June 8, 2016

ALASKA NATURAL GAS PIPELINE PROJECT

CAPABILITIES IN NORTH AMERICA

High Penetration of Distributed Solar PV Generation

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

PUBLIC DOCUMENT TRADE SECRET DATA EXCISED. Before the Minnesota Public Utilities Commission State of Minnesota. Docket No.

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * *

Fact Sheet: Siemens Energy in the US

Appendix G Process For Protection of Proposal Information For

PROCEDURES FOR IMPLEMENTATION of FERC STANDARDS OF CONDUCT for OHIO VALLEY ELECTRIC CORPORATION AND INDIANA KENTUCKY ELECTRIC CORPORATION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Wind Service Offshore. We can t conquer the elements But we can outthink them

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

Retention & Destruction

Combined Heat & Power. Discussion with Connecticut Energy Advisory Board. February 23, 2010

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Successful Partnerships. Sid Saunders. June 3, 2015

The Advantages of an Integrated Factory Acceptance Test in an ICS Environment

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS 89 JEFFERSON BOULEVARD WARWICK, RHODE ISLAND 02888

Tara A. Higgins. Profile. Engagements. Practices. Education. Honors. Partner Energy and Infrastructure. New York (212)

THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM FOR RESIDENTIAL CUSTOMERS

BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION

Re: Request for No-Action Letter on behalf of FSP Phoenix Tower Corp. and FSP Phoenix Tower Corp. Liquidating Trust

Greg Wortham. Mayor Sweetwater Texas Wind Energy Clearinghouse. Wyoming Infrastructure Authority Spring Board Meeting Cheyenne, Wyoming May 15, 2013

Medicaid & CHIP: November Monthly Applications and Eligibility Determinations Report December 20, 2013

Energy Partnership with SunEdison

SMA SERVICE FOR PV POWER PLANTS

John Chaimanis, Co-Founder and Managing Director, Kendall Sustainable Infrastructure (KSI)

Rapid Prototyping Reveals

Building Relationships by Leveraging your Supply Chain. An Oracle White Paper December 2001

Access Northeast Project New England Energy Reliability Solution

ALCOA POWER GENERATING INC. Long Sault Division. Open Access Transmission Tariff

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * *

Electricity from the Power Plant To the Consumer

AAPG 2011 Annual Convention & Exhibition April 10, 2011

ENERGYWORKS WINDPOWER PROFESSIONAL SERVICES

Business Continuity Plan Summary (Revised November 26, 2012)

Reform of the Grenada Electricity Sector

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION. Before the Atomic Safety and Licensing Board

Transmission Lines. Information and Options for Landowners

Transcription:

RIPUC DOCKET NO. 4574 REVIEW OF POWER PURCHASE AGREEMENT COPENHAGEN WIND FARM, LLC PURSUANT TO R.I. GEN. LAWS 39-26.1-1 ET SEQ. WITNESS: ROBERT CROWELL ON BEHALF OF INTERVENOR COPENHAGEN WIND FARM, LLC SEPTEMBER 11, 2015 PRE-FILED DIRECT TESTIMONY OF ROBERT CROWELL

RIPUC DOCKET NO. 4574 REVIEW OF POWER PURCHASE AGREEMENT COPENHAGEN WIND FARM, LLC PURSUANT TO R.I. GEN. LAWS 39-26.1-1 ET SEQ. WITNESS: ROBERT CROWELL ON BEHALF OF INTERVENOR COPENHAGEN WIND FARM, LLC SEPTEMBER 11, 2015 Table of Contents I. Introduction and Qualifications...1 II. Purpose of Testimony...2 III. Overview of the Copenhagen Wind Farm...3 IV. Current Status of the Development of the Copenhagen Wind Farm...3 V. The Entities Involved in Developing Copenhagen Wind Farm...6 VI. Experience Developing Wind Farm Projects...7 VII. Conclusion...9

