To the suppliers of Eckerle Gruppe. Supplier Self-Assessment. Dear Sir or Madam,



Similar documents
Supplier quality guideline. VOSS Automotive Group Issue Rev00

Supplier Quality Assurance Requirements Manual

Supplier Guide. Suppliers for production material or services may be qualified for the list in one or more of the following ways:

Agreement on Quality, Occupational Health and Safety, Environmental Protection and Social Responsibility (Quality Assurance Agreement)

KEBA 2014 We reserve the right to make technical modifications. No liability accepted for information provided. All rights reserved.

Quality Assurance Agreement (QAA)

LENNOX INTERNATIONAL INC. (Exact name of registrant as specified in its charter)

Supplier Quality Requirements and Clauses

Product Liability Risk Control Checklist

How To Comply With The Supplier Ethics And Compliance Policy Of Xilinx

Self-Assessment Questionnaire on CSR/ Sustainability for Automotive Sector Suppliers

Logistics Agreement. between. SMA Solar Technology AG Sonnenallee Niestetal Germany. hereinafter referred to as SMA. and.

Supplier Manual. for Hutchinson GmbH, Mannheim

General Terms and Conditions of Purchase

GE Power Electronics Business Total Quality Management for Suppliers

ISRINGHAUSEN GmbH & Co. KG ISRINGHAUSEN-Ring Lemgo Germany Local Court (Amtsgericht) Lemgo, 6 HRA 1276

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM SD SPECIALIZED DISCLOSURE REPORT

HNI Corporation (Exact Name of Registrant as Specified in Charter)

Dear Contractor: If you have any questions about the Program or your Application, please feel free to call our office at

SQM-H. This Handbook is a summary of the processes and documents of the supplier quality management 1/13

Food Safety and Quality Management System

THE FOLLOWING ARE INSTRUCTIONS FROM THE FRONT SIDE OF SEAGATE PURCHASE ORDERS:

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

Century Fasteners & Machine Co., INC. /CFMC PURCHASE ORDER

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Motorola Taps Product Compliance Capability for Conflict Minerals By : Jim Brown President Tech-Clarity

HELLA Quality. Guidelines for Suppliers (HP-C-509)

Sustainable procurement of mobile phone service contract

Fire? Loss of Profits? 3. What company covers the machinery to be insured under a Machinery Breakdown Policy?

Warranty Agreement. the following agreement is concluded relating to the reimbursement of warranty costs:

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

GENERAL TERMS AND CONDITIONS OF PURCHASE

Code of Conduct. Version 3, November 2009 BSCI /09

THE FOLLOWING ARE INSTRUCTIONS FROM THE FRONT SIDE OF SEAGATE PURCHASE ORDERS:

Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8)

QBE PRODUCT LIABILITY PROPOSAL FORM

The supplier evaluation will in future be sent out every six months.

Industry launches first integrated Conflict Minerals and RoHS, REACH web database for suppliers

THE DOW CHEMICAL COMPANY (Exact name of registrant as specified in its charter)

Quality Assurance Agreement (QAA)

Quality Management Requirements for Suppliers

Anti-Counterfeit Policy Mouser has adopted this Anti-Counterfeit Policy to eliminate the impact of counterfeit products on Mouser and its customers.

Comparison between FDA QSR and ISO 13485

ORIX KABUSHIKI KAISHA (Exact Name of Registrant as Specified in Its Charter)

ZETA. Business Software Defined INVENTORY & ORDER MANAGEMENT

Quality Assurance Agreement with Production Material Suppliers. History of revisions

VDA Structure Component Requirement Specification. Module I CRS Universal Requirements. <Title> <Number> Version 1.0

Welcome! Frank Teleso. Quality Manager

Direct Alloys LLC. An Online Premium Metals Clearinghouse 901 Broad Street Utica, NY Fax

BRC Food Safety and Quality Management System. New Issue 7

Management System Procedure N 4/01/ of 14

Hella KGaA Hueck & Co. Concept for returnable load carrier in IAM. Status:

Supplier Quality Requirements Document (SQRD)

Real-time Visibility for SAP in Supply Chain & Logistics:

Quality Assurance Agreement

VERIZON SUPPLIER CODE OF CONDUCT

TERMS AND CONDITIONS OF PURCHASING Europe Version as of July 2009

General Terms and Conditions of Irlbacher Blickpunkt Glas GmbH

File:Quality-Management Manual-V2

HP SUPPLIER ENVIRONMENTAL PERFORMANCE REVIEW QUESTIONNAIRE

UNHCR VENDOR REGISTRATION FORM (Rev. Apr 09)

PERFORMANCE EXCELLENCE Procurement Standards

IMPROVING QUALITY WITH IFS QUALITY MANAGEMENT IFS CUSTOMER SUMMIT 2011, CHICAGO

Terms and Conditions of Purchase

Supplier Training - Module 4: Strong management systems

ENTERPRISE MANAGEMENT AND SUPPORT IN THE AUTOMOTIVE INDUSTRY

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

Fact Sheet. Sustainable Textile Production (STeP)

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

Supplier Quality Manual

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Contaminated Products Insurance Application Form

Comparison ISO/TS (1999) to VDA 6.1 (1998)

Combined General Liability Insurance

Supplier Quality Agreements

Supply Chain Management

consulting group Increase Competitiveness Reduce Costs

Supplier Quality Assurance Requirements Manual

Ege Fren Ege Fren San. ve Tic. A.Ş.

Measuring instruments in industry.

GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page

Note Logistics documents at MAN Truck & Bus AG (MTB) 1. Overview of Logistics documents Logistics Key Data Sheet... 3

ALLIED PRINTING SERVICES, INC. CORPORATE SUSTAINABILITY AND ENVIRONMENTAL MANAGEMENT PROGRAM REPORT

A120/A120A. Environmental Product Declaration According to ISO GIGASET. INSPIRING CONVERSATION.

HP Supply Chain Responsibility EICC code HP SER/EICC Audits

Quality Assurance Agreement with Production Material Suppliers. History of revisions

Human Resources PolicyPro - Quebec Edition

KOSTAL TERMS AND CONDITIONS OF PURCHASE

Quality Manual. DuraTech Industries, Inc Commerce Street La Crosse, WI MANUAL SERIAL NUMBER 1

CORPORATE QUALITY MANUAL

JST Specification QUALITY GUIDELINES RECEIPT CONFIRMATION

Maximum Customer Satisfaction

Supply Chain. Environment Safety Quality Human Resources Philanthropy Supply Chain

AS9100 Quality Manual

The EICC is committed to obtaining regular input from stakeholders in the continued development and implementation of the Code of Conduct.

Quality Management System Manual ISO9001:2008

Brady Corporation. Global Standards. (Adopted from EICC Code of Conduct)

It s all about managing food. Food Recall Plan Template For Food Manufacturers

General Terms of Purchase. of HAN University of Applied Sciences

Transcription:

Eckerle Holding GmbH Industriestraße 15 77833 Ottersweier To the suppliers of Eckerle Gruppe Supplier Self-Assessment Dear Sir or Madam, with our integrated management system, we commit to also working towards further development of our suppliers. The basis for the evaluation of our suppliers is the documented quality-capacity as a supplier and the enclosed self-assessment on the subjects of quality, environment and work protection. We want to engage in a trusting customer-supplier partnership with your company or continue it. Therefore, we ask you to complete the following "supplier self-assessment" questionnaire, enclose any applicable certificates and return them to the address indicated on the questionnaire. This request replaces the previous ones. We will only use the information provided by you according to the statutory specifications. If you need any further information on the questions, contact our purchasing department: einkauf.sqm@de.eckerle-gruppe.com Phone: +(49)7223.9843.0 Thank you for your support! With kind regards, Eckerle Holding GmbH signed: Christoph Herrmann Head of purchasing and logistics 1 / 15

Supplier Self-Assessment General notes Purpose The information from this questionnaire serves to evaluate and release the supplier. Data privacy We are happy about your interest in a trusting business cooperation. The personal data submitted by you will only be saved and processed by us in the scope of cooperation. Eckerle-Gruppe represents that your information will be treated confidentially according to the applicable data-privacy-law provisions. Which documents do we need from you? For smooth processing, we need the following documents from you in addition to supplier self-assessment: Certificates/proof if they are asked for in the following questionnaire Conflict Minerals Reporting Template (CMRT) or declaration for your customers if your products contain conflict materials Other documents if they are asked for in the following questionnaire Quality assurance agreements (QAA) The QAAs entered into with us shall not be affected by this supplier self-assessment. Return information Please send the completed supplier self-assessment and attachments to: Email: einkauf.sqm@de.eckerle-gruppe.com Fax: +(49)7223.9843.134 Mail: Eckerle Holding GmbH Purchasing Industriestraße 15 77833 Ottersweier Completion notes Conflict materials If you want to use the Conflict Minerals Reporting Template (CMRT) of CFSI, you can download the current version from www.conflictfreesourcing.org. You will find more information there on the subject. 2 / 15

