LOCK-OUT/TAG-OUT PROGRAM I. Purpose



Similar documents
Page85. Lock-out Tag-out Plan

LOCKOUT/TAGOUT (LOTO) SAFETY PROGRAM

BWC Division of Safety and Hygiene

Control of Hazardous Energy (Lockout / Tagout)

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR

Lock-out/Tag-out.

LOCKOUT/TAGOUT PROGRAM ENERGY CONTROL PLAN

Lockout / Tagout Program

Lockout/Tagout (LOTO) Compliance Guide

LOCKOUT/TAGOUT PROGRAM. Table of Contents

Lockout - Tagout Program

Energy Control Lockout/Tagout

File Name: LO/TO Orig. Date: November 2005 Revision Date:November 2006 Reviewed Date: November Standard: OSHA: 29CFR

Lockout/Tagout Training Program

Lockout/Tagout Compliance Guide and Checklist

Lockout Tagout Program. Table of Contents

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

3088 Lockout-Tagout Training Program Course Outline

WEEKLY SAFETY MEETING All Euramax Subsidiaries LOCKOUT / TAGOUT. Safety Meeting Contents. Meeting Notice. Leaders Guide.

ELECTRICAL SAFETY. The standard unit for measuring electrical current.

Lockout / Tagout Awareness

C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES. Leader s Guide. 2005, CLMI Training

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016

LOCK-OUT / TAG-OUT SAFETY TRAINING

CONTROL OF HAZARDOUS ENERGY (Lockout Tagout)

HealthStream Regulatory Script

ISSUE: LOCK OUT BLOCK OUT

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

Business Unit/Area: N/A. Protocol No.: COR-3S3-PR

Lockout-Tagout Training for Albany Employees Control of Hazardous Energy OSHA standard

LOCKOUT GUIDELINE. To ensure that a piece of equipment cannot be turned on, pressurized or switched on accidently while an employee is working on it.

Department of Environmental Health & Safety. Lock Out/Tag Out Program. Date Effective: November 2010

Lockout/Tagout. Training: 29 CFR Lockout Tagout Standard States employer must provide training on lockout tagout.

HERSHEY ENTERTAINMENT & RESORTS COMPANY LOCKOUT / TAGOUT PROCEDURE

Occupational Health Program Safety Training Series. Lockout/Tagout Safety Awareness Training

L O C K O U T / TA G O U T A D M I N I S T R AT I V E G U I D E

CONTROL OF HAZARDOUS ENERGY/ LOCKOUT/TAGOUT PROGRAM

OPTIONAL INFORMATION ELECTRICAL SAFETY WORK PRACTICES SELF INSPECTION CHECKLIST

Control of Hazardous Energy

Control of Hazardous Energy Equipment-Specific Lockout/Tagout Procedure (ELP) Template Instructions

Hampshire College. Lockout/Tagout and Electrical Safety Program and Procedures

Preventative Maintenance Policy

3053 Electrical Safety Training Program Course Outline

Union County Public Schools. Facilities Department. Electrical. Safe Work Practices

UC Berkeley Energy Isolation Lockout Tagout (EI-LOTO) Program

NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers

OSHA Training Guidelines (An Unofficial Summary)

section 5 machine guarding and lockout

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3

!!! SAFETY!MANUAL/PROGRAM!! FOR!!! MERIT!ELECTRIC!COMPANY,!LTD.!!!!!!!!!

INTRODUCTION ARC FLASH PROTECTION AND SAFETY MEASURES. September 2010

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)

Master Workplace Inspection Checklist for General Shop Safety. MASTER WORKPLACE INSPECTION CHECKLIST General Shop Safety

Oil and Coolant Circulating Heating System. Model - OCSM

Citation 1 Item 1a. #22: Struck by Inspection #

Massachusetts FACE Occupational Fatality Report

ARC FLASH HAZARD OVERVIEW. Presented August 13, 2015 WWOA Lake Michigan District by Mead & Hunt, Inc.

What s up with Arc Flash?