RIPUC DOCKET NO. 4574 REVIEW OF POWER PURCHASE AGREEMENT COPENHAGEN WIND FARM, LLC PURSUANT TO R.I. GEN. LAWS 39-26.1-1 ET SEQ. WITNESS: ROBERT CROWELL ON BEHALF OF INTERVENOR COPENHAGEN WIND FARM, LLC SEPTEMBER 11, 2015 PAGE 1 OF 9 1 2 3 4 I. Introduction and Qualifications Q. Please state your name and business address. A. My name is Robert Crowell. My business address is OwnEnergy, Inc., an EDF Renewable Energy Company, 45 Main Street, Suite 536, Brooklyn, New York, 11201. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Q. Please describe your general background and qualifications. A. I earned a Bachelor of Science degree in Civil Engineering from Rose-Hulman Institute of Technology in 1984 and an MBA from Illinois State University in 1995. I have more than 31 years of multi-discipline technical, construction, operating, and executive experience in the utility and independent power segments of the energy industry. I am currently the Chief Operating Officer of OwnEnergy, Inc. ( OwnEnergy ) and a Vice President of Development at EDF Renewable Energy, Inc. ( EDF Renewable Energy ). I have developed two natural gas-fired electric generating plants in eastern Kentucky with a total installed capacity of 830 MW, which were constructed in 2000 and 2001. Since 2001, I have developed or provided executive oversight to the development of 15 wind farms in 8 different states totaling more than 1,256 MW installed capacity. Each of these projects is either in operation or under construction. Since 2013, I have also provided executive oversight for OwnEnergy s construction management and asset management services. 20 21 Q. What is your relationship to Copenhagen Wind Farm, LLC?

RIPUC DOCKET NO. 4574 REVIEW OF POWER PURCHASE AGREEMENT COPENHAGEN WIND FARM, LLC PURSUANT TO R.I. GEN. LAWS 39-26.1-1 ET SEQ. WITNESS: ROBERT CROWELL ON BEHALF OF INTERVENOR COPENHAGEN WIND FARM, LLC SEPTEMBER 11, 2015 PAGE 2 OF 9 1 2 3 4 5 6 A. I have had executive oversight responsibilities since OwnEnergy began developing the project in 2011. My involvement in the project includes obtaining land control, managing public relations, securing environmental and technical studies, coordinating the wind resource analysis, and oversight of all permitting. Prior to the completion of the merger of OwnEnergy, Inc. and EDF Renewable Energy, I served as a Vice President of Copenhagen Wind Farm, LLC. 7 8 9 10 11 Q. Have you previously testified in regulatory proceedings before the Rhode Island Public Utilities Commission or a similar regulatory body in another state? A. Yes. I have provided testimony before the Minnesota Public Utilities Commission for the permitting of two wind farms in Minnesota. 12 13 II. Purpose of Testimony 14 15 16 17 18 19 20 Q. What is the purpose of your testimony? A. My testimony is offered in support of Power Purchase Agreement ( PPA ) entered into between The Narragansett Electric Company d/b/a National Grid ( National Grid ) and Copenhagen Wind Farm, LLC ( Copenhagen ), which National Grid submitted to the Rhode Island Public Utilities Commission (the Commission ) for review and approval in this docket. My testimony will provide information about the progress of the development of the Copenhagen Wind Farm, the plans to meet the commercial operation

