1 SECTION DISINFECTION OF PIPE AND WATER STORAGE FACILITIES PART 1 GENERAL 1.01 DESCRIPTION This section describes requirements for disinfection by chlorination of potable water mains, services, pipe appurtenances and connections REFERENCED STANDARDS The publications listed below form part of this specification to the extent referenced and are referred to in the text by the basic designation only. Reference shall be made to the latest edition of said standards unless otherwise called for: AWWA B301 AWWA C651 AWWA C652 Standard for Liquid Chlorine Disinfecting Water Main Tank Disinfection 1.03 RELATED WORK SPECIFIED ELSEWHERE Section Section Section Section Section Section AWWA Standard Methods for the Examination of Water and Waste Water Hydrostatic Testing of Pressure Pipe Ductile Iron Pipe and Fittings Copper Tube, Brass and Bronze Pipe Fittings PVC Pipe (C900) PVC Pipe (C905) CML&C Steel Pipe and Specials 1.04 SERVICE APPLICATION A. All water mains and appurtenances taken out of service for inspection, repairs, or other activity that might lead to contamination shall be disinfected before they are returned to service. B. All new water mains and temporary high lines shall be disinfected prior to connection to the District's existing system. C. All components incorporated into a connection to the District's existing system shall be disinfected prior to installation SUBMITTALS A. A written disinfection and dechlorination plan signed by a certified chlorinator shall be submitted to the District for review and approval prior to starting disinfection operations. JUNE
2 B. A Record of Disinfection shall be provided to the District water quality staff prior to sampling. The Record of Disinfection shall include the time of injection, time length of injection and log of disinfection. Disinfection must be completed by a licensed and certified company DELIVERY, STORAGE AND HANDLING Chlorination and dechlorination shall be performed by competent individuals knowledgeable and experienced in the operation of the necessary application and safety equipment in accordance with applicable Federal, State and Local laws and regulations. The transport, storage and handling of these materials shall be performed in accordance with Code of Federal Regulations (CFR), and the California Occupational and Health Administration (Cal-OSHA) - California Code of Regulations (CCR), Title DISINFECTION AND HYDROSTATIC TESTING The specified disinfection of the pipelines shall not be performed concurrently with the hydrostatic testing. Disinfection shall only be performed after lines have been flushed and have passed hydrostatic tests per Section CONNECTION TO EXISTING MAINS Prior to connection to existing mains, disinfection and bacteriological testing shall be performed in accordance with this specification, and hydrostatic testing shall be performed per Section District authorization for connection to the existing system shall be given only on the basis of acceptable hydrostatic, disinfection and bacteriological test results. PART 2 MATERIALS 2.01 SODIUM HYPOCHLORITE (LIQUID) Sodium hypochlorite is available in liquid form in glass or plastic containers, ranging in size from 1 qt. to 5 Gal. The solution contains approximately 10% to 15% available chlorine GRANULAR HYPOCHLORITE Granular hypochlorite may be used when mixed into a solution containing approximately 10% to 15% available chlorine. When using granular hypochlorite in solution, follow the procedure for sodium hypochlorite solution in this section PART 3 EXECUTION 3.01 GENERAL A. Disinfection of pipelines shall not proceed until all appurtenances and any necessary sample ports have been installed and the District Engineer provides authorization. B. Every effort shall be made to keep the water main and its appurtenances clean and dry during the installation process. C. All piping, valves, fittings, and appurtenances which become contaminated during installation shall be cleaned, rinsed with potable water, and then sprayed or swabbed with a 5% sodium hypochlorite disinfecting solution prior to installation. JUNE
3 D. Water mains under construction that become flooded by storm water, runoff, or ground water shall be cleaned by draining and flushing with metered potable water until clear water is evident. Upon completion, the entire main shall be disinfected using a method approved by the Engineer METHODS A. Sodium Hypochlorite Solution (Liquid) 1. Sodium hypochlorite solution shall be used for cleaning and swabbing piping and appurtenances immediately prior to installation and for disinfecting all components of connections to the District's existing system. 2. Sodium hypochlorite solution may be used for the initial disinfection of newly installed water mains. The solution shall be applied at a terminus of the system to be chlorinated using an injector which can adjust the amount of solution being injected into the piping system. The solution shall be injected at the appropriate concentration to achieve the specified concentration range of chlorine throughout the entire piping system. Where pumping equipment is used in conjunction with an injector, an integral backflow prevention device shall be installed and connected to the potable water supply. 