CONCRETE FLOOR REPAIR/REMODEL SAMPLE SPECIFICATION LIGHT TRAFFIC RETAIL/COMMERCIAL APPLICATION



Similar documents
SECTION POLISHED CONCRETE FINISHING

Sample Specification Guideline for Installing a Polished Overlay Using Rapid Set TRU Self-Leveling SECTION POLISHED CONCRETE TOPPING

SECTION POLISHED CONCRETE FINISHING. InovaCrete Polished Concrete Floor Finish (GUIDE SPEC)

ARDEX GUIDE SPECIFICATION

SECTION Formatted Specification for the ULTRAFLOR DIAMATIC Topical Polished Concrete System DRAFT

Section Polished Concrete Finishing. Vexcon

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

MASONRY RESTORATION Lime Putty Mortar Repointing Guide

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

Minor Cracks in Horizontal Surfaces

1.1 This section is to be utilized for polishing both integral colored or natural gray concrete floors.

INDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA

BENTLEY ELEMENTS COLLECTION LVT

Metropolitan Builders Association Masonry & Concrete Standard

GUIDELINES FOR POLISHED CONCRETE FLOORS A Guide for Integrally Colored, Dyed and Stained Polished Floors

SCENIC VIEW SV 10 SECTION SOLAR CONTROL FILMS

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Natural Thin Stone Veneer

Sikaflex Sealant Installation. Sika Corporation

Division 9. SignaFlor Pad and Pour Flooring System

Wecryl Waterproofing System under surfacing supplied by others

CRACK and JOINT REPAIRS on INDUSTRIAL CONCRETE FLOORS, PAVEMENTS and SECONDARY CONTAINMENT AREAS

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

SECTION 1 GENERAL REQUIREMENTS

Shower Walls and Tub Surrounds

PERFORMANCE GUIDELINES

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

SECTION POLISHED CONCRETE FLOOR FINISHING

METHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.

UNIVERSITY OF CHICAGO ELEVATOR PIT LEAK REPAIR

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

GRINDING GUIDE CONCRETE POLISHING SOFT CONCRETE EXPOSED AGGREGATE HEAVIER MACHINES (650/680/800/820/950)

Installation PowerPoint for Grasscrete Formers

K2 STONE NATURAL VENEER

LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

Tecnoepo Flooring System 185

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

7. Installation. installation CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

Guide for SOLID CONCRETE BLOCK SEALS

Armstrong Do-It-Yourself Tile Installation System

How to Install Hardwood Flooring Over a Sub Floor

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

SECTION RESURFACING CAST IN PLACE CONCRETE

Repairing Drywall Techniques for fixing everything from popped screws to big holes

BLACK JACK ALL WEATHER ROOF COATING

ARDEX GUIDE SPECIFICATION

Concrete Resurfacing. System Guide. by Parchem Construction Supplies

Architectural Concrete Masonry

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

Vinyl Composition Tile Installation System

DIY CABINET REFACING INSTALLATION GUIDE

COLLISION REPAIR TECHNOLOGY CONTEST DESCRIPTION

PART E SPECIFICATIONS

How to build a Pizza Oven in 4 days

See photo below showing this product being applied to a badly corroded floor.

Installation System. Existing Resilient Sheet Floors

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

SCHWARTZ WATER-BASE WOOD FLOOR SEALER AND WATER-BASE PREMIIUM WOOD FLOOR FINISH

STONE PANELS, INC. 100 South Royal Lane Coppell, TX Phone: (469) * Toll Free: (800) Fax: (469)

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

Installation for Wood Flooring

Chrome Finishing For 3d Powder Prints

Standard details forming part of this Specification include the following drawings:

Pink & White Gel Tip Overlay Rules, Judges Instructions & Criteria Student Division Competition Rules

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Concrete Repair. Applications and Procedures

1300 West Bartlett Road Elgin, Illinois Phone: (847) Fax: (847) SUBJECT: Pelican NP and NS Cab Glass Replacement

ARDEX GUIDE SPECIFICATION ARDEX PC-T POLISHED CONCRETE TOPPING Part of the ARDEX Polished Concrete System (APCS)

Laying the First Course. 1. Excavate the site and construct the footing.

