SUMMARY OF WORK FOR GENERAL CONTRACTOR



Similar documents
Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Schedule of Maintenance Fees

IMPROVEMENT COST ESTIMATE powered by HomeFixers

Code Enforcement Inspection Manual. City of Virginia Beach Department of Housing and Neighborhood Preservation Code Enforcement Division

REQUEST FOR PROPOSALS. Unit Make Ready Services for Public Housing for HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Final Walk-Through Checklist

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

Damage Charge Lists. FLOORING Replace Repair Carpet per square foot (Mohwak heat carpet tile)

Does Wall Township require an inspection by the building department on resale of a home?

Minimum Housing and Health Standards

Quality Home Inspections, LLC 4433 Tennyson Street Denver, Colorado

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

Stanley Neighborhood Series

Estimator: Miami Estimates Business: (305) Date Entered: 04/30/2008

Drain Replacement Project Overview

8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE:

Georgia Home Inspection Services

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

Building Condition Assessment Report

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

2015 Beaver Run Refurbishment Department Flip Packet for Homeowners

Page 1 of 5. Exterior Finish. 1.) 8 textured lap siding. Roofing. 1.) 30-year dimensional shingles over a layer of 30# felt. Color is Weathered Wood.

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Your Basement Remodeling Specialist LLC

TENANT MOVE-OUT GUIDELINES

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

Applications for building permits will not be reviewed until all of the required information has been submitted.

How To Insure Against Problems With Your Home Warranty

Borges Construction Company A limited liability Corporation Page1 of 1

Inspecton Report. Property Address:

TIPS TO PREPARE FOR MOVING OUT OF YOUR UNIT Cleaning Tips and Price List

New Home Walk-Through Package

Estimating Database Checklist

Holz Choices & Specifications

Replacement Costs and Cleaning & Service Charges for Northwood

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Vari Inspection Services

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

LEASE AGREEMENT. Screening Services When a handshake isn t enough. Made this day of year by and between: Landlord:

Latigos Trail 911 Latigos Trail ~ Des Peres, Missouri $428,500

GENERAL WIRING RULES FOR HOUSES

RRIO Checklist. Use of checklist: Definitions: Limitations

S t e p h e n A l e x a n d e r

2015 Maintenance Tenant Charge Schedule

Self-Home Inspection Checklist

ADDENDUM # 1 To: RFP for: Various Construction Maintenance & Repair Services

HOUSING QUALITY STANDARDS (HQS)

Spring Valley Trails Quick Move In & Inventory Towns Colours have been selected for some of these unit. See Agent for details.

HOMEOWNER S PERMIT GUIDE

Beautiful kitchens and bathrooms to meet your budget! KITCHEN REMODELING BATHROOM REMODELING COUNTERTOPS AND MORE!

Orlando Home Inspection Services

healthy homes assessment

WILLIAM LYON HOMES - ARIZONA 3-YEAR WARRANTY & SERVICE PROGRAM

Building Condition Assessment Report

*PLEASE RETURN THIS FORM TO THE RENTAL OFFICE*

MANUFACTURER WARRANTY LIST

INVENTORY AND CONDITION FORM CONCERNING THE PROPERTY AT

A.C.E. Home Inspection Service St. Peters, MO (636)

Home Management Checklist: Spring

Housing Quality Standards Inspection Checklist

Total Home Inspection Checklist

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

Spring 2016 Checkout Information

EAST STROUDSBURG BOROUGH RESIDENTIAL RENTAL INSPECTION CHECK LIST

MUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK

HVAC 95% + Energy Efficient Furnace KC Heating and Air. Derald Smith Plumbing. Mountain Vista Homes Customer Care Department

Printed Monday, August 27, 2007 Inspected By: Michelle Teague. Client Information: Inspection, Condo City Lane Chicago, IL. Inspected 8/22/07 8:00 AM

CITY OF SHAKER HEIGHTS HOUSING INSPECTION DEPARTMENT 3450 LEE ROAD SHAKER HEIGHTS, OHIO (216) POINT OF SALE CERTIFICATE OF INSPECTION

City of Elk River BASEMENT Office Use Only

SWF Home Inspections

Gramercy Place Condo Association, Inc.

