How To Retaining Wall Guide



Similar documents
How to build raised beds page

FLAT ROOF BOX SPAN CARPORTS

Permeable Pavement Construction Guide

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Chapter. Restoration of Damaged Structures

How to build a Pizza Oven in 4 days

LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND

Timber Decks. Technical Note. March 2007

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

Storm Drain Inlet Protection - IP

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Residential Foundations and Basements

Instruction Manual 19/9/01. Flat Roof Carport

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

Installation Guide. Bath and Wall Surrounds SERIES B

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION GUARDRAILS

The minimum reinforcement for the stem wall is the placement of:

LAYING BLOCK AND BRICK

Table 4.9 Storm Drain Inlet Protetion Applicable for

POST AND FRAME STRUCTURES (Pole Barns)

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

Residential Deck Safety, Construction, and Repair

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

SECTION SUPPORT OF EXCAVATION

Sun Windows General Information Sun New Construction Window Installation Instructions

Superform Products Ltd.

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

Guidelines for Earthquake Bracing of Residential Water Heaters

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

International Greenhouse Company

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

How To Build A Gambrel Roof And A Gable End Roof

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

SUPER SHED. Indoor shelter for your outdoor tools.

Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

PERGOLAS AND CARPORTS

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012

Guidelines for Earthquake Bracing Residential Water Heaters

Wood Projects Outdoors. Post Hole Specifications. Deck Span Tables. Eakes.com

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Removable Aluminium posts

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Section 402. STORM SEWERS

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

Construction Specification for Concrete Curb and Concrete Curb and Gutter

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Sonotube Instructions for PreFab Sheds

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

Pro-Lift Steel Pile Foundation Repair

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

Installation Instructions For Slider Casement Air Conditioners

R E S I D E N T I A L H O U S I N G

How to Install Pavers

Top 10+ Mistakes of DWV plumbing design

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

SMarT_Foundation [Simple Modular Technology] Assembly and Installation Instructions (U.S. Patent Pending)

Section 2100-Trenching and Tunneling

Packaged Terminal Air Conditioner Wall Sleeve Installation

Team Skills Challenge Event # 1 Plant Layout Score Sheet

December J-Ply Roofing, Flooring and Decking

Lighthouse Engineering, L.L.C.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Connex. Mortarless Masonry Block System

Brian Coppock, Regional Compliance Officer. Office of Statewide Health Planning and Development Facilities Development Division

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Chapter 3 Pre-Installation, Foundations and Piers

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

High Strain Dynamic Load Testing of Drilled Shafts

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

INSTALLATION GUIDE. americanwick.com WICK (9425)

Shower and Floor Gullies Channel Drain and Tile Drain SECTION

GLOSSARY OF TERMINOLOGY

MUNICODE SERVICES LTD.

Laying the First Course. 1. Excavate the site and construct the footing.

SECTION EARTH MOVING

Total Quantity: IMPORTANT: Plans are to be used with 3 x6 Plexiglass (SKU # ).

Gas Meter Clearances and Service Installation Requirements

Holes & Selective Laser Sintering

Transcription:

How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra load on top from traffic, nearby buildings or steeply sloping banks also require a building consent. This guide is prepared on the basis of no traffic, non-boundary and with a maximum slope of 1 in 10 above the wall. Soil types can have a significant effect on how a wall performs. For the purpose of this guide the ground has been taken to be a firm clay soil type. Other soils may require specific engineering design. If in doubt, check with your local council. Engineering Design This information is provided as a guide only and does not constitute a complete design aid. As such Crofts accept no responsibility with the design and construction of pole retaining walls or their suitability for any purpose. The advice of a suitably qualified engineer should be obtained.

Retaining Wall Design Concepts Retaining Wall Concepts A retaining wall has to be strong enough to support the load of soil pressing against it. This load determines the size of poles and the thickness of retaining timber to be used so that the poles or timber do not break. However, the most important part of the wall is the part below the ground that anchors it. If the footings, foundations or the soil is weak then there is nothing stopping it from falling over. One of the key things is to drain water from the bank behind the wall. If a wall doesn t drain well then the bank behind and footings can become waterlogged and the wall fall over. Good drainage is critical to the success of a retaining wall. Materials Poles or Piles Poles or piles should be H5 treated high density pine to meet the ground contact load bearing requirements. Timber Boards The timber for the wall should be H4 treated and can be either a rough sawn, machined or tongue and groove profile. If the wall has been engineered the specifications may require specific timber treatment or stress graded material.