Planned, Limited Notice and Emergency Outage Guidelines

Lockout Tagout Presentation For GOSH Group Aberdeen UK

100% Rule Alternate Method Arc Blast Arc Flash Approved Approved Equipment Authority Having Jurisdiction (AHJ) Authorized Work Bare Hand Work

Electrical Safety in the Workplace

OSHA 29CFR1910 Subpart S

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23

High Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance


IMPLEMENTING THE NEW ELECTRICAL SAFETY REQUIREMENTS

Electrical Safety Program

Written Program ELECTRICAL SAFETY. Based on OSHA Subpart S and NFPA 70E Standards

Congratulations on your purchase of a PTR Baler.

Planned and Emergency Utility Outage Guidelines

MORE HIGH-IMPACT LOCKOUT/TAGOUT SAFETY TRAINING

Electrocution Hazards

Root & Contributing Causes. Site Answers & Comments: Preventative / Recommended / Accepted Steps of Risk Mitigation, Points of Interest:

Electrical Wiring Methods, Components and Equipment for General Use. Approved for Public Release; Further Dissemination Unlimited

Operational Overview and Controls Guide. Two or Three Pump IronHeart Lite with Variable Frequency Drives

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

City Of Ottawa High Voltage Substation Inspection, Maintenance Rev July 17 and Testing, ROPEC Page 1

Department of Environmental Health and Safety & Emergency Management

Bypass transfer switch mechanisms

Installation Instructions for Alarm Module Kit A043F059

LOS ANGELES UNIFIED SCHOOL DISTRICT DIVISION OF ADULT AND CAREER EDUCATION SAFETY TEST FOR ELECTRICIAN PROGRAM

MANCON Human Resources Workers Compensation or ext 312 or

Test Before Touch Easier Said Than Done. Ken Crawford, DuPont Kent Haggerty, Dupont

Model Safety Program

Employee Safety and Health Training Plan

OPERATOR S MANUAL WARNING

This Guidance Notes is prepared by the Occupational Safety and Health Branch, Labour Department. This edition July 2004

KELLER S 5-MINUTE WORKPLACE SAFETY TALKS

Part 1 System Modeling & Studies for Existing Systems

Machine Guarding and Operator Safety. Leader Guide and Quiz

Arc Flash Hazards. Electrical Hazards. Dan Neeser Field Application Engineer Electrical Hazards 2/18/2015. Shock.

Dining Services OSHA Safety Training Program TRAINING RECORD

Transcription:

LOCK-OUT/TAG-OUT PROGRAM I. Purpose This procedure establishes requirements for the lockout of energy isolating devices. It should be used to ensure that the machine or piece of equipment is isolated from all potentially hazardous energy and locked out and freed of all residual or accumulation energy before employees perform any servicing or maintenance activities where the unexpected energization, start-up or release of stored energy could cause injury. II. General Program Management A. Responsibility 1. Management 2. Authorized Employees 3. Affected Employees It is the responsibility of management to approve all Hazardous Energy Control Procedures. The following people can give approvals: Departmental Supervisor Facilities Maintenance Associate Director Facilities Maintenance Director Facilities Resource Director Authorized employees shall be knowledgeable about the lockout procedure electrical and mechanical energy for each piece of equipment, the type and magnitude of the energy that each piece of equipment utilizes, and the hazards of the energy. Only authorized employees can lock and tagout electrical and mechanical equipment. Affected employees and any other employees, whose work operations are or may be in the area, will be knowledgeable about the purpose and the use of the energy control procedure and the prohibitions against attempting to restart the equipment during lockout. Affected employees are identified on each Energy Control Procedure Form. Employees who do not comply with the provisions of this program shall be disciplined in accordance with KSU policy of progressive discipline. B. Program Review and Update To keep our general program up-to-date, it is reviewed and updated under the following circumstances: 1) Annually, on or before December 1st of each year. Each year the program will be reviewed in order to correct any deviations or inadequacies identified. A copy of the review will be kept by the Facilities Resource Director. In addition, each year the Supervisor will conduct an annual audit see (Appendix A) to assess the employee s knowledge and understanding of the policy and the steps to conduct a lockout and tagout. 2) Whenever new equipment is put into service. Additionally, whenever major replacement, repair, renovation or modification of machines or equipment is performed, and whenever new machines or equipment are installed, energy isolating devices for such machines or equipment shall be designed to accept a lockout device. III. Methods of Compliance A. Preparation for Lock-out The authorized employee shall determine the appropriate lockout and tagout procedures and implement the Energy Control form when indicated. B. Group Lockout Procedure 1) Authorized: HVAC Shop, Electric Shop, Power Plant, ZPM, and Ahearn Custodial Supervisor are authorized for all energy sources. Plumbing, Metal Shop and Construction are authorized for mechanical energy sources, if electrical hard controls are needed it will be completed by the employees qualified for electrical. This procedure will afford the same level of protection for each employee that is provided by the implementation of a personal lockout device.