PROPERTY INSPECTION REPORT

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK

The UPLANDS at ORO VALLEY Sterling Features

PROPERTY INSPECTION REPORT Property Address:

Basement Development Construction requirements for the development of basements in residential dwellings.

SAMPLE QUOTE FROM: JOE THE BUILDER

RUSS L. ROBINSON ATLANTA COMMUNITIES (770)

BUILDING PERMIT SPECIFICATIONS

Rapid Repairs Value Price List

A and S Property Inspector

Summer 2015 Checkout Information

HEDDERMAN ENGINEERING, INC Carrie Cove Ct., Spring, TX , fax

Acceptable Donations List

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Mike and Jen Sample 111 Main St. Tabb, VA SPECIFICATION LIST

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

Stanley Martin Custom Homes

CONDITION OF QUALITY ITEMS

Plumbing Identification and Damage Assessment Guide

Home Inspection Report

SEMINOLE COUNTY REHABILITATION STANDARDS FOR: NSP, HOME, CDBG and SHIP For New Construction, Re-Construction, and Rehabilitation Projects

Cost of Repair Worksheet

How to report a repair

TEXAS ASSOCIATION OF REALTORS

Transcription:

SUMMARY OF WORK FOR GENERAL CONTRACTOR 1. General scope of work A. The work at 163 Seabrook consists of: 1. Finish the kitchen and 1 st floor hallway area 2. Finish 1 st floor bathroom and laundry area 3. Complete work started on 1 st floor living room 4. Repair stairwell to 2 nd floor 5. Finish 2 nd floor hallway 6. Total redo of 2 nd floor bathroom except for bathtub 7. Miscellaneous preparation work for new tenant 2. Time of completion A. Commence work as soon as possible AFTER award is made B. Unit must be ready for occupancy by or before May 30 th, 2011 3. Existing conditions: A. 163 Seabrook Road will be made available for a full inspection of existing conditions B. Full utility service at the site C. Tenant residing on 2 nd half of the duplex (therefore early morning and/or late night work is NOT an option) 4. Existing building: The existing building is a two (2) family home located at 163-165 Seabrook Road in Hyannis. Property built approximately 1970. Rehab side is known as 163 Seabrook. It consists of a kitchen, bathroom/laundry area, living room, fireplace, and cellar way on the first floor. There are three (3) small bedrooms and one bathroom on the 2 nd floor. All rooms have been newly sheet rocked except for the upstairs bath. The 1 st floor has new windows installed. The building has a new roof, replaced in the Fall of 2010. There is no existing floor plan except for the placement of the kitchen cabinets. Kitchen cabinets are supplied and are on the property. The power outlets will need to be changed and GFIs installed. 5. Retained items: Slate fireplace Tub and shower in upstairs bathroom

6. The adjacent dwelling unit will be occupied during the rehab. The general contractor shall take all necessary precautions to ensure the safety and convenience of the occupants during rehab. 7. The General Contractor shall supervise and direct the work, using his best skill and attention. The contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures and for coordinating all portions of the work under contract. 8. After the installation of the work by any subcontractor is completed, the general contractor shall be responsible for its protection and for repairing, replacing, or cleaning any such work which has been damaged by other trades or by any cause, so that all work is in first class condition at the time of substantial completion. 9. Cleaning up General contractor is responsible for removal and legal disposal of waste materials and rubbish from the site. Contractor will not allow accumulations of waste, debris, and rubbish. All doors should be level, square, and plumb. Adjust doors to work easily, smoothly, and correctly. Kitchen cabinets should be installed according to manufacturer s recommendations and instructions. Laminate used for countertop shall be 1/16 thick. Adhesive shall be as recommended by laminate manufacturer KITCHEN/HALL *install new electrical devices/plates *install eleven (11) supplied kitchen wall and base cabinets as per drawing rendered by maintenance department *install hardware on above mentioned kitchen cabinets *fabricate laminate kitchen countertop using Wilsonart D30 Almond *install countertop and caulk properly * supply and install single basin kitchen sink into sink base cabinet *supply and install Delta style single lever faucet * supply and install four (4) overhead lighting fixtures as per specs * supply and install outside vented range hood fan *install supplied new refrigerator and stove * supply and install ½ underlayment over existing floor * supply and install new kitchen flooring 12 square VCT tiles * supply and install new hot water heat register

