Centerwide System Level Procedure



Similar documents
Document Control. DOWNLOADED AND/OR HARD COPY UNCONTROLLED Verify that this is the correct version before use.

Software and Hardware Configuration Management

Quality Enhancement Unit Environmental Management System Module 6. Document Control

This procedure applies to the following categories of documents:

DEC STD ISO Quality Systems - Model for Quality Assurance in Production and Installation

ISO 14001:2004 Environmental Management System Manual

Quality Management Plan Procedure

Standard Operating Procedure: EMS Document Control and Record Keeping

CENTRIS CONSULTING. Quality Control Manual

Revision Date Author Description of change Jun13 Mark Benton Removed Admin. Manager from approval

Row Manufacturing Inc. Quality Manual ISO 9001:2008

Procedure Document Control QAM-P001

Surgi Manufacturing Quality Manual

QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G A, Appendix A, )

Title: COFL-FF-EP Control of Documents Procedure

UNCONTROLLED DOCUMENT ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL UNCONTROLLED DOCUMENT

Quality Manual. DuraTech Industries, Inc Commerce Street La Crosse, WI MANUAL SERIAL NUMBER 1

Camar Aircraft Products Co. QUALITY MANUAL Revision D

QUALITY MANUAL REVISION RECORD

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

ISO/IEC QUALITY MANUAL

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

ISO 9001:2008 Audit Checklist

ONTIC UK SUPPLIER QUALITY SURVEY

ALL PRODUCTS MFG & SUPPLY

Rail Network Configuration Management

Quality Management System Quality Manual

ISO 9001:2008 Clause PR001 Document Control Procedure

CORPORATE QUALITY MANUAL

0. 0 TABLE OF CONTENTS

Quality Management System Manual

FORT KNOX. Environmental Management System Manual EMS-01 FORT KNOX. Environmental Management System Manual. Reference Number: Revision Date: 19MAY15

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Table of Contents 1. SCOPE APPLICABLE DOCUMENTS TERMS AND DEFINITIONS QUALITY MANAGEMENT SYSTEM...4-8

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

FMC Technologies Measurement Solutions Inc.

Document Control. White Paper By Galaxy Consulting. At Your Service Today Tomorrow We Appreciate The Privilege Of Serving You! Abstract.

ISO 9001:2008 Internal Audit & Gap Analysis Checklist

ISO 9001 Quality Systems Manual

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

Quality Management System Manual

Cartel Electronics. AS 9100 Quality Systems Manual

QUALITY SYSTEM DOCUMENTATION CONTROL

U. S. Department of Energy Consolidated Audit Program Checklist 5 Laboratory Information Management Systems Electronic Data Management

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

Technical Manufacturing Corporation (TMC) Quality Manual

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q Date: Title. Revision: QUALITY MANUAL PROCEDURE Q September 2014

ABC COMPANY INC ISO 9001:2000 QUALITY MANUAL

DNV GL Assessment Checklist ISO 9001:2015

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL

Example of a food company quality

AS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc Business Park Drive, Suite A-1 Costa Mesa, CA 92626

CONFIGURATION MANAGEMENT PLAN GUIDELINES

QUALITY MANAGEMENT SYSTEMS MANUAL

Procedure for Document Control and Management

QUALITY POLICY MANUAL Document: Revision: E Effective Date: January 15, 2010

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE

QUALITY MANAGEMENT SYSTEM GENERAL POLICY

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

PUBLICATIONS. Introduction

To outline the process for creating and maintaining health and safety documentation for the JCU Health, Safety Management System (HSMS).

TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY MANAGEMENT SYSTEM FOR ACCREDITATION

Honeywell. Our Quality & Environmental. Commitment. The Sensing and Control (S&C) Global Management System Manual. Honeywell Page 1 of 37

Frequently Asked Questions for: Settlement Disputes System Submittal Process

Quality Management System Manual ISO9001:2008

Quality Procedure ISO 9001: 2008 Control of Documents

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

WHS DOCUMENT CONTROL GUIDELINES

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

QUALITY MANAGEMENT SYSTEM MANUAL

ISO 9001 and ISO Quality Management Guidance for CM Relative to CMII (Rev B)

AS9100 B to C Revision

UNCONTROLLED COPY FOR REFERENCE ONLY

Quality Manual ISO9001:2008

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

PROCEDURE. Part 3.1: Metering Service Provider (MSP) Registration, Revocation, and Deregistration PUBLIC. Market Manual 3: Metering. Issue 14.

