Revision: X Date of Issue: January 28 th, 2014 Approved by: Greg Vassmer Management Representative PURPOSE OF THE QUALITY POLICY MANUAL

Size: px
Start display at page:

Download "Revision: X Date of Issue: January 28 th, 2014 Approved by: Greg Vassmer Management Representative PURPOSE OF THE QUALITY POLICY MANUAL"

Transcription

1 Page 1 of 51 PURPOSE OF THE QUALITY POLICY MANUAL This manual is issued to describe the Quality Assurance System to be employed by Trostel, Ltd. This manual and the systems and processes it describes will serve to ensure: Implementation of Trostel, Ltd. Quality Policy at all manufacturing sites Conformance to our customers requirements Conformance to ISO/TS16949:2009(E) As the Top Level Manager at my facility, I am ultimately responsible for the implementation and support of this Quality Policy Manual. My signature is proof of my commitment to the Policies stated in this manual. Steve Dyer President and CEO Trostel, LTD. Greg Vassmer Chief Technology and Quality Officer Trostel, LTD.

2 Page 2 of 51 TROSTEL QUALITY POLICY TROSTEL IS COMMITTED TO BUILD A CULTURE OF CONTINUOUS IMPROVEMENT THAT ENABLES US TO BE WORLD-CLASS IN ALL FACETS OF OUR BUSINESS, AND MOST IMPORTANTLY TO EXCEED CUSTOMER EXPECTATIONS. TROSTEL MISSION INCREASE SHAREHOLDER VALUE BY PROVIDING CUSTOMERS WITH HIGH QUALITY ELASTOMERIC SOLUTIONS, WHILE PROMOTING EMPLOYEE GROWTH AND ENSURING CORPORATE RESPONSIBILITY. SCOPE AND EXCLUSIONS The scope of this Quality Policy Manual applies to all the Trostel locations Worldwide. - The manufacture of rubber seals, precision moldings, assemblies, compression, injection and transfer moldings at Trostel Mexico S. de R.L. de C.V. located AV. Fomento Industrial Lote 8 Manzana 3, Parque Industrial del Norte, Reynosa, Tamps, 88736, Mexico, - The manufacture of custom rubber compounds at Trostel Whitewater located 736 Executive Drive, Whitewater, Wisconsin, , United States, - The cleaning and prepping of metals at Trostel Texas located at 3701 W Ursula Ave, McAllen, TX 78503, - The design and engineering of molded products, material development lab, sales, finance, MIS, quality management system, purchasing at Trostel Lake Geneva located 901 Maxwell Street, Lake Geneva, WI Exclusions: - The Trostel Quality Management System excludes the Design and Development requirements of ISO/TS 16949:2009, section 7.3, from its Trostel Whitewater facility. The justification for exclusion is that automotive customers provide their own recipes, thus removing design responsibilities from Trostel.

3 Page 3 of 51 Quality Policy Manual Index ISO/TS16949:2009 (E) Section/Clause TITLE PAGE N/A Purpose of Quality Manual Quality Policy/Vision Statement/ 2 Scope and Exclusions N/A Quality Policy Manual Index Quality Management System General Requirements Documentation Requirements 6-8 * General * Quality Manual * Control of Documents * Control of Records 5 Management Responsibility Management Commitment Customer Focus Quality Policy Planning 10 * Quality Objectives * Quality Management System Planning 5.5 Responsibility, Authority and Communication * Responsibility and Authority * * Internal Communication 5.6 Management Review * General * Review Input * Review Output 6 Resource Management Provisions of Resources 13

4 Page 4 of 51 Quality Policy Manual Index ISO/TS16949:2009 (E) Section/Clause TITLE PAGE 6.2 Human Resources * General * Competence, Awareness and Training 6.3 Infrastructure Work Environment 15 7 Product Realization Planning of Product Realization * Planning of Product Realization-Supplemental * Acceptance Criteria * Confidentiality * Change Control 7.2 Customer related Processes * Determination of Requirements Related to the Product * Review of Requirements Related to the Product * Customer Communication 7.3 Design and Development * Design and Development Planning * Design and Development Inputs * Design and Development Outputs * Design and Development Review * Design and Development Verification * Design and Development Validation *7.3.7 Control of Design and Development Changes 7.4 Purchasing * Purchasing Process * Purchasing Information * Verification of Purchased Product 7.5 Production and Service Provision * Control of Production and Service Provision * Validation of Processes for Production and Service Provision * Identification and Traceability * Customer Property

5 Page 5 of 51 * Preservation of Product Quality Policy Manual Index ISO/TS16949:2009 (E) Section/Clause TITLE PAGE 7.6 Control of Monitoring and Measuring Devices Measurement, analysis and improvement General Monitoring and Measurement * Customer Satisfaction * Internal Audit * Monitoring and Measurement of Processes * Monitoring and Measurement of Product 8.3 Control of Nonconforming Product Analysis of Data Improvement * Continual Improvement * Corrective Action * Preventive Action ---- Appendixes A. Documented Procedures 42 B. Organizational Charts-See file 43 C. Controlled Circulation 44 D. Continuous Improvement Cycle 45 E. Documentation Pyramid 46 F. Amendment Record G. Process Road Map 49 H. Molding Process Interaction Map 50 I. Compounding Process Interaction Map 51

6 Page 6 of 51 4 QUALITY MANAGEMENT SYSTEM 4.1 General requirements TROSTEL, LTD. has established, documented, implemented and maintains a quality management system. We continually improve its effectiveness in accordance with the requirements of ISO/TS 16949:2009(E) TROSTEL, LTD. has: a) identified the processes needed for the quality management system and their application throughout TROSTEL, LTD..; b) determined the sequence and the interaction of these processes, which is defined through the procedures; c) determined the criteria and the methods needed to ensure that both the operation and the control of these processes are effective; d) ensures the availability of resources and information that is necessary to support the operation and monitoring of these processes; e) monitors, measures, and analyses these processes, and; f) implements actions that are necessary to achieve planned results and to continually improve the processes The processes are managed by TROSTEL, LTD. in accordance with the requirements of ISO/TS 16949(E). When TROSTEL, LTD. chooses to outsource any process that affects customer product conformity with requirements, TROSTEL, LTD. ensures control over such processes. Control of these outsourced processes is identified within the quality management system. The method to ensure this control is documented in the SOP s for purchasing Ensuring control over outsourced processes does not absolve TROSTEL, LTD. of the responsibility of conformity to all customer requirements. 4.2 Documentation requirements General The quality management system documentation includes: a) Documented statements of a quality policy and quality objectives; b) A quality manual; c) Documented procedures that are required by ISO/TS 16949:2009, See Appendix A; d) Documents needed by TROSTEL, LTD. to ensure the effective planning, operation and control of our processes; e) Quality records that are required by ISO/TS 16949:2009 and are listed on the Quality Document Matrix.

7 Page 7 of Quality manual TROSTEL, LTD. has established and maintains a quality manual that includes: a) The scope of the quality management system, including details and justification for any exclusion. See Scope and Exclusions on page 2. b) Documented Tactical procedures established for the quality management system are referenced in Appendix A of this manual c) A description of the interaction between the processes of the quality management system that is accomplished through following the documented procedures and SOP s. See Appendix G Control of documents Documents that are required by the quality management system are controlled. Quality records are controlled as specified in A documented procedure (See Appendix A) is established to define the controls needed to: a) Approve documents for adequacy prior to their issue; b) Review and update as necessary and to re-approve documents, c) Ensure that changes and the current revision status of documents are identified, d) Ensure that relevant versions of applicable documents are available at points of use, e) Ensure that documents remain legible and are readily identifiable; f) Ensure that documents of external origin are identified and that their distribution is controlled; g) Prevent the unintended use of obsolete documents, and to apply suitable identification to them if they are retained for any purpose Engineering specifications TROSTEL, LTD. has a process to assure the timely review, distribution and implementation of all customer engineering standards / specifications and changes based on our customer required schedule. The timely review is as soon and possible and does not exceed two working weeks. TROSTEL, LTD. maintains records of the date on which each change is implemented in production. Implementation includes updating pertinent documentation Control of quality records

8 Page 8 of 51 Quality records are established and maintained to provide evidence of conformity to requirements and of the effective operation of the quality management system. Quality records are legible, readily identifiable and are retrievable. A documented procedure is established that defines the controls needed for the identification, storage, protection, retrieval, retention time and disposition of quality records. See Appendix A Records retention The control of records satisfies regulatory and customer requirements.

9 Page 9 of 51 5 MANAGEMENT RESPONSIBILITY 5.1 Management commitment The Top Management of TROSTEL, LTD. provides evidence of its commitment to the development and implementation of the quality management system and to continually improving its effectiveness. This is done by: a) Communicating throughout the organization the importance of meeting customer as well as statutory and regulatory requirements at TROSTEL, LTD. meetings and also living the quality system on a daily basis; b) Establishing and living the quality policy; c) Ensuring quality objectives are established and that the objectives are used to drive improvement to the system; d) Conducting management review on a minimal of a semi annual basis; and e) Ensuring the availability of needed resources Process efficiency Top Management reviews the product realization processes and the support processes to ensure their effectiveness and efficiency. 5.2 Customer focus The Top Management group ensures the customer requirements are determined and fulfilled with the aim of enhancing customer satisfaction. Customer satisfaction is ensured by increasing customer confidence in TROSTEL, LTD. 5.3 Quality policy The Top Management ensures the quality policy a) Is appropriate to the purpose of TROSTEL, LTD.; b) Includes a commitment to comply with requirements and continually improves the effectiveness of the quality management system; c) Provides a framework for establishing and reviewing quality objectives; d) Is communicated and understood within the organization; and e) That it is reviewed for continuing suitability.