RIPUC DOCKET NO. 4574 REVIEW OF POWER PURCHASE AGREEMENT COPENHAGEN WIND FARM, LLC PURSUANT TO R.I. GEN. LAWS 39-26.1-1 ET SEQ. WITNESS: ROBERT CROWELL ON BEHALF OF INTERVENOR COPENHAGEN WIND FARM, LLC SEPTEMBER 11, 2015 PAGE 3 OF 9 1 2 date for the wind farm, and the experience of OwnEnergy and EDF Renewable Energy in wind farm development, operation, and maintenance. 3 4 III. Overview of the Copenhagen Wind Farm 5 6 7 8 9 10 Q. Please provide a brief description of the Copenhagen Wind Farm. A. The Copenhagen Wind Farm is a 79.9 MW wind powered electric generation project under development in Denmark, New York. The project will interconnect to the electric power system on the Niagara Mohawk Power Corporation d/b/a National Grid Black River Lighthouse Hill 115 kv #6 line. The point of interconnection will be located approximately 4.89 miles from Black River and 30.51 miles from Lighthouse Hill. 11 12 13 Q. What is the projected commercial operation date for the Copenhagen Wind Farm? A. The current projected commercial operation date is December 31, 2017. 14 15 IV. Current Status of the Development of the Copenhagen Wind Farm 16 17 18 19 20 21 Q. What is the status of Copenhagen s efforts to obtain the necessary permits for the project? A. Copenhagen has started the permitting process and anticipates it will receive all permits required to start construction no later than May 2016. Copenhagen intends to submit a Joint Application for Permit to the US Army Corps of Engineers and New York State Department of Environmental Conservation (NYSDEC) no later than October 2015 and

RIPUC DOCKET NO. 4574 REVIEW OF POWER PURCHASE AGREEMENT COPENHAGEN WIND FARM, LLC PURSUANT TO R.I. GEN. LAWS 39-26.1-1 ET SEQ. WITNESS: ROBERT CROWELL ON BEHALF OF INTERVENOR COPENHAGEN WIND FARM, LLC SEPTEMBER 11, 2015 PAGE 4 OF 9 1 2 3 4 5 6 7 8 anticipates receiving the necessary wetland fill, stream crossing, and water quality approvals from both agencies in the first quarter of 2016. Copenhagen also plans to submit an application to NYSDEC for a State Pollution Discharge Elimination System (SPDES) permit in that time frame. Lastly, Copenhagen intends to submit applications to the New York Department of Transportation (NYDOT) to allow the project to temporarily improve various public roads to allow for the delivery of oversized project components. Copenhagen anticipates receiving this permit from NYDOT in the first quarter of 2016. 9 10 11 12 13 14 15 16 17 18 Additionally, Copenhagen has voluntarily committed to securing an Individual Take Permit (ITP) from the US Fish and Wildlife Service (FWS) to address the potential risk of harm to federally endangered bat species. This permit is not required for construction or operation. Nevertheless, Copenhagen has spent more than three years in consultation with the FWS on plans that will culminate in the receipt of an ITP, likely in second quarter of 2016. Copenhagen anticipates receiving a technical assistance letter from the FWS in October 2015 that commits the project to total avoidance measures while awaiting receipt of the ITP, such that even if the ITP is not issued in the expected timeframe the project could still start construction and operation. 19 20 21 Copenhagen has already received conditional site plan approval for the development of the wind farm. Copenhagen is in the process of completing site plan review and receipt

RIPUC DOCKET NO. 4574 REVIEW OF POWER PURCHASE AGREEMENT COPENHAGEN WIND FARM, LLC PURSUANT TO R.I. GEN. LAWS 39-26.1-1 ET SEQ. WITNESS: ROBERT CROWELL ON BEHALF OF INTERVENOR COPENHAGEN WIND FARM, LLC SEPTEMBER 11, 2015 PAGE 5 OF 9 1 2 of a special use permit covering the development of the 8.8 mile 115kV transmission line. Copenhagen expects to complete this process in the fourth quarter of 2015. 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Q. Are the facilities necessary for Copenhagen to deliver the energy to the Delivery Point defined in the PPA already in place? A. Stand-alone system upgrades and select network upgrades must be completed before Copenhagen can deliver energy to the PPA Delivery Point. The stand-alone upgrade consists of a new 3-breaker ring bus point of interconnection (POI) station adjacent to the existing Black River Lighthouse Hill 115kV line #6. Additional network upgrades include short loop-in/loop-out structures that line the new POI station to the existing electrical grid, as well as upgrades to the protection and communication systems within the Black River and Lighthouse Hill stations. National Grid New York expects to complete development of functional specifications for these upgrades in December 2015. Following the issuance of the functional specification, Copenhagen will prepare detailed engineering drawings for the POI station for National Grid New York s approval. Then, Copenhagen will build the POI station. National Grid - New York will manage the engineering, procurement, and construction of the other network upgrades. At present, National Grid New York has committed to accommodating a commercial operation date in May 2017, however, Copenhagen and National Grid New York are working together to try to shorten this time line. 21

