Pathway to Production



Similar documents
For personal use only

ANNUAL GENERAL MEETING November 2015

Positioned for Production: Exploring for Growth

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

Change of Company Name to Neometals Ltd (ASX: NMT)

How To Mine And Treat Ore From Castle Hill Stage 1

For personal use only

For personal use only

Resources Rising Stars

ALCYONE REPORTS JORC SILVER RESOURCES

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

INVESTOR PRESENTATION JULY 2013

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

For personal use only

FOCUS MINERALS LIMITED

ASX ANNOUNCEMENT FEASIBILITY STUDY DELIVERS EXCELLENT RESULTS AT PILGANGOORA LITHIUM PROJECT

Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September Successful Share Issue Raises A$5.6 Million

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb TORONTO

Cummins Range Rare Earths Project

HALF YEAR FINANCIAL REPORT

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015

Ironbark Zinc Limited

September 2015 Quarterly Activities Report

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT

Mines and Money Presentation

The World s Newest Mineral Sands Producer Proactive Investors Luncheon Presentation 2-3 February 2016

Botswana Power Development! March 2015!

BAUXITE RESOURCES LIMITED

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

Press Release 30 th October 2015

Proactive Spotlight Investor Presentation Sydney and Melbourne 20 & 21 October 2015

C R A D L E / T R E M O N T J V A C Q U I R E S % O F P A N D A H I L L L I C E N C E S

Punching Above Its Weight

Core : CXO. and. Uranium Session SAREIC Conference Adelaide 13th April 2015

DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS

Update on Heap Leach potential of the Murchison gold project

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME

Feasibility Study shows low cost battery grade lithium hydroxide production possible using ELi Technology

Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing

For personal use only

Higher throughput PLUS higher prices Pilgangoora 55Mt in Resources plus 80 90Mt Target

Diversified Commodities Deliberate Focus

Shaw River Manganese Ltd January 2012 Update. Vincent Algar - Managing Director

Cannon Big Pit Given the Green Light

Savannah North Scoping Study Looking into the future 3 February 2016

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q at Grants Patch Gold Tribute Project, Australia

For personal use only. MRV Metals Launch February 2016

Aspire Mining Limited

For personal use only

Sorby Hills Silver Lead Project

ASX ANNOUNCEMENT 2 December 2014 PRESENTATION

DISCLAIMER DISCLAIMER FORWARD-LOOKING STATEMENTS

Fast Tracking to Production

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015

Interim Financial Report for the half-year ended 31 December 2011

The Unparalleled Opportunity of Colluli the Colluli Potash Project presented by Danakali

For personal use only

WARWICK AND ATLAS IRON ANNOUNCE MERGER TO CONSOLIDATE PILBARA IRON PROJECTS

New technology and new approach uncovers new opportunities in WA s Fraser Range

Irvine Island: Location. Irvine Island: Location

An Industrial Minerals Company. Corporate Presentation (ASX:TON)

AJM hard rock lithium

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.

Report for the Quarter Ended 30 September 2015

EQUITY RAISING ANNOUNCEMENT

Barkly Phosphate Project Tenement Granted

Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back

KIBARAN RESOURCES INVESTOR PRESENTATION

UPDATE ON SRIG - ALTONA TRANSACTION AGREED WORK AND DRILLING PROGRAMME COMMENCES

MAJOR NEW COPPER EXPLORATION PROGRAM UNDERWAY IN NORTH QUEENSLAND

Corporate Presentation February 2016

Australia s next mid-tier gold producer

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

AIM Ticker ZRL ASX Ticker - ZRL. Investor Briefing - Melbourne May 10 th Africa s most active exploration company

NEARING ROCK PHOSPHATE PRODUCTION IN SENEGAL MAKING A DIFFERENCE

INTERIM REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER

Quarterly Report December 2015

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

For personal use only

Presentation to Analysts and Investors, Leonora Operations

For personal use only TALGA RESOURCES LTD AND CONTROLLED ENTITIES ABN

Listings Officer Company Announcements ASX Limited, Melbourne

Quarterly Activities Report - for the period ended 31 December 2015

Press Release 29 th January 2016

Fraser Range Acquisition

For personal use only

A Battery Technology focused Graphite Company

Mt Carrington Gold Silver Project Positive Scoping Study

THE MBALAM-NABEBA IRON ORE PROJECT. Mr Giulio Casello Managing Director and CEO Sundance Resources Ltd