*trim out two windows and one interior door *furnish and install new basement interior access door *furnish or fabricate two (2) closet doors 1 st FLOOR BATHROOM/LAUNDRY AREA *redirect plumbing for new installation * supply and install new washing machine valve *repair existing 5/8 sub floor * supply and install ½ underlayment over existing floor * supply and install new bathroom flooring 12 square VCT tiles or sheet goods to be determined *furnish and install new 24 bath vanity with one piece molded sink top *caulk properly * supply and install new lighting fixtures as per specs * supply and install new electrical devices/plates *furnish and install new toilet * supply and install new hot water heat register * supply and install new dryer vent *supply and install interior door *trim out one (1) window and interior entryway door *install one (1) toilet paper holder, one (1) shower curtain rod, and one (1) towel rod LIVING ROOM * supply and install new living room flooring 12 square VCT tiles * supply and install ¼ underlayment over existing floor * supply and install electrical devices/plates * supply and install new hot water heat registers *trim out four (4) windows and one (1) doorway * supply and install new thermostat *re-point faux fireplace *level out hearth to existing floor

STAIRWELL *repair and or replace as necessary existing stairway treads and risers *repair and or replace existing handrails *sand, stain and seal wood balusters and handrails * supply and install carpeting on stairway UPSTAIRS HALL * supply and install ¼ underlayment over existing floor * supply and install new flooring 12 square PVT tiles * supply and install new ceiling light fixture * supply and install new thermostat *supply and install one (1) new interior door *trim out interior door UPSTAIRS BEDROOM(S) *supply and install ¼ underlayment over existing floor * supply and install new flooring 12 square PVT tiles *repair and paint existing closets *install new hot water heat registers in each room * supply and install new electrical devices/plates *furnish and install three (3) new interior bedroom doors *trim out total of three (3) interior doors *trim out total of five (5) windows within bedrooms UPSTAIRS BATHROOM *remove and dispose of all sheetrock, flooring material, and fixtures (except bathtub) *repair existing plumbing as necessary * supply and install new cement board in tub/shower area * supply and install, tape, and mud new sheetrock to complete wall areas in room * supply and install ceramic tile in tub/shower area

with mold resistant additive with mold resistant additive *repair or replace any damaged floor or sub-floor and install ¼ underlayment over existing floor *supply and install new bathroom flooring 12 square VCT tiles *install new 24 vanity and medicine cabinet *caulk properly *disconnect and remove 48 section heat register on interior wall *re-pipe to under window heating unit *supply and install new hot water heat register *supply and install new toilet *trim out window and doorway MISCELLANEOUS *supply and install three (3) smoke detectors 1 unit per floor *supply and install three (3) carbon monoxide detectors *clean and test heating system Prior to returning access keys to BHA General Contractor shall perform a final touch-up and cleaning of unit Barnstable Housing Authority 146 South Street, Hyannis, MA 02601 508.771.7222

The Barnstable Housing Authority, the awarding Authority, invites sealed bids from General Contractors for Interior Remodeling, located at 163 Seabrook Road, Hyannis, MA, in accordance with the documents prepared by Barnstable Housing Authority. The project consists of interior alterations and repairs to include plumbing, electrical, and heating work, finishes, and all work as described within the detailed scope of work. The work is estimated to cost $50,000. Bids are subject to M.G.L. c. 149 44A-J to minimum wage rates as required by M.G.L. c.149 26 to 27H inclusive. General bids will be received at the Barnstable Housing Authority offices at 146 South Street, Hyannis, MA 02601 until 2 p.m. Wednesday, March 9th, 2011, and publicly opened forthwith. General bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (considering all alternates), and made payable to Barnstable Housing Authority. Detailed scope of work is available for pick up at Barnstable Housing Authority, 146 South Street, Hyannis, MA after 12 noon on Wednesday February 23, 2011. There is a required unit walk-through scheduled for March 2, 2011 at 7:30 a.m. Published February 23, 2011 Barnstable Housing Authority 146 South Street, Hyannis, MA 02601 508.771.7222 Equal Opportunity Housing