10 Page 10 of Planning Quality objectives Top Management ensures the quality objectives, including those needed to meet requirements for product is established at relevant functions and levels within the organization. The quality objectives are measurable and consistent with the quality policy. These objectives are described in the Strategic Road Map. See Appendix C Quality objectives Supplemental Top management ensures that quality objectives and measurements are included in the business plan and used to deploy the quality policy Quality management system planning Top Management ensures that: a) The planning of the quality management system is carried out in order to meet the requirements given in 4.1 as well as the quality objectives; and b) The integrity of the quality management system is maintained when changes to the quality management system are planned and implemented. 5.5 Responsibility, authority and communication Responsibility and authority Top Management ensures that the responsibility, authorities and their interrelation are defined and communicated appropriately within TROSTEL, LTD. Our organizational chart indicates the level of authority of each position and the job descriptions, Tactical procedures and SOP s clearly define each functions responsibility. See Organizational Chart Responsibility for quality Managers with responsibility and authority for corrective action are promptly informed of products or processes that do not conform to requirements. Personnel responsible for product quality have the authority to stop production to correct quality problems. Production operations across all shifts are staffed with personnel in charge of, or delegated responsibility for, ensuring product quality.

11 Page 11 of Management representative The President & CEO has appointed the Chief Technology and Quality Officer as the who, in addition to other responsibilities, has the responsibility and authority that includes: a) Ensuring the processes needed for the quality management system are established, implemented and maintained; b) Reporting to top management on the performance of the quality management system and any need for improvement; and c) Ensuring that awareness of customer requirements throughout the organization is promoted; d) Directing TROSTEL, LTD. employees to meet the requirements and to implement the quality management system Customer representative The President & CEO has appointed the Vice President of Sales and Marketing with responsibility and authority to ensure that customer requirements are addressed. This includes: a) Special characteristics; b) Setting quality objectives and related training; c) Corrective and preventative actions; d) Product design and development Internal communication Top management ensures the appropriate communication processes are established within TROSTEL, LTD. and that communication takes place regarding the effectiveness of the quality management system. This is done in two ways; by ensuring that procedures define which functions communicate information that is transferred internally and externally and a variety of regularly scheduled meetings. 5.6 Management review General Top management reviews the TROSTEL, LTD.'s quality management system, on a minimal of an annual basis, to ensure it is suitable, adequate and effective. This review includes assessing opportunities for improvement and the need for changes to the existing quality management system, including the quality policy and quality objectives. Records of management review are maintained.

12 Page 12 of Quality management system performance These reviews include all requirements of the quality management system and its performance trends as an essential part of the continual improvement process. Part of the management review is the monitoring of quality objectives, and the regular reporting and evaluation of the cost of poor quality. These results are recorded to provide, as a minimum, evidence of the achievement of - the quality objectives specifies in the business plan, and - customer satisfaction with product supplied Review input The input to management review includes, as a minimum, information on: a) The results of audits; b) Customer feedback; c) Process performance and product conformity; d) The status of preventive and corrective actions; e) Follow-up actions from previous management reviews; f) Planned changes that could affect the quality management system; and g) Recommendations for improvement; h) Input from other TROSTEL, LTD.. employees; i) Measuring progress against established objectives Review input Supplemental Input to management review includes an analysis of actual and potential field-failures and their impact on quality, safety or the environment Review output The output from the management review includes any decisions and actions that are related to: a) Improvement of the effectiveness of the quality management system and its processes; b) Improvement of product related to customer requirements; c) Resource needs; d) Improvement to product related to increase in improvement and efficiencies; and e) Any actions as a result of review of each input item.

13 Page 13 of 51 6 RESOURCE MANAGEMENT 6.1 Provision of Resources The organization determines and provides, in a timely manner, the resources needed to: a) Increase efficiency; b) implement, maintain and improve the quality system; c) enhance customer satisfaction by meeting or exceeding customer requirements. 6.2 Human Resources General Personnel affecting quality are competent on the basis of applicable education, training, skills and experience. The applicable education, training, skills and experience for each position are defined in the position specifications Competence, Awareness and Training TROSTEL, LTD..: a) Identifies competency needs for personnel performing activities affecting quality; b) Provides training or other actions to satisfy these needs; c) Evaluates the effectiveness of the training/actions taken; d) Ensures that its employees are aware of the relevance and importance of their activities and how they contribute to the achievement of the quality objectives; e) Maintains appropriate records of education, training, skills and experience Product design skills TROSTEL, LTD. ensures that personnel with product design responsibility and competent to achieve design requirements and are skilled in applicable tools and techniques. Applicable tools and techniques are identified by TROSTEL, LTD...

14 Page 14 of Training TROSTEL, LTD. has established and maintains a documented procedure for identifying training needs and achieving competence of all personnel performing activities affecting product quality. Personnel performing specific assigned tasks are qualified, as required, with particular attention to the satisfaction of customer requirements. See Appendix F Training on the job TROSTEL, LTD. provides on-the-job training for personnel in any new or modified job affecting product quality, including contract or agency personnel. Personnel whose work can affect quality are informed about the consequences to the customer of nonconformity to quality requirements Employee motivation and empowerment TROSTEL, LTD. has implemented a process to motivate employees to achieve quality objectives, to make continual improvements, and to create an environment to promote innovation. The process includes the promotion of quality and technological awareness throughout the whole organization. TROSTEL, LTD. has implemented a process to measure the extent to which its personnel are aware of the relevance and importance of their activities and how they contribute to the achievement of the quality objectives. 6.3 Infrastructure TROSTEL, LTD. determines, provides and maintains the infrastructure required to achieve the conformity to product requirements. This infrastructure includes as applicable: a) Buildings, workspace and associated utilities; b) Process equipment, both hardware and software; c) Supporting services (such as transport and communication).

15 Page 15 of Plant, facility and equipment planning TROSTEL, LTD. uses a multidisciplinary approach for developing plant, facility, and equipment plans. Plant layouts shall optimize material travel, handling and value-added use of floor space, and facilitates synchronous material flow. Methods are developed and implemented to evaluate and monitor the effectiveness of existing operations. Lean Manufacturing is an integral part of this process Contingency plans TROSTEL, LTD. utilizes contingency plans to satisfy customer requirements in the event of an emergency such as utility interruptions, labor shortages, key equipment failure and field returns. 6.4 Work Environment TROSTEL, LTD. has determined and manages the work environment needed to fulfill obligations and achieve conformity to product requirements Personnel safety to achieve product quality Product safety and means to minimize potential risks to employees are addressed by TROSTEL, LTD. especially in the design and development process and in manufacturing process activities Cleanliness of premises TROSTEL, LTD. maintains its premises in a state of order, cleanliness and repair consistent with the product and manufacturing process needs.

16 Page 16 of 51 7 Product Realization 7.1 Planning of Realization Processes TROSTEL, LTD. plans and develops processes needed for product realization. Planning of product realization is consistent with the requirements of the other processes within the quality management system. In planning the processes for product realization, TROSTEL, LTD. has determined the following, as appropriate: a) Quality objectives and requirements for the product; b) The need to establish processes and documentation and provide resources specific to the product; c) Required verification, validation, monitoring, inspection and test activities specific to the product and the criteria for product acceptance; d) The records to provide evidence that the realization processes and resulting product meet requirements. The output of planning is in a form that is suitable for TROSTEL, LTD.'s method of operation Planning of product realization Supplemental Customer requirements and references to its technical specifications are included in the planning of product realization as a component of the quality plan Acceptance criteria Acceptance criteria is defined by TROSTEL, LTD. and, where required, approved by the customer. For attribute data sampling, the acceptance level shall be zero defects Confidentiality TROSTEL, LTD. ensures the confidentiality of customer-contracted products and projects under development, and related product information.