Pole and Timber Sizes Typical Sizes for a Non-boundary, no traffic wall with a 1:10 slope above the wall and 2 to 2.4m of level ground in front of the wall in stiff clay type soil. Square Poles (Small Walls and gardens) Wall Height Sawn Timber Square Pile Size Max Spacing depth Auger Retaining timber 700 1.5 / 100x100 1200 900 300 150 x 50 800 1.8 / 125x125 900 950 300 150 x 50 950 2.1 / 125x125 1200 1100 350 150 x 50 1000 2.4 / 125x125 900 1250 350 150 x 50 1250 2.7 / 150x150 900 1350 350 150 x 50 Round Poles Wall Height Large Walls Construction Pole Max Spacing depth Auger Retaining timber Retaining timber (Length x small end diameter) 1st Layer 2nd Layer 750 1.8m x 150 SED 1200 900 300 150 x 50 850 1.8m x 150 SED 1200 950 300 150 x 50 1100 2.4m x 150 SED 1200 1300 300 150 x 50 1350 3.0m x 175 SED 1200 1500 350 150 x 50 1700 3.6m x 200 SED 1200 1900 400 150 x 50 2000 4.2m x 225 SED 1200 2200 450 150 x 50 2250 4.8m x 250 SED 1200 2500 450 150 x 50 2500 5.4m x 275 SED 1200 2750 500 150 x 50 2700 6.0m x 300 SED 1200 3000 550 150 x 50 2900 6.0m x 325 SED 1200 3100 550 150 x 50

Concrete Poles should be set in 17Mpa concrete. Pre-bagged mix or 6:1 ratio of builder mix to cement. Timber and Pegs Timber and pegs will be required to temporarily brace the poles while the concrete sets Nails 100mm, 125mm or 150mm flat head Hot dipped galvanised nails to fix the boards to the back of the piles. Nails should be at least twice the thickness of the timber being fixed. Timber Preservative Any cut surfaces should be liberally painted with timber preservative (Copper Napthenate) before installation. Drainage Pipe 100mm diameter perforated polyethylene pipe, preferably fitted with a filter sock, to drain behind the entire length of the wall. You may need to add extra to reach appropriate discharge points for the drains. Backfill A free draining metal or scoria back fill will be required at least 250mm thick behind the wall. Geotextile cloth or polystyrene sheeting can also be added to assist with drainage. Beer A supply of ice cold lager at the end of each day will encourage assistance from Mates. Crofts recommends you drink in moderation as this can adversely affect the quality of the wall.

Instructions- Building your wall. 1 Draw your plans and calculate the quantity of materials required. 2 Assess your design and check whether it will require specific engineering and or building consent. Check that the proposed wall is clear of sub soil drains, electrical, water or gas services. 3 Excavate the bank to give at least 250mm gap between the back of the wall and the bank. 4 Make sure the ground behind the wall is level or slopes to one end to provide drainage. 5 Dig or auger the foundation holes. Depth of the poles will normally be at least equal to the height of the wall above the ground. Allow 100mm extra for the base concrete. 6 Put 100mm of concrete into the two end holes. Set posts on top of this concrete making sure that only uncut or preservative treated ends go into the holes. Check that the top of the posts sit high enough. 7 Set the posts at the recommended 1:10 inclination from vertical towards the bank. Fix the poles in place with temporary braces and ground pegs. (Small, low garden walls may be installed vertically as long as sufficient depth into the ground is provided) 8 Use two string lines (top and bottom) run from the end poles to align the back side of the intermediate poles. Set these poles in place in a similar fashion to the end poles. 9 Check the poles are all vertical and plumb when viewed from the front. 10 When all poles are set in their final position pour in the concrete foundation. Tamp the concrete down with a piece of timber and leave to set for at least two days. 11 Nail the horizontal rails to the back of the poles, starting at the bottom and working up to the top of the wall. Stagger and make joins only at the back of the poles. 12 Once the wall is complete lay 50mm of clean free draining metal along the bottom at the back of the wall and then lay over the drain coil (with sock). If possible protrude both end of the drain-coil so it can be flushed. Cover with another 250mm of free draining metal. 13 The back of the wall can have a polystyrene sheet attached or backfilled with for 250 to 300mm with a scoria drainage material to within 300mm of the top of the wall. Finish to level with topsoil. ( geotextile cloth can be used between the topsoil and the scoria if drainage is a concern)