INDUSTRIAL PLANTS, COMPUTER & MACHINERY Manufacturing & Trade Co.Ltd.



Similar documents
PROFESSIONAL CEMENT PLANT OPTIMIZATION, MODERNIZATION AND ENERGY CONSERVATION

The point where technique meets with experience. REPAIR WELDING SERVICE. Services for Cement Manufacturer, Iron & Steel Works, Mining Industry.

ASPHALT PLANT, NOMINAL PRODUCTION OF 160 T/H, IN

Efficiency on a large scale CFB Steam Boilers

ANKARA/TURKEY NORM MAKİNA SAN. İNŞ. TİC.LTD.ŞTİ. REFERANCE LIST COMPLETED WORKS.

Up-to-Date with Electrical Equipment

Study tour in two cement plants, Enci and Lixhe and one sewage sludge treatment plant, Waterschapsbedrijf Limburg

Cement Processing Overview. Power Transmission Products & Solutions for Cement Processing

Presentation of. factory at Segmon, Grums municipal.

I BAU HAMBURG Dry Product Handling

EXECUTIVE SUMMARY. * Power cuts, power trippings and unstable supply voltage.

Antonio Jose Cumbane (PhD) Maputo, 31 st May 2011

BLASTING SYSTEMS. Turbine blasting systems. Air blasting systems. Automatic Painting plants

Lime Kiln Principles And Operations. Outline

Iron Ore Processing for the Blast Furnace (Courtesy of the National Steel Pellet Company)

Recent Development of the Indian Cement Industry...

TOWER BETON - VERTICAL BATCHING AND MIXING PLANTS CONCRETE BATCHING PLANTS

BEST PRACTICES TOWARDS ENERGY EFFECIENCY. UltraTech Cement Limited. (Unit -Kotputli Cement Works)

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

4 Project Description

CONVEYING TECHNOLOGY LOADING TECHNOLOGY PALLETIZING TECHNOLOGY PACKAGING TECHNOLOGY SORTATION AND DISTRIBUTION SYSTEMS

King Fahd University of Petroleum and Minerals Electrical Engineering Department EE399 Summer Training. Prepared for. By Baqer Bu-Shafie ID:

Pellet Process - Uses and Exposures

Research and Development Information

1.3 Properties of Coal

INDUSTRIAL DIRECT DRIVEN PISTON COMPRESSORS CL - CH - CK

FOR SALE: RECYCLING PLANT FOR. - Aluminum scrap - Light metals - WEEE - Mixed industrial waste BANO PREMAC HYDRO. Single shaft shredder

Federal Wage System Job Grading Standard for Heating and Boiler Plant Equipment Mechanic, Table of Contents

LarsLap model C for cutting, milling grinding and lapping seats and flanges on globe, safety and control valves

1300 MAXTRAK SPECIFICATION

Rauhalahti Biomass CHP Plant

Practical Examples of Heat Regenerative System at Steelmaking Works

HANDY MANUAL CEMENT INDUSTRY. Output of a Seminar on Energy Conservation in Cement Industry. Sponsored by

FLSmidth ball mill for cement grinding

Layout Planning of Waste-to-Energy Plants

Installation of Greenfield Vs Brownfield Cement Plant

Tyre Derived Fuel The Basics to Successfully Co-Process Tyre Chips

A guide to volume measurement solutions for the. Mining Industry. Changing the market from level to volume

FIBER OPENING AND BLENDING. AUTEFA Solutions leads the way

W E C O N V E Y Q U A L I T Y DISCHARGE SYSTEMS

rbital Fields of application Variants

GRECO KILN BURNERS FOR PETCOKE COMBUSTION

I BAU HAMBURG. Information. Shipunloaders, Road- or Port-Mobile

Concrete energy savings

Highly flexible couplings

Stora Enso Fors Ltd Sweden

Combustible Dust Ensuring Safety and Compliance. Brian Edwards, PE Conversion Technology Inc. ENVIRONMENTAL & SAFETY CONSULTING ENGINEERS

Introduction. Example of inverted cone silos

Batching and Mixing Plants

IMPROVING ENERGY EFFICIENCY IN CEMENT PLANTS

First Aid Kit The Expert in Lubrication Solutions

1/6 ROXON AB REFERENCE LIST OE ASH HANDLING EQUIPMENT

Vertical Roller Mills for Clinker Grinding within Holcim

HMHF DIRECT DRIVE BELT DRIVE. Manufactured by UDY Corporation. Cyclone Models Available:

Pulverized Coal Pipe Testing and Balancing

University of Iowa Power Plant

Heating with wood chips and pellets

Waste to Energy in Düsseldorf. for a clean city.

W E C O N V E Y Q U A L I T Y Bucket Elevators

Cooking at the Speed of light!