17 Page 17 of Change control TROSTEL, LTD. utilizes a process to control and react to changes that impact product realization. The effects of any change, including those changes caused by any supplier, are assessed, and verification and validation activities are defined, to ensure compliance with customer requirements. Changes are validated before implementation. For proprietary designs, impact on form, fit and function (including performance and/or durability) are reviewed with the customer so that all effects can be properly evaluated. When required by the customer, additional verification/identification requirements, such as those required for new product introduction, are met 7.2 Customer-Related Processes Determination of Requirements Related to the Product TROSTEL, LTD. determines: a) Requirements specified by the customer, including the requirements for delivery and post delivery activities; b) Requirements not specified by the customer but necessary for intended use; c) Statutory and regulatory requirements; including all applicable government, safety and environmental regulations, applied to acquisition, storage, handling, recycling, elimination or disposal of materials. d) Additional requirements identified by TROSTEL, LTD Customer-designated special characteristics TROSTEL, LTD. demonstrates conformity to customer requirements for designation, documentation and control of special characteristics Review of Requirements related to the product TROSTEL, LTD. reviews the requirements related to the product. The review is conducted before TROSTEL, LTD. commits to supply the product to the customer and ensures that: a) Product requirements are defined; b) Contract or order requirements differing from those previously expressed are resolved;

18 Page 18 of 51 c) TROSTEL, LTD. has the ability to meet the defined requirements. The results of the review and subsequent follow-up actions are recorded and maintained. When the customer does not provide a documented statement of requirement, TROSTEL, LTD. confirms these requirements before acceptance. Where product requirements are changed, TROSTEL, LTD. ensures that relevant documentation is amended and that relevant personnel are made aware of the changed requirements Review of requirements related to the product Supplemental Waiving the requirement stated in for a formal review requires customer authorization Organization manufacturing feasibility TROSTEL, LTD. investigates, confirms, and documents the manufacturing feasibility of the proposed products in the contract review process, including risk analysis Customer Communication TROSTEL, LTD. has determined and implemented arrangements for communication with customers relating to: a) Customer expectations and corporate philosophy; b) Product information; c) Enquiries, contracts or order handling, including amendments; d) Customer feedback, including customer complaints Customer communication Supplemental TROSTEL, LTD. has the ability to communicate necessary information, including data, in a customer-specified language and format.

19 Page 19 of Designs and/or Development Design and /or development planning TROSTEL, LTD. plans and controls design and/or development of the product. The planning includes and determines: a) The stages of design and/or development processes; b) The review, verification and validation activities appropriate to each design and/or development stage including prototypes; c) The responsibilities and authorities for design and/or development activities. The interfaces between different groups involved in design and/or development is managed to ensure effective communication and clarity of responsibilities. Planning output is updated, as appropriate, as the design and development progresses Multidisciplinary approach TROSTEL, LTD. utilizes a multidisciplinary approach to prepare for product realization, including: - development/finalization and monitoring of special characteristics, - development and review of FMEAs, including actions to reduce potential risks, and - development and review of control plans Design and/or development inputs Inputs to the product requirements are determined and records are maintained. These inputs include: a) Functional and performance requirements; b) Applicable regulatory and legal requirements; c) Applicable information derived from previous similar designs; and d) Any other requirements essential for design and/or development. The inputs are reviewed for adequacy. Incomplete, ambiguous or conflicting requirements shall be resolved Product design input TROSTEL, LTD. Identifies, documents and reviews the product design input

20 Page 20 of 51 requirements, including the following - Customer requirements (contract review) such as special characteristics identification, traceability and packaging; - Use of information: TROSTEL, LTD.. has a process to deploy information gained from previous design projects, competitor analysis, supplier feedback, internal input, field data, and other relevant sources, for current and future projects of a similar nature; - Targets for product quality, life, reliability, durability, maintainability, timing and cost Manufacturing process design input TROSTEL, LTD. identifies, documents and reviews the manufacturing process design input requirements, including - product design output data, - targets for productivity, process capability and cost, - customers requirements, if any, and - experience from previous developments. - Includes the use of error-proofing methods to a degree appropriate Special characteristics TROSTEL, LTD. identifies special characteristics and - Includes all special characteristics in the control plan, - Complies with customer-specified definitions and symbols, and - Identifies process control documents including drawings, FMEAs, control plans, and operator instructions with the customer s special characteristic symbol or the organization s equivalent symbol or notation to include those process steps that affect special characteristics Design and/or development outputs The outputs of the design and/or development process are documented in a manner that enables verification against the design and/or development inputs and are approved prior to release. The design and/or development output: a) Meets the design and/or development input requirements; b) Provides appropriate information for production and service operations; c) Contains or references product acceptance criteria;

21 Page 21 of 51 d) Defines the characteristics of the product that are essential to its safe and proper use. Design and/or development output documents are approved prior to release Product design outputs Supplemental The product design output is expressed in terms that can be verified and validated against product design input requirements. The product design output includes - design FMEA, reliability, - product special characteristics and specifications, - product error-proofing, as appropriate, - product definition including drawings or mathematically based data, - product design reviews results, and - diagnostic guidelines where applicable Manufacturing process design output The manufacturing process design output is expressed in terms that can be verified against manufacturing process design input requirements and validated. The manufacturing process design output includes - specifications and drawings, - manufacturing process flow chart/layout, - manufacturing process FMEAs, - control plan, - work instructions, - process approval acceptance criteria, - data for quality, reliability, maintainability and measurability, - results of error-proofing activities, as appropriate, and - methods of rapid detection and feedback of product/manufacturing process nonconformities Design and/or development review At suitable stages, systematic reviews of design and/or development are conducted in accordance with planned arrangements to: a) Evaluate the ability of the results to fulfill requirements; b) Identify problems and propose necessary actions. The participants at each review include representatives from the functions concerned with the design and/or development stage that is being reviewed. The results of the design review and the follow-up actions that are needed are recorded.

22 Page 22 of Monitoring Measurements at specified stages of design and development are defined, analyzed and reported with summary results as an input to management review Design and/or development verification Verification is performed in accordance with planned arrangements to ensure that the design and development outputs have met the design and development input requirements. Records of the results of the verification and any necessary actions are maintained Design and/or development validation Design and or development validation is performed in accordance with planned arrangements to confirm that the product is capable of meeting the requirements for the intended use. When applicable, validation is completed prior to the delivery or implementation of the product. When it is not practical to perform full validation before delivery or implementation, partial validation is performed to the extent it is applicable. The results of validation and any required follow-up activities are recorded Design and development validation - Supplemental Design and development validation is performed in accordance with customer requirements including program timing Prototype program When required by the customer, TROSTEL, LTD. has a prototype program and control plan. TROSTEL, LTD. uses, wherever possible, the same suppliers, tooling and manufacturing processes as will be used in production. All performance-testing activities are monitored for timely completion and conformity to requirements. While services may be outsourced, TROSTEL, LTD. is responsible for the outsourced services, including technical leadership Product approval process TROSTEL, LTD. conforms to a product and manufacturing process approval procedure recognized by the customer. This approval process also applies to suppliers

23 Page 23 of Control of design and/or development changes Design and development changes are identified and records are maintained. The changes are reviewed, verified and validated, as appropriate, and approved before implementation. The review of design and development changes includes evaluation of the effect of the changes on constituent parts and product already delivered. Records of the results of the review of changes and any necessary actions are maintained. 7.4 Purchasing Purchasing Process TROSTEL, LTD. controls the purchasing processes to ensure that purchased product conforms to requirements. The type and extent of our control is based upon the effect the product has on the product realization or the final product. TROSTEL, LTD. has a process in place to evaluate and select suppliers based on their ability to supply product or service in accordance with our requirements. Criteria for selection and periodic evaluation are defined in SOP s. The results of evaluations and follow-up actions are recorded per these procedures Regulatory conformity All purchased products or materials used in product conform to applicable regulatory requirements Supplier quality management system development TROSTEL, LTD. performs supplier quality management system development with the goal of supplier conformity with this Technical Specification. Conformity with ISO is the first step in achieving this goal. Unless otherwise specified by the customer, suppliers to TROSTEL, LTD... Are third party registered to ISO9001:2008 by an accredited third-party certification body Customer-approved sources

24 Page 24 of 51 Where specified by the contract (e.g. customer engineering drawing, specification), TROSTEL, LTD. purchases products, materials or services from approved sources. The use of customer-designated sources, including tool/gauge suppliers, does not relieve TROSTEL, LTD. of the responsibility for ensuring the quality of purchased products Purchasing Information Purchasing documents describe the product to be purchased, including where appropriate: a) Requirements for approval of product, procedures, processes and equipment; b) Requirements for personnel qualifications; and c) Quality management system requirements. TROSTEL, LTD. ensures the adequacy of specified requirements contained in the purchasing documents prior to their communication to the supplier Verification of Purchased Product TROSTEL, LTD. has established and implemented the inspection or other activities necessary for ensuring that purchased product meets specified purchase requirements. When TROSTEL, LTD. or its customer intends to perform verification at the supplier's premises, TROSTEL, LTD. states the intended verification arrangement and method of product release in the purchasing information Incoming product quality TROSTEL, LTD. has a process to assure the quality of purchased product utilizing one or more of the following methods: - receipt of, and evaluation or, statistical data by TROSTEL, LTD.., - receiving inspection and/or testing such as sampling based on performance, - second- or third-party assessments or audits of supplier sites, when coupled with records of acceptable delivered product quality,

25 Page 25 of 51 - part evaluation by a designated laboratory, - another method agreed with the customer Supplier monitoring Supplier performance is monitored through the following indicators: - delivered product quality, - customer disruptions including field returns, - delivery schedule performance (including incidents of premium freight), - special status customer notifications related to quality or delivery issues. TROSTEL, LTD. promotes supplier monitoring of the performance of their manufacturing processes. 7.5 Productions and Service Provision Control of Production and Service Provision TROSTEL, LTD. controls manufacturing operations through the following controlled conditions, as applicable: a) The availability of information that specifies the characteristics of the product; b) Where necessary, the availability of work instructions; c) The use and maintenance of suitable equipment; d) The availability and use of monitoring devices; e) The implementation of monitoring and measurement devices; f) The implementation of release, delivery and post-delivery activities Control plan TROSTEL, LTD. has - developed control plans at the system, subsystem, component and/or material level for the product supplied, including those for processes producing bulk materials as well as parts, and, - a control plan for pre-launch and production that takes into account the design FMEA and manufacturing process FMEA outputs.