Chapter. Restoration of Damaged Structures

EAST LYME HIGH SCHOOL

Construction Specification for Concrete Curb and Concrete Curb and Gutter

Section EXTERIOR STONE VENEER Full Mortar

INSTRUCTIONS FOR COORDINATION SECTION SOLID SURFACE FABRICATIONS

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

The Art of Concrete 9/17/2012. ACI Spring 2012 Convention March 18 21, Dallas, TX. Amerete, Inc. started in 2004 as American Concrete Technologies

Installation Guidelines for Modular Carpet

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

Technical Data Sheet Art. No Kiesol. applications. Shelf-life. rate depending on application. Characteristic data of the product

RECOATING AND RENEWING SPF ROOFING SYSTEMS

Aspect Metal Peel & Stick Tile Installation Guide

Herringbone Pattern Flooring

Asbestos Work Permit Procedures

Grinding equipment that causes raveling, aggregate fractures or disturbance to the joints shall not be permitted.

Guide Specifications for Maple Flooring Systems

FIRESTOPPING & SMOKE SEALS

APPENDIX B. I. Background Information

SECTION CAST-IN-PLACE CONCRETE

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

Transcription:

CONCRETE FLOOR REPAIR/REMODEL SAMPLE SPECIFICATION LIGHT TRAFFIC RETAIL/COMMERCIAL APPLICATION Industry Standard Floor Joint Fillers and Concrete Repair Products P.O. Box 2217 Concord, NH 03302 800-223-6680 www.metzgermcguire.com

JOINT FILLING AND CONCRETE SLAB REPAIR PART 1 - GENERAL 1.1 DESCRIPTION OF WORK Provide all labor, products and equipment required to properly install semi-rigid filler in joints in the interior concrete floor slabs and low viscosity structural polymer required for narrow crack, surface spall, bolt hole, or defect repair. Scope of Work Fill all contraction and construction joints in the interior concrete floor slab where joints have been previously left unfilled. Joint filler removal and replacement where existing joints have been previously filled and show signs of deficiency. Repair of all non-moving narrow cracks with low viscosity structural repair polymer, 1/32 ¼. Repair of cracks greater than ¼ with rapid setting polyurea joint filler compound. Repair of surface defects including pop-outs, chips, spalls, and surface pitting. 1.2 SUBMITTALS Section 01330 - Submittal Procedures: Procedures for Submittals. Contractor Qualifications Installer shall have been trained by Metzger/McGuire in performing the types of work covered by this Section and shall have Certified Repair and Remodel certification from Metzger/McGuire. Use only Metzger/McGuire Approved Applicators for work covered by this section. Applicator shall use tools and equipment specifically designed for the preparation and placement of industrial joint fillers. Product data for: Submit Manufacturer s data describing joint filler proposed for use on the project. Submit Manufacturer s Approved Applicator Certificate. All products and primary equipment used for repair of existing concrete slab defects. 1.3 ENVIRONMENTAL REQUIREMENTS Limit and control damage from excessive dust caused by demolition, preparation, and installation of all Work. Limit and control damage from moisture. All replaced concrete shall be cured a minimum of 28 days prior to joint filler installation. Concrete repair area shall be closed to traffic during preparation and repair for a time as recommended by manufacturer. PART 2 - PRODUCTS 2.1 MATERIALS Subject to compliance with project requirements, provide products as manufactured by the following: Metzger/McGuire (800) 223-6680. Polyurea Joint Filler: Rapid setting, two-component polyurea polymer liquid of 100% solids content, Shore hardness 85-92, compatible with construction materials in contact. Spal-Pro RS 88, by Metzger/McGuire. Match color of adjacent exposed concrete slab surface. Joint Filler Stain Preventing Film: (Where pre-installation test proves necessary) SPF by Metzger/McGuire. Low Viscosity Rigid Structural Polyurea/Urethane: Rapid Refloor, by Metzger/McGuire Rapid Refloor XP, by Metzger/McGuire. Match color of adjacent exposed concrete slab surface. Structural Epoxy Mortar Armor-Hard Extreme, by Metzger/McGuire

