The Gwent Group of Companies. Quality Assurance Presentation



Similar documents
GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page

Donaldson Buys Value SBOSS. Donaldson Supplier Business Operating System Standard (SBOSS)

Supplier quality guideline. VOSS Automotive Group Issue Rev00

ISO Introduction

ISO 9000 Introduction and Support Package: Guidance on the Documentation Requirements of ISO 9001:2008

Comparison ISO/TS (1999) to VDA 6.1 (1998)

Core Fittings C-Core and CD-Core Fittings

APQP information to suppliers. Volvo Construction Equipment 2012

Overview of Medical Device Design Controls in the US. By Nandini Murthy, MS, RAC

TL 9000 and TS16949 Comparison

Product Development and Commercialization Lifecycle

VDA 6.3 Training & Qualification.

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

Best Practice In A Change Management System

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

General Motors Global Purchasing and Supply Chain Global Supplier Quality

ISO-9001:2000 Quality Management Systems

Micron Quality Manual

AS9100 Quality Manual

ISO 9001 : 2000 Quality Management Systems Requirements

Accreditation and Competence?

Design Failure Modes and Effects Analysis DFMEA with Suppliers

INTERSIL CORPORATION QUALITY SYSTEMS MANUAL

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

PFMEA Process Failure Mode and Effects Analysis. James Davis, General Dynamics

NASDAQ:BLDP TSX:BLD. Smarter Solutions for a Clean Energy Future

MANAGEMENT SYSTEMS CERTIFICATION

Contents. Management Policy Manual SEM USA Page 2 of 12

Commercialization Life Cycle

THE QUALITY AUDITOR SOLUTIONS TEXT

Comparison between FDA QSR and ISO 13485

Free Download ISO/TS 16949:2009. Requirements Checklist. 29 of 57 pages (PDF) For additional information see

CORPORATE QUALITY MANUAL

FSSC Q. Certification module for food quality in compliance with ISO 9001:2008. Quality module REQUIREMENTS

Key Elements Procedure 3 Production and Engineering

Production Part Approval Process AIAG PPAP 4 th Edition

In some cases the exclusion may not be justified depending on who is the customer, and what is the product.

Teknia Group. Corporate Video. Teknia is a Spanish family owned company. The group consists of two business units: Automotive and Technologies

Using Document Control Software to Meet ISO Document Control Requirements

ISO 13485:2003 U.S. QSR (21 CFR 820) Quality Systems Manual

MAN AFCC Handbook Supplier Quality Management External Edition

Supplier Quality Management Production Part Approval Process (PPAP) Manual

Turnkey Solutions for Science and Technology in Education

OMCL Network of the Council of Europe QUALITY ASSURANCE DOCUMENT

Supplier Quality Agreements

Electroluminescent Materials

PSA Peugeot Citroën Customer-Specific Requirements for use with ISO/TS 16949:2009

Quality System Manual

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

MANAGEMENT SYSTEMS CERTIFICATION FROM AUTOMOTIVE SPECIALISTS

Ford Motor Company Customer-Specific Requirements

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

ISO 9001:2008 Audit Checklist

Introduction of ISO/DIS (ISO 26262) Parts of ISO ASIL Levels Part 6 : Product Development Software Level

Introduction to AS 9100

LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

General Motors Global Purchasing and Supply Chain Global Supplier Quality

Design Verification The Case for Verification, Not Validation

ISO/IEC 17021:2011 Conformity assessment Requirements for bodies providing audit and certification of management systems

ISO/TS 16949:2002 Guidance Document

PIETER HAASBROEK SENIOR MANAGER SABS RSA

16) QUALITY MANAGEMENT SYSTEMS

TEC Nov08 Rev A

DRAWING NUMBER REVISION TITLE PAGE C Planning of Product Realization 1 of 5

What is ISO 9001 and should i care? SAFER, SMARTER, GREENER

The Prophotonix (UK) Ltd Quality manual

Training Schedule for 2016/2017 CERTIFIED COURSES

Quality Manual. ISO/TS 16949:2009 Quality Management System. Sensing and Control

Implementing an ISO 9001 Quality Management System

Quality, Environmental, Health and Safety Manual Toshiba International Corporation