2) One authorized employee selected by the Departmental Supervisor will coordinate the lockout procedure for all group lockouts and complete the Group Lockout Tagout form (Appendix B). When the Group Lockout and Tagout is completed, the tag and form will be given to the Director of Resources. 3) The sequence of Lockout and Tagout for the specific piece of equipment will be reviewed with all affected and authorized personnel by the group coordinator prior to the lockout. 4) Each employee will affix his or her lock to the equipment being serviced. 5) The bottom portion of the lockout tag used will be placed in the assigned designated area. 6) No employee will be allowed to remove another employee's lock. 7) Each employee will remove their own lock when their part of the operation is completed. 8) When servicing or maintenance will involve more than one shift the off-going shift will remove their locks as the oncoming shift applies their locks. 9) When equipment has only enough room for one lock, the coordinator of the procedure will place the lock on the equipment and then place the key to that lock in a cabinet or box and each authorized employee will then affix their lock to the cabinet or box. 10) Submit completed lockout tags and Group Lockout Forms to the supervisor, who will give them to the Director of Resources. C. Shift or Personnel Changes The specific procedure used by KSU Facilities to ensure the continuity of lockout are as follows: 1) During Shift Change or when the authorized employee currently performing the repair must leave before their replacement arrives, the Supervisor shall place their lock on the equipment and then the authorized employee will remove his lock. The supervisor will remove his lock after the replacement-authorized employee has placed their lock on the equipment. 2) Where the replacement employee is present during the time that the current authorized employee is preparing to leave, the replacement employee will place his lock on the equipment and then the current employee will remove his lock. D. Outside Service or Contractor Personnel Outside personnel or contractors that may be involved with or affected by the energy control procedures must submit their energy control procedures to the Project Manager. Affected employees of this company will be trained and notified of the proper procedures by the Director of Resources. E. Testing or Positioning of Equipment during Lockout In situations in which lockout devices must be temporarily removed from the energy-isolating device because the machine or equipment must be energized to test or for positioning, the authorized employee shall consult the Energy Control Procedure Form and follow the sequence of actions listed for Restoring Equipment to Service. Once the testing or positioning is complete and before servicing or maintenance is continued, de-energization following the steps on the Energy Control Procedure Form shall be re-instituted. IV. Information and Training The Director of Resources will give training on lockout. Affected Employees will be trained on the following: 1. The purpose and use of the energy control procedure. Other Employees whose work operations are or may be in an area where energy control procedures may be utilized shall be instructed about the procedure and the prohibitions against attempting start-up of any locked out equipment. Authorized employees (those permitted to work on or near exposed energized parts) shall, at a minimum, be trained in and familiar with: 1. Recognition of applicable hazardous energy sources. 2. The type and magnitude of the energy available in the workplace. 3. The method and means necessary for energy isolation and control. 4. The energy control procedures. 5. The skills and techniques necessary to distinguish exposed live parts from other parts of electrical equipment.

