PROjEcT NORD STREAM. Two pipelines linking Russia and Germany.



Similar documents
Pipelines and seabed intervention

Baltic Sea Perspective on - Building a Gas Pipeline and - Oil Spills

Worldwide Technip in Norway

Chaudière Crossing Bridge Rehabilitation

E&P in Brief. A Wintershall Fact Sheet. Wintershall in Argentina. Annual production in Argentina approx. 25 million barrels of oil equivalent

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

BONATTI: COMPANY OVERVIEW

and to mutually agree mitigation measures to reduce identified concerns and risks to acceptable levels.

Trenching and Excavation Safety

Algeria-Europe gas pipeline via Spain. Haga clic para cambiar el estilo de título

Saipem UK Ltd. Saipem. Eni. for graduate engineer recruitment

A comprehensive range

THE FISHERIES REQUIREMENTS FOR AREA IN RELATION TO SEISMIC ACTIVITIES THE FISHERIES

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.

TECHNICAL INFORMATION

Global Excellence Strengths, Solutions, Advantages

Cable Care. ABB Power Cables Service Products

PIPELINE INSPECTION UTILIZING ULTRASOUND TECHNOLOGY: ON THE ISSUE OF RESOLUTION By, M. Beller, NDT Systems & Services AG, Stutensee, Germany

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

TEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL Pre-Insulated Piping

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

By Chris Gorman, PE M.ASCE PROBLEM:

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

MERMAID FLEET PROFILE SUBSEA SERVICES

il Castorone la più avanzata nave posatubi al mondo: acquisti e logistica Paolo Daleffe Armando Favi

DEVELOPMENT OF THE PATHFINDER FOAM CALIPER PIG. By: Peter Ward, Pipeline Innovations Ltd, UK

Premium Tubular Solutions Super Duplex Welded Tubes for Umbilical Applications

Contents. 1. PROFILE p2. 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8

AAF Manufacturing Services. Leading the way in engineering excellence

WATERWAYS in Finland

Why infrastructure is so important

Offshore Wind. Cable Installation Cable Trenching Survey & Seabed Mapping IMR

SECTION IX SLIP LINING PIPELINES

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SWIMMER. An innovative Subsea Intervention System for Deep Offshore Fields. Jean-Jacques QUESNEL CYBERNETIX S.A. Oil&Gas Division

COMPANY PROFILE PELICAN COMPANY LIMITED

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Turnkey cable solutions to better deploy your windfarm infrastructure

In-line inspection (intelligent pigging) of offshore pipeline. Birger Etterdal

DP platform installation/ decommissioning and pipelay vessel Pieter Schelte

ALEXEY MILLER: SOUTH STREAM AND EUROPEAN ENERGY SECURITY

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Invitation for Tender: Sea Bed Survey Services (Geophysical, Bathymetric and Geotechnical)

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

Marine industry careers

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

UNDERSTANDING IN DEPTH, COMMITTED TO CORE.

SECTION 3 SANITARY SEWER DESIGN

Comanche Trail Pipeline Project. September 2015

1.2 For piping systems that operate at hoop stress of 20% or more of the Specified Minimum Yield Strength the following shall apply.

High Capacity Helical Piles Limited Access Projects

TRANSNET PIPELINES. TPL 25 Tarlton Commissioning Plan

Floor Heating Warehouse.co.uk

RHEDA MRT The ballastless track for underground and surface commuter transit

Worldwide subsea pipeline cathodic protection surveys

DESCRIPTION OF WORK:

The Pipelines Regulations, 2000

The E.ON View on a N-DK Connection

An Overview of Seabed Surveys (High resolution Geophysical Site Surveys)

Profile. Marine ingenuity In just two words, we show what we do, how we do it, and what makes us different. Dredging and Marine Contractors

HV Submarine Cable Systems Design, Testing and Installation

London Array. Operations and Maintenance

Section SEWER PIPE INSTALLATION AND TESTING

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

Det norske oljeselskap - Our first diving operation. Annual Conference The Norwegian Oil and Gas Association Stavanger, Norway

TOTAL CAPABILITY IN SCAFFOLDING & ACCESS SYSTEMS REACHING NEW HEIGHTS OF INNOVATION & SAFETY

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site

Program Design and Engineering Key to Infrastructure Replacement and Cost Containment

Intermodal Handling TOP PERFORMANCE WITH SMART SOLUTIONS

DIVISION 4300 STORM DRAINAGE

Birth of a Norwegian. giant

Life-of-Field. seabed-to-surface

Welcome to ERGO Insurance Group

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

Taking a Giant Leap in Subsea Technology

Feasibility Study of Deep Water Power Cable Systems. Enrico Colombo CESI S.p.A

ADVANCED NDT TECHNIQUES FOR PLASTIC PIPELINE INSPECTION

SIMULATION SUCCESS STORIES: BUSINESS PROCESS REENGINEERING

SUBSIDIARY LEGISLATION WILDLIFE & PROTECTED AREAS. Marine Protected Areas Order S. R. & O. No: 1 of 2012