26 Page 26 of 51 The control plan - lists the controls used for the manufacturing process control, - includes methods for monitoring of control exercised over special characteristics defined by both the customer and the organization. - Includes the customer-required information, if any, and - Initiates the specified reaction plan when the process becomes unstable or not statistically capable Work instructions TROSTEL, LTD. has prepared documented work instructions for all employees having responsibilities for the operation of processes that impact product quality. These instructions are accessible for use at the workstation. These instructions are derived from sources such as the quality plan, the control plan and the product realization process Verification of job set-ups Job set-ups are verified whenever performed, such as an initial run of a job, a material change over or a job change. Work instructions are available for set-up personnel. TROSTEL, LTD. uses statistical methods of verification where applicable Preventive and predictive maintenance TROSTEL, LTD. identifies key process equipment and provides resources for machine/equipment maintenance and develops an effective planned total preventive maintenance system. This system includes the following: - planned maintenance activities; - packaging and preservation of equipment, tooling and gauging; - availability of replacement parts for key manufacturing equipment;

27 Page 27 of 51 - documenting, evaluating and improving maintenance objectives. TROSTEL, LTD. utilizes predictive maintenance methods to continually improve the effectiveness and efficiency of production equipment Management of production tooling TROSTEL, LTD. provides resources for tool and gauge design, fabrication and verification activities. TROSTEL, LTD. has established and implemented a system for production tooling management which includes: - maintenance and repair facilities and personnel; - storage and recovery; - set-up; - tool-change programs for perishable tools; - tool-design modification documentation, including engineering change level; - tool modification and revision to documentation; - tool identification, defining the status, such as production, repair or disposal. TROSTEL, LTD. has implemented a system to monitor these activities if any work is outsourced Production scheduling Production is scheduled in order to meet customer requirements, such as just-in-time supported by an information system that permits access to production information at key stages of the process and is order driven Feedback of information from service A process for the communication of information on service concerns to manufacturing, engineering and design activities is established and maintained.

28 Page 28 of Service agreement with customer Currently Trostel, Ltd. does have any contractual agreements with the customer to provide service. When there is a service agreement with the customer, TROSTEL, LTD. will develop the system needed to meet the requirements of the standard Validation of Processes for Production and Service Provision TROSTEL, LTD. validates any processes for production and service provision where the resulting output cannot be verified by subsequent monitoring or measurement. This includes any processes where deficiencies become apparent only after the product is in use or the service has been delivered. Validation demonstrates the ability of these processes to achieve planned results. TROSTEL, LTD. has established arrangements for these processes including, as applicable: a) Defined criteria for review and approval of the processes; b) Approval of equipment and qualification of personnel; c) Use of specific methods and procedures; d) Requirements for records; and e) Revalidation Validation of processes for production and service provision - Supplemental The requirements of are applied to all processes for production and service provision Identification and Traceability TROSTEL, LTD. identifies the product by suitable means throughout the product realization. TROSTEL, LTD. identifies the status of the product with regard to monitoring and measurement requirements. Where traceability is a requirement, TROSTEL, LTD.. controls and records the unique identification of the product Identification and traceability - Supplemental The words Where appropriate in of the TS (E) standard do not apply and have been removed from our statement.

29 Page 29 of Customer Property TROSTEL, LTD. exercises care with customer property while it is under the organization's control or is being used by TROSTEL, LTD... TROSTEL, LTD. identifies, verifies, protects and safeguards customer property provided for use and/or incorporation into the product. If any customer property is lost, damaged, or is otherwise found to be unsuitable for use, it is reported to the customer and records of this are maintained Customer- owned production tooling Customer-owned tools, manufacturing, test, inspection tooling and equipment is permanently marked so that the ownership of each item is visible, and can be determined Preservation of Product TROSTEL, LTD. preserves the conformity of the product to requirements while under TROSTEL, LTD. control and during delivery to the intended destination. This preservation includes identification, handling, packaging, storage and protection. Preservation shall also apply to the constituent parts of a product Storage and inventory In order to detect deterioration, the condition of product in stock is assessed at appropriate planned intervals. TROSTEL, LTD. uses an inventory management system to optimize inventory turns over time and assure stock rotation, such as first-in-first-out (FIFO). Obsolete product is controlled in a similar manner to nonconforming product.

30 Page 30 of Control of Measuring and Monitoring Devices TROSTEL, LTD. has determined the measuring and monitoring to be undertaken and the monitoring and measuring devices needed to provide evidence of conformity of product to determined requirements. Processes are established to ensure that monitoring and measurement can be carried out and is carried out in a manner that is consistent with the monitoring and measurement requirements. Measurements to be made and the measuring and monitoring devices required are identified. This is to assure conformity of product to defined requirements. The measuring and monitoring devices are used and controlled to ensure that measurement capability is consistent with the measurement requirements. Where necessary to ensure valid results, measuring equipment is: a) Calibrated or verified at specified intervals, or prior to use, against measurement standards traceable to international or national measurement standards; where no such standards exist, the basis used for calibration or verification is recorded; b) Adjusted or re-adjusted as necessary; c) Identified to enable the calibration status to be determined; d) Safeguarded from adjustments that would invalidate the measurement result; e) Protected from damage and deterioration during handling, maintenance and storage. In addition, TROSTEL, LTD. assesses and records the validity of previous measuring results when the equipment is found not to conform to requirements. TROSTEL, LTD. takes appropriate action on the equipment and also on any product affected. Records of the results of calibration and verification are maintained. When used in monitoring and measurement of specified requirements, the ability of computer software to satisfy the intended application is confirmed. This is undertaken before the initial use and is reconfirmed as necessary Measurement system analysis Statistical studies are conducted to analyze the variation present in the results of each type of measuring and test equipment system. This requirement is applied to measurement systems referenced in the control plan. The analytical methods and acceptance criteria used conforms to those in customer reference manuals on measurement systems analysis. Other analytical methods and acceptance criteria may be used if approved by the customer.

31 Page 31 of Calibration/verification records Records of the calibration/verification activity for all gauges, measuring and test equipment, needed to provide evidence of conformity of product to determined requirements, including employee- and customer-owned equipment, include - equipment identification, including the measurement standard against which the equipment is calibrated, - revisions following engineering changes, - any out-of-specification readings as received for calibration-verification, - an assessment of the impact of out-of-specification condition, - statements of conformity to specification after calibration/verification, and - notification to the customer if suspect product of material has been shipped.

32 Page 32 of Laboratory requirements Internal laboratory TROSTEL, LTD. s internal laboratory facility has a defined scope that includes its capability to perform the required inspection, test, or calibration services. This laboratory scope is included in the quality management system documentation. The laboratory specifies and implements, as a minimum, technical requirements for: - adequacy of the laboratory procedures, - competency of the laboratory personnel, - testing of the product, - capability to perform these services correctly, traceable to the relevant process standard, and - review of the related records External laboratory External/commercial/independent laboratory facilities used for inspection, test or calibration services by TROSTEL, LTD. have a defined laboratory scope that includes the capability to perform the required inspection, test, or calibration, and either - there is evidence that the external laboratory is acceptable to the customer, or - the laboratory is accredited to ISO/IEC or national equivalent. When a qualified laboratory is not available for a given piece of equipment, calibration may be performed by the equipment manufacturer.

