GEORGIA MINNESOTA NEW YORK OREGON



Similar documents
Sheet Metal Products for the HVAC Industry

Installation Instructions

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

Cooktop Low-Profile Ventilation Hoods

GrEAT PACIFIC ELBOW COMPANY PRODUC T C ATALOG

CATTURA TM DOWNDRAFT MODELS D49M30SB, D49M36SB, D49M48SB

How To Install A Perfect 16 Id Series Filter System

Duct Design. Presented by Dave Janquart

How to Install UnderDeck The Original.

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. North America Version

Design Information. Designing Your Dust Collection System. Typical dust or fume collection system

MGB Chrome Bumper Conversion

FIRE DAMPER APPLICATION GUIDE

Ceiling Mounted Folding Attic Ladders Installation Instructions

Shingle Installation Guide

4 Installation Requirements

DUCT SYSTEM DESIGN CONSIDERATIONS Part 1

glass & Glazing Products

WORKSHEET FOR RESIDENTIAL AIR SYSTEM DESIGN page 1

Best Barns USA Assembly Book

INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT CHEVROLET/GMC VANS FOR

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

PANELIZED HOME INSTALLATION GUIDELINE

CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

ASX7-4-IOM-7 J

Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation

Gas Stoves. H15-10 Direct Vent Gas Stove. Model H15-NG10 H15-LP10. Approved Venting Systems

Speed-Mat Rectangle Cutter

GENUINE PARTS INSTALLATION INSTRUCTIONS

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Andersen Electric Window Opener for Andersen Awning and Roof Windows

Cooling Capacity CFM in. w.c. (125 Pa)

Basic Spring Motor Roller Shades

SECTION AIR INLETS AND OUTLETS

Diagnostics for Mobile Homes: HVAC

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

FINAL December 2012 SECTION DUCTWORK

Tips for Professional Ceiling Installers

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

HVAC Code Requirements

Installing the Sno-free Standing Seam System for Metal Roofs

Protecting Your Home from Wind Damage

Chapter 8. Duct Design and Sealing

sound reduction systems for commercial, educational and industrial environments

How to Install Hardwood Flooring Over a Sub Floor

Premier & Deluxe 3-Season Room Sliding Glass Door

Installation Guide. Bath and Wall Surrounds SERIES B

Installing Window and Door Mouldings

Window Installation Instructions

plenum slot diffusers

UNIT 4: SHEATHING AND SHINGLING THE ROOF

Cedar Cottage Doghouse Plans

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

OWNER S MANUAL FOR THE PATIO SAUNA

Roof Curbs, Extensions and Equipment Supports

Brick Veneer Construction

Guidelines for Earthquake Bracing of Residential Water Heaters

Classic Products, Inc. ClickLock Standing Seam Installation Manual

Integral Kit Instructions

H-Stud Area Separation Wall System

HOW TO INSULATE A CRAWLSPACE

Installation Instructions

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Builder Specifications for Solar Ready Homes

FSD35, FSD36 AND FSD37 COMBINATION FIRE and SMOKE DAMPERS

Crawford Inspection Services C.C.B. #

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Guidelines for Earthquake Bracing Residential Water Heaters

2010 Residential Water Heater Replacement Check List

GYPSUM AREA SEPARATION FIREWALLS GA

Picnic Table Plans. Made out of a single sheet of plywood, it s also portable! By Kevin Ayer. This children's picnic table would

Clad Direct Glaze Window Installation Instructions

One Year Warranty. Stock U.S. # of Volts Weight CONN. Height Dia. Watts # GAL. Elements INS. Inches NATURAL GAS* Six Year Warranty

WINDOW REPAIR MANUAL & REFERENCE GUIDE

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair

Uni-Quick Duct System. Moveable. Uni-Quick. Duct System. DUST COLLECTION and MATERIAL HANDLING APPLICATIONS a McGill AirFlow product

Installation Manual for STANDING SEAM ROOFING

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

RODENT PROOFING CHECKLIST

1932 Lexington Houston, Texas (713) Recommendations for installation of cooling systems

DE Frame with C Series Sidelight

Retail Reception kiosk

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings

AMPSEAL* Automotive Plug Connector and Header Assembly

Installation Instructions

INSTALLATION OF A BAY WINDOW

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades

All-Season Sunroom Sliding Glass Door Installation Instructions

Installation Instructions For Slider Casement Air Conditioners

Sun Windows General Information Sun New Construction Window Installation Instructions

450 SERIES SLIDING GLASS DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

Element D Services Heating, Ventilating, and Air Conditioning

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Chapter 10 - Scaffolding Systems

Your safety and the safety of others are very important.