For personal use only. South Burnett Project Update January 2016

Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review

PILBARA LITHIUM. June 2016

Investing in an Underground Coal Mine in Indonesia

Interview with Paul Atherley, Managing Director of Berkeley Energia (911733, ASX: BKY, London: BKY)

Transcription:

Charging forward with Lithium Pathway to Production 8th Lithium Supply & Markets Conference 24 26 May 2016 Las Vegas

Disclaimer This presentation has been prepared by Altura Mining Limited ( Altura or the Company ). It should not be considered as an invitation or offer to subscribe for or purchase any securities in the Company or as an inducement to make an invitation or offer with respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of this presentation. This presentation is provided on the basis that none of Altura nor its respective officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advisers make any representation or warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the presentation and nothing contained in the presentation is, or may be relied upon as, a promise, representation or warranty, whether as to the past or the future. The Company hereby excludes all warranties that can be excluded by law. The presentation contains forward looking information and prospective financial material which is predictive in nature and may be affected by inaccurate assumptions or by known or unknown risks and uncertainties, and may differ materially from results ultimately achieved. All references to future production, production targets and resource targets and infrastructure access are subject to the completion of all necessary feasibility studies, permitting, construction, financing arrangements and infrastructure-related agreements. Where such a reference is made, it should be read subject to this paragraph and in conjunction with further information about the Mineral Resources and Exploration Results, as well as the Competent Persons' Statements. All persons should consider seeking appropriate professional advice in reviewing the presentation and all other information with respect to the Company and evaluating the business, financial performance and operations of the Company. Neither the provision of the presentation nor any information contained in the presentation or subsequently communicated to any person in connection with the presentation is, or should be taken as, constituting the giving of investment advice to any person. 2

Altura Mining Pilgangoora TOP 5 global sized deposit of hard rock lithium 100% Altura Mineral Resource estimate of 35.7mt @ 1.05% Li 2 O Ore Reserve estimate of 18.47mt @ 1.07% Li 2 O Production set for 2017 Planned 15+ year Mine life *Refer 3 to ASX announcements 11 February 2016 and 11 April 2016

Altura Mining Corporate Capital Structure (as at 20 May 2016) Shares on issue 977.1M Share price $0.24 Options (expire 30 June 2016 - $0.02) 150.6M Market capitalisation $234.5M Cash (inc. A$3M option exercise) circa $5.7m 52 week trading range A$0.282 A$0.011 Directors and Major Shareholders Directors: James Brown Managing Director Paul Mantell Executive Director Allan Buckler Non-executive Director BT Kuan Non-executive Director Dan O Neill Non-executive Director Share Price Graph from December 2015 Major Shareholders: Directors 22% Top 20 shareholders 58% 4

Pilgangoora Region Western Australia worlds new lithium supply hub Two (2) advanced developments scheduled for production in 2017 Altura Mining and Pilbara Minerals Resource 36Mt @ 1.05% Li 2 O One (1) mine under construction Mt Marion Pilgangoora Lithium District Resource 80Mt @ 1.26% Li 2 O Resource 23Mt @ 1.39% Li 2 O Two (2) Producing mines Greenbushes and Mt Cattlin Resource 16Mt @ 1.08% Li 2 O Greenbushes Lithium Mine 5

Pilgangoora Altura Origins Origins - history 2009 Exploration tenements formally approved for on ground work October 2010 Discovered high levels of lithium in rock chip samples (>5% Li 2 O) August 2010 Drilling commenced initial reconnaissance program January 2011 Resource definition drilling commenced August 2011 Maiden JORC Mineral Resource estimate of 10.5Mt @ 1.25% Li 2 O October 2012 Revised JORC Mineral Resource estimate of 25.2Mt @ 1.23% Li 2 O November 2012 Scoping Study completed with positive results 6

Pilgangoora Statistics Pilgangoora region Western Australia Now the world hotspot for hard rock lithium exploration with 20+ companies now exploring Total Mineral Resource discovery of 116mt Altura attributed 31% Total Ore Reserves of 48mt Altura attributed 39% Altura s contribution First discovery of lithium mineralisation at Pilgangoora First to delineate a spodumene Mineral Resource at Pilgangoora FS completed with tight tolerance of +/- 20% accuracy Executed Binding Offtake Agreement for spodumene concentrate 7

Lithium Market Applications by sector Altura primary product to supply technical grade lithium feedstock for the rapidly expanding battery production sector Significant opportunity to capitalise on increasing CAGR in EV battery sector Outstanding growth in EV and large EV power battery applications Altura plans to enter the market with 215ktpa of 6% Li 2 O spodumene concentrate Source: Canaccord Genuity 8 Offtake partners leaders in power battery production with over 85,000 EV battery systems already in China