33 Page 33 of 51 8 Measurement, Analysis and Improvement 8.1 General TROSTEL, LTD. has planned and implemented the measurement, monitoring, analysis and improvement activities needed to: a) Demonstrate conformity of the product; b) Ensure conformity of quality management system; and c) Continually improve the effectiveness of the quality management system. This includes determining the applicable methods that include statistical techniques and the extent of their use Identification of statistical tools Appropriate statistical tools for each process are determined during advance quality planning and are included in the control plan Knowledge of basic statistical concepts Basic statistical concepts, such as variation, control, process capability and over-adjustment are understood and utilized by TROSTEL, LTD Monitoring and Measurement Customer Satisfaction TROSTEL, LTD. monitors customer satisfaction and/or dissatisfaction considering the customer's perception of satisfaction and/or dissatisfaction as one of the measurements of performance of the quality management system. The methodologies for obtaining and using this information are determined and defined Customer satisfaction Supplemental Customer satisfaction with TROSTEL, LTD. is monitored through continual evaluation of performance of the realization processes. Performance indicators are based on objective data and include, but are not limited to:

34 Page 34 of 51 - delivered part quality performance, - customer disruptions including field returns, - delivery schedule performance (including incidents of premium freight), and - customer notifications related to quality or delivery issues. TROSTEL, LTD. monitors the performance of manufacturing processes to demonstrate compliance with customer requirements for product quality and efficiency of the process Internal Audit TROSTEL, LTD. conducts planned internal audits to determine whether the quality management system: a) Conforms to planned arrangements and the requirements of ISO/TS 16949:2009(E) and the requirements of the TROSTEL, LTD. quality system; and b) Has been effectively implemented and maintained. TROSTEL, LTD. plans the audit program taking into consideration the status and importance of the processes and areas to be audited as well as the results of previous audits. The audit criteria, scope, frequency and methods are defined. Selection of auditors and the conduct of audits ensure objectivity and impartiality of the audit process. Auditors do not audit their own work. A procedure is documented that includes the responsibilities and requirements for planning and conducting audits, as well as reporting results and maintaining records. See Appendix F Management responsible for the area being audited ensures that actions are taken without undue delay to eliminate detected nonconformities and their causes. Followup actions include the verification of the implementation of corrective action, and the reporting of verification results Quality management system audit TROSTEL, LTD. audits its quality management system to verify compliance with this Technical Specification and any additional quality management system requirements.

35 Page 35 of Manufacturing process audit TROSTEL, LTD. audits each manufacturing process to determine its effectiveness Product audit TROSTEL, LTD. audits products at appropriate stages of production and delivery to verify conformity to all specified requirements, such as product dimensions, functionality, packaging and labeling, at a defined frequency Internal audit plans Internal audits cover all quality management related processes, activities and shifts, and are scheduled according to an annual plan. When internal/external nonconformities or customer complaints occur, the audit frequency appropriately increases Internal auditor qualification TROSTEL, LTD. has internal auditors who are qualified to audit the requirements of this Technical Specification Monitoring and Measurement of Processes TROSTEL, LTD. applies suitable methods for monitoring and where applicable, measurement of the quality management system processes. These methods shall demonstrate the ability of the processes to achieve planned results. When planned results are not achieved, correction and corrective action are taken appropriately to ensure conformity of the product to requirements Monitoring and measurement of manufacturing processes

36 Page 36 of 51 TROSTEL, LTD. performs process studies on all new manufacturing (including assembly or sequencing) processes to verify process capability and to provide additional input for process control. The results of process studies are documented with specifications, where applicable, for means of production, measurement and test, and maintenance instructions. These documents include objectives for manufacturing process capability, reliability, maintainability and availability, as well as acceptance criteria. TROSTEL, LTD. maintains manufacturing process capability or performance as specified by the customer part approval process requirements. TROSTEL, LTD. ensures that the control plan and process flow diagram are implemented, including adherence to the specified - measurement techniques, - sampling plans, - acceptance criteria, and - reaction plans when acceptance criteria are not met. Significant process events, such as tool change or machine repair, are recorded. TROSTEL, LTD. initiates a reaction plan from the control plan for characteristics that are either not statistically capable or are unstable. These reaction plans include containment of product and 100 % inspection as appropriate. A corrective action plan is then completed by TROSTEL, LTD. to indicate specific timing and assigned responsibilities to assure that the process becomes stable and capable. The plans are reviewed and approved by the customer when so required. TROSTEL, LTD. maintains records of effective dates of process changes Monitoring and Measurement of Product TROSTEL, LTD. monitors and measures the characteristics of the product to verify that product requirements have been met. This is carried out at appropriate stages of the product realization process in accordance with the planned arrangements. Evidence of conformity with the acceptance criteria is maintained. Records indicate the person(s) authorizing release of product. Product release and service delivery does not proceed until specified activities have been satisfactorily completed, unless otherwise approved by the relative authority and/or the customer where applicable.

37 Page 37 of Layout inspection and functional testing A layout inspection and a functional verification to applicable customer engineering material and performance standards are performed for each product as specified in the control plans. Results are available for customer review Appearance items For TROSTEL, LTD. s manufacturing parts designated by the customer as appearance items, TROSTEL, LTD. provide - appropriate resources including lighting for evaluation, - masters for color, grain, gloss, metallic brilliance, texture, distinctness of image, as appropriate, - maintenance and control of appearance masters and evaluation equipment, and - verification that personnel making appearance evaluations are competent and qualified to do so. 8.3 Control of Nonconforming Product TROSTEL, LTD. ensures product that does not conform to requirements are identified and controlled to prevent unintended use or delivery. The activities, responsibilities and authorities for handling nonconforming product are defined in procedures. See Appendix A Nonconformances are dealt with using one of the following methods a) Taking action to eliminate the nonconformity; b) Authorizing product use, release or acceptance under concession by relevant authority or customer, as applicable; c) Taking action to preclude original intended use or application. Records of the nature of nonconformities and any subsequent actions taken, including concessions obtained, are maintained. When nonconforming product is corrected it is subject to re-verification to demonstrate conformity to the requirements. When nonconformities are detected after delivery or product use, TROSTEL, LTD. takes action appropriate to the effects, or potential effects, of the nonconformity.

38 Page 38 of Control of nonconforming product Supplemental Product with unidentified or suspect status is classified as nonconforming product Control of reworked product Instructions for rework, including re-inspection requirements, are accessible to and utilized by the appropriate personnel Customer information Customers are informed promptly in the event that nonconforming product has been shipped Customer waiver TROSTEL, LTD. obtains a customer concession or deviation permit prior to further processing whenever the product or manufacturing process is different from that which is currently approved. TROSTEL, LTD. maintains a record of the expiration date or quantity authorized. TROSTEL, LTD. also ensures compliance with the original or superseding specifications and requirements when the authorization expires. Material shipped on an authorization is properly identified on each shipping container. This applies equally to purchased product. TROSTEL, LTD. agrees with any requests from suppliers before submission to the customer. 8.4 Analysis of Data TROSTEL, LTD. determines, collects and analyzes appropriate data to demonstrate the suitability and effectiveness of the quality management system and to identify improvements that can be made. This includes data generated by measuring and monitoring activities and other relevant sources. Analysis of this data provides information on: a) Customer satisfaction;

39 Page 39 of 51 b) Conformance to product requirements; c) Characteristics of processes, product and opportunities for preventive action; d) Suppliers Analysis and use of data Trends in quality and operational performance are compared with progress toward objectives and lead to action to support the following: - development of priorities for prompt solutions to customer-related problems; - determination of key customer-related trends and correlation for status review, decision-making and longer term planning; - an information system for the timely reporting of product information arising from usage. 8.5 Improvement Continual Improvement TROSTEL, LTD. continually improves the effectiveness of the quality management system through the use of the quality policy, objectives, audit results, analysis of data, corrective and preventive action and management review Continual improvement of the organization TROSTEL, LTD. shall define a process for continual improvement Manufacturing process improvement Manufacturing process improvement continually focuses upon control and reduction of variation in product characteristics and manufacturing process parameters Corrective Action

40 Page 40 of 51 TROSTEL, LTD. takes corrective action to eliminate the cause of nonconformities in order to prevent recurrence. Corrective action is appropriate to the impact of the problems encountered. The documented procedure for corrective action (See Appendix A) defines requirements for: a) Reviewing nonconformities (including customer complaints); b) Determining the causes of nonconformity; c) Evaluating the need for actions to ensure that nonconformities do not recur; d) Determining and implementing the corrective action needed; e) Recording results of action taken; f) Reviewing of corrective action taken Problem solving TROSTEL, LTD. has a defined process for problem solving leading to root cause identification and elimination. If a customer-prescribed problem-solving format exists, TROSTEL, LTD. uses the prescribed format Error-proofing TROSTEL, LTD. uses error-proofing methods in their corrective action process Corrective action impact TROSTEL, LTD. applies to other similar processes and products the corrective action, and controls implemented, to eliminate the cause of nonconformity Rejected product test/analysis TROSTEL, LTD. analyzes parts rejected by the customer s manufacturing plants, engineering facilities and dealerships. TROSTEL, LTD. minimizes the cycle time of this process. Records of these analyses are kept and made available upon request. TROSTEL, LTD. performs analysis and initiates corrective action to prevent recurrence.

41 Page 41 of Preventive Action TROSTEL, LTD. identifies preventive action to eliminate the causes of potential nonconformities to prevent occurrence. Preventive actions taken are appropriate to the effects of the potential problems. The documented procedure for preventive action (See Appendix A) defines requirements for: a) Determining where potential problems may occur and their causes; b) Evaluating whether or not action is needed to prevent occurrence of the nonconformity to other processes; c) Determining and implementing action needed; d) Recording results of action taken; e) Reviewing preventive action taken.

42 Page 42 of 51 Appendix A - Documented Procedures Procedure Name Documentation Of Tactical Procedures Doc, Data and Records Control Non-Conforming Materials Internal Quality Audits Training Documentation Control Policy Corrective and Preventive Action Process TPQA-001 TPQA-002 TPQA-003 TPQA-004 TPQA-005 TPQA-006 TPQA-007 Number

43 Page 43 of 51 Appendix B Organization Charts Organization Charts are maintained and kept by the Director of Human Resources.

