If stepping is required, step at 180mm as seen in this picture.

LAYING BLOCK AND BRICK

Lay blocks with mortar

DIY CABINET REFACING INSTALLATION GUIDE

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

SEE HOW TO MAKE LIME PLASTER WHY USE LIME? PATTI STOUTER, BUILD SIMPLE INC. FEBRUARY 2013

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

FRAMED & MOUNTED TILE MURAL

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

Free-Form Concrete Pool

Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko

Installation Instructions

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

Barewood Octagon and Elongated Windows Installation Instructions

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

How to Install GoBoard:

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

How To Retaining Wall Guide

INSTALLATION GUIDE FOR GIROLAMI CAMINETTI OVEN

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

Saferand easierinstallation

How To Work With Beads. By Rowan

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Shower Walls and Tub Surrounds

Build Your Own Solar Car Teach build learn renewable Energy! Page 1 of 1

1. Input pot circumference: use a soft tape to measure the circumference of the pot at the widest point below the handles.

Cedar Cottage Doghouse Plans

FREESTANDING CLEAN AIR WOODBURNER

Total Quantity: IMPORTANT: Plans are to be used with 3 x6 Plexiglass (SKU # ).

Screen Melts. Introduction. Selecting Screen Material. Prefire Before Using. Spalling. Kiln Shelf

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

How to build raised beds page

Chapter. Restoration of Damaged Structures

Brick Veneer Construction


Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts.

How to Install Pavers

INSTALLATION OF A BAY WINDOW

DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP

make a model Roman Villa Supported by bbc.co.uk/history

Alfa Romeo 147 On board instruments installation guide

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

Management Consultancy Training. Asbestos Materials. Residential Guide

Industrial Strength Rocket Launcher

Residential Foundations and Basements

Installation Instructions

Speed-Mat Rectangle Cutter

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

International Greenhouse Company

Written By: Walter Galan

DuPont Surfaces DUPONT TM CORIAN SOLID SURFACE 12mm GAUGE STANDARDIZATION

TopSky DLG Installation Manual

30 minutes in class, 2 hours to make the first time

Installation Window Building In Details

BUILDING MATERIALS, Wood, Laminated (Page 1 of 3) Viz.: Rafters; Arches; Beams; Joists; Timbers or Planks, structural or roof.

Solid Wood Worktops Installation and Aftercare Instructions

Building a clay oven

Removable Aluminium posts

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

How To Repair A House After An Earthquake

FREEBIRD THE ORIGINAL D.I.Y. ORNITHOPTER! Tools and Glue. Required Materials

WATERPROOFING OF WET ROOMS

Making A Mirror Grinding Tool By Allen Malsburry

Raised Panel Doors Made Simple With Freud s 2+2 Raised Panel Bit Set

Information Technology Solutions

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

Written By: Walter Galan

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

SHELVES.

Getting Started in Tinkercad

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows

How to Build Your Own CornHole Game

W I T H I N J O I ST S I N STA L L AT I ON

Base Cabinet with Self-storing Folding Doors and Floor

THINGS YOU SHOULD KNOW

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

Site sampling and testing of concrete

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

Thin Veneer Stone Installation Guide

Timber Decks. Technical Note. March 2007

DOUBELL MACHINES MODEL: DIY

Dave s Sheet Metal Bending Brake

The minimum reinforcement for the stem wall is the placement of:

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Wren Kitchens Installation Tips Carefully check your kitchen delivery Measuring out and marking up Fitting the base cabinets...

Technical Information

OWNER S MANUAL Table Tennis Table Patent Pending

Guidelines for Earthquake Bracing Residential Water Heaters

Written By: Walter Galan

Craft and Design Application of Injection Moulding (Mobile Phone)

Transcription:

How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY 1 preparing the base 2. Besser brick (400x200) base 3 ½ deep, 3 wide, 5 high. Total 47 bricks. 3. Check bricks are level. Use plumb line to ensure walls are vertical. 4. Insert steel angle for shelf. Drop this between bricks set into mortar 5. Second row of angle for base of oven to rest on 6. Galvanised lintel to hold front row of besser bricks. Steel angle facing upwards behind 7 2 nd steel angle facing downwards to support base of oven 8. Helper still in PJ s 9

10. Besser brick base complete 11. Could fill the besser bricks with concrete which prevents movement and reduces cracks in the mortar so I have been told. Also could put reinforcement bar inside the bricks. I didn t. Mine s still standing 12 13. Fill besser brick holes with scraps of brick and concrete, stuff with paper, fill top with concrete. (see #11 could fill them with concrete from the bottom and reinforce ) 14. Timber formwork pieces supported under front besser bricks to hold concrete in place. 15. Ready for next stage. That s the end of day #1 Sand leveling photo required here DAY 2 The oven floor 16. Drop in 15mm cement sheet 17. Fill with crushed rock and packed down hard. 18. Level sand with straight timber or pipe. Place timber runners each side of sand area to create perfectly smooth sand, packed down hard with trowel.