Altura Mining Pilgangoora FS FS Key Outcomes April 2016 Mineral Resource estimate of 35.7mt @ 1.05% Li 2 O* Ore Reserve estimate of 18.47mt @ 1.07% Li 2 O* Positive results from recently completed detailed FS * Annual ore feed of 1.4 mtpa Annual steady state lithium oxide production 215ktpa 15+ years LOM LOM strip ratio of 2.7:1 LOM Net Revenue of A$1,562 million Capex A$129 million Payback period < 2 years DFS to be delivered in Q3 2016 Production Q3 2017 *Refer 9 to ASX announcement 11 April 2016

Pilgangoora Development Waste Dump Single Open Pit Operation Process Plant and Site Facilities 10

Pilgangoora Process Plant 11

Process flowsheet 4 Stage Crushing 3 Stage Dense Media Separation Classifier 3 Stage Flotation 12

Our Partners Altura and Lionergy Binding Offtake agreement signed on 22 April 2016 with Chinese based downstream lithium production and investment group Lionergy Limited Supply of 100,000 tonnes of spodumene concentrate annually Valuable partnership formed with Lionergy investing A$3M in Altura via share placement Lionergy has interests in production of lithium iron phosphate (LiFePO4) or LFP for power battery production in China 13

Our Partners Altura OptimumNano - Lionergy Tripartite non-binding Memorandum of Understanding (MOU) for supply of spodumene concentrate to leading Chinese power battery application developer and producer OptimumNano www.optimumnanoenergy.com MOU for spodumene concentrate supply of 100,000 150,000 tonnes annually mine to market concept Lionergy also party to MOU and will focus on downstream spodumene processing for LFP applications 14

Project Timeline April Publish Feasibility Study April Commenced Definitive Feasibility Study December Commence construction February August Complete DFS Offtake & Investment partners October First production 15

Pilgangoora Our strengths Completed Feasibility Study FS input drilling completed Significant upside potential to increase resources in tenement package Over 70% of Resource Indicated Very simple Orebody to mine, outcropping at the surface. Low Capital Cost Strategic partners secured 16

Unit 5 & 6 25 Hamilton Street Subiaco WA 6008 Australia Phone: +61 8 9488 5100 Fax: +61 8 9488 5199 E-mail: info@alturamining.com Thank you alturamining.com

Reserve and Resource estimates JORC Category Cut-off Li 2 O (%) Tonnes (Mt) Li 2 O (%) Fe 2 O 3 (%) Contained Li 2 O (tonnes) Measured 0.40 - - - - Indicated 0.40 26.70 1.05 1.73 280,000 Inferred 0.40 9.00 1.02 1.68 92,000 Total Resource 0.40 35.70 1.05 1.72 372,000 Proved 0.40 - - - - Probable 0.40 18.47 1.07 1.70 198,000 Total Reserve 0.40 18.47 1.07 1.70 198,000 *Refer 18to ASX announcement 11 February 2016 and 11 April 2016

Competent Persons Statement Pilgangoora Western Australia The information in this report that relates to the Mineral Resource for the Pilgangoora lithium deposit is based on information compiled by Mr Stephen Hyland and Mr Bryan Bourke. Mr Hyland is a Fellow of the Australasian Institute of Mining and Metallurgy and Mr Bourke is a Member of the Australian Institute of Geoscientists. Mr Hyland is a principal consultant at Ravensgate and has sufficient experience that is relevant to the style of mineralisation under consideration and to the activity of mineral resource estimation to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bourke is the Exploration Manager of Altura Mining Limited and has had sufficient experience that is relevant to the style of mineralisation and to the type of deposit under consideration to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Hyland and Mr Bourke consent to the inclusion in the report of the matters based on this information in the form and context in which it appears. The information in this report that relates to the Ore Reserve for the Pilgangoora lithium deposit is based on information compiled by Mr Jake Fitzsimons. Mr Fitzsimons is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Fitzsimons is a principal consultant at Orelogy Consulting Pty Ltd and has sufficient experience that is relevant to the style of mineralisation under consideration and to the activity of ore reserve estimation to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Fitzsimons consents to the inclusion in the report of the matters based on this information in the form and context in which it appears. The Company confirms that it is not aware of any new information or data that materially affects the information in included in the ASX announcements on 11 February 2016 and 11 April 2016. Further, all material assumptions and technical parameters underpinning the mineral resource and ore reserve estimates in those announcements continue to apply and have not materially changed. 19