3. Pumping equipment, piping, appurtenances and all other equipment in contact with potable water shall be disinfected prior to use. Water trucks shall not be used for disinfection of pipelines. 4. Sodium hypochlorite solution may also be used to increase the total chlorine residual if the concentration from the initial chlorination of the system is found to be low. The solution shall be added to the system in sufficient amounts at appropriate locations to ensure that the disinfecting solution is present at a concentration within the specified range throughout the piping system PROCEDURE FOR DISINFECTING WATER MAINS AND APPURTENANCES A. The pipeline shall be filled at a rate not to exceed 300 GPM or a velocity of 1 foot per second (156 GPM in an 8-inch pipe), whichever is less. B. Disinfection shall result in an initial total chlorine concentration of 50 ppm to 150 ppm. This concentration shall be evenly distributed throughout the system to be disinfected. C. All valves shall be operated with the disinfection solution present in the pipeline. All appurtenances such as air-vacuum relief valves, blowoffs, hydrants, backflow prevention devices, and water service laterals shall be flushed with the treated water for a sufficient length of time to ensure a chlorine concentration within the specified range in all components of each appurtenance. (Note the limitations for discharge of chlorinated water outlined below.) D. The Contractor will verify the presence of the disinfection solution throughout the system by sampling and testing for acceptable chlorine concentrations at the various appurtenances and/or at the test ports provided by the Contractor. Areas of the system found to be below the specified chlorine concentration level shall receive additional flushing as noted above and/or additional disinfection solution as necessary. (Note the limitations for discharge of JUNE
4 chlorinated water outlined below.) All testing will be done in the presence of the District Engineer. E. The chlorinated water shall be retained in the system for a minimum of 24 hours. The District Engineer will test the total chlorine residual. The system shall contain a total chlorine residual of not less than 80% of the initial total chlorine residual before the 24-hour soaking period began. If the total chlorine residual has decreased more than 20%, the system shall be soaked for an additional 24-hour period. If the total chlorine residual has not deceased after this additional 24-hour period, the system shall be flushed in accordance with the procedure detailed herein. If the total chlorine residual has decreased, the system shall be flushed in accordance with the procedure detailed herein, and shall be redisinfected. F. Following a successful retention period as determined by the District Engineer, the chlorinated water shall be flushed from the system at its extremities and at each appurtenance, using potable water from a source designated by the District Engineer. The minimum water velocity during flushing shall be 3 feet per second or as directed by the District Engineer. Flushing shall continue until the replacement water in the new system is equal in chlorine residual to the potable source of supply as verified by the District Engineer. (Note the limitations for discharge of chlorinated water outlined below.) G. The District will collect water samples and a California State certified drinking water laboratory will perform bacteriological testing, in accordance with paragraph 3.05 below, and provide a certificate of compliance to the District Engineer that the unit tested met the AWWA C651 requirements DISINFECTION OF WATER-STORAGE FACILITIES Disinfection of water storage facilities shall be done in accordance with AWWA C DISCHARGE OF CHLORINATED WATER A. Indiscriminate onsite disposal or discharge to sewer systems, storm drains, drainage courses or surface waters of chlorinated water is prohibited. B. The environment to which the chlorinated water is to be discharged shall be examined by the Developer, Certified Chlorinator, and the District Engineer. Where necessary, federal, state and local regulatory agencies shall be contacted to determine special provisions for the disposal of chlorinated water. Any discharge of chlorinated water to the environment shall require the neutralizing of the chlorine residual by means of a reducing agent in accordance with AWWA C651, San Diego Regional Water Quality Control Board (SDRWQCB), Standardized Best Management Practices for Portable Water Discharges in Region 9 and the requirements of this specification. C. A chlorine reducing agent shall be applied to the water prior to exiting the piping system. The Certified Chlorinator shall monitor the chlorine residual during the discharge operations. Total residual chlorine limits in these locations, and for the discharge of chlorinated water from the testing of pipelines to surface waters of the San Diego Region are as follows: Total Residual Chlorine Effluent Limitations Instantaneous Maximum ppm JUNE