Section 402. STORM SEWERS

Natural gas knowledge series : Laying Natural Gas Pipeline Contents

The Advance of New ROV Conveyed Geotechnical Acquisition Tools - Going Where No Man Has Gone Before. Subsea UK Expo February 2014

Measuring the Condition of Prestressed Concrete Cylinder Pipe

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

Safe & Sound Bridge Terminology

The role of technology and knowhow in the sector

Steel construction. Solutions for the renewable energy and offshore sectors. published by energyengineering magazine

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Installation & Technical Guide

Hurricanes and the Offshore oil and Natural Gas Industry

SPECIALIST OFFSHORE PACKAGES KNOW YOUR COVER

Wastewater Capital Projects Management Standard Construction Specification

Transcription:

PROjEcT NORD STREAM Two pipelines linking Russia and Germany. RUSSIA GERMANY

NORD STREAM Two pipelines linking Russia and Germany.

2 A large-scale gas pipeline system transporting resources from distant areas which represents a powerful tool for economic growth. Today, EUROPE and RUSSIA are working together for the first time to create new routes and development. With more strength and energy.

Project NORD STREAM A B Starting Point End Point A Pipeline route RUSSIA B GERMANY Gas pipelines with the potential for world beating capacity The resources of the far North to heat Europe Nord Stream is the largest scale subsea pipeline project made to date. Offshore gas pipelines that can boost energy supplies to Europe by bringing natural gas direct from Siberia. Its ambitious objective is an overall transport capacity of 55 billion cubic metres of gas per year. A line that opens up new opportunities Nord Stream consists of two parallel pipelines that link Vyborg in Russia with Greifswald in Germany, passing through the Baltic Sea. A strategic infrastructure that also symbolizes the new era of exchange and cooperation between Europe and Russia. A prestige project for prestige clients The project was commissioned and developed under the supervision of Nord Stream AG, an international joint venture composed of Gazprom (51%), Wintershall - a BASF subsidiary (15,5%), E.ON Ruhrgas (15,5%), N.V. Nederlandse Gasunie (9%) and GDF SUEZ (9%). 1.224 kilometers 55 BILLION m 3 OF NATURAL GAS PER YEAR THE LARGEST SUBSEA PIPELINE EVER BUILT LENGTH OF EACH PIPELINE 3

Saipem. A role that goes beyond innovation Nord Stream AG chose Saipem for its experience and reputation for innovation, best methods, schedule and technical approach, commissioning the company to lay the two sections of pipelines in their entirety. Saipem met the challenge with a Task Force Team and with two of its prize vessels, the Castoro 6 and Castoro 10, suitably refitted and modernized, along with the subcontracted Allseas DP vessel Solitaire and an overall fleet of more than 40 support vessels. Saipem s task was to lay the two 48 pipelines, with wall thickness ranging from 26.8 mm to 41 mm and concrete weight coating thickness from 60 mm to 110 mm. It also included the management of other construction activities like Survey, Crossings Preparation, Rock Placement, Trenching and Backfilling and shore approach Pipe Pulling Operations in Germany and Russia. The total length of 2448 km makes the project both unique and revolutionary in its construction procedures. The route was divided into three separate sections, each with very different characteristics and critical aspects: Russian and German Landfalls, with laying depth of only 2-3 metres. Preliminary trench dredging and construction works were required before laying to avoid damage to the seabed. South-East German Baltic waters, with maximum depth of 18 metres, where the Castoro 10 came into its own laying a stretch of 57 km. Finnish, Swedish and Danish waters, with water depths down to over 210 metres were surveyed and investigated using highly sophisticated sub sea technologies such as Saipem designed and owned remotely operated underwater vehicles (ROV). TIMELINE 4 1 st PIPELINE 2 nd PIPELINE 6 th April 2010 Start of construction 9 th June 2011 Start of construction