Fuller-Kinyon Pump: Dry Material Line Charger

Self-Discharging Cement Carrier

ARE YOU IN COMPLIANCE WITH THE OSHA COMBUSTIBLE DUST DIRECTIVE? Revised March 18, 2009

EXTRUDER FEEDING SYSTEMS

What is Cement? History Overview of the Cement Manufacturing Process Brief Overview of Kiln Operations Why Burn Wastes?

By K.K.Parthiban / Boiler specialist / Venus Energy Audit System

For New Technology Network. Steel Manufacturing Machinery Product Guide Book

Silo Plants for Grain, Seed and Foodstuff

AGJ APRÍTÓGÉPGYÁR Kft.

Volkswagen Jetta, Golf, GTI 1999, Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

1 DESCRIPTION OF THE APPLIANCE

Maverick Consulting. Engineering and Management Consulting Company

ANALYSIS OF ENERGY SAVING OPPORTUNITIES IN CEMENT SECTOR

Silo Discharge CENTREX

After close to 50 years working with an unloading

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance

SITEMA PowerStroke. Technical Information TI-P12. 1 Function. 2 Applications. Mould Closing Devices series FSKP. Contents

AESCO/MADSEN. Self-Erect Silos by AESCO/MADSEN

Combustible Dust. Overview

Investor Site Visit. Western Cape. 25 March

Precise heavy-duty cutting

HRP - Hydraulic Roller Press

BEUMER solutions for the

VeMet, Utrecht, NL «Solution in Wear Protection» Dipl.-Ing. Wolfgang Leichnitz. Quit

Kymijärvi - Lahden Lämpövoima Oy Finland

heat treatment equipment & accessories

PE1 Pellet. PE1 Pellet. Pellet boiler. PE1 Pellet.

Transforming Bottom Ash Into Fly Ash in Coal Fired Power Stations

ELECTROPUTERE ROTATING ELECTRICAL MACHINES DIVISION

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

Filter & Silo Systems A COMPETENT PARTNER

Design and Analysis of Screw Conveyor at Inlet of Ash/Dust Conditioner

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)

INDUSTRIA CEMENTIERA IMPIANTI INDUSTRIALI E OPERE CIVILI CEMENT INDUSTRY INDUSTRIAL PLANTS AND CIVIL WORKS TEAM ENGINEERING AND MANAGEMENT

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

Free Examples of plant layout drawing

IBAU HAMBURG A MEMBER OF THE HAVER GROUP. Information I BAU HAMBURG. Original Components

Transcription:

INDUSTRIAL PLANTS, COMPUTER & MACHINERY Manufacturing & Trade Co.Ltd. Reference list: 2013 1

1. CNL Cimento Nacional LDA Maputo - Mozambik Project Definition : Capacity increasing the existing plant as modifying the equipment of the plant Technical Details : System optimization of the cement grinding plant and supplying the new modification equipment System design, Project design, equipment manufacturing(silo, bag filter, delivery system, belt conveyor, screw conveyors, de-bagging equipment, air slides, hot gas generator, and auxiliaries, erection consultancy on site, Commissioning. : 350,000.-Euro Date of Delivery/Start-up : 03.10-26.12.2013 2. ÇİMSA Co. Inc., Mersin Cement Plant, Mersin - Türkiye, Project Definition : Ram material Crushing & Drying Plant installation Technical Details : Raw material preparation plant to increase the capacity of raw mill System design, Project design, equipment manufacturing(impact crusher, combine dryer, dust cyclones, transportation equipment, auxiliaries, erection consultancy on site, Commissioning. : 550,000.-Euro Date of Delivery/Start-up : 07.05.2012 3. GÜRİŞ CONSTRUCTION Co. Inc., Al Raqqah - Syria, Project Definition : Consulting the project studies concerning the complete cement Technical Details : Technical consultancy on project studies. : 25,000.-Euro Date of Delivery/Start-up : 15.07.2011 4. ADOCİM CEMENT PLANT Co.Inc. Tokat Cement Plant, Tokat Project Definition : Project Management for 3.rd Cement mill installation Technical Details : Installation of new cement grinding line; project management, execution management & process cosulting. : 90,000.-Usd Date of Delivery/Start-up : 15.07.2011 5. GÜRİŞ CONSTRUCTION Co. Inc., Al Raqqah - Syria, Project Definition : Turnkey hot gas generator project Technical Details : 2,000,000 kcal/h hot gas generator, 15,000m³/h secondary air ventilator, fuel preparation & feeding system, control system. : 20,800.-Euro Date of Delivery/Start-up : 12/02/2010 6. ANADOLU MICRONISE Co. Inc., Niğde, Project Definition : Capacity increasing Technical Details : Capacity increasing by adding 4 separators, 3 bag filters and transfer equipments(air slides, bucket elevators, rotary valves, etc) : 180,000.- Euro Date of Delivery/Start-up : June 2009 2