AS9100 Quality Manual

HSE DOCUMENT CONTROL PROCEDURE

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

ITRM Guideline CPM Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

Dryden Centerwide Procedure (DCP) Code SQ. Government Industry Data Exchange Program (GIDEP) Alert / NASA Advisory Process

The Prophotonix (UK) Ltd Quality manual

Testing Facility Laboratory Manual

Transcription:

1 of 11 REVISION HISTORY Rev Description of Change Author Effective Date 0 Initial Release M. Walsh 6/17/8 1 Changes were caused from 1st Internal Audit findings of actual practices. Major rewrite. Refer to DCR 8-001. 2 Clarifications based on 7/8 DNV Audit and 6/8 Internal Audit (see DCR 8-006). Major rewrite. B. Navarro 7/17/8 M. Hines /2/8 3 Add to section 6.1 & revise 3 subject in item 7 of Appendix A R. Carvalho & R. Stroub 10/2/8 4 Added * designee to section 5.2.1, Removed the following statement and forward DCR to package to the DCA. From 6.1.2.3 & 6.1.4.4 5 Clarifications based on 11/8 DNV Audit (DCR 8-054) 6 Added to section 6.5 and Appendix A, para a available, on the following web sites and include, but are not limited to, Software Guidebooks and Standards at http://www.ivv.nasa.gov/swg/resources, etc. Added to Appendix A, para 10 controlled by either a date or revision level noted on the form. (DCR -008) 7 Clarifications based on Internal Audits and 4/ DNV Audit (DCR -021) 8 Clarification based on CAR #ARC-0055 (DCR - 030) Clarification based on CAR #ARC-00775 (DCR 00-010) Appendix A, section 6 and added definition of CWDCA R. Serrano 11/13/8 R. Serrano 12/18/8 R. Serrano 4/21/ G. Miyahara 8/2/ G. Miyahara /7/ J. Weller 5/4/00 REFERENCE DOCUMENTS Document Number Document Title 53.ARC.0000 Ames Research Center Quality Manual, Section 4.5.1 Work Instruction for DCAs

.2 Creation of Quality System Procedures and Instructions 2 of 11 Documents referenced in this procedure are applicable to the extent specified herein. 1. Purpose This procedure defines the implementation of a document and data control system in accordance with the Ames Research Center (ARC) Quality Manual. This procedure defines the method for preparing, reviewing, approving, maintaining, tracking, and changing documents and data identified on the Master List. 2. Scope This procedure applies to the control of documents and data pertaining to the ARC Quality System. The ARC Quality Manual, Centerwide System Level Procedures (SLPs), Directorate-Level procedures, and associated forms shall follow this procedure. All other ARC Quality System procedures, work instructions, forms, data and document control systems shall, as a minimum, satisfy the General Requirements defined in Appendix A of this procedure. However, it is recommended that the entire procedure be followed whenever practical. 3. Definitions and Acronyms 3.1 Administrative Change Any clerical change to a document or data which does not impact its basic intent (i.e. grammatical, template formatting, typo-fixes, etc.) 3.2 Author Person designated to create or revise a document or Quality System data 3.3 Centerwide Document Control Administrator (CWDCA) Person responsible at the center-wide level for control of the ARC Quality Manual, Centerwide System Level Procedures (SLPs), and associated forms. 3.4 Data Quality System information used to control the process that affects the final product (e.g. reference values, benchmarks) 3.5 Document Quality System procedure, work instruction, manual, or associated form which is used to control the processes that affect the quality of the final product 3.6 Document Change Request (DCR) Form used to create or change a document (ARC 760)

3 of 11 3.7 DCR Package DCR (ARC 760) and any supporting documentation (i.e., document, flowchart, etc.) 3.8 Document Control Administrator (DCA) 3. External Document and Data Person responsible at any organizational level for control of documents and data that affect only that organization Quality System documents and data not generated at ARC 3.10 Master List List which identifies the Quality System documents and data and includes current revision status 3.11 Originator Person(s) who initiates a DCR 3.12 Responsible Manager Person having the responsibility and authority to accomplish/implement a specific activity or process (includes organizational line managers, project managers, etc.) 3.13 Signature/Sign Handwritten, electronically written, or electronically typed name of an individual that indicates an act of approval, disapproval, review, etc.