Transcription:

GEORGIA MINNESOTA NEW YORK OREGON www.snappyco.com REGISTER HEAD 90º ANGLE BOOT R.H. BOOT END BOOT PIPE WALL STACK CONNECTOR TAKEOFF STACK BOOT REGISTER HEAD TAKEOFF OFFSET STARTING COLLAR PLENUM DUCT STRAIGHT STARTING COLLAR DUCT REDUCER L.H. BOOT TAKEOFF JOIST PANNING TOP COLLAR FRESH AIR INTAKE END CAP CEILING HEAD RETURN AIR DROP Ductwork Installation Guide Copyright 2014, Snappy. All rights reserved.

Comfort Distribution Products 1011 11th Ave. SE, Detroit Lakes, MN 56501 800-328-2044 3365 Florence Rd, Powder Springs, GA 30127 800-888-4391 214 Commercial St., Medina, NY 14103 16233 N. East Cameron Blvd., Portland, OR 97230 800-229-0021 800-300-1660 NOTICE The combination of facts, data, design elements, engineering data, drawings, manufacturing data and assembly data contained in this Guide Book may not be copied or transmitted to any third parties without prior written permission from Snappy. These materials are protected under Copyright Law and Treaties. All rights are reserved.

Table of Contents Extended Plenum Diagram...4 Round Duct Diagram...5 Introduction...6 Preparation...7 Installation - Plenum...8 Installation - Main Trunk Line...11 Installation - Branch Runs...15 Installation - Return Air...19 Air Distribution Products...22 Product Checklist...23 3

Extended Plenum System Round Duct System 4

Product Checklist Qty. Size Plenum Custom Plenum Universal Plenum Main Trunk Line Rectangular Duct Round Pipe Rectangular Reducers Rectangular S.W. Elbow Rectangular B.W. Elbow Drive Cleats S Cleat Rectangular End Cap Duct Hanger Rectangular Starting Collar Branch Runs Round Pipe 90 Elbow Damper Pipe Bracket 90 Vent Saddle Round Starting Collar 90 Tee Round Reducer Branch Wye Perimeter Boot- 90 Perimeter Boot- End Perimeter Boot- Straight Qty. Size Return Air Return Air Drop Return Air Drop Joist Panning Joist Pan Header Wall Stack Wall Stack Stack Boot-End Stack Boot- Straight Stack Boot-90 Register Stack Head Black Smoke Pipe Pipe Endcap Elbows Trim Collar Connectors Round to Oval Transitions Misc. Adjustable Roof Flashing Rain Cap Non-Adjustable Rain Cap Fresh Air Intake Insulated Flex Recessed Dryer Vent Box Multi-Cut Hole Cutter May-Aire Fresh Air Exchange 5

Introduction The information supplied is designed to provide a basic understanding of an air distribution system and the components required to successfully complete an entire ductwork installation. The installation guide is broken into 4 stages. 1. Plenum 2. Main Trunk Line 3. Branch Runs 4. Return Air Each stage consists of: What it Does? Where it Goes? Components Required? How to Install? KEYS SUCCESS to At the end of each stage a box will appear which is designed as important reminders to the installer to ensure a successful installation. It is important to read the entire installation manual prior to beginning. According to NHRAW (North American Heating, Refrigeration & Air conditioning Wholesalers) the goals for any finished duct system are: 1. The system is reasonably air tight. 2. The system is noise/vibration free. 3. The system minimizes resistance to air flow. 4. The system is economical. Keep each of the 4 goals in mind as you begin the installation of your duct system. 6

Preparation As with any project, it is important to plan ahead to ensure a successful installation. To assist in the planning, a set of questions has been prepared to provide direction and to help avoid any unforeseen problems that may arise. It is important to answer each question before you begin the actual installation. 1. What equipment will be needed to complete the installation? Although each installation may vary, the tools/supplies listed below provide a good foundation to work from: hammer screwdriver tin snips sheet metal screws metal hangers duct, pipe & fittings* sabre saw (*will vary by installation) 2. How much ductwork will be needed to complete the installation? 3. What is the best location for outlets and inlets? 4. What is the most efficient pathway for routing the duct? 5. What type of return air system will be utilized? 6. How much air will be required for each room? 7