44 Page 44 of 51 Appendix C CONTROLLED CIRCULATION The Master Copy of the Quality Policy Manual is stored in Autodesk Vault. It shall be the final authority as to the amendment status for all sections in the manual. The access is read only to the manual and any printed copies are for reference only and may not be considered at the correct revision. The or designee is responsible for the maintenance of all controlled access to the Quality Policy Manual.

45 Page 45 of 51 Appendix D Continual Improvement Cycle of The Quality Management System at Trostel (A model of our process-based quality management system.) (1. Trostel, Ltd. Top Management 2. Corporate Quality 3. Divisional General Manager & Quality Manager) Management Responsibility Customers (and other interested parties) (People Training Equipment) Customers Requirements (Approved Suppliers, APQP process, Blueprints Customer Specifications Packing Requirements, PPAP, etc) Resource management Product Realization Measurement, analysis and improvement Product Satisfaction (PPM, Customer Visits, Customer Surveys, Corrective Actions, Internal Audits, etc) Output Key Value-adding activities Information flow NOTE Statements in parentheses do not apply to ISO9001(2008).

46 Page 46 of 51 Appendix E Documentation Pyramid Level 1 Quality Policy Manual QPM Environmental Management System EMS Other Policies (i.e. safety, travel, etc.) Level 2 Tactical Procedures for Quality Assurance TPQA s Level 3 Standard Operating Procedures Data Records Process Flow Forms, etc.

47 Page 47 of 51 Appendix F AMENDMENT RECORD This manual may contain only the pages issued and approved by the. The or designee will process all authorized changes. The Master Copy of the Quality Policy Manual is stored in Autodesk Vault. The effective date of the latest revised section or element is the Issue date of the Policy Manual. Amendment Record List Revision Effective Date Description of Change(s) REL 11/15/1995 Initial Release A 12/12/1996 APQP was Technical Marketing. Engineering was Product Engineering. Process Validation was Mold, Die, Equipment and Process Validation. Purchasing was Materials Management. Restricted, Toxic or Hazardous Material Approval was numbered Manufacturing and Material Control was Materials Management. Supplier Sample Submission was DRAAPP. Engineering was Tool Engineering. B 7/23/1998 Product Development and Launch Process (PDLP) was Advanced Product Quality Planning (APQP). Project Management was APQP. C 1/15/1999 Added QSA in Section 2.0 QS Y2K Compliance 3.0c Added Y2K compliance statement to the introduction Production Part Approval Process deleted and moved into Element Continuous Improvement deleted and moved into Element Manufacturing Capabilities deleted and moved into Element 4.2. Added glossary. D 02/22/2000 Updated to reflect organization change transferring tool management to the individual plants and updating Advanced Engineering to the Methods Team. Section 2.0 Added QS rd Edition, PPAP 3 rd Edition, QSA 2 nd Edition. Section 3.0 Updated to state fully Y2K compliant. Section 4.2 Updated to include reference to Custom Mixed Compound (PDLP). Change Advanced Engineering to Methods Team, Tool Engineering to Plant Engineering. E 03/20/2002 Section 1.0 Removed Trostel Mission Statement paragraph and rewrote the Vision and Goal paragraphs. Section 4.1 changed title of procedure and added procedure and Section 4.4 changed title of procedure Section 4.5 changed title of procedure Section 4.8 changed title of procedure Section 4.10 Added reference of mixed compound in Section and ISO F 8/30/2003 Completely restructured quality policy manual to reflect structure and requirements of ISO/TS 16949:2002. G H I J 10/20/03 11/10/03 06/21/04 05/20/05 Added Process Maps to Appendix Made revisions per the Desk Audit report Revised Process Flow diagram (pg 48) per surveillance audit finding June 21, Revised due to Organizational change and updated process Roadmap.

48 Page 48 of 51 K 04/24/06 Updated Process Road Map to include Engineering Design, Program, Process L 09/29/06 Updated signature page for new Plant Manager (TMX) M 5/15/07 Updated signature page for Plant Managers at MCD & TMX N 8/28/07 Changed Trostel Vision to Trostel Mission on page 2 along with Bruce Betters as President and CEO. P 2/3/09 Updated process roadmap to reflect no production at Lake Geneva facility. Updated org. chart for business units. Updated management representative & customer representatives Q 10/23/09 Updated process road map to include LG lab testing. Remove Nate Salasis as Plant Manager - TMX R 12/4/09 Updated for TS16949 (2009)(E) and ISO9001 (2008) S 04/16/2010 Updated Appendix G T 9/20/11 Addition of Trostel Texas and Power Business Unit U 9/24/12 Updated to reflect current organization. Management representative and Customer representative updated. V 12/20/12 Updated Process Road map, Quality Policy Statement and Mission Statement. W 11/5/13 Updated the High Level Process Map, Updated signature page with Steve Dyer as President and CEO, Updated the Trostel Quality Policy and Mission statement, added TPQP-006 and 007. X 1/28/14 Updated documentation pyramid, Appendix E. Updated the customer representative section , updated scope and exclusions p.2, updated page 5 to remove division wording and details of organization charts, added Appendix H and I, molding and compounding process interaction maps.

49 Page 49 of 51 Appendix G High Level Process Map

50 Customer Specifications, Control Plans, Instructions, etc. Policies & Directions Trostel, Ltd. Quality Manual Uncontrolled copy if printed Page 50 of 51 Appendix H Molding Process Interaction Map Personnel & skills TPQA-005 Facilities Management Equipment & tooling maintenance Information System Finance Business Planning & Objectives Management Review Control of Non- Conforming Products TPQA-003 Continuous Improvement Corrective & Preventive Actions TPQA-007 Internal Audits TPQA-004 Customer Satisfaction Customer complaints Customer Surveys Supplier Assessments Product Return Finished Goods Material Purchase Order Order Entry Scheduling Requirements Manufacturing Meterials Inventory Mgt. Received Products Shipping Packaged Finished Products Material Requests Purchasing Purchase Order Product Tests & Results Supplier Metrology Receiving Purchased Products Shipper Billing Invoices Payments Customer RFQ APQP Process APQP001 PPAP Quotes Corporate Support Process Site Process

51 Customer Specifications, Control Plans, Instructions, etc. Policies & Directions Trostel, Ltd. Quality Manual Uncontrolled copy if printed Page 51 of 51 Appendix I Compounding Process Interaction Map Personnel & skills TPQA-005 Equipment & tooling maintenance Finance Business Planning & Objectives Management Review Control of Non- Conforming Products TPQA-003 Corrective & Preventive Actions TPQA-007 Internal Audits TPQA-004 Facilities Management Information System Continuous Improvement Customer Satisfaction Customer complaints Customer Surveys Supplier Assessments Product Return Quality Control Material Purchase Order Order Entry Scheduling Requirements Manufacturing Material Inventory Mgt. Received Products Shipping Packaged Finished Products Material Requests Purchasing Purchase Order Supplier Receiving Purchased Products Shipper Billing Invoices Payments Customer RFQ L0025 (Custom Mix) Trial Quotes Corporate Support Process Site Process

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier: Plant/Location: Date: Audit Team: Scope of Audit: Number of C.A.R. s: Corrective Action Due: Potential suppliers

More information

1029 A West State Blvd. Ft Wayne, Indiana 46808 QUALITY MANAGEMENT SYSTEM POLICY MANUAL. Based on: ISO 9001:2008 AND ISO/TS 16949:2009.

1029 A West State Blvd. Ft Wayne, Indiana 46808 QUALITY MANAGEMENT SYSTEM POLICY MANUAL. Based on: ISO 9001:2008 AND ISO/TS 16949:2009. 1029 A West State Blvd. Ft Wayne, Indiana 46808 QUALITY MANAGEMENT SYSTEM POLICY MANUAL Based on: ISO 9001:2008 AND ISO/TS 16949:2009 Authorized By: Randy Shepherd VP of Quality Issue Date: March 1, 2004

More information

Free Download ISO/TS 16949:2009. Requirements Checklist. 29 of 57 pages (PDF) For additional information see www.rcglobal.com

Free Download ISO/TS 16949:2009. Requirements Checklist. 29 of 57 pages (PDF) For additional information see www.rcglobal.com RCGLOBAL.COM Free Download ISO/TS 16949:2009 Requirements Checklist 29 of 57 pages (PDF) For additional information see www.rcglobal.com RCGLOBAL(Canada), for internal use only. Page 1 of 57 Review performed

More information

ISO 9001:2000 AUDIT CHECKLIST

ISO 9001:2000 AUDIT CHECKLIST ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality

More information

CUSTOMER SPECIFIC REQUIREMENTS

CUSTOMER SPECIFIC REQUIREMENTS CUSTOMER SPECIFIC REQUIREMENTS For Use With ISO 9001:2008 & ISO/TS 16949:2009 Page 1 SYSTEMS POLICY MANUAL CONTENTS Revision History Approval Document Distribution and Control General Application Background

More information

CENTRIS CONSULTING. Quality Control Manual

CENTRIS CONSULTING. Quality Control Manual CENTRIS CONSULTING Quality Control Manual ISO 9001:2008 Introduction Centris Consulting developed and implemented a Quality Management System in order to document the company s best business practices,