The pipelines were linked by hyperbaric welded tie-ins after hydrotesting of the individual sections. State of the art technical services were used in the process, carried out by the Nord Stream contractor Technip, using specialist equipment supplied by Statoil. These included: Controls of seabeds and alignment of the pipeline. Positioning of aligned segments. Cutting of segment ends. Insertion of watertight welding plugs in each pipe end to create a dry area for welding. Overlapping of pipelines. Bevelling of the pipe ends. Alignment of pipelines using pipe handling frames (PHF). Hyperbaric tie-ins in underwater welding habitats at depths of between 80 and 110 m. Total control of all welding operations. A hugely complex project in terms of capabilities required, variety of resources mobilized and deadlines to be met. Two important deadlines Laying of the pipeline entailed a strict schedule of deadlines which were fully met. Indeed, many intermediate deadlines were achieved well in advance: the second pipeline was completed three months before the stipulated contract date. End of first line pipelay: 5 th May 2011 End of second line pipelay: 18 th April 2012 Further proof, if proof were needed, that Saipem can perform to excellent standards despite ever more stringent deadlines. Outperforming objectives and expectations. CASTORO SEI CASTORO 10 SOLITAIRE OVER 40 VESSELS 5 th May 2011 Pipelay completed 8 th November 2011 First Gas Line 1 18 th April 2012 Pipelay completed 8 th October 2012 Gas through Line 2 (both lines operational) 5

The most innovative technology ever used to date on an underwater pipeline project. Three state of the art vessels worked together to exceed the most ambitious expectations, with an average of 3.5 km and more than 7000 tonnes of pipe laid per day (Line 2), significantly higher than is currently achieved with traditional onshore pipeline construction techniques. CASTORO SEI A sophisticated semisubmersible pipelaying vessel which began operations in Sweden before excelling during the shore-pull operations in waters off the coast of Russia. 3.5 km and more than 7000 tonnes of pipe laid per day 6

Three technological giants in perfect synergy CASTORO 10 The Castoro 10 was involved in the shore-pull operations and approach for both pipelines and in laying in the shallow waters off the coast of Germany. The complex requirements entailed modifications and customization of the vessel, the removal of some structures from the bridge to reduce draught and consequently help protect delicate shallow marine environments. Once shore-pull pipelay had completed, the Castoro 10 laid the pipelines across the shallow water section of Germany, alternating sections of line 1 and line 2. Simultaneous dredging operations prepared the trenches ahead of the pipelay vessel, thus reducing the risk of trench refill and accelerating laying times. Other new equipment, including soft polyethylene anchor lines, allowed the vessel to manoeuvre and operate without damaging important historic wrecks on the seabed. SOLITAIRE This vessel has a dynamic positioning system, using thrusters, which enables it to operate without anchors. Solitaire installed sections of Line 1 & 2 through Russian and Finnish waters along particularly complex routes which had previously been prepared. In conclusion, three high-tech floating gems, over 40 vessels and a multinational task force working 24 hours a day, 7 days a week, 365 days a year. A unique venture and a unique result. CONTINUOUS SUPPLIES DOUBLE-JOINT TEST NDT 7

A project built on challenges matched with performance UNDERWATER WELDING AT DEPTHS OF BETWEEN 80 and 110 m Total control of resources, times and operational capabilities Precise definition of every step, activity and professional capability. Right from the tendering stage strategic thinking was all important in order to monitor all activities scrupulously, at every level. Saipem s considerable international experience of trunkline gas pipeline construction was put to good use in the Nord Stream project. A complex management system, fine tuned at every level, ensured accurate timing of required material deliveries that significantly reduced costs and respected the delicate ecosystems involved. Detailed planning included construction of new sites near the laying zones for preparation of the coated pipes and support materials. Logistics were handled by a team of highly qualified professionals available to travel to the lay areas at short notice and oversee regular and continuous supplies of piping and materials. The pre-commissioning phase followed meticulous final as built inspection of the entire 2448 km of line and included an extensive database of information recorded by the vessels during operations. Professionalism, efficiency and team spirit were the hallmarks of the project, from start to finish. Going beyond. 3 km OFF-LIMITS ZONE 8

Accurate logistics, systematic plans and specific actions calibrated to each step. A strategic idea to reach objectives ahead of schedule. Optimum professional performance, even at the bottom of the sea The project s construction operations involved innovative working techniques, many applied for the very first time: Detailed pre-lay inspection of the transit route from Russia to Germany, with vessels at sea for over a year. Definition of undersea bedrock prior to laying, which allowed the semisubmersible Castoro 6 to operate as closely as possible to the coast during shore-pull operations. Selective location of sites for coating and storage of pipes to limit the distance by sea from the pipelay vessels to under 100 nautical miles and favouring low emission transport such as ships and trains. Implementation off-limit zones with a radius of 3 km to prevent collisions with other vessels in busy shipping lanes. Vessels had to comply with severe operational regulations controlling marine traffic, particularly off the Russian coast. Continuous installation of pipeline by the Castoro 6 for an uninterrupted 1700 km. Rock placing for pipeline protection, free spans support and stability for a total length of almost 200 km. German landfall Shore-Pull of the 2 pipelines with an 800 tonnes winch in synergy with the Castoro 10. PIG Traps and Intelligent PIGs 9

