SECTION 33 12 19 FIRE HYDRANTS



Similar documents
SECTION 15 AIR RELEASE VALVE ASSEMBLIES General

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION DUCTILE IRON PIPE AND FITTINGS

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

SECTION DUCTILE IRON PIPE AND FITTINGS

Fire Hydrant Troubleshooting

SECTION STORM DRAINAGE SYSTEM

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

American- Darling 5¼" B-84-B-5.

INDEX. Sec. No. Items Page Nos.

SURFACE PREPARATION STANDARDS

Section Four: Linings and Coatings

SECTION SANITARY SEWER PIPE

SECTION WATER STORAGE TANK PAINTING

STANDARD SPECIFICATION SECTION STEEL PIPE, FUSION-BONDED EPOXY LINED AND COATED

SECTION GROUND WATER STORAGE TANKS

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

SECTION DUCTILE-IRON PIPE AND FITTINGS

SECTION 560 COATING NEW STRUCTURAL STEEL

SECTION FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

Section C-1 Pipes and Fittings

Specification for Pipe Coating Repairs Offshore

Mechanical Installation

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION POLYVINYL CHLORIDE (PVC) PIPE

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

SECTION HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

Section 3510: Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011

OPERATION AND MAINTENANCE MANUAL 5-1/4 B-84-B-5 FIRE HYDRANT

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Fire Hydrant Operation and Inspection

SECTION 1081 COATING OF STRUCTURAL STEEL

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

Suggested Specifications: Steel Pipe for Water Transmission

SANITARY SEWER SPECIFICATIONS

Section SEWER PIPE INSTALLATION AND TESTING

DENVER MODEL 30 X 30 SPECIFICATIONS

SECTION CAST-IN-PLACE CONCRETE

Underground Piping for Private Hydrants & Sprinkler Supply Line

TIGER Drylac U.S.A., Inc Swenson Avenue St Charles, IL T F office.us@tiger-coatings.us

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

COLORADO MODEL. 35 x 65 SPECIFICATIONS

SECTION DISINFECTION OF PIPE AND WATER STORAGE FACILITIES

List of Frequently Utilized Storage Tank Standards and Practices

Price List January 1, 2015

Ductile Iron Pipe Couplings

SECTION PVC PRESSURE PIPE AWWA C900

Pictorial Surface Preparation Standards For Painting Steel Surfaces

Copper and Copper Alloy Tube, Pipe and Fittings

THE JERSEY CITY MUNICIPAL UTILITIES AUTHORITY REQUIREMENTS FOR FIRE AND DOMESTIC WATER LINE AND METER INSTALLATIONS

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

A. The shade structure contractor shall be responsible for the design, engineering, fabrication, and supply of the work specified herein.

A. Shop Drawing submittals shall include, but not be limited to, the following:

STANDARD SPECIFICATION SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE (AWWA C900)

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SECTION FACILITY STORM DRAINAGE PIPING

SECTION PAINTS AND COATINGS. Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text".

ApplicatorTrainingBulletin. The Galvanized Surface. Surface Preparation of New Galvanizing

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

2013 Edition. Flanged fittings 30"-64" NSF. industrial Applications, water & Wastewater. Certified to ANSI/NSF 61

MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water

Special Specification 7021 Water Main and Sewer Line Replacements

Chapter 6 Material Specifications

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

Wastewater Capital Projects Management Standard Construction Specification

4 of /7/ :51 PM

Mueller. Pipe Repair Products. Saddles Tapping Sleeves Pipe Repair Clamps A complete selection for all types of pipe... all from a single source.

Triarch Products Over Various Interior Substrates

ATLANTA MODEL SPECIFICATIONS

DESIGN CLARIFICATION (DC)

SECTION WATER STORAGE TANK PAINTING

Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method F (100 C) calculated VOC-US/Hong Kong. US EPA method 24 (tested)

SECTION 4Aggegate Subbase

BLADDER SURGE CONTROL SYSTEM

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

THE CONSERVATION OF AN 1879 HASKELL AND BARKER WOODEN BOX CAR

SECTION STORM DRAIN SYSTEM

TOP RUNNING SINGLE GIRDER BRIDGE CRANE

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

ASTM C76, Class III, Wall B, except as modified herein. Clean natural sand, ASTM C33. Artificial or manufactured sand will not be permitted.