2.2 EQUIPMENT Subject to compliance with project requirements, provide equipment manufactured by the following: U.S. Saws, Santa Ana, CA (866) 987-7297 PerfectTrac, Haverill, MA (978) 521-5855 Joe Due Blades & Equipment, Mauston, WI (877)563-3383. Joint Filler Removal and Preparation Dust Buggy, by U.S. Saws. PerfectTrac by PerfecTrac. Approved equal. Crack Repair: 5 Dustmizer 007, by Joe Due. 5 Crack Attacker, by Joe Due. 7 Handheld Crack Chaser, by Joe Due. SawTec 5 Tile Vac, by U.S. Saws. SawTec 7 Crac-Vac, by U.S.Saws. Approved equal. Surface Grinder: Handheld 5-7 electric surface grinder with dustless shroud/housing. SASE SC 50 with appropriate grinding/polishing pads from #50 metals to #800 resins Dust Avenger 5, by Joe Due. Dust Avenger 7, by Joe Due. SawTec 5 Grinder Vac, by U.S. Saws. SawTec 7 Grinder Vac, by U.S. Saws. Approved equal. PART 3 - EXECUTION 3.1 EXAMINATION An evaluation of the existing floor slab shall be conducted, identifying all defects. Scope of repairs shall be confirmed by the Owner and Architect of Record prior to commencement of work. Repairs are not acceptable unless specifically approved on a case-by-case basis by the Owner and/or Architect of Record. 3.2 PREPARATION Protect surface of slab immediately adjacent to defect under repair. 3.3 JOINT FILLER REPLACEMENT If joints have been previously filled and existing filler is loose, easily removed, or able to be forced downward with a hand tool, remove all filler material from joint. Where potential staining from new joint filler application may be objectionable, utilize Metzger/McGuire SPF-P (Stain Preventing Film) following manufacturer installation instructions. Place SPF prior to joint cleanout process commences. An acceptable alternative method is to tape both sides of the joint with painter s tape, etc. Clean existing joints full depth with a dry-cut, vacuum-equipped saw using a slightly oversized concrete diamond blade. The blade width should be sufficient to encapsulate the widest spall along a given contraction joint segment to produce a sharp corner on each side of the joint with a minimum of two passes through the joint. Remove all existing filler material where present. Clean joint of all debris and laitance. Refill with Spal-Pro RS88 polyurea joint filler per manufacturer s installation guidelines. Fill joints from the bottom up taking care not to entrap large air bubbles. Slightly overfill and shave flush to the slab surface after cure, approximately 1hr 4hrs after placement

Step 1: Saw out all existing filler to full depth of original joint. Ensure that no residual filler remains on sides of joint walls or base of joint. Example of properly cleaned/prepared joint. All edges should be sharp and clean and joint base should be visible. Joint must be dry.

Step 2: Protect slab surface along joints using removable tape or Metzger/McGuire s SPF-P (stain prevention film). Slightly overfill joint with Spal-Pro RS 88 (color to match adjacent surface). Monitor regularly for seepage and re-apply if needed. Step 3: After cure razor off excess using razor scraper equipped with disposable blades. Monitor curing to test for optimal shave timing that yields flush material profile-typically between 35 mins. 2 hours. Blades should be changed often to ensure smooth cutting/profile.

3.4 SPALLED JOINT REPAIR (LESS THAN 1 ) For joints that are spalled or have radius tooled edges not exceeding 1 in width at slab surface. Where potential staining from new joint filler application may be objectionable, utilize Metzger/McGuire SPF-P (Stain Preventing Film) following manufacturer installation instructions. Re-saw the joint edge to a minimum depth of 3/4 with a dry-cut, vacuum-equipped saw allowing removal of the widest spall along a given joint segment to produce a sharp corner on each side of the joint with a minimum of two passes through joint. Clean joint of loose concrete, joint filler, laitance, dirt, debris, backer rod, etc. Joints must be free of all moisture. Fill joint cavity per manufacturer s instructions, taking care not to entrap large air bubbles. Overfill joint slightly and shave flush to slab surface prior to grinding process. It may be necessary to place a trace layer (1/8-1/4 ) of clean dry silica sand at the joint base to prevent material seepage down through the shrinkage crack. Step 1: Saw cut behind outside of any joint edge spalling to a minimum depth of ¾. Example of properly cleaned joint. Edges should be clean and crisp.

