CMPDI. An ISO 9001Company. R.K.Chopra Director (Tech/RD&T), CMPDI, Ranchi, INDIA

COAL BED METHANE. 2 nd INDO-US COAL WORKING GROUP MEETING WASHINGTON NOVEMBER 2005

Estimated Resources of Crude oil & Natural Gas (MMT)

Gas Flow Testing Update. Gas flow testing resumed successfully and continues with positive results to date

SURGE IN INDIAN STEEL INDUSTRY : CHALLENGES OF INPUT SECURITY

How To Secure Gas Supplies For The Cgd Sector

TOWARDS HYDROGEN ENERGY ECONOMY IN INDIA

Name of the issue: Coal India Limited Last Updated 20-Jun-13

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal

How To Reduce Coal Power Plant Emissions

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology

Coal India Limited (COALINDIA) - Financial and Strategic SWOT Analysis Review

World economic forum. introduction. (DIPP) Department of Industrial Policy and Promotion:

LNG Poised to Significantly Increase its Share of Global Gas Market David Wood February 2004 Petroleum Review p.38-39

High Efficiency Low Emissions: The first way forward for clean coal technology. Dr Andrew Minchener OBE General Manager IEA Clean Coal Centre

User Guide for India s 2047 Energy Calculator Oil & Gas Sector

An Overview of Landfill Gas Energy in the United States

Guidelines for Solar Grid Power Projects

The Future of Coal-Based Power Generation With CCS UN CCS Summit James Katzer MIT Energy Initiative web.mit.edu/coal/

2015 Annual General Meeting. 25 November 2015

Making Coal Use Compatible with Measures to Counter Global Warming

Coalbed Methane Production!

ANALYSIS OF INTERNATIONAL BEST PRACTICES FOR COAL MINE METHANE RECOVERY AND UTILIZATION

Ukraine s Gas Market Reform: Green Light to Investments in Natural Gas Transmission, Production and Energy Efficiency

Indian Electricity Sector

Alberta Research Council (ARC) Enhanced Coalbed Methane (ECBM) Recovery Project in Alberta, Canada

GENERATION TECHNOLOGY ASSESSMENT

EXECUTIVE SUMMARY. Availability of fossil fuels

Underground Coal Gasification in South Africa the SAUCGA

STEVE HENNINGS, M.S., P.E.

Yu. F. Vasyuchkov*, M. Yu. Bykova* NEW TECHNOLOGY OF GAS EXTRACTION ON THE BASE OF A COAL TO A HYDROGEN TRANSFER

World Energy Outlook 2007: China and India Insights. International Energy Agency

AN OVERVIEW OF INDIA S ENERGY SECTOR

Investing in an Underground Coal Mine in Indonesia

What Coal Technologies Can Do to Reduce Global CO2 Emission

GESTCO final report. Work Package 2, Study area F: Storage in deep coal beds : Germany

Oil and Gas Terms. Anticline: An arch of stratified rock layers that may form a trap for hydrocarbons.

Keisuke Sadamori Director, Energy Markets and Security International Energy Agency Kuala Lumpur, 8 October

GROUNDWATER RESOURCES MANAGEMENT IN SAUDI ARABIA

World Energy Outlook Presentation to the Press London, 10 November 2009

Coalbed Methane CO2 Sequestration Project Mecsek Mts Hungary

Biocoal for Renewable. Copyright Bepex International 2011 All Rights Reserved

SECARB 10 th Annual Stakeholders' Briefing. Southern Company CCS R&D: Plant Barry CCS Demo. Dr. Richard A. Esposito Southern Company.

How To Develop Energy Resources In China

29 May Eden signs Conditional Heads of Terms to Sell UK Gas and Petroleum Assets for 10million

China Energy efficiency report

DATA RECOVERY SOLUTIONS EXPERT DATA RECOVERY SOLUTIONS FOR ALL DATA LOSS SCENARIOS.

INVITATION OF PROPOSAL

Financing New Coal-Fired Power Plants

Canada s Energy Sector in a Changing Global Market. Kristi Varangu Director, International Energy Division March 10, 2014

GAO Peng PetroChina Planning & Engineering Institute September 24th - 26th, 2013 Xi An

Oil and Gas Exploration and Production (E&P) in Colombia - Market Analysis, Competitive Landscape and Forecasts to 2020

Sixth Annual Conference on Carbon Capture & Sequestration

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management

Effects of chemical composition and petrography of coal for coalbed methane evaluation with special reference to in-situ gas content

Viresco Energy s Advanced Gasification Technology

Rainwater Harvesting

Opportunities and Challenges for Australian Gas Presentation by James Baulderstone at the Australia Gas Conference

CEFC financing first for major Western Australian waste-to-gas project

Partha S Bhattacharyya Former Chairman, Coal India Ltd, & Former MD, Haldia Petrochemicals Ltd.