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

DIVISION: PLUMBING SECTION: DOMESTIC WATER PIPING REPORT HOLDER: CURAFLO IP LLC 4035 E. OASIS STREET MESA, AZ 85215

SECTION PIPE HANGERS AND SUPPORTS

Jay R. Smith Mfg. Co.

Style 07 Zero Flex Rigid Coupling. Style 75 Flexible Coupling. Style 77 Flexible Coupling 11. Description

2014 SPECIFICATION GUIDE Conveyor Equipment

FIVE YEAR CERTIFICATION REPORT

SECTION CHAIN LINK FENCES AND GATES

PROTECTO 401 Price List

Transcription:

SECTION 33 12 19 FIRE HYDRANTS PART 1: GENERAL 1.01 SCOPE A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 - Submittals. B. Submit name of hydrant manufacturer, type of bonnet paint, and engineering control drawing number for hydrant proposed for use. PART 2: PRODUCTS 2.01 HYDRANTS A. Provide hydrants in conformance with AWWA Standard C502, Dry Barrel Fire Hydrants (Latest Edition). Hydrants are approved by AW by issuance of a Certificate of Responsibility. Hydrants shall open left (counterclockwise). The following hydrant has been approved. Alternate hydrants will not be considered. APPROVED HYDRANT TYPE The AW approved hydrant at all locations is Mueller Model Super Centurion 250. B. The AW Project Manager may, at any time prior to or during installation of hydrants, randomly select furnished hydrant for disassembly and laboratory inspection, at AW s expense, to verify compliance with Specifications. When hydrant is found to be non-compliant, replace, at Contractor's expense, hydrants, with hydrants that comply with Specifications. C. Provide lower hydrant barrel fabricated from Ductile Iron Pipe as single piece, connected to upper hydrant barrel by means of joint coupling that will provide three hundred sixty (360) degree rotation of upper barrel. Revised June 2013 33 12 19-1

2.02 HYDRANT TEE A. Fire hydrant installations shall require the use of a hydrant tee on the main line. Hydrant valves shall be bolted to the hydrant tee for all installations. Mechanical joint hydrant tee shall be ductile iron class 350 and shall be produced in accordance with ANSI/AWWA A21.53/C153 and ANSI/AWWA A21.11/C111 for joints and ANSI/AWWA A21.4/C-104 for cement lining in sizes 3 through 24. Hydrant tee mechanical joint nuts and bolts shall be ductile iron, high strength, low alloy steel per ANSI/AWWA A21.11/C-111. 2.03 LEADS A. Branches (Leads): Conform to requirements of Section 33 11 00.15 - Ductile Iron Pipe and Fittings and Section 33 11 00.11 - Polyvinyl Chloride Pipe. 2.04 HYDRANT PAINTING A. New hydrants and refurbished hydrants shall be shop coated as specified herein. B. Exterior Above Traffic Flange (Including Bolts & Nuts). 1. Surface preparation to be in accordance with SSPC-SP 10 (NACE 2) near white blast cleaned surface. 2. Coat with three coat alkyd/silicone alkyd system with total dry film thickness (DFT) of 6-9 mils as follows: a. Prime Coat - Oil modified alkyd primer, to be in general conformance with SSPC Paint Specification No. 25. Total dry film thickness (DFT) 2-3 mils. b. Intermediate Coat - Heavy Duty Industrial Alkyd Enamel to be in general conformance with SSPC Paint Specification No. 104, and Federal Standard A-A-2962A. Total dry film thickness (DFT) of 2-3 mils. c. Finish Coat - Silicone Alkyd Resin Enamel to be in general conformance with SSPC Paint Specification No. 21. Total dry film thickness (DFT) to be 2-3 mils. Exception - hydrant bonnet shall not be finished shop coated, only intermediate coated. Install color coded finish coating of bonnet in field. d. Bonnet Paint - Field apply finish coat of Silicone Alkyd Resin Enamel to be in general conformance with SSPC Paint Specification No. 21. Dry film thickness of 2-3 mils. Bonnet colors are to be as specified in Paragraph 3.01 to designate the available fire flow at 20 psi residual. 3. Colors - Primer: Manufacturers standard color. Finish coat of hydrant body and connection caps, to be painted to match the color of existing in Revised June 2013 33 12 19-2