More information

ISO 9001:2000 Gap Analysis Checklist

ISO 9001:2000 Gap Analysis Checklist ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system

More information

ISO 9001:2008 Audit Checklist

ISO 9001:2008 Audit Checklist g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation

More information

ISO 9001 Quality Systems Manual

ISO 9001 Quality Systems Manual ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best

More information

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval Page 2 of 15 Document Revision History Revision Date Author Description of change 10 07Jun13 Mark Benton Removed Admin. Manager from approval 12Feb13 Mark Benton 08 01Oct12 Mark Benton 07 8/30/2012 Refer

More information

Micro Plastics, Inc. Quality Manual

Micro Plastics, Inc. Quality Manual ISO 9001:2008 11 Industry Lane Flippin, Arkansas 72634 QM-001-2008-F Page 2 of 39 Introduction Micro Plastics, Inc. developed and implemented a Quality Management System in order to document the company

More information

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents Chapter j 38 Self Assessment 729 QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements 1. Establishing and implementing a documented quality management system 2. Implementing a documented quality

More information

ISO-9001:2000 Quality Management Systems

ISO-9001:2000 Quality Management Systems ISO-9001:2000 Quality Management Systems REQUIREMENTS 10/10/2003 ISO-9001:2000 Requirements 1 Process Based Approach C U S MANAGEMENT RESPONSIBILITY RESOURCE MANAGEMENT C U S T O M Requirements PRODUCT

More information

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS CONTENTS 1. CONTROL PLANS 2. PROCESS APPROACH 3. PERFORMANCE 4. INTERNAL AUDITING 5. CONTROL OF NON-CONFORMING PRODUCT 6.

More information

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:

More information

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 Section 1. REVISION STATUS Revision 01 Initial Issue 02/13/95 Revision 02 ECO No.Q-0032 05/07/96 Revision 03 ECO No.97171

More information

QUALITY MANUAL ISO 9001. Quality Management System

QUALITY MANUAL ISO 9001. Quality Management System Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval

More information

FINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A

FINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A FINE LOGISTICS Quality Manual Document No.: 20008 Revision: A 20008 Rev. A FINE LOGISTICS, Quality Manual Page 1 of 24 Quality Manual: Table of contents Number Section Page 1. GENERAL 3 1.1 Index and revision

More information

ED FAGAN INC. QUALITY SYSTEM MANUAL

ED FAGAN INC. QUALITY SYSTEM MANUAL ED FAGAN INC. QUALITY SYSTEM MANUAL APPROVED BY: Ed Fagan President ED FAGAN INC. January 13, 2010 TABLE OF CONTENTS 1. PURPOSE AND SCOPE 2 2. PRODUCTS, SERVICES AND CAPABILITIES 2 3. REVISION HISTORY

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic

More information

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION INTRODUCTION What auditors should look for: the items listed in these headings that the ISO requirement is met that the requirement is met in the manner described in the organization's documentation Page

More information

QUALITY MANAGEMENT SYSTEM Corporate

QUALITY MANAGEMENT SYSTEM Corporate Page 1 of 12 4 Quality Management System 4.1 General Requirements The Peerless Pump Quality Management System shall include: Documented statements of a quality policy and of quality objectives; A quality

More information

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368 Quality Manual CBT Technology, Inc. 358 North Street Randolph, MA 02368 Issue 4 Revision 4 Note: updates are in italics Page 1 of 18 1.0 Scope and Exclusions Scope This Quality Manual contains policies

More information

Disclosure to Promote the Right To Information

Disclosure to Promote the Right To Information इ टरन ट म नक Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information

More information

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998)

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998) 1 APPLICABILITY VDA 6.1: Section: 3.1; 7 new: In addition to the applicability for supplier sites for production, services and their subcontractors for: products and production materials, or services like

More information

Row Manufacturing Inc. Quality Manual ISO 9001:2008

Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing 210 Durham Drive Athens, Alabama 35611 Phone:256.232.4151 Fax:256.232.4133 Page 2 of 33 This Page intentionally left Blank Page 3 of

More information

The Prophotonix (UK) Ltd Quality manual

The Prophotonix (UK) Ltd Quality manual The Prophotonix (UK) Ltd Quality manual Date: March 2014 Revision: D Sparrow lane, Hatfield Broad Oak, Herts, UK, CM22 7BA Tel: +44 (0)1279 717170 Fax: +44 (0)1279 717171 e-mail: info@prophotonix.com Page

More information

ISO 9001:2008 QUALITY MANUAL. Revision B

ISO 9001:2008 QUALITY MANUAL. Revision B ISO 9001:2008 QUALITY MANUAL Revision B Because we want you to achieve the highest levels of performance, we connect care Because with leading we want science you to achieve continuously the highest improve,

More information

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page Quality Manual Page 1 of 20 Change Log Document Revision Date Description of Change 15/04/09 Initial Release Page 2 of 20 1.0 Scope and Exclusions Scope This Quality Manual contains policies that have

More information

ISO 9001:2008 Quality Management System Requirements (Third Revision)

ISO 9001:2008 Quality Management System Requirements (Third Revision) ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management

More information

Quality System Manual

Quality System Manual Quality System Manual Joe Coatter 9/23/15 President - Joe Coatter Date Bill Gareis ISO/TS Management Representative - Bill Gareis 9/23/15 Date Revision Status: Revision # 7 (9-23-15) QUA-0003 4.2.2 SECTION

More information

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL 14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive

More information

The President of Inductors Inc. is the senior executive responsible for operations.

The President of Inductors Inc. is the senior executive responsible for operations. Title: Quality Management System Manual Page: 1 of 20 INTRODUCTION Inductors Inc., founded in 1991, specializes in the distribution of inductive components, including but not limited to standard and custom

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Cartel Electronics. AS 9100 Quality Systems Manual

Cartel Electronics. AS 9100 Quality Systems Manual Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed

More information

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22 ISO 9001:2008 Page: 1 of 22 Central Technologies has developed a Quality Management System, and the associated procedures and work instructions, to be compliant to ISO 9001:2008. Utilizing this Quality

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual 10V Gill Street Woburn, MA USA 01801 INTRODUCTION RL CONTROLS, LLC RL Controls, LLC is a privately held company headquartered in Woburn, MA, USA. RLC has more than 80 years

More information

DNV GL Assessment Checklist ISO 9001:2015

DNV GL Assessment Checklist ISO 9001:2015 DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization

More information

Quality Manual. ISO/TS 16949:2009 Quality Management System. Sensing and Control

Quality Manual. ISO/TS 16949:2009 Quality Management System. Sensing and Control Sensing and Control ISO/TS 16949:2009 Quality Management System CORPORATE HEADQUARTERS: OPTEK Technology 1645 Wallace Drive Carrollton, TX 75006 MANUFACTURING: Optron de Mexico Avenue Rio Bravo #1551 Parque

More information

Eagle Machining, Inc. Quality Management System

Eagle Machining, Inc. Quality Management System Eagle Machining, Inc. Quality Management System 1 of 10310 Antoine Drive Bldg D, Houston, Texas 77086 BUSINESS OPERATING MANUAL (QUALITY MANUAL) Revision Date: 08/01/2014 Approved By: Joseph Vu Date: 08/01/2014

More information

Quality Management System Manual

Quality Management System Manual Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:

More information

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT

More information

This Business Management System Manual is based on ISO 9001:2008 requirements

This Business Management System Manual is based on ISO 9001:2008 requirements Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with

More information

QUALITY OPERATING PROCEDURE QOP-00-02 QUALITY ASSURANCE SYSTEM MANUAL

QUALITY OPERATING PROCEDURE QOP-00-02 QUALITY ASSURANCE SYSTEM MANUAL PAGE 1 OF 40 QUALITY Note: The revision level of this document and any referenced documents must be verified for latest issue before use QOP-00-02 TITLE QUALITY ASSURANCE SYSTEM MANUAL APPROVALS DATE REVISIONS

More information

Quality Management System Requirements for the Suppliers Of Arçelik A.Ş.

Quality Management System Requirements for the Suppliers Of Arçelik A.Ş. Quality Management System Requirements for the Suppliers Of Arçelik A.Ş. Rev : 0.1 Date of issue : September 2005-1/23- -2/23- 0. INTRODUCTION... 5 0.1. GENERAL... 5 1. SCOPE... 5 1.1. GENERAL... 5 1.2.