Step 2: Slightly overfill joint with Spal-Pro RS 88. Monitor joint for seepage/material loss and re-apply as needed. Step 3: After cure razor off excess using razor scraper equipped with disposable blades. Monitor curing to test for optimpal shave timing that yields flush material profile-typically between 35 mins. 2 hours. Blades should be changed often to ensure smooth cutting/profile. 3.5 SPALLED JOINT REPAIR (GREATER THAN 1 ) OR LARGE SURFACE REPAIR For joints that are spalled or have radius tooled edges exceeding 1 in width at slab surface. Where potential staining from new joint filler application may be objectionable, utilize Metzger/McGuire SPF (Stain Preventing Film) following manufacturer installation instructions.

Saw lines behind the joint edge or surface spall to a minimum depth of 3/4 with a dry-cut, vacuum-equipped saw allowing removal of the widest spall along a given joint segment to produce a sharp corner on each side of the joint repair. Vacuum newly formed channel clean. If repairing joint, place backer rod or sand in original joint below the newly formed shelf to prevent Armor-Hard from running into existing joint. Mix and place Armor-Hard Extreme mortar into repair cavity Trowel Armor-Hard Extreme mortar flush with floor surface. If repairing joint only: Snap a chalk line over existing joint Re-saw cut completely through Armor-Hard Extreme repair to the depth of original joint. Fill newly created joint with Spal-Pro RS 88 After Spal-Pro RS 88 cures razor off overfill flush with floor surface. If large surface repair or joint repair, for best match to surrounding polished concrete surface: For initial grind, use #50 metals After #50 metals, polish repair using the following resin steps: 100, 200, 400 Apply thin coat of lithium densifier (Consolideck LS or Ameripolish 3DHSL), then do final polish with 800 resin disc Step 1: Saw cut lines behind outside of joint spalling to a nominal depth of ¾

Step 2: Prime newly cut repair channel with neat liquid Armor Hard Extreme Step 3: Fill channel with Armor Hard Extreme mortar, trowel flush with floor surface

Step 4. Allow mortar to cure into solid (2 hrs plus) and grind flush with floor surface. Step 5: Snap chalk line over existing joint.

Step 6: Saw cut along chalk line over existing joint. Cut should go completely into original joint. Step 8: Mask joint edge with tape of SPF-P. Slightly overfill joint with Spal-Pro RS 88.

Step 9: Razor off Spal-Pro RS 88 overfill flush with repair/floor surface. Example sequence of photos showing additional required steps to best blend repair area to surrounding concrete

3.6 CRACK REPAIR Cracks from 1/32 to 1/4 in width. a. Clean crack cavity b. Remove loose concrete, dirt and debris from crack with a wire brush or hand grinder with wire or Nylalox wheel. c. Remove any loose segments, including islands formed by crack, with sharp tool. d. Use methods that will not widen existing crack if possible. e. Vacuum crack to remove all dirt, debris and other laitance. f. Mask slab surface along crack as necessary to minimize overfill. g. Choose material color that closely matches the adjacent floor. h. Install Rapid Refloor in accordance with manufacturer s instructions. i. Repeat until all voids are filled and material crowns slab surface. j. Watch for bubble formation and off gassing as that would indicate that moisture is present in crack cavity and steps will need to be taken to dry area prior to further repairs. k. Do not allow material to gel before adding additional material. l. Grind material flush to surface upon full cure, approximately 30 minutes 1 hour. Step 1: Chase crack using small grinder equipped with Nyalox or soft wire wheel brush.

Step 2: Vacuum clean, ensuring crack is free of all loose debris and dust. Step 3: Gradually overfill crack with Rapid Refloor. Monitor crack for seepage and refill as needed prior to material cure.