service hydrants on the base. Approval of the color paint to be used on the hydrants shall be approved by the American Water Project Manager prior to the final application of paint to the newly installed hydrant. C. Field Maintenance Painting (Exterior Above Traffic Flange) 1. Surface Preparation to be in accordance with SSPC - SP2, Hand Tool Cleaning, or SSPC - SP3, Power Tool Cleaning, depending on condition of existing paint and extent of corrosion. It is not necessary to remove tightly adhered mill scale, rust, and paint. Mill scale, rust and paint are considered tightly adherent when they cannot be removed with dull putty knife. In some severe cases where it is necessary to remove majority of existing paint, surface should be cleaned in accordance with SSPC - SP11, Power Tool Cleaning to Bare Metal. 2. When surface is cleaned to bare metal (SSPC - SP11), coat hydrant with three coat Alkyd/Silicone Alkyd system in accordance with Paragraph 2.03.B.2 as for new hydrants. When surface is cleaned to SSPC - SP2 or SSPC - SP3, coat hydrant with Silicone Alkyd Resin Enamel in general conformance with SSPC Paint Specification No. 21. Total dry film thickness of 3-6 mils surface is cleaned to bare metal (SSPC - SP11), coat hydrant with three coat Alkyd/Silicone Alkyd system in accordance with Paragraph 2.04.B.2 as for new hydrants. D. Exterior Below Traffic Flange 1. Surface preparation in accordance with SSPC-SP10 (NACE 2) Near White Blast Cleaned Surface. 2. Primer and intermediate coat: coal tar epoxy in general conformance with SSPC Paint Specification No. 16. Apply two (2) coats with dry film thickness (DFT) of 8-10 mils each for total DFT of 16-20 mils. 3. Finish coat: Water based vinyl acrylic mastic. Apply one coat with dry film thickness of 6-8 mils. Color of finish coat to be same as finish coat for exterior above traffic flange. E. Interior Surfaces Above and Below Water Line Valve 1. Material used for internal coating of hydrant interior ferrous surfaces below water line valve must meet the requirements of local or State standards. 2. Coating shall be liquid or powder epoxy system in accordance with AWWA Standard C-550. Coating may be applied in two or three coats, according to manufacturer's recommendations, for total dry film thickness of 12-18 mils. Revised June 2013 33 12 19-3

PART 3: EXECUTION 3.01 INSTALLATION A. Set fire hydrant plumb and brace at locations and grades as shown on Drawings. When barrel of hydrant passes through concrete slab, place 1-inchthick piece of standard sidewalk expansion joint material around section of barrel passing through concrete. B. Place 12-inch by 12-inch yellow indicators (plastic, sheet metal, plywood, or other material approved by AW Project Manager) on pumper nozzles of new or relocated fire hydrants installed on new water lines not in service. Remove indicators after new water line is tested and approved by Project Manager. C. Thrust blocks are required on all hydrant tees. If hydrant lateral is not restrained, contractor shall provide a thrust block behind hydrant shoe. Do not cover drain ports, bolts, or fittings when placing concrete thrust block. D. Obtain AW Project Manager's approval in writing prior to installation of hydrants which require changes in bury depth due to obstructions not shown on Drawings. Unit price adjustments will not be allowed for changes in water line flow line or fire hydrant barrel length caused by obstructions. E. Plug branch lines to valves and fire hydrants shown on Drawings to be removed. Deliver fire hydrants designated for salvage to AW at their base depot location. F. Coating Requirements: 1. Apply coatings in strict accordance with manufacturer's recommendations. No requirements of this specification shall cancel or supersede written directions and recommendations of specific manufacturer so as to jeopardize integrity of applied system. G. Furnish affidavit of compliance that coatings furnished complies with requirements of this Specification and referenced standards, as applicable. Per NFPA standards, provide a color code for the hydrant bonnet to indicate the hydrant s available flow at 20 psi according to the following table: Supply Water Line Flow Characteristics Less than 500 GPM Bonnet Color Red 500-999 GPM Orange 1000-1499 GPM Green 1500 GPM & Above Light Blue Revised June 2013 33 12 19-4

H. Remove and dispose of unsuitable materials and debris in accordance with local or State requirements. END OF SECTION 33 12 19 Revised June 2013 33 12 19-5