1 COMPANY DATA 1.1 General Company Data 1.1.1 Basic Data Company name / legal form Group of companies Year of founding Company situation / owner Address (corporate seat) Street Postal code / town Country Contact Phone Fax Email Bank statement IBAN BIC / SWIFT Code Bank Tax ID VAT ID D-U-N-S Negotiation language Sales Development Quality Logistics German English Other 1.1.2 Data Exchange / Communication EDI WebEDI CAD format Other 3 / 15

1.1.3 Contacts / Employees Management HR management Quality management Environmental management REACH Work safety Purchasing Distribution / Sales Development / Construction Production Logistics Total number of employees 4 / 15

1.2 Finance Data 1.2.1 General In-house currency Corporate turnover (past 3 years and plan for current BY) Year 01 Year 02 Year 03 Plan curr. year Investment volume (past 3 years and plan for current BY) Year 01 Year 02 Year 03 Plan curr. year 1.2.2 Insurances Please enclose a copy (copies) of the insurance policy (policies) Product/producer liability (including operating liability insurance) Do you have product/liability insurance, including extended product and liability insurance? If so, coverage totally present for: Damage type Coverage total in / year Deductible per claim Injury Property damage Asset damage Recall campaigns Is the US risk included in the insurance? What are the maximum warranty periods that you may agree on with customers? (Indicate in months) 1.2.3 Competitors Please indicate your competitors (max. 4): Market share Market share Competitor 1 Competitor 2 Market share Competitor 3 Competitor 4 Market share 5 / 15

2 PRODUCTION AND DELIVERY RANGE 2.1 Main Purchasers / Customers List of main customers (A-customers) Please name your A-customers that generate 80% of your total turnover: Turnover share Industry Turnover share Industry Main customer 1 Main customer 2 Turnover share Industry Main customer 3 Main customer 4 Turnover share Industry 2.2 Product Range / Groups (only core competence) 2.2.1 Services 2.2.2 Main Products / Product Groups Designation Production site(s) Standard conformities Designation Production site(s) Standard conformities Product 1 Product 2 Designation Production site(s) Standard conformities Product 3 Product 4 Designation Production site(s) Standard conformities What products of your range do you think are particularly competitive? 6 / 15

2.3 Development / Production / Manufacture Development / construction Number of developers/constructors Is all development work performed in-house? Do you have your own prototype construction? Do you have your own tool/model construction? Production procedures Single Small series Series Mass Lot sizes Lot sizes Lot sizes Lot sizes What machines do you have? What work processes are awarded to external offices? Information on your production capacities (e.g. machinery) Software What ERP systems are used? What construction software is used? 2.4 Spare Parts Supply How long after the expiration of a serial article will complete spare parts supply be ensured? 7 / 15

3 STANDARD CONDITIONS FOR THE CUSTOMER-SUPPLIER RELA- TIONSHIP Delivery conditions Freight & packaging conditions Payment conditions Guarantee agreements 4 LOGISTICS Barcode / QR label Type Delivery systems What delivery systems do you support? KANBAN Call orders Consignment warehouse JIT Supply procurement VMI concept Other Safety / buffer storage Is there a safety/buffer storage for already-present customers? Infrastructure shipping / storage Own processing of transport storage Third-party processing of transport storage Type of storage High-bay storage Block storage Other Ramp present? Packaging Disposable packaging Recyclable packaging What standard load carriers are used? Compliance with the country-specific provisions for wood packaging (ISPM15 standard)? Are you always able to ensure compliance with the CLP-regulation (Classification, Labelling and Packaging)? 8 / 15