Supplier Quality Requirements Manual

Business Management System Manual. Context, Scope and Responsibilities

Enrolment in the training course and exam for auditors of accredited bodies certified to ISO/TS 16949

UNCONTROLLED COPY FOR REFERENCE ONLY

SUPPLIER QUALITY SYSTEM AUDIT

THE PROCESS APPROACH IN ISO 9001:2015

Revision: X Date of Issue: January 28 th, 2014 Approved by: Greg Vassmer Management Representative PURPOSE OF THE QUALITY POLICY MANUAL

Quality Management System Manual

IT Project: System Implementation Project Template Description

How to implement a Quality Management System

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS

UNICEF s Quality Assurance System for Procurement of Micronutrient Powders (MNP)

GE Oil & Gas. Quality at. GE Oil & Gas. GE imagination at work QUALITY

ISO 14001:2004 Environmental Management System Manual

Integrated Supplier Quality Requirements

Vigilant Security Services UK Ltd Quality Manual

DESIGNED FOR QUALITY ASSURANCE

Software Quality Assurance: VI Standards

CENTRIS CONSULTING. Quality Control Manual

CUSTOMER SPECIFIC REQUIREMENTS

FSSC Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART I

NATO GUIDANCE ON THE USE OF THE AQAP 2000 SERIES

Integrated Quality Assurance in Engine Assembly

Association for Project Management Business Management System

IMPROVING QUALITY WITH IFS QUALITY MANAGEMENT IFS CUSTOMER SUMMIT 2011, CHICAGO

Transcription:

The Gwent Group of Companies Quality Assurance Presentation

The Gwent Group of Companies Suppliers to Major Multinational Companies in :- The Automotive Industry. The Fuel Cell Industry. The Electro-ceramics Industry. The Pharmaceutical Industry. The Bio Science Industry. The Electronic Display Industry. and General Electronics.

The GEM Quality Management System Recognises the need of the market for quality and fitness of purpose of the companies products. The strategic decision was made on the adoption of a Quality Management system. An internationally recognised standard

Qualifications

QUALITY STANDARDS OVERVIEW ISO 9001:2000 THE INTERNATIONAL QUALITY STANDARD ISO 13485:2003 THE QUALITY STANDARD AS APPLIED TO MEDICAL DEVICES. BASED ON ISO 9001 ISO 16949:2002 REQUIREMENTS FOR APPLICATION OF ISO 9001 TO THE AUTOMOTIVE INDUSTRY

QUALITY SYSTEM OVERVIEW ONE QUALITY SYSTEM COVERING ALL THREE STANDARDS IT ADDRESSES EACH SECTION OF THE STANDARDS Documentation and Records Control Management Responsibility Resource Management Product Realization Measurement, Analysis and Improvement

PRODUCT REALISATION OVERVIEW THE PROCEDURES FOR CONTROLLING THIS ARE VERY STRICTLY MAINTAINED. PARTICULARLY FOR ESTABLISHING CUSTOMER REQUIREMENTS, QUALITY PLANNING, DESIGN CONTROL AND PRODUCTION CONTROL THEY DIFFER IN DETAIL AND APPLICATION DEPENDANT ON WHETHER THE CUSTOMER IS SUBSCRIBING TO ISO9001, ISO 13485 OR ISO/TS 16949 1. Contract Review 2. Advanced Product Quality Planning 3. Design Projects 4. Production Control