6. The skills and techniques necessary to determine the nominal voltage of exposed live parts. 7. The appropriate clearance distances specified in 29 CFR 1910.333 (c) and the corresponding voltages to which the authorized person will be exposed. Authorized employees will be given training prior to any initial involvement in the lockout procedures. Affected employees will be given training at the time of hiring. Retraining will be given whenever there is a change in job assignment, a change in equipment or processes that would create a new hazard, or whenever a change would occur. A list of employees trained, type of training, and dates of training will be maintained by the Director of Resources. V. Record keeping As an important part of our Energy Control Program, we keep accurate records of our employees' training. These records are maintained and filed in the Health and Safety training office, and are available for review by our employees and their representatives. VI. Energy Control Procedure A. Scope This procedure establishes performance requirements for the control of energy during servicing and/or maintenance of machinery and equipment. B. Purpose This procedure shall be used to ensure that the machine or equipment is stopped, isolated from all potentially hazardous energy sources, and locked out before employees perform any servicing or maintenance where the unexpected energization or start-up of the machine or equipment or release of stored energy could cause injury. 1910.147(c)(4)(i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section. The Energy Control form (Appendix C) is required for all equipment that does not meet the exception. Note: Exception: The employer need not document the required procedure for a particular machine or equipment, when all of the following elements exist: (1) The machine or equipment has no potential for stored or residual energy or reaccumulation of stored energy after shut down which could endanger employees; (2) the machine or equipment has a single energy source which can be readily identified and isolated; (3) the isolation and locking out of that energy source will completely deenergize and deactivate the machine or equipment; (4) the machine or equipment is isolated from that energy source and locked out during servicing or maintenance; (5) a single lockout device will achieve a locked-out condition; (6) the lockout device is under the exclusive control of the authorized employee performing the servicing or maintenance; (7) the servicing or maintenance does not create hazards for other employees; and (8) the employer, in utilizing this exception, has had no accidents involving the unexpected activation or reenergization of the machine or equipment during servicing or maintenance. C. Compliance with this Program All employees are required to comply with the restrictions and limitations imposed upon them during the use of lockout. The authorized employees are required to perform the lockout in accordance with this procedure. All employees, upon observing a machine or piece of equipment, which is locked out to perform servicing, or maintenance shall not attempt to start, energize, or use that machine or equipment. Employees who fail to adhere to this policy will automatically be disciplined by KSU s progressive discipline policy. Authorized Employees: HVAC Shop, Electric Shop, Power Plant, ZPM, and Ahearn Custodial Supervisor are authorized for all energy sources. Plumbing, Metal Shop and Construction are authorized for mechanical energy sources. An authorized employee is a person who locks out or tags out machines or equipment in order to perform servicing or maintenance on that machine or equipment; this could include an "affected" employee if that employee's duties include performing servicing or maintenance covered under this procedure. An affected employee is an employee whose job requires him/her to operate or use a machine in which servicing or maintenance is being performed under lock-out or tag-out, or whose job requires him/her to work in an area in which such servicing or maintenance are being performed. D. Sequence of Lockout 1) Notify all affected employees that servicing or maintenance is required on a machine or piece of equipment and that the machine or equipment must be shut down and locked out to perform the servicing or maintenance. 2) The authorized employee shall review current diagrammatic drawings (or other equally effective means), tags, labels and signs to identify and locate all disconnecting means to determine that power is interrupted by a physical break and not a circuit interlock. Make a list of disconnecting means and determine task to be performed by identifying the type and magnitude of the energy that the machine or equipment utilizes, to understand the hazards of the energy, to know the methods to control the energy. Type(s) and magnitude(s) of energy, its hazards and the methods to control the energy. The Supervisor shall have trained the authorized employee to enable him/her to understand the hazards and know the methods to control the energy.