5 The various methods of dechlorination available can remove residual chlorine to concentrations below standard analytical methods of detection, 0.02 ppm, which will assure compliance with the effluent limit. The Contractor will perform all necessary tests to ensure that the total residual chlorine effluent limitations listed above are met BACTERIOLOGICAL TESTING A. A testing firm will perform bacteriological sampling and testing of all new system installations. The testing methodology employed shall be in accordance with AWA 651. The Certified Labratory will analyze the samples for the presence of coliform bacteria and heterotrophic-type bacteria (heterotrophic plate count). B. The evaluation criteria employed by the District for a passing test sample is as follows: 1. Coliform bacteria: no positive sample 2. Heterotrophic plate count (HPC): 500 colony forming units/mi or less REDISINFECTION If the initial disinfection fails to produce satisfactory bacteriological test results, the pipeline system shall be re-flushed and re-sampled. If the second set of samples does not produce satisfactory results, the pipeline system shall be re-chlorinated, flushed, and re-sampled. The chlorination, flushing, and sampling procedure shall continue until satisfactory results are obtained. Redisinfection and retesting shall be at the Contractor's expense DISINFECTING TIE-INS AND CONNECTIONS Pipes, fittings, valves and all other components incorporated into connections with the District's existing system shall be spray disinfected or swabbed with a liquid chlorine solution in accordance with AWWA C651 and as specified herein. Upon connection to the main, the line shall be flushed as directed by the District Engineer. Disinfection by this method is generally limited to assemblies of 20-feet or less in length. Alternate methods such as "pre-disinfection" prior to installation in accordance with AWWA C651 may be required at the discretion of the District Engineer. END OF SECTION JUNE
STANDARD OPERATING PROCEDURES FOR ALL WATERMAIN DISTRIBUTION REPAIR & INSTALLATION
Page 1 of 14 O&P 1.1 October 2005 J. Boc No.:F11 15/06/10 J. Boc STANDARD OPERATING PROCEDURES FOR ALL WATERMAIN DISTRIBUTION REPAIR & INSTALLATION 1.0 Purpose The purpose of this procedure is to ensure
Water System Disinfection
Water System Disinfection Document Number Revision 1 Approved By Ric Morris All 6/2/04 Active Divisions/Departments FEMC Raytheon Polar Services Company HARD COPY NOT CONTROLLED-CONTROLLED COPY AVAILABLE
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains
SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General
SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL 1.01 Testing - General Testing shall be of the type and frequency described in each section and summarized in Item 1 of this section. In addition to
BULK WATER HAULING GUIDELINES
BULK WATER HAULING GUIDELINES Under The Public Health Act regulations, Bulk Water Haulers must obtain a permit to sell or convey water for sale for domestic purposes. For the purposes of this guideline,
Dechlorination of Potable and Superchlorinated Water
Dechlorination of Potable and Superchlorinated Water Department of Environmental Services November 17 and 19, 2014 Training Agenda Why we need to dechlorinate Modifications to Arlington s Standards and
Amendments to the 2012 International Plumbing Code
Amendments to the 2012 International Plumbing Code North Central Texas Council of Governments region The following sections, paragraphs, and sentences of the 2012 International Plumbing Code are hereby
Repair and Disinfection of Water Mains Water Protection Program fact sheet
Repair and Disinfection of Water Mains Water Protection Program fact sheet 9/2012 Every year waterborne disease outbreaks occur in the United States as a result of public water distribution system defi
Specifications For Rehabilitation Hudson #1A Hudson #2 Foster Island Well #41
Specifications For Rehabilitation Hudson #1A Hudson #2 Foster Island Well #41 ITEM #6 1) Scope of Work The scope of this proposal is: Hudson Street Well #1A and Hudson Street Well #2 - clean and rehabilitate,
SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL
SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos
Presented By: Fred J. Sánchez Water Quality Operations Supervisor
Presented By: Fred J. Sánchez Water Quality Operations Supervisor CDPHE Suspected Salmonella in Alamosa s Drinking Water Supply CDPHE & Denver Water Developed a Strategy: Water Distribution Operations
Section C-1 Pipes and Fittings
Section C-1 Pipes and Fittings C1.00 Work Included The work under this Division of the Specifications shall include all labor, materials, and equipment necessary to furnish and install all piping, pipelines,
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS Water system improvements proposed for inclusion into Western s service area shall be designed in accordance with all appropriate AWWA standards, include
ELECTRIC/DIESEL FIRE PUMP CHECK LIST
BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested
Design & Construction Standards, Revised January 2013 5.21.30-1
PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of The University of Texas at Austin for fire pumps. This document is not intended to serve as a guide specification.
