PROJECT FORMULATION GRANT FOR CHILE



Similar documents
INFORMATION SUBMITTED BY IMPLEMENTING ENTITIES ON THE REQUESTED FEES FOR PROJECT/PROGRAMME IMPLEMENTATION

REPORT OF THE CONFERENCE OF THE PARTIES ON ITS SEVENTH SESSION, HELD AT MARRAKESH FROM 29 OCTOBER TO 10 NOVEMBER 2001 Addendum

RULES OF PROCEDURE OF THE CO-ORDINATING BODY OF THE CONVENTION ON MUTUAL ADMNISTRATIVE ASSISTANCE IN TAX MATTERS

Draft conclusions proposed by the Chair. Recommendation of the Subsidiary Body for Implementation

Resolution adopted by the Human Rights Council* 16/21 Review of the work and functioning of the Human Rights Council

Additional Modalities That Further Enhance Direct Access, Including Through Funding Entities

Ninth Round PROJECT MONITORING, REPORTING, REVISION AND EXTENSION GUIDELINES

NEPAD Climate Change Fund. Guidelines for applicants

FCCC/SBSTA/2016/1. United Nations. Provisional agenda and annotations. I. Provisional agenda

Resolution adopted by the General Assembly. [without reference to a Main Committee (A/65/L.78)] 65/281. Review of the Human Rights Council

Guidelines for Civil Society participation in FAO Regional Conferences

Status Report on the Operations Manual and Appraisal Toolkit

UNDP Programming Manual December Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1

REPORT 2016/066 INTERNAL AUDIT DIVISION. Audit of management of technical cooperation projects in the Economic Commission for Africa

Terms of Reference for Assessment of the Environment & Natural Resources Sector in Kenya

Status Report on the Operations Manual and Appraisal Toolkit

FINAL. World Education Forum. The Dakar Framework for Action. Education For All: Meeting our Collective Commitments. Revised Final Draft

192 EX/6. Executive Board Hundred and ninety-second session

Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification

Draft decision -/CP.15. Copenhagen Accord

REPORT OF THE CONFERENCE OF THE PARTIES ON ITS FIRST SESSION, HELD AT BERLIN FROM 28 MARCH TO 7 APRIL Addendum

Basel Committee on Banking Supervision. Charter

Report of the Conference of the Parties on its nineteenth session, held in Warsaw from 11 to 23 November 2013

KYOTO PROTOCOL TO THE UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE

Brief on Climate Change Finance

PROCEDURES FOR ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING OF INVESTMENT PROJECTS

Forest Carbon Partnership Facility (FCPF)

Contact address: Global Food Safety Initiative Foundation c/o The Consumer Goods Forum 22/24 rue du Gouverneur Général Eboué Issy-les-Moulineaux

Regional and Subregional Input to UNFF9

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Twenty-first session Buenos Aires, 6 14 December 2004

1. Title: Support for International Development Research

OUTLINE. Source: 36 C/Resolution 16, 190 EX/Decision 9 and 192 EX/Decision 6.

Advance unedited version. Decision -/CP.13. Bali Action Plan

STAKEHOLDER ANALYSIS. Objective: To develop an understanding of stakeholder analysis methods

REPORT OF THE CONFERENCE OF THE PARTIES ON ITS SEVENTH SESSION, HELD AT MARRAKESH FROM 29 OCTOBER TO 10 NOVEMBER 2001 Addendum

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Governing Body 310th Session, Geneva, March 2011 TC FOR DECISION

GEF/LDCF.SCCF.17/05/Rev.01 October 15, th LDCF/SCCF Council Meeting October 30, 2014 Washington, DC. Agenda Item 5

Guidelines for the UN.GIFT Call for Proposals from Civil Society Organizations

Organisational and Leadership Development at UWS

Assessment of Institutions Accredited by Other Relevant Funds and Their Potential for Fast-track Accreditation

SAHARA AND SAHEL OBSERVATORY IN COLLABORATION WITH GOVERNMENT OF UGANDA (MINISTRY OF WATER AND ENVIRONMENT) AND

Introduction. Background

STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July

Road map to an integrated budget: cost classification and results-based budgeting. Joint report of UNDP, UNFPA and UNICEF

Central Emergency Response Fund Guidelines

Evaluability Assessment Template

Turkey. Country Fact Sheet. The MDG- F in Turkey. Joint Programmes Information. Joint Programmes: 4 Total Budget: USD 17,311,930

Terms of Reference for Consultant to Support Development of Country Level Land Policy Issues Papers

Expected Duration of Assignment : Final product to be submitted by March 18, 2016

WATER FOR LIFE BEST PRACTICES AWARD

NATIONAL RESEARCH FOUNDATION (NRF) SOUTH AFRICA SCIENCE AND TECHNOLOGY DEVELOPMENT FUND (STDF) EGYPT FIRST JOINT CALL FOR PROPOSALS 2016

FCCC/CP/2015/L.9/Rev.1

Risk Management Strategy EEA & Norway Grants Adopted by the Financial Mechanism Committee on 27 February 2013.