More information

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011 Quality Manual 1 QM-001 Quality Manual Issue 1 January 1, 2011 This document is uncontrolled when printed. Please verify with Quality Management Representative 16 Dukes Close, West Way, Walworth Industrial

More information

Quality Systems Manual

Quality Systems Manual Quality Systems Manual This manual was developed to support ISO 9001 elements Revision Description of Change Author Effective Date 5-28-02 Initial Release Support ISO 9001: 2000 L. Hook 5-28-02 7-01-02

More information

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Revision D October 27, 2015 Statement of Commitment and Authority Commitment This Quality Management System Manual (QMSM) delineates the processes,

More information

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL QUALITY MANAGEMENT SYSTEM (QMS) MANUAL This document and the data contained herein are the property of ISOLINK, and shall not, without prior written permission, be reproduced or used for any unintended

More information

Disclosure to Promote the Right To Information

Disclosure to Promote the Right To Information इ टरन ट म नक Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information

More information

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production

More information

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE AEROSPACE STANDARD AS9100C Issued 1999-11 Revised 2009-01 Superseding AS9100B Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE This standard has been revised

More information

QUALITY MANUAL REVISION RECORD

QUALITY MANUAL REVISION RECORD Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion

More information

FMC Technologies Measurement Solutions Inc.

FMC Technologies Measurement Solutions Inc. Table of Contents 1 Revision History... 4 2 Company... 5 2.1 Introduction... 5 2.2 Quality Policy... 6 2.3 Quality Organization... 6 2.4 Company Processes... 7 3 Scope and Exclusions... 8 3.1 Scope...

More information

Quality Management System General

Quality Management System General Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in

More information

AS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc. 3554 Business Park Drive, Suite A-1 Costa Mesa, CA 92626

AS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc. 3554 Business Park Drive, Suite A-1 Costa Mesa, CA 92626 AS 9100 Rev C Quality Management System Manual B&A Engineering Systems, Inc. 3554 Business Park Drive, Suite A-1 Costa Mesa, CA 92626 Doc. No. AS9100C Rev E Effective Date: 01 JAN 2013 Page 2 of 45 CONTROLLED

More information

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Camar Aircraft Products Co. QUALITY MANUAL Revision D QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)

More information

ALL PRODUCTS MFG & SUPPLY

ALL PRODUCTS MFG & SUPPLY ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY

More information

Quality Management System Policy Manual

Quality Management System Policy Manual Quality Management System Burns Engineering, Inc. 10201 Bren Road East Minnetonka, MN 55343 4. 4.1 General Requirements The Quality Manual consists of the quality system policy documents and the quality

More information

QUALITY MANUAL ISO 9001:2015

QUALITY MANUAL ISO 9001:2015 Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to

More information

Quality Management System Manual QM-QUA-001

Quality Management System Manual QM-QUA-001 Quality Management System Manual QM-QUA-001 Nelson-Miller Inc. 2800 Casitas Avenue Los Angeles, Ca 90039 P a g e 2 Revision Date Description of the Change N/C 10/10/79 Initial release of documented inspection

More information

Contents. Management Policy Manual SEM USA Page 2 of 12

Contents. Management Policy Manual SEM USA Page 2 of 12 SEM USA Page 2 of 12 Contents 1. The Schneider Electric Motion USA Management Policy... 3 2. PROCESS INTERACTION... 4 3. COMPANY OBJECTIVES:... 5 4. MANAGEMENT SYSTEM... 6 4.1. General Requirements...

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual Acro Industries, Inc. 554 Colfax Street Rochester, NY 14606 585.254.3661 www.acroind.com Revision P Page 1 of 46 Introduction Acro Industries, Inc. is a leading manufacturer

More information

Vigilant Security Services UK Ltd Quality Manual

Vigilant Security Services UK Ltd Quality Manual Quality Manual Date: 11 th March, 2014 Issue: 5 Review Date: 10 th March 2015 VSS-COM-PRO-001 SCOPE This Quality Manual specifies the requirements for the Quality Management System of Vigilant Security

More information

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008 WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,

More information

Uncontrolled Document

Uncontrolled Document SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT

More information

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008.

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008. ALABAMA RESEARCH & DEVELOPMENT This complies with the Requirements of ISO 9001:2008. Prepared By: Phyllis Olsen Release Date: 03/19/09 Quality Policy & Objectives s quality policy is to achieve sustained,

More information

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.1 Status : APPROVED Effective: 12/11/2014 Page 2 of 23 Quality Manual Table of Contents

More information

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization 4.1 Understanding the organization and its context

More information

Quality Assurance System Manual

Quality Assurance System Manual The online version of this procedure is official. Therefore, all printed versions of this document are unofficial copies. St. Louis Public Schools Quality Assurance System Manual 801 North 11 th Street

More information

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.2 Status : APPROVED Effective: 9/25/2015 Page 2 of 23 Quality Manual Table of Contents

More information

EMS Engineered Materials Solutions, LLC Quality Management System Manual

EMS Engineered Materials Solutions, LLC Quality Management System Manual EMS Engineered Materials Solutions, LLC Quality Management System Manual Location: 39 Perry Avenue Attleboro, MA 02703 USA Telephone: 508.342.2235 Fax: 508.342.2538 Internet: www.emsclad.com www.copperplus.com

More information

Quality Management Systems Manual

Quality Management Systems Manual Washington Division Quality Management Systems Manual ISO 13485:2003 DOCUMENT NUMBER 01-QM-MED REVISION LEVEL 01 PAGE 1 of 40 This manual describes the quality management systems structure at GM Nameplate

More information

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.

More information

Quality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.

Quality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1. This complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.0 2011-04 Prepared By: Phyllis Olsen Release Date: 10/28/15 Certificate No: CERT-08776-2006-AQ-HOU-RvA

More information

ISO 9001:2015 Internal Audit Checklist

ISO 9001:2015 Internal Audit Checklist Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence

More information

Quality, Environmental, Health and Safety Manual Toshiba International Corporation

Quality, Environmental, Health and Safety Manual Toshiba International Corporation Quality, Environmental, Health and Safety Manual Toshiba International Corporation Doc. No. QEHS 001 Rev. 19 (12/12) Title: Prepared By: Revision No.: Table of Contents and Cross Reference Ken Mori/Homer

More information

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

Surgi Manufacturing Quality Manual

Surgi Manufacturing Quality Manual Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6

More information

ONTIC UK SUPPLIER QUALITY SURVEY

ONTIC UK SUPPLIER QUALITY SURVEY MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return

More information

Quality Manual ISO9001:2008

Quality Manual ISO9001:2008 Quality Manual ISO9001:2008 Connor Winfield Corp. Date: 4/26/10 Revision: 3 Quality Manual Quality Manual Connor Winfield GENERAL Section 0.1 Section Rev.: 2 Rev. Date: 4/26/10 Section Page 1 Index and

More information

QUALITY MANAGEMENT SYSTEMS

QUALITY MANAGEMENT SYSTEMS QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL Revision 7 Page: 1 of 57 This document contains proprietary information and is not lo be distributed to or copted for a third party without the express written permission

More information

Quality Management System

Quality Management System LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority

More information

Honeywell. Our Quality & Environmental. Commitment. The Sensing and Control (S&C) Global Management System Manual. Honeywell Page 1 of 37

Honeywell. Our Quality & Environmental. Commitment. The Sensing and Control (S&C) Global Management System Manual. Honeywell Page 1 of 37 Our Quality & Environmental Commitment Honeywell The Sensing and Control (S&C) Global Management System Manual Honeywell Page 1 of 37 HONEYWELL Global Management System Manual No. GMS 0001 Issue 6 Revision

More information

Quality Manual. DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1

Quality Manual. DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1 Quality Manual Approval Page Document: QA1000 Issue Date: 5/29/1997 Page 1 of 17 Revision Date: 5/20/2013 DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1 This

More information

Quality Management System Manual ISO9001:2008

Quality Management System Manual ISO9001:2008 Quality Management System Manual ISO9001:2008 Controlled Copy Rev. 3 Page 1 of 21 7/1/13 Table of Contents Company Profile...5 Past...5 Present...5 Mission...5 Vision...5 Locations...6 1 Scope...6 1.1

More information

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008 ISO 9001: 2008 Boosting quality to differentiate yourself from the competition xxxx November 2008 ISO 9001 - Periodic Review ISO 9001:2008 Periodic Review ISO 9001, like all standards is subject to periodic

More information

Turbo Resources International Quality Procedure

Turbo Resources International Quality Procedure TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE

More information

THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632

THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632 THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632 Metal Finishing Instrumentation, Equipment and Supplies ISO 9001: 2008 QUALITY MANAGEMENT MANUAL ISSUED: 03/01/02(REV. 0) REVISION NO: 4 DATE:

More information

QUALITY MANAGEMENT SYSTEM MANUAL

QUALITY MANAGEMENT SYSTEM MANUAL The online version of this document is controlled. Therefore, all printed versions of this document are unofficial copies. QUALITY MANAGEMENT SYSTEM MANUAL 6901 Charles Street Towson, Maryland 21204 Manual

More information

ISO/IEC 17025 QUALITY MANUAL

ISO/IEC 17025 QUALITY MANUAL 1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4

More information

AS9100 Quality Manual

AS9100 Quality Manual Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

0. 0 TABLE OF CONTENTS

0. 0 TABLE OF CONTENTS QUALITY MANUAL Conforming to ISO 9001:2000 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2

More information

ISO/TS 16949 TECHNICAL SPECIFICATION

ISO/TS 16949 TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ISO/TS 16949 Second edition 2002-03-01 Quality management systems Particular requirements for the application of ISO 9001:2000 for automotive production and relevant service part

More information