Plenum STAGE 1 What it Does? The plenum is the central collecting chamber of the conditioned fresh air leaving the furnace. Where it Goes? The plenum is the first stage of the ductwork system. The plenum is attached to the supply air opening of the furnace. Components Required? The only component required for this stage of the installation is a plenum kit assembly which should provide you with all of the necessary components needed. How to Install? The plenum is manufactured in two designs, a Universal Plenum and the Custom Plenum. The Universal Plenum allows the installer to trim the panels to fit the appropriate size required, for any brand furnace. The Custom Plenum is manufactured to the exact dimensions specified to fit all furnaces. 8

Plenum Plenum Kit Assembly Custom Plenum 1. Assemble 3 panels together by sliding the flat edges into the slots. 2. Insert top panel into position. 3. Place final side panel into position. 4. Secure with sheet metal screws along edges. Universal Plenum 1. Determine the appropriate dimensions 2. Trim necessary panels to fit dimensions 3. Assemble side panels. 4. Secure with sheet metal screws. 5. Position and secure top panel. Note: It is not recommended that the height of the plenum be reduced unless required due to space restrictions. 9

Plenum Plenum to Furnace Assembly After the plenum has been assembled the plenum must now be secured to the furnace. The installer must first determine whether the furnace is an upflow or downflow furnace. On an upflow furnace the plenum is secured to the top of the furnace. Once the furnace type is established the installer simply places the plenum over the supply air opening of the furnace and secures the plenum with sheet metal screws along the bottom edges. KEYS SUCCESS to Trunk lines should only come off the sides of the plenum rather than the top. Trunk Lines must come off the plenum at least 6 below the top of the plenum in order to maximize air mixing. 10

Main Trunk Line STAGE 2 Prior to the installation of the main truck line it is important to determine how many supply outlets will be required in order to design the main trunk line to incorporate necessary reductions. What it Does? The main trunk line is the central distribution source for conditioned air leaving the plenum. (This type of system is sometimes referred to as the extended plenum system). Where it Goes? The main trunk line is attached to the plenum and extends the entire length of the home. In most installations, the furnace will be centrally located with the main trunk line extending in both directions. Depending on the climate of the installation, the main trunk line may run above the ceiling or below the floor. Components Required? starting collar or takeoff round or rectangular duct metal hangers sheet metal screws end cap trunk transition 11

Main Trunk Line Rule of Thumb: The width required for a section of rectangular duct is determined by counting the number of outlets that section will be required to serve. Multiply the outlet number by two and then add two. This total will be the width in inches required to properly heat/cool the room while maintaining a constant airflow pressure. Note: The above calculation is used when installing 6 around pipe (standard) off the main trunk line. Example: A section of duct will serve 5 supply air outlets. Six inch pipe will be used for branch runs. The width of the duct should be: 5 (supply air outlets x 2 = 10 10 + 2 = 12 This section would require a 12 x 8 piece of duct. *8 is standard rectangular duct height. How to Install? 1. Attach a starting collar or takeoff to the plenum. (a) cut hole in the plenum to match dimensions of the fitting. (b) position fitting in plenum hole, fold back tabs of fitting to secure into position. *Be sure to attach fitting 6 inches from the top of the plenum *DO NOT install fittings on top of plenum 2. Secure main trunk line to the starting collar/takeoff *rectangular duct is most commonly used and recommended due to its air flow characteristics and ease of installation. 12

Main Trunk Line Rectangular Duct Assembly Rectangular duct is manufactured in L shaped pieces which are connected using a snaplock system. (a) Assemble rectangular duct. 1. place one half on the floor 2. Position the second half on top of the first half. 3. At one end, line up the edges and slide the tongue and groove into position. 4. Secure in place by gently tapping the edges with a hammer. (b) Connect two sections of assembled duct using S and drive cleats. S and drive cleats are metal attachment connectors that help to assemble the top and bottom sides ( S ) and the left and right sides (drive). Drives are typically 2 longer than the duct section allowing the extra 1 on each side to be bent over to secure the section. 13