RIPUC DOCKET NO. 4574 REVIEW OF POWER PURCHASE AGREEMENT COPENHAGEN WIND FARM, LLC PURSUANT TO R.I. GEN. LAWS 39-26.1-1 ET SEQ. WITNESS: ROBERT CROWELL ON BEHALF OF INTERVENOR COPENHAGEN WIND FARM, LLC SEPTEMBER 11, 2015 PAGE 6 OF 9 1 2 3 4 5 6 Q. Please describe any other additional steps Copenhagen has taken to date to meet the proposed commercial operation date? A. Through OwnEnergy s merger with EDF-RE, Copenhagen has secured the ability to balance-sheet-finance the project s construction; a significant milestone in the development of the project. Copenhagen also is negotiating a turbine supply agreement with General Electric for turbine deliveries in fourth quarter of 2016. 7 8 9 10 11 12 Q. Are the steps you have described above typical for the development of a land-based wind farm of this size and is that development on track? A. Yes. This project is on track and proceeding through the typical progression of actions and steps. The sale of the energy through the procurement of a PPA is a key element in advancing the project and moving into the active construction phase. 13 14 15 16 17 18 19 20 21 V. The Entities Involved in Developing Copenhagen Wind Farm Q. What is the corporate relationship between Copenhagen, OwnEnergy, Inc., and EDF Renewable Energy, Inc.? A. Through a recent acquisition by EDF Renewable Energy, Inc. of OwnEnergy, Inc., EDF Renewable Energy, Inc. essentially owns the Copenhagen Wind farm. Here are the details and corporate structure: The Copenhagen Wind Farm is owned by Copenhagen Wind Farm, LLC, a Delaware limited liability company. Copenhagen Wind Farm Holdings, LLC, a Delaware limited liability company is the sole Member and owns 100%

RIPUC DOCKET NO. 4574 REVIEW OF POWER PURCHASE AGREEMENT COPENHAGEN WIND FARM, LLC PURSUANT TO R.I. GEN. LAWS 39-26.1-1 ET SEQ. WITNESS: ROBERT CROWELL ON BEHALF OF INTERVENOR COPENHAGEN WIND FARM, LLC SEPTEMBER 11, 2015 PAGE 7 OF 9 1 2 3 4 5 6 7 8 9 of the membership interests of Copenhagen Wind Farm, LLC. OE Copenhagen Wind Farm Holdings, LLC, a Delaware limited liability company is the Managing Member of and owns 87.5% of Copenhagen Wind Farm Holdings, LLC. OE Copenhagen Holding Company, LLC, a Delaware limited liability company is the Managing Member of and owns 87.5% of OE Copenhagen Wind Farm Holdings. OwnEnergy. is the sole Member of and owns 100% of OE Copenhagen Holding Company, LLC. EDF Renewable Energy owns approximately 95% of the stock of OwnEnergy, with the remainder held by common stockholders. It is anticipated that EDF Renewable Energy will own 100% of OwnEnergy in the near future. 10 11 VI. Experience Developing Wind Farm Projects 12 13 14 15 16 17 18 Q. Please describe OwnEnergy s experience with constructing and operating projects of this nature. A. OwnEnergy has developed 8 wind farms located in 6 different states (Pennsylvania, Kansas, Oklahoma, Iowa, Montana and Texas) that are either in operation or under construction. These wind farms have a combined nameplate capacity of 329 MW. These projects range in size from 10 MW to 68 MW and use wind turbines manufactured by General Electric, Siemens and Gamesa. 19 20 21 Q. Are any of OwnEnergy s other projects comparable to the Copenhagen Wind Farm?