ENVIRONMENTAL MONITORING MONITORING OF WAR REMNANTS 10

Monitoring of the environment and of war remnants Technology and innovation can be environmentally friendly All pipelaying operations were carried out with specific procedures aimed at safeguarding the unique natural habitat of the Baltic Sea. A detailed and rigorous programme of environmental and social controls was drawn up before and after installation of lines and extending until 2016. In short, a project within a project, with operations to restore flora and fauna, individually tailored to specific areas and protected species. The following were (and are) monitored: Quality of water. Migration of birds. Movements of fish. Population of mammals. Recovery of historical remains from the seabed. The environmental monitoring system also included the following inspection activities: Pre laying, sophisticated controls and clearing out of Unexploded Ordnance (UXO). Post-laying, with the recovery and restoration of historical remains. Along the route over 80 munitions were identified and catalogued. A valuable contribution by technology to local authorities, society at large and to historical records. The programme scrupulously follows the strictest regulations on environmental protection and uses innovative tools such as: Underwater vehicles (ROV), controlled from the support vessels, enabling better results with minimum impact on seabeds. Passive acoustic system to monitor mammals and prevent them approaching operational zones. ROV 11

PIPELAYING PROCESS.01 The pipes are unloaded from the pipe carrier vessels and stacked on the storage areas on each side of the laybarge. Pipes are delivered regularly to ensure that there are always enough supplies on board to maintain the 24 hour construction schedule. Pipelaying Process.02 To prepare the pipes for welding, the ends are bevelled to make them exactly the right shape to be fitted together. The inside of the pipe is then cleaned using compressed air before it is conveyed to the double-joint welding station. Pipelaying Process Edge Edge Bevel Bevel Pipe Cross Pipe Cross section section Edge Edge Bevel Bevel Pipe Cross Pipe Cross section section Heat Heat Weld Weld Heat Heat Weld Weld.05 Following non-destructive testing, the double-joint is moved in a pipe elevator to the central assembly line, or firing line. There, the insides are checked for debris. The ends of the double-joint are then pre-heated in preparation for welding onto the main pipe string..06 The prepared double-joints are now joined to the end of the pipeline in a semiautomatic welding process. Qualified welders oversee each of the steps to ensure that welding procedures meet Nord Stream s and authority approved quality standards. 12

At the double-joint welding station, two bevelled, 12-metre pipe joints are aligned and welded together to create a doublejoint segment measuring 24 metres. These double-joint sections will later be connected to the main pipe string..03 The double-joint is moved to the nondestructive testing station where every millimetre of the weld undergoes ultrasonic testing to detect any unacceptable flaws. If required, the defect will be repaired and the weld rescanned to meet international quality standards..04 Weld Weld Ultrasonic Ultrasonic Rays Rays Weld Weld Ultrasonic Ultrasonic Rays Rays Polyurethane Polyurethane Foam Foam Polyurethane Polyurethane Foam Foam Ultrasonic Ultrasonic Rays Rays Former Former Ultrasonic Ultrasonic Rays Rays Former Former The weld of the double-joint that has been welded onto the main pipeline also undergoes ultrasonic testing at another non-destructive testing station. Any unacceptable flaws will be repaired, and the weld rescanned so that it meets international quality standards..07 Once the weld is confirmed acceptable, a corrosionresistant, heat-shrink sleeve is applied around its entire circumference. Then, polyurethane foam is poured into a mould surrounding the weld area. This foam hardens, providing further protection..08 13

14 Know-how, expertise, research, investments, innovation, courage. A great number of diverse resources coming together in a single project, with unprecedented results.

An outsize project of huge strategic value Nord Stream is a project that has broken barriers and records, in terms of those already achieved and those expected in terms of results in the coming years thanks to closer relations between Europe and Russia. But the numbers are only the outward symbols of the huge pool of Saipem resources: know-how, expertise, research, investments, innovation and courage. A human value without precedence, going beyond the contractual value of 2.2 Billion Euros. The longest and largest capacity trunkline in the world 2 lines of pipe, each 1,224 km long. 55 billion cubic metres per year - overall throughput. Individual pipes Diameter Length Individual weight Total weight 1.4 m 12.2 m ~ 25 t 5,000,000 t Optimum power and energy efficiency 50,000 t of materials lifted per day. 8 km of pipes laid per day (Castoro Sei + Solitaire). Continuous laying for over a year without interruptions with Castoro Sei. 15

16

Photos Thomas Eugster and Saipem Illustrations & Photos courtesy of Nord Stream

01.2013 People, Skills, Equipment. Saipem S.p.A. Via Martiri di Cefalonia, 67 20097 San Donato Milanese, Milan - Italy Tel. +39.02.520.1 Fax +39.02.520.44415 saipem.com - A subsidiary of Eni S.p.A.