Main Trunk Line (c) Assemble the remainder of the predetermined amount of duct incorporating transition/reducer at points where a takeoff is to be installed. A transition/reducer is installed to maintain a balanced pressurized air flow system. When a takeoff or takeoffs are installed on a section of the main trunkline, the airflow pressure at that point is thus reduced requiring a smaller amount of duct to distribute the conditioned air. (d) At the end of the duct run, install a rectangular end cap to halt the air flow at that point. (e) Fasten the duct to the floor joists using metal hangers or other appropriate fasteners. In most installations the main trunk line is routed through the center of the home, either in the basement or the attic. When a necessary turn in the main trunk line is required, a short way or long way elbow may be used. KEYS SUCCESS to Avoid as many turns in the main trunk line as possible Plan for the locations of branch runs that will takeoff from the main trunk line in order to install necessary transitions/reducers in the main run. 14

Branch Runs STAGE 3 What it Does? Branch Runs are used to distribute the conditioned air from the main trunk line to the predetermined supply air outlets in the floor or wall. Where it Goes? The Branch Run is attached to the main trunklines and is routed to the designated supply outlet. Components Required? Starting color or takeoff 6 round pipe or other appropriate pipe Metal hangers Elbows Perimeter boots Sheet metal screws 15

Branch Runs How to Install? The number of branch runs required will vary by each installation. The first step in the branch run installation is to install necessary boot or fitting into the predetermined supply air outlet location. Colder Climates The supply air register should be located on the floor near an outside will, preferably under a window in order to minimize drafting. Warm Climates The supply air register should be located on the ceiling, for optimum air conditioning performance. Floor Installation (Colder Climates) 1. Locate floor joists 2. Determine the location of the outlet. 3. Trace the rectangular opening of the fitting (register boot) on the floor 4. Use a key hole or sabre saw to cut out the tracing, cutting through both the floor and subfloor. 5. Smooth sides of the opening with a coarse file. 6. Install fittings (register boot) by nailing into the sub floor at each end of the boot opening. Drop Ceiling Installation 1. Locate both the wall studs and the ceiling joints 2. Determine the location of the outlet. 3. Trace the rectangular fitting of the opening onto the ceiling. 4. Use a key hole or sabre saw to cut out the opening. 5. Smooth sides of the opening. 6. Install fitting. (Ceiling diffuser or register box) 16

Branch Runs Once the boot has been secured into position, the next step is to install the branch run. 1. Attache a top takeoff or side takeoff to the main trunkline. The takeoff required will vary by each installation. Top-Takeoff typically rectangular to round or round to round adjustable or non-adjustable various rises Side-Takeoff used when their is not sufficient room between the main trunk line and the floor. 2. Cut the appropriate opening in the main trunk line and secure the takeoff into position. Most takeoffs are manufactured with tabs that are used to secure the fitting. Note: in basement installations, be sure there is sufficient room between the floor and the main trunk line to install a top-takeoff. 17

Branch Runs 3. Attach 6 round galvanized pipe (or other appropriate duct) to the take-off. Secure using sheet metal screws. Pipe Assembly 1. Hold pipe with both hands. 2. Start with one end and lock together as you slide down the pipe. 3. To join two sections of pipe simply insert the crimped end of one pipe to the smooth end of another section of pipe. Secure with sheet metal screw or other appropriate fasteners. 4. Attach the second end of the pipe to the fitting (register boot) in the supply outlet location. Note: Various fittings such as elbows and angles may be required to efficiently run to the supply outlet. KEYS SUCCESS to Avoid as many turns as possible when installing the branch run. Proper positioning of supply air outlets is essential to reach maximum efficiencies for the system The crimped end of the pipe should always face the register boot. 18

Return Air STAGE 4 What it Does? For every cubic foot of air the system delivers to the home, an equal amount of air must be returned to the furnace. The return air system is designed to redirect air that has been circulated throughout the home, back to the furnace where it can be reconditioned and delivered back into the supply air. Where it Goes? The return air is directed from predetermined return inlets and is directed back to the furnace. In homes where air can easily locate in one central area, one central return may suffice. Components Required? Many of the same components used on the supply ply side of the system can be sued to redirect air back to the furnace. return air drop assembly joist panning adjustable pan header sheet metal screws return air grille How to Install? The principles and components used in the supply side distribution can be utilized on the return air side. 1. The first step in the return air system is to install the Return Air Drop Assembly. In most installations the return air system is installed at a ceiling level and the return air inlet on the furnace unit is located near the floor. This type of installation requires a Return Air Drop Assembly which consists of a collar, 2 sections of duct, slips and drives, and a return elbow. Assembly & Installation 1. Install the return air elbow to the return air opening in the furnace. Insert the return air elbow and fold back tab.s (The installer may have to cut out the return air opening in the furnace) 2. Using slips and drives, connect one section of duct to the elbow. 3. Continue by connecting the second piece of duct. 19 4. Complete the installation by installing the collar fitting.