4 of 11 4. Flowchart Start Originator ----------------------- Identifies and initiates need for new or changed document 6.1.1 6.1.2.3 Responsible Manager ------------- Identifies reason DCR was not approved and notifies Originator No Responsible Manager Reviews DCR ------------- Accepts? Yes 6.1.2 With Modifications Author ----------------------- Creates or revises document or data 6.1.3 No Responsible Manager Reviews document or data ------------- Approves? 6.1.4 With Modifications Yes Responsible Manager ------------- Identify review team and obtains comments 6.1.4.1 DCA ----------------------- Processes DCR per.1 6.1.5 End

5 of 11

6 of 11 5. Responsibilities 5.1 Centerwide Document Control Administrator (CWDCA) shall:? process, control, and coordinate new or revised centerwide documents and data. (This includes the tracking, status, maintenance, and distribution of information relating to controlled documents and data comprising the Quality System).? provide document change control training and communications, and? coordinate and receive direction from the ISO Project Manager regarding the ARC ISO 000 web site. 5.2 Document Control Administrators (DCAs) shall:? process, control, and coordinate new or revised Directorate-level and lowerlevel documents and data. 5.3 Responsible Manager shall:? identify a method for tracking external documents and data which are used to control and define the processes that affect the quality of the final product,? designate which managers are responsible for review and approval of documentation and data,? ensure the effective implementation of a document and data control system within their organizations, and? review and approve DCR package prior to submittal to the appropriate DCA. 5.4 ARC Quality System Management Representative or designee shall:? approve all center-level documentation and data. 5.5 Document Users shall: 6. Procedure? check the Master List to verify that the document and/or data being used is the current version. 6.1 Change Control Process This process applies, as a minimum, to the ARC Quality Manual, SLPs, Directorate-level procedures, and associated forms. 6.1.1 Originator obtains a DCR form (ARC 760), from http://dqa.arc.nasa.gov/iso000 and fills out the appropriate section using either an electronic or a hardcopy version. Originator contacts appropriate DCA to assist in identifying the Responsible Manager when necessary. The Originator forwards the DCR package to the Responsible Manager.

7 of 11 6.1.1.1 For creations and revisions, the DCR package should include the DCR and any supporting documentation, or 6.1.1.2 For administrative changes, the DCR package should include the DCR, a redline of the original document or data, and any supporting documentation, or 6.1.1.3 For cancellations, the DCR package should include only the DCR. 6.1.2 The Responsible Manager or designee shall contact the appropriate DCA for a DCR number, review the DCR and perform one of the following actions: 6.1.2.1 If accepted, assign an Author to write or revise the proposed document or data, sign the DCR, and forward the DCR package to the Author, or 6.1.2.2 If revisions to the DCR are required, return the DCR package to Originator for modification, or 6.1.2.3 If not accepted, identify the reason DCR was not accepted, and notify Originator. 6.1.3 The Author shall create or revise the document or data (documents shall be created or revised in accordance with.2). When finished, the Author shall submit the DCR package and proposed document or data to the Responsible Manager for review and approval. 6.1.4 The Responsible Manager or designee shall review the proposed document or data and perform one of the following actions: 6.1.4.1 If approved, sign the DCR and forward DCR package and proposed document or data to the appropriate DCA. If further review is required before deciding to approve or reject the proposed document or data, the Responsible Manager shall identify required review members and obtain their comments. 6.1.4.2 If revision is required, return the DCR package and proposed document or data to the Author for modification, or 6.1.4.3 If not accepted, identify the reason proposed document or data was not accepted and notify Originator by returning DCR package to Originator. 6.1.5 The DCA shall process the DCR in accordance with.1.