CHAPTER 26 PLUMBING CODE
CHAPTER 26 PLUMBING CODE 26.01 PLUMBING CODE The Illinois Plumbing Code as promulgated by the Illinois Department of Public Health at 77 Illinois Administrative Code, Part 890, is hereby adopted as the
Water Quality Contingency Planning Standard EPB 540B
Water Quality Contingency Planning Standard EPB 540B November 15, 2012 Water Quality Contingency Planning Standard The Water Quality Contingency Plan Standard is provided to aid waterworks owners and operators
RECOMMENDED PROGRAM FOR WELL AND SEPTIC SYSTEM REAL ESTATE TRANSACTION INSPECTIONS
Contra Costa Environmental Health 2120 Diamond Blvd., Suite 200 Concord, CA 94520 Phone: (925) 692-2500 Fax: (925) 692-2504 www.cchealth.org/eh/ RECOMMENDED PROGRAM FOR WELL AND SEPTIC SYSTEM REAL ESTATE
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,
Chapter 5 Water, Plumbing, and Waste
Chapter 5 Water, Plumbing, and Waste Parts 5-1 WATER 5-2 PLUMBING SYSTEM 5-3 MOBILE WATER TANK AND MOBILE FOOD ESTABLISHMENT WATER TANK 5-4 SEWAGE, OTHER LIQUID WASTE, AND RAINWATER 5-5 REFUSE, RECYCLABLES,
SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
RULES OF THE DEPARTMENT OF PUBLIC HEALTH CHAPTER 511-3-6 PORTABLE SANITATION CONTRACTORS
RULES OF THE DEPARTMENT OF PUBLIC HEALTH CHAPTER 511-3-6 PORTABLE SANITATION CONTRACTORS TABLE OF CONTENTS 511-3-6-.01 Applicability 511-3-6-.02 Definitions 511-3-6-.03 General Provisions 511-3-6-.04 Construction
SECTION 33 12 19 FIRE HYDRANTS
SECTION 33 12 19 FIRE HYDRANTS PART 1: GENERAL 1.01 SCOPE A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 - Submittals.
1. Site plans assist the Fire Department to determine where a potential spill can be contained. The detailed site plan shall include the following:
Secondary Containment, Spill Control and Drainage Guidelines for Hazardous Materials per 2010 CFC PURPOSE The intent of this guideline is to provide the requirements for the design and construction of
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS a. New Plumbing and Gas Piping Systems. This code in conjunction with the Plumbing and Fuel Gas Codes of the State of New York shall apply to plumbing
WESTFIELD WATER RESOURCES DEPARTMENT
WESTFIELD WATER RESOURCES DEPARTMENT DRINKING WATER DIVISION CROSS CONNECTION CONTROL RULES AND REGULATIONS POLICY NO. CS-009 Effective January 1, 1999 Revised March 14, 2007 I. Purpose: A. To protect
What To Do When Your Well is Flooded. Common Sense Steps To Take If Your Well Is Covered by Flood Water
What To Do When Your Well is Flooded Common Sense Steps To Take If Your Well Is Covered by Flood Water Courtesy of CleanWaterStore.com 2016 Contents 1. What To Do If Your Well Is Covered by Flood Water...
BLADDER SURGE CONTROL SYSTEM
PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
The Plumbing Pipeline
The Plumbing Pipeline A Newsletter for licensed Plumbers and Drainlayers November 2015, Issue 28 Please copy this bulletin and distribute to your staff. The Plumbing Pipeline is a semi-annual information
812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE EMERGENCY (TEMPORARY) TREATED WATER SUPPLIES
EMERGENCY (TEMPORARY) TREATED WATER SUPPLIES Document Title: Document Reference: Work Procedure - Emergency (Temporary) Treated Water Supplies Date: October 2013 Approved By: Public Health Team Title:
Close-Out Documents... 9
Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter
NFPA 25 FAQs. 1. When inspecting an old system (60 years or older), when/where does NFPA 25 require a system to be upgraded to present standards?
NFPA 25 FAQs Responses to FAQs are prepared by NFPA technical staff to assist users in reading and understanding NFPA codes and standards. The responses, however, are not Formal Interpretations issued
505.3.6 For a building with a crawl space, see Figure 10. 505-1
505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the
IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1
IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1 CHAPTER 44 ON-SITE CONTAINMENT OF PESTICIDES, FERTILIZERS AND SOIL CONDITIONERS [Prior to 7/27/88, see 21 Ch 9] PESTICIDES 21 44.1(206) Definitions.
SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS
SECTION 15056 PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. A written request to use Ductile
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
SECTION 10 WATER WELL SUPPLY 10.01 SCOPE OF WORK
10.01 SCOPE OF WORK The work covered by this section of the specifications consists in furnishing all labor, equipment and material necessary to perform the installation of a Type I water supply well per
Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
December 2003 EPB 241B. Some sections are completed, some are partially complete and some are left blank.
Note: As of October 1, 2012 The Water Security Agency and Saskatchewan Ministry of Environment share responsibility and authority for the administration of The Environmental Management and Protection Act,
(a) Purpose. The purpose is to safeguard potable water supplies by preventing backflow into public water systems.
12.33 - CROSS-CONNECTION CONTROL. (a) Purpose. The purpose is to safeguard potable water supplies by preventing backflow into public water systems. (b) Definitions. The following definitions shall apply
SECTION 810 SEWER LINE CLEANING
SECTION 810 SEWER LINE CLEANING I. GENERAL 1.1 DESCRIPTION OF WORK The work covered by this section consists of providing all labor, equipment, material and supplies and performing all operations required
AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month
, as published in July 2008 Opflow Question of the Month Thanks to: Mike Grahek, Los Angeles Department of Water, Los Angeles, California Ahmad Havivian, Black & Veatch, Gaithersburg, Maryland David Kroon,
ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.
ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of
A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.
SECTION 224500 - EMERGENCY PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
ENVIRONMENTAL HEALTH FACT SHEET NO. 500
ENVIRONMENTAL HEALTH FACT SHEET NO. 500 DECOMMISSIONING OR REUSE OF ON-SITE WASTEWATER SYSTEMS This provides information regarding the destruction, removal or reuse of septic tanks, collection wells, aerated
MC4-50 Feeding System
MC4-50 Feeding System Dry Calcium Hypochlorite For Municipal Applications The smarter way to water quality PATENTED SPRAY TECHNOLOGY DELIVERS UNPARALLELED CONSISTENT RESULTS The Constant Chlor Plus MC4-50
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
SECTION 221413 FACILITY STORM DRAINAGE PIPING
SECTION 221413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872
Treatment options for hydrogen sulfide. Testing for hydrogen sulfide
Sometimes hot water will have a sour smell, similar to that of an old damp rag. This smell often develops when the thermostat has been lowered to save energy or reduce the potential for scalding. Odor-causing
D. Open hydronic systems, including [condenser] [fluid-cooler spray] water, shall have the following water qualities:
SECTION 232500 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following HVAC water-treatment systems: 1. Open Loop Chemical Treatment Systems. 2. Closed Loop Chemical Treatment Systems. 3.
The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
SILICON VALLEY CLEAN WATER. May 2015
SILICON VALLEY CLEAN WATER May 2015 Slug Discharge Control and Spill Containment Guidelines This document was revised and used with the permission of the Los Angeles County Sanitation District, Industrial
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent
San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
Revised April (May) 2015
Section 19.0 Cross Connection Control Policy 19.1 Responsibility 19.1.1 The Elkhart Water Utility has the responsibility to supply safe, potable water from the source to the point of delivery defined as
THE CORPORATION OF THE CITY OF COURTENAY BYLAW NO. 2182. A bylaw to amend Storm Sewer Bylaw No. 1402, 1986
THE CORPORATION OF THE CITY OF COURTENAY BYLAW NO. 2182 A bylaw to amend Storm Sewer Bylaw No. 1402, 1986 The Council of the Corporation of the City of Courtenay in open meeting assembled enacts as follows:
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in
PRIVATE WELL SEPARATION
PRIVATE WELL SEPARATION This is an explanation to explain what you have to do with your well, and/or the other sources of water that you may have, in order to receive public water. The term well includes
Guidance on applying for approval of installation of a commercial onsite wastewater system
Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the
Outdoor Storage of Raw Materials SC-33
Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.
ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES
ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES WHEREAS, Wheaton Sanitary District had a cost reimbursement
SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS
SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work
Emergency/Disaster Response Plan
This EXAMPLE is for a small water system and represents the minimum information required. The information required for your plan will be based on the complexity of your water system. Emergency/Disaster
Dominic i Barbato Dpt. Of Building and Safety (818) 374 4361 [email protected]
Dominic i Barbato Dpt. Of Building and Safety (818) 374 4361 [email protected] b 2011 Los Angeles Plumbing Code LAPC changes from 2008 2011 Los Angeles Plumbing Code Consists of the following:
CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS
CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS 62-624.100 Policy and Purpose. 62-624.200 Definitions. 62-624.300 General Provisions. 62-624.310 General Conditions, Individual Permits. 62-624.400
PNWS-AWWA PRESENTATION May 9, 2013 Spokane, Washington. Water Operations Stormwater Best Management Practices
PNWS-AWWA PRESENTATION May 9, 2013 Spokane, Washington Water Operations Stormwater Best Management Practices Presenters David Owens- Senior Water Pipe Worker; Certified Erosion and Sediment Control Lead
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 19 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES
PLUMBING ROUGH IN INSPECTION
This Program is made Possible through the Code Officials Education & Training Fund. Revenue for the Fund comes from Assessments on Building Permits. Please turn down cell phones and put pagers on vibrate.
City of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
Florida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
AN ORDINANCE BY FINANCE EXECUTIVE COMMITTEE
AN ORDINANCE BY FINANCE EXECUTIVE COMMITTEE AN ORDINANCE TO AMEND CHAPTER I. ENTITLED ADMINISTRATION OF APPENDIX C ENTITLED PLUMBING CODE AMENDMENTS TO ADOPT SECTION 1300 ENTITLED REQUIREMENTS FOR RAINWATER
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
Reference Guide for Obtaining Permits and Utility Services For New Construction
Reference Guide for Obtaining Permits and Utility Services For New Construction (Revised 04-2012) Table of Contents City Offices Telephone Numbers...1 Application for Utilities...2 Building Permits New
The Jockey Pump, an Important Part of a Fire Pump System.
The Jockey Pump, an Important Part of a Fire Pump System. May 18, 2008 A Jockey Pump is an important component of a fire pump system. The Jockey Pump is not as mundane, as many engineers, contractors and
UTILITIES DEPARTMENT
UTILITIES DEPARTMENT Dear Business Owner, As a Business owner or manager you know how important it is to provide a safe and reliable service or product. Similarly, the City of Brighton Utilities Department
Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents
Chapter 1 Administration Chapter 3 General Regulations Chapter 5 Water Heaters Chapter 7 Sanitary Drainage Chapter 9 Vents Chapter 11 Storm Drainage Policy Statements Table of Contents Chapter 2 Definitions
CHAPTER 11 STORM DRAINAGE
CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
SECTION 15410 GROUND WATER STORAGE TANKS
SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design
Assessment Blueprint PHCC Educational Foundation Plumbing Year 2
Assessment Blueprint PHCC Educational Foundation Plumbing Year 2 Post-Test Code: 7662 Copyright 2008. All Rights Reserved. General Assessment Information PHCC Educational Foundation Plumbing Year 2 General
E-Version SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL PART 2 - PRODUCT
SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL 1.1. SCOPE OF WORK A. Under this item the Contractor shall furnish and install a sodium hypochlorite solution metering system complete with all accessories
Design Criteria & Service Goals
4.1 Design Life of Improvements The design life of a water system component is sometimes referred to as its useful life or service life. The selection of a design life is a matter of judgment based on
DRAFT July, 2006 Page 1 of 18
DRAFT July, 2006 Page 1 of 18 Swimming Pool Venue Environmental Health Outbreak Investigation Survey: An Environmental Health Systems Approach to Recreational Water Illness Prevention - Information Collection
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
SECTION 7 UNDERDRAIN SERVICE
SECTION 7 UNDERDRAIN SERVICE ARTICLE I USE OF THE PUBLIC UNDERDRAIN SYSTEM 7.100 The purpose of the District s underdrain system is to provide a method for conveying ground water from around building foundations
EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding
A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS
GEORGIA DEPARTMENT OF HUMAN RESOURCES ENVIRONMENTAL HEALTH SECTION A HOMEOWNERS GUIDE TO ON-SITE SEWAGE MANAGEMENT SYSTEMS March 12, 2002 WHAT IS AN ON-SITE SEWAGE MANAGEMENT SYSTEM An on-site sewage management
SUMP PUMP. Sump Pump Backup Systems. City of Ann Arbor B A C K U P O P T I O N S. Does everyone need a backup system?
Sump Pump Backup Systems A backup sump pump is a system used to protect your basement from flooding when the main sump pump isn't operating. There are several types of backup systems including battery
The Plumbing Pipeline
The Plumbing Pipeline A Newsletter for licensed Plumbers and Drainlayers May 2016, Issue 29 Please copy this bulletin and distribute to your staff. The Plumbing Pipeline is a semi-annual information newsletter