RIPUC DOCKET NO. 4574 REVIEW OF POWER PURCHASE AGREEMENT COPENHAGEN WIND FARM, LLC PURSUANT TO R.I. GEN. LAWS 39-26.1-1 ET SEQ. WITNESS: ROBERT CROWELL ON BEHALF OF INTERVENOR COPENHAGEN WIND FARM, LLC SEPTEMBER 11, 2015 PAGE 8 OF 9 1 2 3 A. OwnEnergy managed the 2014 construction of a 68 MW wind farm in Archer County, Texas, and continues to manage the operation of that wind farm. The Archer County, Texas wind farm is comparable in size and operation to the Copenhagen Wind Farm. 4 5 6 7 8 9 10 11 12 13 14 15 Q. Can you describe EDF Renewable Energy s experience developing wind farms? A. EDF Renewable Energy has extensive experience developing, operating, and maintaining wind farms throughout many regions of the United States, as well as in Canada and Mexico. Currently, in North America, EDF Renewable Energy owns and operates 3.1 Gigawatts (GW) of installed capacity, has 1.1 GW of installed capacity under construction, and has developed a total of 5.6 GW of installed capacity, including projects it developed and then sold. Additionally, EDF Renewable Energy provides operation and maintenance wind projects totaling 9,500 MW of nameplate capacity, much of which is provided for third-party owners. The depth and breadth of EDF Renewable Energy s experience in the wind energy sector is demonstrated in the EDF EN North America, provided as Attachment 1 to this testimony. 16 17 18 19 20 21 Q. How do those wind farms compare the Copenhagen wind farm? A. Many of the projects that EDF Renewable Energy has developed, operated, and/or maintained are similar to the Copenhagen Wind Farm in terms of size, construction, and operation. Additionally, EDF Renewable Energy has experience installing and operating the General Electric turbines planned for this project.

RIPUC DOCKET NO. 4574 REVIEW OF POWER PURCHASE AGREEMENT COPENHAGEN WIND FARM, LLC PURSUANT TO R.I. GEN. LAWS 39-26.1-1 ET SEQ. WITNESS: ROBERT CROWELL ON BEHALF OF INTERVENOR COPENHAGEN WIND FARM, LLC SEPTEMBER 11, 2015 PAGE 9 OF 9 1 VII. Conclusion 2 3 4 Q. Have you reviewed the pre-filed testimony of Corinne DiDomenico submitted by A. Yes. National Grid in this docket? 5 6 7 8 Q. Do you agree with the testimony provided by Ms. DiDomenico regarding the A. Yes. provisions of the PPA? 9 10 11 Q. Does this conclude your testimony? A. Yes.

EXHIBIT 1

EDF EN NORTH AMERICA COMPANY OVERVIEW 30 June 2015

Sustainability Starts Here EDF Renewable Energy is a leading independent power producer with more than 25 years of expertise in the renewable industry covering all range of services from project development, management, to operations and maintenance. We are dedicated to helping drive the transition to a sustainable energy economy through our deployment of renewable energy resources We provide extensive services all along the value chain, from site selection & development, to long-term operations and maintenance services We operate in Canada and Mexico through affiliate companies: EDF EN Canada and EDF EN Mexico 3.1 GW Installed Capacity (North America) as of 30 June 2015 5.6 GW MW Developed (North America) 2

EDF EN North America: 3 business Lines; 3 countries; 1 brand Development Generation Operations & Maintenance Mexico US Canada 3

Our Mission & Values Turning innovative renewable energy ideas and long-term relationships into ethical, high-value sustainable business. Safety Respect Passion Passion Good Sense Transparency At EDF Renewable Energy, we believe our core values are the foundation upon which our success is built. By embracing these seven values we will foster continued success allowing EDF Renewable Energy to thrive and adapt in an ever-changing competitive marketplace. Teamwork Accountability 4