5 SUPPLIER AND RISK MANAGEMENT 5.1 Suppliers Origin of the suppliers Where are your suppliers from? Country/region Share of suppliers Share in the purchased volume How many active suppliers for production material do you have (basis: current year)? With how many suppliers do you cover 80% of your purchasing volume? Which share of your purchasing volume do you cover with your TOP 10 suppliers? 5.2 Risk Management Instruments of supplier management Supplier audit Collection of financial information Supplier evaluation Other What instruments of risk management do you use additionally? Which price securing instruments do you use (e.g. currency securing, raw materials hedging)? For which materials? Please explain your procedure briefly. Are you willing to work on shared improvement projects (poss. also with your suppliers)? Comment 9 / 15

6 QUALITY MANAGEMENT / QM-SYSTEMS (These questions should be answered by a quality officer) 6.1 Certification What certifications does your quality management system have? (Please enclose the certificate) If you are not certified, please answer the questions in section 6.4 Certified purs. to Certification company Valid unit 6.2 Auditing by Customer Have you already been audited by your customers? If so, please indicate the type of audit (system, process or product audit) that are no more than two years back Date of audit Type of audit Customer % achieved Classification 6.3 Quality Assurance Type of internal inspections Incoming goods inspection Interim inspection Final inspection Traceability Quality parameters Internal ppm-rate Internal scrapping rate Actual values Product share without rework External ppm-rate Number of complaints Delivery compliance / deadline compliance Internal ppm-rate Internal scrapping rate Quality targets Product share without rework External ppm-rate Number of complaints Delivery compliance / deadline compliance 10 / 15

6.4 Questions If No Certification Please only answer these questions if you indicated no certifications in section 6.1. 1. Do you have a quality management system? If so, do you have a certification planned? If so: when? Certification purs. to 2. Is the QM-system described in a manual and is it ensured that your documentation is subject to a traceable change management? 3. Is there a written chance procedure? 4. Is the QM system regularly reviewed by internal system audits? 5. Are internal targets for ppm, answer times for 8D reports specified continually? 6. Are quality requirements of the customer known at all offices involved? (specifications, deadlines, quantities, quality agreements) 7. Is the training demand systematically determined and are the corresponding training plans derived? 8. Is an incoming goods inspection performed according to specified inspection plans according to the ZERO ERROR principle? 9. Are test results documented and evaluated? 10. Is it ensured that the valid documentation is used at all times in production? 11. Are initial samples taken for series release before use in serial production? 12. Are process acceptances performed in-house or at your supplier's site? 13. Are inspections according to specified indications performed during production? 14. Are series-supporting tests performed (e.g. service life, function, material)? 15. Are final inspections performed according to inspection plans according to the ZERO ERROR principle? 16. Are statistical methods used for production and inspection processes? 17. Are risk analyses such as FMEAs or fault tree analyses performed? 18. Are test results documented, evaluated and, if required, measures derived? 19. Are defective parts marked and stored separately? 20. Is rework performed, inspected and documented separately? 21. Are written work instructions generated and used? 22. Are complaints processed systematically? 23. Are fault causes examined and removed? (in production, customer complaints) 24. Is traceability of finished parts ensured? 25. Is there any test equipment monitoring? 26. Is test equipment regularly calibrated? 11 / 15

7 ENVIRONMENTAL PROTECTION MANAGEMENT (These questions should be answered by an environmental protection officer, if present) 7.1 Certification What certifications does your environmental protection energy management system have? (Please enclose certificate) If you are not certified, please answer the questions in section 7.4 Certified purs. to Certification company Valid unit 7.2 ACCESS IMDS DATABASE Do you have access to the IMDS database? If so, state ID. If not, are you willing to register? 7.3 REACH / ROHS Applies to all products delivered to us that may be substances or products purs. to the REACH definition 1. Are you familiar with REACH / RoHS / PAK / CLP and the connected obligations? 2. Can you ensure that these requirements are fully complied with by your products? 3. Do you have a REACH declaration of conformity in your company for your customers? (Please enclose if present) 3. Can you ensure that we receive all relevant safety data sheets (SDS) without prompting? 4. Do you therefore see any delivery problems for the products you deliver to us from the REACH regulation in future? If so: which ones? 12 / 15