UBS Grass Roots Conference

Issue. September 2012

ASSOCIATION INC Geothermal Energy: New Zealand s most reliable sustainable energy resource

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

Unconventional Oil and Gas Production Drives Trends in Water Management and Treatment

The Aegean LNG and the IGB Pipeline

Clean Coal Technology in Future Energy Supply

UNITED STATES SECURITIES AND EXCHANGE COMMISSION. Washington, D. C FORM 8-K CURRENT REPORT

Russia: energy market developments. Marc-Antoine Eyl-Mazzega Russia Programme Manager Paris, 16 December 2014

MEETING DEMAND CHALLENGES OF AN EMERGING LNG MARKET: INDIA

A History and Overview of the Barnett Shale

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

YOUR GUIDE TO HEAT PUMPS & SOLAR THERMAL

NEW HORIZONS, HOPE & INVESTMENTS WINNERS FOR THE RECOVERY THE DONKIN MINE NOVA SCOTIA

Freight Transport Industry in India

A report to the International Association of Oil and Gas Producers (OGP) MACROECONOMIC EFFECTS OF EUROPEAN SHALE GAS PRODUCTION.

Review of Potential Efficiency Improvements at Coal-Fired Power Plants

Thermal Mass Flow Meters

FINAL REPORT LIFE-CYCLE COST STUDY OF A GEOTHERMAL HEAT PUMP SYSTEM BIA OFFICE BLDG., WINNEBAGO, NE

Small Scale Coal Power Plant in Indonesia

STUDY ON UNDERGROUND COAL MINING IN CIL PROBLEMS, POTENTIAL, TECHNOLOGY, MODERNISATION, PRODUCTION AND SAFETY

Universidade Fernando Pessoa - CIAGEB, Praça de 9 de Abril 349, Porto, Portugal 2

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

SKI Coal Gasification Technology. Feb. 23, 2012

Sixth Annual Conference on Carbon Capture & Sequestration

Development of Coal Gasification System for Producing Chemical Synthesis Source Gas

nrsc/isro Application of Remote Sensing Satellite Data in Coal Exploration & Mining

OPTIONS FOR COMMERCIAL GAS DEVELOPMENT OF MARGINAL FIELDS

Transcription:

Development of CBM in India: An Overview Flare of Methane at Moonidih A.K.Singh S R Pump at Moonidih Chairman-cum-Managing Director, CMPDI & Co-chair, Coal Sub-committee, M2M

Presentation outline India s s energy scenario Coal: Reliable source for energy security in India Coal: A source of clean energy Development of CBM: India s accomplishments Development of CBM/CMM: CIL/CMPDI s initiatives Development of CMM: Opportunities and challenges VAM: An area for development

India s s Energy Scenario India is one of the fastest growing economies The GDP growth is over 8%, likely to increase to over 10% in near future This GDP growth is required to eradicate poverty and meet country s human development goal To sustain such growth 3/4 fold increase in primary energy requirement envisaged Integrated Energy Policy Document indicates total energy requirement of the country will increase from a current level of about 500 MTOe to 2000 MTOe by 2031-32. Efforts are on to utilize all possible energy resourcerenewable, non-renewable, coal based additional resource etc to meet this gigantic target.

Coal: Reliable Source for Energy Security in India Coal is the main source of energy in India. At present it meets about 55% of the primary energy requirement of the country. Studies indicate that this situation is likely to continue in the foreseeable future To meet the projected demand of coal (2 BT by 2031-32), 32), efforts are on to: Increase the proved resource base New coal extraction technologies

Coal: A Source of Clean Energy Usage of coal as a source of clean energy is a priority area both at Govt. and CIL level to meet the overall objective of low carbon path For the purpose Clean Coal Technology is being pursed with right earnest and a National Mission has been established for coordinating efforts taken in this field by academic & scientific institutions along with industry : Pre-combustion processes Coal Beneficiation: CIL to increase the existing washing capacity from 39.4 MT to 140.5 MT by 2012 mainly through participation of private players under BOM Combustion processes Development of sub-critical, Super-critical & Ultra super-critical Pulverized Coal Fired Boilers, IGCC Un-conventional energy source Priority development of CBM, CMM, AMM,VAM, Gasification (surface & in-situ) of coal etc.

Development of CBM: India s s Accomplishments To facilitate development of CBM, Govt. of India formulated CBM Policy in 1997. The highlights are as under: Blocks to be awarded through open international competitive bidding ing system No participating interest of the Government No upfront payment, No signature bonus Exemption from payment of customs duty on imports required for CBM C operation Freedom to sale gas in the domestic market A seven years tax holiday As a result of liberal fiscal provisions, commercial development of CBM took a fast pace 26 such blocks allotted, 8 more blocks under allotment by Govt of India. Production started from few allotted blocks Production likely to pick-up rapidly.