7. CIMPOR CEMENT Co. Inc., Ankara Project Definition : Manufacturing and installation of flay ash silo & delivery system to cement grinding plant. Technical Details : Fly ash silo, dosing system, dedusting filters, feeding lines equipment manufacturing and erection. : 120,000.- Euro Date of Delivery/Start-up : February 2008 8. VICAT, BAŞTAŞ CEMENT Co. Inc., Ankara, Project Definition : Capacity increasing of the cement mill by adding statopol system. Technical Details : Transportation equipment manufacturing and complete installations : 475,000.- Euro Date of Delivery/Start-up : April 2008 LAFARGE CEMENT Co. Inc., Ankara Project Definition : Manufacturing and installation of cement grinding plant with 120 tph capacity. Technical Details : Cement grinding plant complete installation and transportation equipment manufacturing. : 2,900,000.- Euro Date of Delivery/Start-up : July 2007 9. KONYA CEMENT Co. Inc., Konya, Project Definition : Dismantling the existing electrostatic precipitators. Manufacturing and installation of bag filters for both kiln lines. Technical Details : Bag filters manufacturing and installations : 1,075,000.- Euro Date of Delivery/Start-up : 26.03.2007 10. ANADOLU MICRONISE Co. Inc., Niğde, Project Definition : Turnkey plant installation Technical Details : Complete grinding & packing plant installation for calside less than 1 micron with 90 t/h capacity : 2,750,000.- YTL Date of Delivery/Start-up : 09.10.2007 11. KONYA CEMENT Co. Inc., Konya, Project Definition : Basic design, general arrangement drawings, project management, manufacturing & erection management Technical Details : Cement silo(10,000 t) & feeding lines complete installation : 2,275,000.- Euro Date of Delivery/Start-up : 28.12.2006 3

12. ADO CEMENT Co. Inc., Bucak Burdur, Project Definition : Basic design, general arrangement drawings, project management, manufacturing management & erection management & commissioning Technical Details : Integrated cement plant installation with 3,330 tpd clinker & 150 tph cement grinding capacity with the following sub systems, Crushing department with Hammer crusher 600 tph Raw material preblending department with Bedeschi 800/350 stacker/reclaimer system Raw material grinding department through 2 raw mill Pfeiffer MPS 3200 & Loesche LM 25 Raw meal homogenization silo & kiln feed with IBAU silo PASEC Preheater with calciner & Polysius kiln Ø 4.2 x 60.0 m. with Unitherm coal firing system. Coal grinding unit with Pfeiffer MPS 2200 vertical raw mill and coal delivery system with hassle dosers. IKN Pendulum type clinker cooler with roller crushers Aumund clinker transportation & storage system 60,000 t closed clinker storage Roller press and cement grinding department with 2 abll mills 10,000 t + 4x1000 t Cement silos & packagers Laboratory and axuliary departments : 65,000,000.- Euro Date of Delivery/Start-up : Clinker line; 18/03/2005, grinding &packing line; 28/11/2005 13. KARS Cement Co. Inc., Kars, Project Definition : Design & manufacturing Technical Details : Capacity: 180 t/h, Wear resistant rotary valves : 11,600.- USD Date of Delivery/Start-up : 07/03/2001 14. ŞİŞECAM KORMSAN Co. Inc. Mersin, Project Definition : Design, manufacturing & installation Technical Details : Hot gas generation unit with 3,500,000 kcal/h heating capacity, burner, fan, hot gas piping, fuel-oil feeding system. : 78,000.-USD Date of Delivery/Start-up : 19/02/2003 15. ETİ ALUMINUM Co. Inc., Seydişehir - Konya, Project Definition : Design, manufacturing, disassembly & assembly Technical Details : Rotary kiln & rotary cooler revision(replacement of the ring support plates) and kiln alignment : 40,500.- USD Date of Delivery/Start-up : 17/08/2001 14/09/2001 16. KARS Cement Co. Inc., Kars, Project Definition : Design & manufacturing Technical Details : Capacity: 250 t/h, Wear resistant rotary valves : 11,600.- USD Date of Delivery/Start-up : 07/03/2001 4