7.4 QUESTIONS IF NO CERTIFICATION 7.4.1 Environmental Management System Please only answer these questions if you have not introduced the certification. 1. Do you have an environmental management system? If so, do you have a certification planned? If so: when? Certification purs. to 2. Have you documented objectives to improve the environmental protection in your company? 3. Is achievement of the objectives systematically monitored and do you document compliance? 4. Is the training demand on the subject of environmental protection systematically determined and are the corresponding training plans derived or the employees regularly informed? 5. Can you always ensure that legal provisions are complied with? 6. Are regular production processes, supply and disposal processes examined for their environmental effects? 7. Are environmental aspects a fixed part of your product and service design? 8. Do you work towards improvements of environmental protection in your suppliers and contracting partners? 9. Do you have any systems and facilities in use that require approvals or permits? 10. Have there been any operating faults in the last 5 years where harmful substances (emissions have been released into the air, sewers, surface waters or the soil? 7.4.2 Energy Management System Please only answer these questions if you have not introduced the certification. 1. Do you have an energy management system? If so, do you have a certification planned? If so: when? Certification purs. to 2. Have you documented objectives to improve the energy efficiency in your company? 3. Is achievement of the objectives systematically monitored and do you document compliance? 4. Is the training demand on the subject of energy management systematically determined and are the corresponding training plans derived or the employees regularly informed? 5. Can you always ensure that legal provisions are complied with? 6. Are energy management aspects a fixed part of your product and service design? 7. Are energy efficiency measures being audited already in your company? 8. Do you work towards improvements of energy efficiency in your suppliers and contracting partners? 13 / 15

8 WORK PROTECTION MANAGEMENT 8.1 Certification What certifications does your work protection management system have? (Please enclose certificate) If you are not certified, please answer the questions in section 8.2 Certified purs. to Certification company Valid unit 8.2 Questions If No Certification Please only answer these questions if you have not introduced the certification. 1. Do you have an work protection management system? If so, do you have a certification planned? If so: when? Certification purs. to 2. Have you documented objectives to improve the work protection in your company? 3. Is achievement of the objectives systematically monitored and do you document compliance? 4. Is the training demand on the subject of work protection management systematically determined and are the corresponding training plans derived or the employees regularly informed? 5. Can you always ensure that legal provisions are complied with? 6. Are regular production processes, supply and disposal processes examined for their work protection effects? 7. Are work protection aspects a fixed part of your product and service design? 8. Do you work towards improvements of work protection in your suppliers and contracting partners? 9 CONFLICT MATERIALS 1. Do your products contain any conflict metals (e.g. tin, tantalum, tungsten and gold)? Questions 2 to 6 only need to be answered if question 1 was answered "yes". 2. Are you willing to complete the Conflict Minerals Reporting Template (CMRT) 1 and send it to us? 1 On this, see the completion aid at the beginning of this self-assessment. If question 2 was answered "no", please answer questions 3 to 6. 3. Do you have a declaration for your customers (if so, please enclose it)? 4. Do you have processes implemented in your management system that ensure traceable review according to the best knowledge or in good faith of conflict materials in the scope of the Dodd-Frank Act, Sec. 1502? 5. Are you able to ensure traceability of the origin of conflict materials across the supply chain using suitable certificates/accompanying documents (e.g. Smelter ID/CID number, proof of origin)? 6. Do you work towards traceability of conflict materials in your suppliers and contracting partners? 14 / 15

10 CORPORATE SOCIAL RESPONSIBILITY / COMPLIANCE 1. Do you have a compliance system? 2. Do you have a Code of Conduct (CoC)? If so, please enclose. 3. Is there a CoC for suppliers/business partners? If so, please enclose. 4. Do you work towards compliance with statutory specifications and promotion of a fair competition with your suppliers and contracting partners? 5. Prohibition of child labour Are you familiar with the ILO convention 138 and do you comply with it? 6. Minimum wages Do you ensure appropriate compensation and do you warrant the statutory national minimum wages? 7. Are you able to ensure compliance with national and international anti-corruption and antibribery laws at all times? 8. Do you ensure the principles of the "Global Compact" of the United Nations, the general declaration of the human rights of the UNO and the declaration of the International Labor Organization about basic principles and rights when working in compliance with national laws and habits in your company? 11 CONFIRMATION OF ACCURACY This document has been completed by Department / position Confirmation of the accuracy of all of the above information I confirm the accuracy of the information provided. We also commit to sending the repeat certificates to Eckerle group unpromoted after the expiration of certificates. Place, date Signature / company stamp 15 / 15