8 of 11 6.1.6 A new document number is assigned to Originator by the appropriate DCA. Once a document number has been assigned and the document approved and placed on the Master List, the document number cannot be re-issued. When a document is cancelled, the cancellation is indicated on the Master List with the cancellation date. 6.2 Master List and Controlled Documents 6.2.1 All document or data users shall check the Master List to verify that a downloaded or hardcopy version of a document or data is the correct version. 6.2.2 The Master List of Quality System documents and data is available at the ARC ISO 000 web site, http://dqa.arc.nasa.gov/iso000. Complete electronic versions of the documents can also be accessed from the web site. The versions on the web site are the official controlled documents and any downloaded or printed hardcopy is uncontrolled. 6.3 ARC ISO 000 Web Sites Requests for changes to the Centerwide ISO web site will be forwarded to the CWDCA via e-mail or handwritten means. The CWDCA will discuss the changes with the ISO Project Manager or designee to determine acceptance and direction and then implement accordingly. Changes to Directorate ISO web sites will be handled by the appropriate DCA. 6.4 Document Revision Control Revisions to Quality System documents are depicted by a revision number or letter appended to the document number. Successive revisions to documents shall use the next sequential number or letter. Initial release of a document may have no revision indicated or may have revision 0 (zero) indicated. 6.5 External Documents External documents referenced in the Quality Manual and the SLPs are available on the following web sites and include, but are not limited to the following: 7. Metrics? NASA On-line Directives Information System (NODIS) at http://nodis.hq.nasa.gov,? Software Guidebooks and Standards at http://www.ivv.nasa.gov/swg/resources, etc. Users of such documents are responsible for verifying that they are using the correct version by checking the documents on the appropriate web site. If they have the incorrect version, they are responsible for ensuring that it is not inadvertently used. There are no metrics required for this document.

8. Quality Records of 11 There are no Quality Records required for this document.. Form(s) Forms required for this document: Form Number ARC 760 Title Document Change Request

Appendix A 10 of 11 General Requirements - All quality document and data control systems shall address the following requirements: 1. New documents and data and changes to existing documents and data are reviewed and approved for adequacy by the Responsible Manager before release. 2. Changes to documents and data may be proposed by anyone in the organization but may only be released if authorized as defined in approved procedures. 3. Changes to documents and data are reviewed and approved by the same organization or functional area that performed the original review and approval, unless specifically designated otherwise. Reviewers shall have access to all pertinent information necessary to review changes. The nature of a change shall be identified within the document or data. 4. All documents and data shall be legible, dated, readily identifiable with unique numbers, titles, and revision levels, and maintained in an orderly manner. 5. Documents and data shall be readily available to all persons within the organization, unless otherwise specified. Users of such documents are responsible for verifying that they are using the correct version by checking the documents on the appropriate web site. If they have the incorrect version, they are responsible for ensuring that it is not inadvertently used. 6. Any document with a document number and revision level that does not match the current version as designated on the Master List is considered invalid or obsolete. Invalid or obsolete documents and data may be kept for historical reference or knowledge preservation purposes. Downloaded or printed hardcopies are considered uncontrolled. Marking old versions of documents as obsolete, superceded, etc. will be marked. 7. Master Lists from all document and data control systems shall link to the ARC Centerwide Master List. 8. Control of external documents and data consists of ensuring that appropriate versions are available to users. Document and data control procedures shall explain how external documents are identified, controlled to ensure that appropriate versions are available and removed from service when obsolete. Use of web sites that contain standards and external documents, such as NASA, industry, military, etc., is recommended as a means for identifying the correct version of external documents. Documents and data of external origin are not included on the ARC Centerwide Master List. 8a. The latest approved NASA agency documents (e.g. policies, directives) are available on the following web sites and include, but are not limited to the following:? NASA On-line Directives Information System (NODIS) at http://nodis.hq.nasa.gov,? Software Guidebooks and Standards at http://www.ivv.nasa.gov/swg/resources, etc.

11 of 11 8b. Military specifications, industry standards, Federal Aviation Administration standards, etc. are available at http://www.hq.nasa.gov/iso/ihs/ihs.htm.. Forms described in or associated with Quality System documents shall be controlled. Forms may be listed separately or they may be embedded in documents on the Master List. Each form shall be controlled by either a date or revision level noted on the form. Forms that are available in electronic format may also have an E next to the form identification.