3) The authorized employee shall determine protective barriers to define safe boundaries. hazardous risk category for task being performed appropriate use of personal protective equipment and voltage rated tools. 4) If the machine or equipment is operating, shut it down by the normal stopping procedure (for example: depress the stop button, open switch, close valve, etc. Remember to include the specific normal stopping procedure for each machine or piece of equipment on the Energy Control Procedure Form.). Type(s) and location{s) of machine or equipment operating controls. 5) Test voltage meter using 3 step method to assure it is operating accurately on equipment to be locked and tagged out. 6) De-activate the energy isolating device{s) so that the machine or equipment is isolated from the energy source(s). Use Energy Control Procedure Form when required. Disconnect electrical power source and release stored energy. Identify the types and locations of energy isolating devices, such as switches, circuit breakers, line valves, or blocks -- any mechanical device that physically prevents the transmission of release of energy. Type(s) and location(s) of energy isolating devices. 7) Lock out the energy isolating device(s) with assigned individual lock(s). Identify the type of lockout device used with each energy-isolating device for each machine. 8) Stored or residual energy (such as that in capacitors, springs, elevated machine members, rotating flywheels, hydraulic systems, and air, gas, steam, or water pressure, etc.) must be dissipated or restrained by methods such as grounding, repositioning, blocking, bleeding down, etc. Identify the type(s) of stored energy and the methods of dissipation or restraint for each machine or equipment type. 9) Ensure that the equipment is disconnected from the energy source(s) by first checking that no personnel are exposed, then verify the isolation of the equipment by operating the push button or other normal operating control(s) or by testing to make certain the equipment will not operate. Verify Aero Mechanical State. Caution: Return operating control{s) to neutral or "off" position after verifying the isolation of the equipment. Identify the method of verifying the isolation of each energy source on each machine or piece of equipment. 10) Install grounding equipment where required to eliminate induced or stored energy before touching them. 11) For de-energized conductors or parts of electrical equipment only: If a lock cannot be applied, the authorized person without a lock may use a tag if it is supplemented by at least additional safety measure that provides a level of safety equivalent to that obtained by the use of a lock. List the safety measures to be used, for example, the removal of an isolating circuit element, blocking of a controlling switch, or opening of an extra disconnecting device. 12) For de-energized conductors or parts of electrical equipment only: A qualified person (one who is familiar with the construction and operation of the equipment and the electrical hazards involved) shall use test equipment to test the circuit elements and electrical parts of equipment to which employees will be exposed and shall verify that the circuit elements and equipment parts are de-energized. The test shall also determine if any energized condition exists as a result of inadvertently induced voltage or unrelated voltage back feed even though specific parts of the circuit have been de-energized and presumed to be safe. If the circuit to be tested is over 600 volts, nominal, the test equipment shall be checked for proper operation immediately before and immediately after this test. 13) The machine or equipment is now locked out. 14) Submit completed lockout tags to the supervisor at the end of shift, who will turn them into the Director of Resources. Note: Lockout and Tagout for Cord and Plug Equipment. As long as the male attachment plug is in the control of the employee providing maintenance or service work on a particular piece of machinery or equipment which is on the cord and plug type and is in the physical control or line of side then a lockout and tagout procedure is not necessary. If the employee cannot touch or see the male attachment plug then it has to be locked and tagged out. E. Restoring Equipment to Service When the servicing or maintenance is completed and the machine or equipment is ready to return to normal operating condition, the following steps shall be taken: 1) Check the machine or equipment and the immediate area around the machine to ensure that nonessential items have been removed and that the machine or equipment components are operationally intact. 2) Check the work area to ensure that all employees have been safely positioned or removed from the area. 3) Verify that the controls are in neutral. 4) Remove the lockout devices and reenergize the machine or equipment. Note: The removal of some forms of blocking may require re-energization of the machine before safe removal.

5) Notify affected employees that the servicing or maintenance is completed and the machine or equipment is ready for used. 6) Submit completed lockout tags to supervisor at the end of each shift.