Step 4: After material cure (approximately 30 mins. or more) grind overfill flush with floor surface using specified finishing pads. Cracks from ¼ ¾ in width Saw along crack to provide square edge, minimum ½ in depth Use small hand grinder with maximum 5 diameter blade with dust attachment. Take care to minimize overall crack width. Clean crack cavity. Vacuum crack to remove all dirt, debris and other laitance. Remove all visible moisture. Mask slab surface along crack as necessary to minimize overfill or utilize Metzger/McGuire SPF-P (Stain Preventing Film) to prevent residual staining from overfill. Install Spal-Pro RS 88 rapid set polyurea joint filler per installation instructions. a. Wait approximately 35 mins-1 hour, periodically checking for material cure. b. Check condition of material by shaving with razor scraper. c. Check condition of material by shaving with razor scraper. d. Material will shave smooth when cured. Proper timing is crucial, typically 1hr to 4hrs after placement 1) Too long and material will be difficult to shave 2) Too soon and material will ravel. Shave material flush to slab surface per manufacturer s instructions.

Step 1: Chase cracks using vacuum equipped angle grinder with diamond blade to a nominal depth of ½. Example of properly prepared crack. Edges should be neat and crisp; nominal depth of repair ½ deep.

Step 2: Gradually overfill crack with Spal-Pro RS 88.Monitor for seepage and refill as needed prior to material cure. Step 3: After Spal-Pro RS 88 cures (approximately 45 minutes minimum) razor off overfill leaving flush filler profile. Monitor various razoring times to find best finished profile. 3.7 SURFACE SPALLING/BOLT HOLE REPAIR Less than 6 Diamater a. Use wire or Nyalox brush to remove all dirt and laitance from spalled surface. b. If bolt is present, cut off or pound down at least ½ below floor surface. c. Mask slab at perimeter of spall with tape or SPF-P if needed.

d. Fill spalled cavity and finish flush with floor surface. e. Slightly overfill defect with Rapid Refloor f. Allow to material to cure into a hard solid (30 mins. or more) g. Grind Rapid Refloor flush with floor surface using specified finishing pads. NOTE: Where isolated or localized surface spalling has occurred adjacent to joints, a form material may be needed to temporarily support vertical face of spalled joint edge. Ensure that the repair material will not adhere to the form. Step 1: Clean defect of all dirt and debris using soft wire or Nyalox wheel. Step 2: Slightly overfill defect with Rapid Refloor, allow to cure 30 mins or more.

Step 3: Grind off cured material flush with floor surface. Edge spall repair Step 1: Dam off area around edge spall. Slightly overfill with Rapid Refloor

Step 2: Grind off Rapid Refloor overfill flush with floor surface. Step 3: Re-saw cut through repair along edge of joint spall repair.

Finished example of joint edge spall repair. 3.8 MULTIPLE SMALL SURFACE PITTING/PIN HOLES For surfaces consisting of micro-deficiencies, pin holes, hairline cracks and other surface clutter that impedes the achievement of the specified overall gloss values 1. Clean pitted sections with 90-degree angle grinder equipped with wire wheel to remove all dirt/laitance. Wheel should be run over defect in multiple directions to ensure proper cleaning. 2. Vacuum prepared pitted sections and entire floor surface per installation instructions. 3. Install and disperse Rapid Refloor Pit Grout over entire floor surface area and work into the surface using a metal smoother or rigid edged trowel or screeding device. 4. Ensure a thin, uniform layer of repair material covers the pitted areas. Monitor surface for air holes resulting from entrapped air and re-apply as needed. In some cases more than one coat will be required for best results. If two coatsare desired, first coat should be ground off prior to installing 5. Grind or polish flush with metal or resin-bond diamonds, ensuring repair material is flush with slab surface. 6. Repeat repairs in areas as required if repair material pulls out of defects. 7. Per manufacturer s directions, apply required applications of densifier, specified dye and polish smooth to meet specified overall gloss values.

Existing Condition Cleaning Defects

Spreading and Troweling Down Pit Grout Fully coated area

Condition After Initial Metal Grind Finishing with Resin Pad

Condition After Resin Finishing Finished Condition After Densification 3.9 PROTECTION Protect surfaces of finished floor. Prohibit traffic until floor repairs have received final approval by Owner. END OF SECTION