Legal and Formal Arrangements with Accredited Entities

Policies and Criteria for IFAD Financing

REPORT OF THE CONFERENCE OF THE PARTIES ON ITS THIRD SESSION, HELD AT KYOTO FROM 1 TO 11 DECEMBER Addendum

Regulation on the implementation of the Norwegian Financial Mechanism

PROJECT PREPARATION GRANT (PPG) APPLICATION FORM-3

7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION NEEDS: INFORMATION GAP ANALYSIS

U.S. Submission on Elements of the 2015 Agreement Introduction

Developing an Implementation Plan

Development of a Knowledge Base for geospatial information Management

Memorandum of Understanding on Labour Cooperation

July 7, 2009 DESIGN DOCUMENT FOR THE FOREST INVESTMENT PROGRAM, A TARGETED PROGRAM UNDER THE SCF TRUST FUND

Web Annex 6: Output indicators and targets

DAC Guidelines and Reference Series. Quality Standards for Development Evaluation

TERMINAL EVALUATION TERMS OF REFERENCE

Letter of Invitation to Tender for Consultancy Services for the Development of Project Proposals

FCCC/SBI/2012/L.44. United Nations

PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES

I CLIMATE AD EERGY POLICY FRAMEWORK

FRAMEWORK PARTNERSHIP AGREEMENT ON THE EUROPEAN INVESTMENT ADVISORY HUB. between the EUROPEAN UNION. and the EUROPEAN INVESTMENT BANK

DEVELOPMENT OF A QUALITY FRAMEWORK FOR THE MEDICARE BENEFITS SCHEDULE DISCUSSION PAPER

Approach Paper: Guidelines for Climate Mitigation Evaluations. Climate-Eval community of practice Draft as of February 8,

How to submit a good tender for BTSF. BTSF Guideline for Tender

Conference Statement:

SUN Donor Network. I. Introduction

ASEAN INTEGRATED FOOD SECURITY (AIFS) FRAMEWORK. Detailed Road Map for the Implementation of COMPONENT 5: Nutrition-enhancing agriculture development

Job Category: Agro/Cooperative Business Analyst

3. Good Practice Example: SEAP (Sustainable Energy Action Plan) (Budapest, Hungary)

PROJECT MONITORING, REPORTING, REVISION AND EXTENSION GUIDELINES

April 2015 C 2015/31 E. Thirty-ninth Session. Rome, 6-13 June Global Soil Partnership - World Soil Charter

Single Stage Light Business Case Template

ACE PROJECT M&E CONSULTANCY

Transcription:

Adaptation Fund Board Project and Programme Review Committee Thirteenth Meeting Bonn, 29-30 October 2013 AFB/PPRC.13/4/Add.1 18 October 2013 Agenda Item 4 a) PROJECT FORMULATION GRANT FOR CHILE

AFB/PPRC.13/4/Add.1 I. Background 1. The Board at its eleventh meeting discussed the document Funding for Project Formulation Costs (AFB/11/6) and agreed, in its Decision B.11/18, that: i. project formulation grants (PFG) should be given once a project concept has been approved ii. consideration should be given in terms of differentiating between NIEs and MIEs, since some NIEs might have financial difficulties in trying to formulate project or programme proposals; iii. a flat rate should be given for project formulation costs; iv. a list of eligible activities and items still needed to be prepared; v. the grant should be additional to the project cost; and vi. the fate of funds if the final project document was rejected should be determined. 2. There was consensus that a three tiered system should be considered for project formulation grants: endorse a project concept with a PFG amount, endorse a project concept without a PFG amount, or reject the project concept. 3. Following the discussion, the Board decided: To request the secretariat to reformulate the document, to include a comparison of eligible activities provided by other funds for project formulation grants, to take into account guidance provided by the Board at the present meeting, and to submit the document to the Board at its twelfth meeting, through the EFC. The EFC should review and finalize the process and policy of the project formulation grant focusing, in particular, on: the issue of unspent project funds; the procedures followed by other funds in that regard; and the determination of a flat-rate. 4. A document was prepared by the secretariat in response to the above mandate and presented at the third EFC meeting, which made specific recommendations to the Board at its twelfth meeting. Having considered the recommendation of the Ethics and Finance Committee, the Board, in its Decision B.12/28, decided that : (a) Project Formulation Grants (PFGs) will only be made available for projects submitted through NIEs. The Board would continue reviewing the question of PFGs for projects submitted through MIEs and would solicit comments from members and alternate members by February 14, 2011; the views would be compiled by the secretariat for presentation to the Board at its March 2011 meeting; (b) If a country required a project formulation grant, a request should be made at the same time as the submission of a project concept to the secretariat. The secretariat will review and forward it to the PPRC for a final recommendation to the Board. A PFG could only be awarded when a project concept was presented and endorsed; (c) A PFG form, reproduced in Annex V, should be submitted; (d) Only activities related to country costs would be eligible for PFG funding; 2