Kansas State University Division of Facilities Annual LO/TO Form Appendix A Employee Name: Employee ID number: Notified All Affected Employees Date: Lockout and Tagout Sequence Pass Fail Identified All Energy Sources and Disconnecting Means Determined Protective Barriers Determined Hazard Risk Category for Task Appropriate PPE and Voltage Rate Tools Shut Down Machine De-activate the Energy Isolating Device from Energy Sources Lockout the Energy Isolating Device with Assigned Locks Dissipate or Restrain Stored or Residual Energy Verify Zero Mechanical State Install Grounding Equipment Remove Equipment or Tools Restoring Equipment Pass Fail All Employees Removed from Area Verify Control are in Neutral Remove Lockout and Tagout Device Notify Employee Service Complete Submit Lockout Tags to Supervisor Auditor Signature: Date of Audit:

Building Group Lockout and Tagout (Appendix B) Room Equipment Job # Person in charge Shops involved in Complex Lockout/Tagout 1 5 2 6 3 7 4 8 Names of employees involved in ComplexLock out / Tag out 1 5 2 6 3 7 4 8 Plan of Action Concerns Date Started Date Ended Person in Charge Supervisor Manager

Lockout/Tagout -- Energy Control Form (Appendix C) Date Written: Date Revised: Equipment: Machine ID #: Location: Mfg: Tasks that may be required to follow this procedure may include, but is not limited to: Energy Sources & Energy Isolation The following Energy Sources and Energy Isolating Devices have been identified for this equipment: STEP 1: Identify the Type of Energy and Lockout/Tagout Devices Electrical Hydraulic Natural Gas Circuit Breaker Controls: Mechanical Control: Compression Fuel Location of Steam Control: Battery Control: Pneumatic Fuse Plug ie: on/off Suspended switch ie: front of machine Compressed Air ie: main disconnect Mult Pwr Src Valve cover Capacitors City Wtr Stored Energy Chain Gravity Chemical Other LOTO lock/key STEP 2: Turn off or Shutdown Procedures On/off Switch Start/stop Emergency Stop Push Toggle Switch Turn Other Pull Flip Switch Lever Button Forward/reverse Key STEP 3: Isolation of Equipment Specific Procedures Throw circuit breakers Throw main disconnect Block, bleed, restrain See diagram Quick disconnect Disconnect is on Disconnect or cap machine Pull Fuses Disconnect is Close Valves Pull Plug GENERAL LOCK-OUT/TAG-OUT PROCEDURE 1. Alert other operators/supervisor of equipment being locked out. If this is applicable. 2. Determine protective barriers, hazardous risk category and appropriate use of personal protective equipment. 3. Turn OFF energy to equipment using the normal on/off switches, etc. 4. Identify all energy sources that must be locked out to ensure that all mechanical or electrical hazards are neutralized to prevent injury in case of unexpected release of this energy. (This will depend on the nature of the work to be performed on the equipment.) IF IN DOUBT, LOCK IT OUT!! - - - Be Sure to Test Your Voltage Meter 5. Place your own LOTO lock/tag on the control switch, main disconnect, etc. When two or more people are working on a job, each shall attach their own lock/tag, so the controls cannot be operated until all locks have been removed.) 6. Ensure all employees are clear of the piece of equipment. 7. Verify all isolation/de-energization of equipment has been accomplished. Push/turn on the on/start button at least three times to TEST if the power is OFF. (Time delay switches shall be tried after their appropriate cycle interval.) This step is important to confirm the proper energy isolating device(s) have been locked out. 8. Be sure to turn all operating switches back to the off position. 9. Perform the necessary repairs, set-up, changes, services, or unjamming of parts. 10. Replace guards/safety devices & remove tools, etc after service is complete. 11. Alert other operators/supervisor that energy is being resumed to equipment. If applicable. 12. Remove your LOTO lock/tag from energy isolating device(s) and turn power back on. 13. Submit completed lockout tags to supervisor at the end of each shift. If you have any questions about the sources of energy that must be controlled for the work you will be performing on the equipment, or what must be locked/tagged out, contact your supervisor!!!! YOU WILL NOT BE PROTECTED UNLESS YOU PUT YOUR LOTO LOCK/TAG ON THE CONTROL! Performing any work/task/service other than what is listed may require a different LOTO Procedure!! Loto.form.doc