EDF Renewable Energy: HISTORY IN BRIEF 1985 1987 1995 2000 2002 2003 2004 2006 2008 2010 2011 2012 Difko Wind Farms in California to provide O&M Services for Wind Projects EDF EN IPO and 530M increase in capital to finance expansion in wind energy Difko Adm. Inc becomes Foras Energy Inc. Expansion into Solar Business First EPC Contracting enxco Inc. formed from Foras Energy Inc.. SIFF Energies acquires enxco Exceed 1GW in ownership Acquire first biogas projects - Completion of First Mexico project Continued growth in Canada enxco contracts the first wind levered tax partnership in the US SIIF Energies changes its name to EDF Energies Nouvelles (EDF EN) EDF acquires full ownership of EDF EN in August 2011 enxco becomes EDF Renewable Energy & enxco Service Corp becomes EDF Renewable Services 5

Historic Safety Performance : United States Safety Performance 2005-2014 9 8 7 7.26 6.81 8.05 6 5.91 5 4.38 4 3 4.1 2.64 2.44 3.11 2 1 1.88 1.34 1.78 1.85 1.86 1.46 0.75 1.08 0.72 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 6

Corporate Structure EDF the leading electricity company in the world EDF Energies Nouvelles (EDF EN) the global renewable arm of the EDF group EDF Renewable Energy the US Subsidiary of EDF EN and headquarters of EDF EN activities in North America EDF Renewable Services the O&M branch for North America EDF EN Canada the Canadian Subsidiary of EDF EN EDF EN Mexico the Mexican Subsidiary of EDF EN 7

Integrated Operator in North America Origination Development Transaction and Construction Generation Operations & Maintenance 6.5 GW developed 1.1 GW under construction 3.2 GW owned and operated 10.5 GW operated as 30 June 2015 8

Integrated Operator in North America Extensive services all along the value chain, from site selection & development, to long-term operations and maintenance services Developme Construction Origination nt Transactio DSSA n Generation Operations& Maintenanc e 9

Balanced Portfolio Over 6 GW developed Over 3.2 GW owned Over 10 GW operated 12000 10000 Developed, Owned, Serviced by Technology 10,583.4 47 899.5 12000 10000 Developed, Owned, Serviced by Country 10,583.4 1853.8 67.5 8000 6000 4000 2000 0 6,050.5 20 20 339.56 3,197. 2 9636.9 91 5670.9 183.7 2922.5 Developed Owned O&M Storage Bioenergy Solar Wind 8000 6000 4000 2000 0 6,050.5 1298 4360.9 391.5 3,197. 2 487.8 2317.8 391.5 8856.1 Developed Owned O&M Mexico Canada US 10

EDF EN North America KEY FIGURES INSTALLED CAPACITY OPERATIONS & MAINTENANCE UNDER CONSTRUCTION 3.2 GW 10.5 GW 1.1 GW EMPLOYEES NORTH AMERICA 1,000 28 YEARS EXPERIENCE 11

North America Presence 3.2 GW INSTALLED CAPACITY OPERATIONS & MAINTENANCE 10.5 GW 1.1 GW UNDER CONSTRUCTION EMPLOYEES 1000 94 PROJECTS DEVELOPED 12

EDF EN North America GROSS INSTALLED CAPACITY NORTH AMERICA Gross Installed Capacity* (megawatts) US Wind: 2,066.5 US Solar: 160.3 US Biogas: 51.0 US Biomass: 40.0 CN Wind: 464.4 CN Solar: 23.4 464.4 23.4 391.5 160.29 US Solar US Wind US Bioenergy Canada Solar MX Wind: 391.5 91 2066.5 Canada Wind Mexico Wind TOTAL: 3,197.1 as of 30 June 2015 *Gross Installed Capacity represents gross megawatts of ownership 13

Project Development EDF Renewable Energy s Project Development team is dedicated to creating value by managing projects from origination through commercial operation. Initial efforts involve identifying potential project sites, establishing business relationships with landowners, and securing permits and transmission rights. As the project progresses, our team executes all contracts, secures financing, procures equipment, and assures timely construction for full operation. 14

UNDER CONSTRUCTION: 1.1 GIGAWATTS As of June 30 UNDER CONSTRUCTION UNITED STATES 1132.9 MW Cottonwood Solar: 1 MW Spinning Spur 3: 194 MW Roosevelt: 250 MW Milo: 49.65 MW Pilot Hill: 175 MW McHenry: 20 MW Slate Creek: 150 MW Heartland: 19MW UNDER CONSTRUCTION CANADA 274 MW Rivière-du-Moulin: 200 MW Mont Rothery: 74 MW 15