19. brickies sand on top of crushed rock. This would be better if it was sand mixed with cement as I have had a little bit of movement in the sand. 20. Square off sand edges around inside brick pavers. 21. Set pavers in brick pattern, to offset the joins. Make the centre row of pavers a little wider to create oval shaped oven wider in the centre. 22. Trowel cement mortar to the outside edge of the pavers to secure them in place. This standard mortar isn t stable in high heat so just use it around the outside of the pavers (not under them) 23. I extended the front pavers 20mm over the edge of the base (right hand side of above photo). This isn t really necessary you can use any sort of paver or tile on the outside edge of the oven as they don t get hot. 24. Form the arch. I used a light smear of ceramic cement to hold the arch pavers in place. A strong bond isn t necessary because the arch is held in place by the main oven structure later. 25. Arch supported by bricks. Arch stuck together with heat resistant ceramic cement. The theory is the door & flue opening height should be 63% of the height of the oven, so warm air is captured inside the top of the oven. 25. After arch complete, place base pavers in shape of oven. Stick together and down with ceramic cement. 26. Cut outside pavers (refractory pavers not necessary for the outside but I used them) and mortar these in place. They don t get too hot.

27. Brickwork done, end of day 2. Arch dimensions 30cm high X 46cm wide Floor & dome dimensions depth (1m deep + archway brick 24cm) X 88cm wide X 48cm high DAY 3 Shaping the dome 28. Stack polystyrene fruit boxes into the oven (this just saves on sand and makes it easier to empty the sand out afterwards). 29. Place a post in the middle to set the height (48cm) and provide strength to hold the concrete. Plate on top not necessary. 30. Cover the styrene boxes with sand 31. Pack the sand down firmly and form the shape with a brickies trowel. 32. Keep the edges of the brickwork clean to provide a good surface for the concrete to stick to. Bring sand close to the inside edges of the bricks to avoid edges in the finished dome. 33. The concrete dome face should be flush with the inside edge of the pavers forming the bottom edge of the dome wall 34. Form the flue cavity. The theory is that the flue opening should be 63% of the height of the dome, that would be the bottom of the dip here above between the dome and the flue opening. So that dip is 30cm off the pavers, the top of the dome is 48cm off the pavers. The arch is also 30cm. 35. This flue opening is not big enough I d make it a 15cm/6 diameter flue (this one is only 11cm/4 ¼ )

36. Form a cardboard tube slightly larger than the stainless steel flue, so the flue will slideinto the concrete dome snugly 37. Finished sand oven dome. This shape has worked very well after using the oven for a year. I wouldn t change it. 38. Cover dome in wet newspaper I used plastic but I reckon wet newspaper would do the job better. Make sure you leave bricks uncovered so concrete can stick to them. 39. Mix up the refractory cement mix in a wheel barrow, a bag or two at a time (I used 9 ½ bags in total). 40. Wearing rubber gloves (not necessarily pink ones) make concrete patties. 41. Pack them onto the dome. I started at the top and worked around and down. 42. Cover the whole sand dome do all this in one session so the concrete doesn t set before you finish the dome. 43. You can add stainless steel strands after the first layer of concrete for reinforcing, but I now this this it totally unnecessary. 44. Put the ceramic pipeinto the dome so it sticks into the sand by 20mm and faces forward so you can easily see the thermometer while cooking. Use a dowel to make a hole if you don t have a pipe. That d do just as well. It should be about 2/3 up the wall of the oven inside. Start second layer of concrete patties.

45. The concrete layers needs to be about 50mm thick. Using 2 layers of concrete patties. Make sure brick pavers forming the base of the wall are covered. 46. Pack concrete firmly around the arch to provide strength to support it. 47. Form a flat area around the flue cavity. As you can see, I m working into the night here so technically not completing within the day 48. Remove the cardboard tube to reveal the clear hole into what will be the oven cavity. 49. Note the flue cavity is slightly over the archway brickwork. This is to stop the stainless steel flue from sliding into the oven should it become loose for any reason (it hasn t by the way..) 50. Damper Mould Cover a piece of plywood (which is 3mm larger than the damper slide) with baking paper (so it ll slip out easily). 51. Place the plywood so it covers the flue void. Note I trimmer the corners off the plywood before I set it (see next pic) 52. Stick the cardboard tube to the plywood. Cut a groove into the bottom of the cardboard tube and slide a piece of cement sheet into the tube (to stop the stainless steel flue from hitting the damper slide) 53. cement around the flue, the cement sheet support shelf and over the top of the damper slide mould.

54. Cover the whole dome in a third layer of concrete patties, strengthening the area around the flue and damper slide. 55. Day 3 finished. That was a long day actualy this is the next morning DAY 4 56. Get your daughter to clean the sand out of the oven. 57. Remove cardboard tube and insert stainless steel flu. Place ceramic insulating blanket over the concrete dome. I used 2 layers but one would probably do. 58. Cover the dome all over. Trim away excess blanket. 59. Mix the vermiculite and fondue in a wheel barrow. Not too wet, and just use enough fondue to stick it all together. The lighter and more airy the better it ll insulate. 60. Pack the vermiculite mix over the dome blanket. 61. Pack 2 3 layers of this mix over the dome as with the concrete, do it all in one hit so it all sets together. Form a flat nest for the thermometer to sit in. 62. Light a small paper fire in the oven first to slowly heat it the first time. Don t do this straight away though! Let the dome dry out completely for a couple of days

63. The next day light a more serious fire you re in business! 64. I made a door out of redgum house stumps and put a sheet of steel on the back (and top of it later because it started smouldering) but you can make a door out of steel which is more conventional. You don t need a door to cook pizzas. 65. You can put a render on the oven to make it more waterproof. I have since put a roof high over the top so I can cook in the rain JOB DONE!!

Things I would change next time: FLUE SIZE increase to 6 (15cm) diameter DAMPER you can buy 6 flues with dampers in them which would be a lot easier to make than this tile damper but the method above has worked fine