Development of CBM: India s s Accomplishments.,. CBM resource in allotted (26)/ under allotment (8) CBM blocks: 1.8 TCM, Area- 17700 sq km Production potential in allotted blocks: 38 Million Cubic Meter per day, which can support power generation of 6700 MW. CBM well drilled: 280, Total investment: Rs 256 Crores (USD 57 million) Reserve established by different operators in 5 blocks: 8.4 TCF 3 blocks (Raniganj South-GEECL, Sohagpur West and Sohagpur East- Reliance Industries Ltd) has entered in development stage Details of allotment of CBM Blocks for Commercial Development up to 3 Round

Status of Allotment/Development of CBM Blocks 1 Blocks awarded till date Total 26 2 Status of Blocks as on date under i. Exploration Phase I 10 ii. Exploration Phase - II 8 iii. Development Phase-III [DGH approved Development Plan for 3 Blocks: Raniganj(S), Sohagpur(E) & Sohagpur (W)] 3 3 Area awarded, sq. km. 13,600 4 Total CBM Resources, BCM 1374 5 CBM wells drilled so far ( Core Hole/ Test well/ Pilot well) 6 CBM reserve established (Gas Initial In Place), TCF/BCM for 4 blocks 7 Expected Production Potential, MMSCMD 38 500 8.4 8 Commercial Production commenced, w.e.f. 14.07.07 9 Approved gas sale Price, $/MMBTU 6.79 10 Present Gas Production from 3 blocks: RG(S), SP(E) & SP(W), MMSCMD 11 Expected CBM gas production from 3 blocks by 2013, [Raniganj (S), Sohagpur (E), Sohagpur(W)], MMSCMD 0.15 7.4

Development of CBM: India s s Accomplishments Commercial production of CBM started and during 2008-09 it was 0.15 MMSCMD (million std cubic meter per day). The CBM production is expected to increase to 3.6 MMSCMD by 2011-12 and to 7.14 by 2014 CBM Production (MMSCMD) 8 7 6 5 4 3 2 1 0 0.15 Production Projection of CBM in India (Source: DGH) 1.11 2.29 3.61 5.35 7.41 08-09 09-10 10-11 11-12 12-13 13-14 Year

Development of CBM/CMM: CIL/CMPDI s initiatives CMPDI is pursuing development of CBM through: Resource assessment: 3.4 TCM (Prognosticated) Generating CBM related data for enlarging resource base Preparation of data dossiers for allotment of CBM blocks Implementation of Projects (Demonstration- CMM & Commercial-CBM) Pursuing development of CMM & VAM

Development of CBM/CMM: CIL/CMPDI s initiatives.. Implementation of Projects: UNDP/GEF/GoI funded Demonstration project at Moonidih & Sudamdih mines of BCCL CIL-ONGC commercial projects in Jharia and Raniganj CBM blocks

CBM Recovery and Commercial Utilization- Demonstration Project CBM Rig unit in operation Successfully implemented at Moonidih mine of BCCL. 3 CBM wells drilled and 3 potential seams in each well hydrofractured 2 CBM wells are producing gas after dewatering Hydro-frac unit at 3 rd Well Dewatering being taken up in 3 rd well after which CBM production will start.

CBM Recovery and Commercial Utilization- Demonstration Project The produced gas is being utilised for continuous running 500 Kw gasbased generators So far over 1.1 million units of electricity generated. Generated electricity being supplied to Moonidih Mine Colony. Successful implementation of this project proved efficacy of CMM extraction technology in Indian geomining conditions.

Commercial Development of Coalbed Methane : CIL/CMPDI s s Endeavour Co-implementing commercial CBM Project in Jharia and Raniganj CBM Blocks allotted to CIL-ONGC consortium. Production from Jharia CBM Block likely to start by 2010. A Development Plan with budgetary estimate of Rs 1290 Crores (USD 290 Million) has been submitted to the Govt. for approval

Development of CMM: Opportunities & Challenges Opportunities Occurrence of high rank coal in many coalfields Substantial coal resource is available in virgin coal seams lying below the worked out seams Successful implementation of demonstration project has opened opportunities for harnessing CMM in Indian mining conditions. CMPDI is implementing a R&D project for identification of suitable area for CMM development. Under this project, few blocks have been identified. Expression of Interest floated for identification of suitable service provider. Blocks to be awarded for commercial CMM development through bidding.

Development of CMM: Opportunities & Challenges Challenges 1. Technical Resource assessment technique of CMM in de-stressed condition Techno-economic evaluation of identified project area. Utilization of recovered methane Since expertise on above are not available, international experts help from partner countries would be required. 2. Regulatory: Regulatory framework for development of coal mines and CBM are in place Regulatory framework for simultaneous and harmonious exploitation of CBM and coal mining under formulation by Govt. of India.

Development of VAM Development of Ventilation Air Methane (VAM) Development of VAM is another priority area. CMPDI has recently generated VAM specific data in several D-III mines of CIL. An EoI has been floated for identification of suitable collaborator for commercial development of VAM projects. Low concentration of methane in the ventilation air is a technological challenge.

India CBM/CMM Clearinghouse India CBM/CMM Clearinghouse has been established at CMPDI, Ranchi in Nov 08 under the aegis of MoC and USEPA. This will help promotion of development of CMM/CBM in country. An international workshop was also held in Nov 08 which was attended by national/international experts in the subject. A web-site is functional which highlights the opportunities of CBM/CMM development in India