DESIGN AND PRODUCTION CONTROL DESIGN REVIEWS Does the design satisfy all the requirements? Are the product design and processing capabilities compatible? Have the FMEAs been completed. Does the design meet the functional and operational requirements? Have appropriate materials been selected? Have environmental and Health and Safety requirements been coverd? Can toleranc es be achieved? DESIGN DEVELOPMENT (VALIDATION) Ensure that product confoms to defined user needs and/or requirements. Performed on the final product under defined operating conditions. Design failures shall be documented. Procedures for corrective and preventive action shall be followed in addressing such design failures. INITIAL PRODUCTION VALIDATION Prodution Trial Run, Measurement Systems Evaluation, Preliminary Process Capability Study, Production product approval, Production Validation Testing, Packaging Evaluation, Production Control Plan, Quality Planning Sign-Off DESIGN & DEVELOPMENT PLAN Objectives, Design Inputs/deign Specifications, Time Scales, Feasability Studies, Design Output, Design Reviews, Design Verification & Validation, Costs DESIGN INPUT PRODUCT DEVELOPMENT DESIGN OUTPUT PRODUCTION Functional Requirements, (VERIFICATION) Adequate assessment of the Process Instructions, Performance Requirement Review of FMEAs. Performing conformance to the input Process Flow Chart, Interface requirements, alternative calculations. Comparing requirements and identify the Control Plan, Process Review of Design Spec., the design with similar proven characterisitics of the design that FMEA Analysis. Determining and Agreeing designs. Undertaking tests and are crucial to the safety and the Measurement Systems Customer/Functional/ demonstrations, and reviewing fuctioning of the product, including Analysis Plan, Product Performance and inter- design stage documents before production and material specs. and Quality Systems face Requirements, FMEA releas e. Production specs. include Reveiw, Preliminary analysis, Reliability Manufacturing Instructions, Process Capability Analysis, Labeling and component and material Study Plan, Packaging Packaging Requirements specifications, packaging and labels Specifications.

PRODUCT REALISATION Contract review DESIGN & DEVELOPMENT PLAN Objectives, Design Inputs/design Specifications, Time Scales, Feasibility Studies, Design Out- put, Design Reviews, Design Verification & Validation, Costs

PRODUCT REALISATION Design Review DESIGN INPUT Functional Requirements, Performance Requirement Interface requirements, Review of Design Spec., Determining and Agreeing Customer/Functional/ Performance and inter- face Requirements, FMEA analysis, Reliability Analysis, Labelling and Packaging Requirements

PRODUCT REALISATION DFMEA Advanced daced Product Quality Planning and Control Plan PRODUCT DEVELOPMENT (VERIFICATION) Review of FMEAs. Performing alternative calculations. Comparing the design with similar proven designs. Undertaking tests and demonstrations, and reviewing design stage documents before release.

DFMEAs, Lab. Books, Capability Studies PRODUCT REALISATION DESIGN REVIEWS Does the design satisfy all the requirements? Are the product design and processing capabilities compatible? Have the FMEAs been completed. Does the design meet the functional and operational requirements? Have appropriate p materials been selected? Have environmental and Health and Safety requirements been covered? Can tolerances be achieved?

PRODUCT REALISATION PFMEAs, Production Control Plan, INITIAL PRODUCTION VALIDATION Production Trial Run, Measurement Systems Evaluation, Preliminary Process Capability Study, Production product approval, Production Validation Testing, Packaging Evaluation, Production Control Plan, Quality Planning Sign-Off

PRODUCT REALISATION DESIGN OUTPUT Adequate assessment of the conformance to the input requirements and identify the characteristics of the design that are crucial to the safety and the functioning of the product, including production and material specs. Production specs. include Manufacturing Instructions, component and material specifications, packaging and labels

Prevetative and Corrective Procedures, Design Review PRODUCT REALISATION DESIGN DEVELOPMENT (VALIDATION) Ensure that product conforms to defined user needs and/or requirements. Performed on the final product under defined operating conditions. Design failures shall be documented. Procedures for corrective and preventive action shall be followed in addressing such design failures.

PRODUCT REALISATION PRODUCTION Process Instructions, Process Flow Chart, Control Plan, Process FMEA Analysis. Measurement Systems Analysis Plan, Product and Quality Systems Review, Preliminary Process Capability Study Plan, Packaging Specifications.

Les. Embury Managing Director The Gwent Group, Monmouth House, Mamhilad Park, Pontypool NP4 0HZ. United Kingdom. sales@gwent.org http://www.gwent.org Tel: +44 (0)1495 750505 Fax: +44 (0) 1495 752121