Return Air 2. The second step in the return air system is to locate and install the return air intake grille. The location of return air grilles should be in low traffic areas on an inside wall. 3. The third and final step of the return air installation is to join the return air grille and the return air drop assembly. This can be accomplished utilizing the wall studs, floor joints, and rectangular duct. Wall studs and floor joints are utilized in place of duct for the return air system. (a) The air is drawn through the return air grille into the wall cavity down to the floor joist. (b) Joist panning is used to seal off the underside of the floor joists where the return air is directed to a section of rectangular duct. (Joist panning is cut in 3 lengths and in widths to space across wood floor joists.) (An adjustable joist pan header is used to seal off the end of a joist.) 20

Return Air 3. (cont.) (c) (d) A collar fitting is used to connect the joist panning to the rectangular duct. Connect the rectangular duct to the collar of the Return Air Assembly. KEYS SUCCESS to Residential codes permit joist and panning installations as return air pathways only. These pathways should not be used for supply air. Many of the same components and principles used in the supply side distribution can be utilized in the return air installation. An effective location for the return air inlets will ensure maximum efficiencies. Remember, these are basic duct installation instructions. Specific questions or problems should be directed to a qualified installer or contractor. 21

(NO.179) ADHESIVE TAKEOFF (NO.175) SQUARE TO ROUND ADHESIVE TAKEOFF PLAIN INSULATED BOXES (NO. 501) PLAIN INSULATED CEILING BOX (NO. 503) INSULATED CEILING BOX W/BOTTOM FLANGE 6 TALL (NO. 505) INSULATED CEILING BOX W/BOTTOM FLANGE 3 1/2 TALL (NO.173) ROUND ADHESIVE PIPE TAKEOFF WITH DAMPER (NO.170) ADHESIVE TAKEOFF WITH SCOOP & DAMPER (NO. 502) INSULATED CEILING BOX W/TOP FLANGE (NO. 504) SHORT PLAIN INSULATED CEILING BOX FLEX-DUCT FITTINGS (NO.39ATD) DHESIVES (NO. 507) 450 INSULATED CEILING BOX ADHESIVE TOP TAKEOFF WITH DAMPER (NO.167) ROUND ADHESIVE DUCT TAKEOFF PLAIN (NO.176) ADHESIVE TAKEOFF WITH DAMPER (NO. 3) 90 ELBOW (NO. 6) TEE JOINT (NO.P17L) L.H. (NO.212) PIPE, ELBOWS & TEES (NO. 717) STUB WYE PERIMETER (NO.CP) CONDUCTOR PIPE DUCT ( NO.2S) REGISTER HEAD T (NO.200) (NO.13) STET (NO.T15) END CAP WALL STACK BOOT TAKEOFF (NO.P17C) END BOOT STACK (NO.P13) 90 ANGLE (NO.26) (NO.99) OR 99U REGISTER HEAD PLENUM (NO.50) OFFSET STARTING COLLAR (NO.S5) TAKEOFF (NO.T25) COLLAR (NO.20) CEILING HEAD BOO (NO.715) SPLITTER WYE (NO.1) (NO.1) PIPE GALVANIZED PIPE IN 2, 5 AND 10 FOOT LENGTHS SYSTE (NO.P17R) R.H. ( NO.S75) CONNECTOR (NO.T10) TAKEOF F (NO.100) DUCT C BOOT (NO.70) OR 71 RETURN AIR DROP (NO.421) FLUE WYE CRIMP INLET (NO.113) DUCT (NO.444) FRESH AIR INTAKE A B REDUCER (NO.16) JOIST PANNING (NO. S-5) PIVOT LOCK TAKEOFF (NO. T25) (NO. T10) RECT. TO RD. TAKEOFF CRIMPED TAB A COLLAR (NO. 100) TRUNK DUCT (NO. 116) 90 SW ELBOW TAKEOFFS & CONNECTORS (NO. T5) HALF TAB TAKEOFF (NO. T26) (NO. 106) 45 SW ELBOW (NO. 50) OFFSET STARTING COLLAR-2 RISE* PLAIN TAB A COLLAR (NO. P13) 90 ANGLE REGISTER BOOT (NO. 190) 90 BW ELBOW* (NO. 113) TRUNK REDUCER (NO. T15) ZERO RISE TAKEOFF (NO. T7) FULL TABBED CRIMPED TAKEOFF (NO. 109) 45 BW ELBOW (NO. S75) CONNECTOR PERIMETER BOOT (NO. P17C) CENTER END BOOT CEILING BOOT DUCT FITTINGS (NO. 212) TRUNK END CAP RADIATION DAMPER BOOT (NO. P5) STRAIGHT REGISTER BOOT 47C TRANSITION (NO. 45) (NO. S55) CONNECTOR STRAIGHT STARTING COLLAR* (NO. 49) TRUNK ADAPTER SIDE REDUCER 165122 8/2012 (NO.45) STRAIGHT STARTING COLLAR A M GEORGIA MINNESOTA NEW YORK OREGON w ww.snappyco.com S B A 22