17. PARK TERMİK Co. Inc., Ankara, Project Definition : Design modification, project & manufacturing mechanical parts Technical Details : Modifying the existing 20 m. Diameter thickener to 10 m. Diameter. : 34,000.-USD Date of Delivery/Start-up : Waiting for project confirmation 18. Boğazlıyan Cement Co. Inc., Yozgat, Project Definition : Design & project Technical Details : Cement grinding plant with 2,600 L: 11,000 mm ball mill, air swept separator, horizontal pre-crusher & other auxiliary equipment : 40,000.-USD Date of Delivery/Start-up : 20/11/2000 19. ÖZGÜR CEMENT Co. Inc., Derince, Project Definition : Plant design, project & consulting. Manufacturing mechanical equipment Technical Details : Cement preparing & packaging plant. Wear resistant rotary valves with 450 mm. diameter & pendulum valves. : 18,000.-USD Date of Delivery/Start-up : 28/03/2000 20. ÖZGÜR CEMENT Co. Inc., Tunçbilek, Project Definition : Manufacturing mechanical equipment Technical Details : Wear resistant rotary valve 550 mm in diameter. U-type screw conveyors W: 550 mm L: 15,000 mm made from Dillidur 400 V Pipe-type screw conveyors 450 mm. L: 6,000 mm. : 34,000.-USD Date of Delivery/Start-up : 02/04/2000 21. ADO CEMENT Co. Inc., Antalya, Project Definition : Design, project & consultant of cement grinding line Technical Details : 2,600 mm L: 13,000 mm ball mill, Air swept separator, 4-Cyclones, 2- Bag Filters, 3-Bucket elevators, 4-Belt conveyors, Air slides, 3-weighting belt conveyors, 3-Rectangular combined silos, cooling water and lubrication systems for mill bearing & gear-box. : 1,280,000.-USD Date of Delivery/Start-up : 23/03/2000 22. ŞİŞECAM - KROMSAN Co. Inc. Mersin, Project Definition : Design, manufacturing & installation Technical Details : Hot gas generation unit with 2,500,000 kcal/h heating capacity, hot gas piping insulated with plastic ceramics, fuel-oil preparation & feeding systems. : 18,000.-USD Date of Delivery/Start-up : 11/02/2000 5

23. TEPE BETOPAN Co. Inc., Ankara, Project Definition : Turnkey project. Technical Details : Drying line for painted concrete panels( 3 carriages with 10 stock layers, rails road to drive the carriages automatically) : 16,000.-USD Date of Delivery/Start-up : 14/01/1999 24. TEPE BETOPAN Co. Inc., Ankara, Project Definition : Design & project Technical Details : Full automatic drying plant. Pneumatic panel loading & unloading units, rolled dryer with 11 layers, reversing station & auxiliaries : 92,500.-USD Date of Delivery/Start-up : 23/12/1999 25. ADO CEMENT Co. Inc., Antalya, Project Definition : Turnkey plant design, project, manufacturing & installation Technical Details : Double passages drum dryer with the dimensions 3,400 x 9,900 mm, Bag filter with the capacity of 35,000 m³/h, bucket elevator 15,000 mm in length, belt conveyors, rectangular combined silos, hot gas generator with 3,500,000 kcal/h heating capacity, electronic control systems : 163,500.-USD Date of Delivery/Start-up : 20/10/1998 26. ÖZGÜR CEMENT Co. Inc., Antalya, Project Definition : Design & project of cement grinding line Technical Details : 2,400 mm x 8,000 mm ball mill, 1 bucket elevator, air slides, belt conveyors, weighting belt conveyors, : 19,000.-USD Date of Delivery/Start-up : 17/07/1998 27. ÖZGÜR CEMENT Co. Inc., Antalya, Project Definition : Turnkey hot gas generator project Technical Details : 3,500,000 kcal/h hot gas generator, 15,000m³/h secondary air ventilator, fuel preparation & feeding system, control system. : 26,700.-USD Date of Delivery/Start-up : 12/04/1998 28. ÖZGÜR CEMENT Co. Inc., Antalya, Project Definition : Design & project of Drying plant for cement additives Technical Details : 2,200 x 10,500 mm drum dryer, bucket elevator, belt conveyor, adjustable speed apron feeder, hot gas generator, jet-pulse bag filter, dry meal silos : 22,800.-USD Date of Delivery/Start-up : 19/02/1998 29. POLSAŞ Co. Inc., Ankara, Project Definition : Turnkey project Technical Details : Grinding plant for agricultural chemicals; Pinned mill with the 1,500 kg/h grinding capacity, jet-pulse bag filter, raw & fine meal bunkers, pan mixer, rotary valves, control systems, concrete & steel construction. : 110,000.-USD Date of Delivery/Start-up : 14/01/1998 6

30. ERDEMİR EREĞLİ IRON &STEEL INDUSTRY Co. Inc., Ereğli Project Definition : Technical consultant Technical Details : Computer Assisted Maintenance Management System : 22,500.-USD Date of Delivery/Start-up : 28/01/1997 31. SEREL Ceramics Co. Inc., Bilecik, Project Definition : Turnkey project Technical Details : Raw material preparation unit with bins, gate vanes, belt conveyors, bucket elevator, spray dryer, rectangular combined silos, tripper belt conveyor : 124,000.-USD Date of Delivery/Start-up : 04/12/1997 7