AFB/PPRC.13/4/Add.1 (e) A flat rate of up to US$ 30,000 shall be provided, inclusive of the management fee, which cannot exceed 8.5 per cent of the grant amount. The flat fee would be reviewed by the Board at its thirteenth and all subsequent meetings; (f) If the final project document is rejected, any unused funds shall be returned to the Adaptation Fund Trust Fund; (g) Once a project/programme formulation grant is disbursed, a fully developed project document should come to the Board for approval within 12 months. No additional grants for project preparation can be received by a country until the fully developed project/programme document has been submitted to the Board; and (h) The Trustee was instructed to remove the set-aside of US$ 100,000 for project preparation that had been decided at the June 2010 meeting, as project preparation would be approved on a project-by-project basis. II. The Project Formulation Grant Request 5. This addendum to the document AFB.PPRC.13.4 Proposal for Chile includes the Project Formulation Grant, requesting a budget of US$30,000, which was received by the secretariat along with the concept for the project CHL/NIE/Agri/2013/1 Enhancing resilience to climate change of the small agriculture in the Chilean region of O Higgins. This proposal was submitted on time by the Agencia de Cooperación Internacional (AGCI), which is the National Implementing Entity of the Adaptation Fund for Chile, for consideration by the Adaptation Fund Board at its twenty-second meeting. 6. In accordance with Decision B.12/28 paragraph (b), the secretariat carried out a review of the PFG request and found that the requested funds are justified and the sought activities are aligned with the goal of the project. The projected activities would help in collecting key additional information, undertaking the necessary consultations and cost benefit analyses and organizing the final validation and translation, to formulate a fully-developed project. 7. Therefore, the PPRC may want to consider and recommend to the Board to approve the PFG Request provided that the related concept proposal is endorsed. 3

Project Formulation Grant (PFG) Submission Date: Adaptation Fund Project ID: Country/ies: CHILE Title of Project/Programme: Enhancing Resilience to Climate Change of the Small Agriculture in the Chilean Region of O higgins Type of IE (NIE/MIE): NIE Implementing Entity: AGENCIA DE COOPERACIÓN INTERNACIONAL DE CHILE (AGCI) Executing Entity/ies: MINISTRY OF AGRICULTURE; MINISTRY OF ENVIRONMENT A. Project Preparation Timeframe Start date of PFG November 2013 Completion date of PFG March 2014 B. Proposed Project Preparation Activities ($) Describe the PFG activities and justifications: List of Proposed Project Preparation Activities Specialized technical consultancies to design project: Output of the USD Amount PFG Activities Project designed 21.500 Regarding this item, we hope to incorporate specialized technical assistance to develop a participatory process to facilitate an integral discussion with the interested parties, both at the regional as well as local level (in the target communities), with the objective of designing the final project with the greatest level of relevance and pertinence for the local sociocultural and economic conditions as well as a high level of validation by the stakeholders. This also implies having the necessary resources to finance the implementation of participatory workshops at the regional and local level, with all of the necessary support to ensure an adequate participatory process. Technical assistance would also be provided to strengthen the process of drafting the final project document, particularly regarding the specific technical areas that are contemplated in the different project components as well as the requirements that are generated during the consultative process, including the identification of relevant indicators to measure the progress and achievement of the expected results and the systematization of baseline indicators. Consultancy to evaluate the project from an economic point of view (cost-benefit analysis, etc.): Economic evaluation of the project 6.000

An ex-ante evaluation of the final project design document is considered, with special emphasis on cost-benefit levels, to be able to suggest eventual modifications in the original project design to strengthen the achievement of the project goals with the highest level of impact and most efficient use of resources. Translation service: We hope to be able to use a translation service (Spanish- English) for the documentation that will be presented as part of the final project to guarantee its on-time delivery and optimum comprehension. Final project translated into English 2.500 Total Project Formulation Grant 30.000 C. Implementing Entity This request has been prepared in accordance with the Adaptation Fund Board s procedures and meets the Adaptation Fund s criteria for project identification and formulation Implementing Entity Coordinator, IE Name Jorge Daccarett Bahna, Executive Director AGCI Signature W Winter Date (Month, day, year) September 25, 2013 Project Contact Person Enrique O`Farrill- Julien, Head of the Bilateral and Multilateral Cooperation Department Telephone (56-2) 28275756 Email Address eofarrill@ agci.cl