Operations & Maintenance EDF Renewable Services understands renewable energy facilities represent a substantial investment for the project owner. Operations and Maintenance is the core business with the goal to optimize plant performance and maximize availability. Over the last two decades, the company has honed its expertise to bring completely transparent service offering to the asset owner. 16

O&M Services Portfolio Reaches 10.5 GW O&M Megawatts by Technology [VALUE] MW [VALUE] MW 9,354.3 MW total [VALUE] MW Solar 8% Bioener gy.5% Wind 91% [VALUE] MW O&M Megawatts by Country 9,354.3 MW total [VALUE] MW Mexic o United States Cana da [VALUE] MW O&M Megawatts Owned vs Third-Party Third- Party [PERCEN TAGE] 7,917 2,666 Owned MW [PERCEN TAGE] MW 12,000 10,000 8,000 6,000 4,000 2,000 0 O&M Growth [VALUE] 418% Growth 4,182 4,719 4,840 5,040 2,043 7,200 7,383 9,354 2007 2008 2009 2010 2011 2012 2013 2014 Today Year Largest third-party provider of O&M services in North America 17

Operations Control Center In 2013 the OCC underwent a modernization and relocation effort to our San Diego headquarters. Profitability Data Expertise 6,000+ MW under OCC monitoring Standard Services Advanced Services 24/7/365 Remote Monitoring Fault Reset & Notification Curtailment Crew Support SCADA Support Balance of Plant Performance Monitoring NERC Compliance Support 18

Operations Control Center 77 projects under monitoring & control 19 Solar Projects Wind Projects 3,500 Wind Turbines 72 300 Solar Inverters 6,000 megawatts under monitoring & control 2400 Third-Party Projects 3600 EDF RE Projects listed as Generation Operator in the NERC Compliance Registry with Western Electricity Coordinating Council 19

Why EDF Renewable Services OCC? Safety Our robust clearance management system ensures the safety of technicians and avoids damage to site assets. Customized Reporting Daily, weekly and/or monthly reports provide a record of key operating parameters and significant operational events, trends and anomalies. This data is summarized to assist with the identification of performance shortfalls and the planning of maintenance activities. Maximized Revenue The Operations Control Center helps EDF RS respond in real-time to site issues and customer needs, decreasing downtime, increasing site availability and thus yield, resulting in maximized revenues and profitability. Reliability EDF RS OCC monitoring and reporting provides confident that assets are operating at maximum efficiency and following reliability standards. Collaborative Troubleshooting Specialists at the OCC work in collaboration with the customer, looking at operation and performance issues to assure the plant equipment is operating to full function. Expertise EDF RS has a 25 year history as an O&M provider bringing decades of expertise to each plant, with an owner/operator sensibility. We understand the opportunities and challenges faced every day in the renewable energy business. 20

OCC s Technological Advancements Integrated SCADA system The Operations Control Center provides Operators with a one-look integrated SCADA system that brings fault conditions to the staff automatically. This Exceptions Management approach uses technology to increase Operators efficiency and response. Cybersecurity The OCC has been designed to meet the physical and cyber security requirements needed to meet regulatory standards and protect the facility from future sabotage or intrusion attacks. System Redundancies The OCC s systems have been designed with redundant layers to provide continuous operations independent of equipment failures. Examples include: Disaster Recovery The redundant systems design allows the OCC to continue operating and controlling plants even when communications, power, or even natural disasters affect the local facility. o o o Full replication of the IT server system in real-time failover mode in a data farm located in another state, Virtualization of servers and hot-replaceable components mitigates the impact of any one failure, Back-up power systems and redundant Internet service providers ensures constant power and communications.. Staff Ergonomics Operator productivity has been addressed by including vertical lift Stand-up workstations, curved consoles, and locker, kitchen, and restroom facilities within the actual control center 21