(NO. 5) STRAIGHT STACK BOOT (NO. 200) WALL STACK (NO. 5836) (NO. 290) 90 BW STACK ELBOW (NO. 17) CENTER END STACK BOOT ALUMINUM & STAINLESS STEEL FITTINGS (NO. 401) ALUMINUM ADJUSTABLE ELBOW STAINLESS STEEL PIPE - 36 LONG (NO. 66) TAPERED REDUCER (NO. 18) RIVES PVC101 REGISTER SADDLE PVC940 CONNECTOR ALL STACK & FITTINGS (NO. 5835) STAINLESS STEEL ADJUSTABLE ELBOW (NO. 400) ALUMINUM SNAP LOCK PIPE (NO. 20 PVC13 REGISTER BOOT S CLEATS (NO. 213S) WALL STACK END CAP (NO. 216) 90 SW STACK ELBOW MISCELLANEOUS ITEMS PVC66 TAPERED REDUCER (NO. 22) STANDING S (NO. VU) REDUCERS - INCREASERS PVC3 ELBOW (NO. 333) DUCT HANGER (NO. 931) ALUMINUM FLEX DUCT (NO. 13) 90 ANGLE STACK BOOT (NO. R23) (18) REVERSE ELBOW LEFT (NO. 64) PLAIN CAP (NO. 404) 0 SADDLE (NO. 7) KWIK-WAY DAMPER (NO. 120) STORM COLLAR (NO. R25) (9) REVERSE ELBOW CENTER (NO. 444) FRESH AIR INTAKE PVC404 COLLAR SADDLE NO. 11 (NO. R24) (19) REVERSE ELBOW RIGHT ADJ. FLASHING (NO. 602) (NO. 6035) OVAL PIPE & FITTING (NO.6012) ROUND TO OVAL STRAIGHT BOOT F LAT 90 ELBOW (NO. 605 ) STRAIGHT REGISTER BOOT (NO. 6015) ROUND TO OVAL END BOOT www.snappyco.com (NO. 99) CUSTOM PLENUM (NO. 6013) OVAL TO OVAL REVERSE BOOT (NO. 6037) STANDARD OVAL STACKHEAD (NO. SBFD) SUPPORT BOX WITH FILTER & DRAWER NO. 71 ALTERAIRE 2510 COLD AIR DROP R.A. SHOE STRAIGHT REGISTER BOX (NO. 6033) VERTICAL 90 ELBOW (NO. 6075) OVAL TOP TAKEOFF PLENUMS, R.A. DROPS, SUPPORT BOXES R.A. DROP OVAL PIPE (OP) D ) 9 0 GEORGIA MINNESOTA NEW YORK OREGON W S 23

SNAPPY - GEORGIA 3365 Florence Rd Powder Springs,30127 Phone: 800-888-4391 SNAPPY - MINNESOTA 1011 11th Avenue S.E. Detroit Lakes,56501 Phone: 800-328-2044 SNAPPY - NEW YORK 214 Commercial St. Medina,14103 Phone: 800-229-0021 SNAPPY - OREGON 16233 N. East Cameron Blvd. Portland,97230 Phone: 800-300-1660 SC - 178528