PRISM CEMENT LTD. CEMENT WORKS MANKAHARI, SATNA



Similar documents
Installation of Greenfield Vs Brownfield Cement Plant

ANALYSIS OF ENERGY SAVING OPPORTUNITIES IN CEMENT SECTOR

BEST PRACTICES ADOPTED IN JINDAL STEEL & POWER LTD., RAIGARH TO ACHIEVE ENERGY EFFICIENCY. Presented By : Kumar Rohit Sudhanshu Rometra

10 Strategic Steps to Reducing Your Energy Costs AEE Regional Chapter Meeting February 2, 2005

Chapter 1.3 Energy management & audit

BEST PRACTICES TOWARDS ENERGY EFFECIENCY. UltraTech Cement Limited. (Unit -Kotputli Cement Works)

Guideline for Energy Efficient Electrical systems for building. Presentation by TERI

EnergySTEP (Sustainability Tiered Efficiency Program) Our Approach to Energy Efficiency

Energy Management Plan <Template>

Delivering exceptional performance and Ecovalue. Ecocent

Tips on Saving Energy in Your Business

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Q Utility Rebate Report. Houston, TX

Best Practice Guide BPGCS007

Unidrive M Energy Savings

Drives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC)

Energy saving technology to deliver the fastest returns. Top 10 energy saving options

Maximization versus environmental compliance

Rules of Thumb Energy Efficiency in Buildings

Formulating an energy management action plan

ENERGY MANAGEMENT. for INDUSTRY AND BUSINESS

INDUSTRIAL ENERGY EFFICIENCY PROJECT CASE STUDIES SUSTAINABILITY CONFERENCE 2014

PROFESSIONAL CEMENT PLANT OPTIMIZATION, MODERNIZATION AND ENERGY CONSERVATION

Hot Water. Heat pump water heaters. Residential and Commercial R410a

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Energy Management Consulting Services. Save Energy Today, Survive Tomorrow

Printing and Publishing Energy Savings Guide

Crowne Plaza Copenhagen Towers The world s greenest hotel

Drives and motors. A guide to using variable-speed drives and motors in data centres

ULTRA-EFFICIENT HVAC DESIGN AND CONTROL

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Capgemini UK Infrastructure Outsourcing

FLSmidth ball mill for cement grinding

Documenting Results to Validate Energy Savings Projects: Case Study of Direct Drive Cooling Tower Installations: Before and After

RASHTRIYA CHEMICALS AND FERTILIZERS LTD. CHEMBUR, MUMBAI TECHNICAL SERVICES

TIPS ON ENERGY SAVING

Design Guide. Managing Peak Energy Demand In Live Performance Venues

National Grid Your Partner in Energy Solutions

Up-to-Date with Electrical Equipment

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

State of the Art Energy Efficient Data Centre Air Conditioning

Agenda. Part I: Introduction to OptimumHVAC. Part II: Initial Energy Savings Analysis for MCO Main Terminal. Part III: Case Studies & Conclusion

Energy Savings through Electric-assist Turbocharger for Marine Diesel Engines

GAS HEATING IN COMMERCIAL PREMISES

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?

Data Centre Testing and Commissioning

Demand Response in Utility EE Programs for India

Screw Compressors ESM Fixed Speed & VS Variable Speed

IMPROVING ENERGY EFFICIENCY IN CEMENT PLANTS

Analysis of data centre cooling energy efficiency

Life Cycle Costing Analysis of Water-cooled Chillers. Chillventa Nuremburg, Germany

Q Utility Rebate Report. Fort Worth, TX

WORLD CLASS ENERGY MANAGEMENT WORKSHOP

Energy Audit and Conservation Tool for Energy Efficiency

Ground Source Heat Pumps The Fundamentals. Southington, Connecticut John F. Sima III P.E.

Take out an interest-free loan of 1,000 to 100,000

Training for Building Technicians: Energy Efficiency & Sustainability (BEST) Program. Seminar Outline & Sample BEST Exam Questions

Nova Scotia s Energy (Efficiency) Resource

ENERGY-SAVINg DRIVE PACKAGE DE ES FR IT. Overview

BGE Smart Energy Savers Program Energy Efficiency and Demand Response Programs December 4, 2012 USEA Global Workshop On Clean Energy Development

HEATER, AIR CONDITIONING AND VENTILATION

How To Design A Building In New Delhi

HEATING, VENTILATION & AIR CONDITIONING

ENERGY EFFICIENT HVAC DESIGN FOR WARM-HUMID CLIMATE CLIMATE

Case Study 27 Energy Savings from Preventative Maintenance of Small to Medium Sized Ducted Air Conditioning Units

The Business Case for Environmental Sustainability

Compressed Air Systems

Year project completed or estimated year of completion: October 2014

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

TECHNICAL GUIDE A GUIDE FOR THE SELECTION OF ENERGY EFFICIENT TECHNOLOGIES

Measurement & Verification Plan

CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)

MEM10019 Select circuit protection devices by type and rating, fit to switchboards and install earthing

Xcel Business Customers: Program and Rebate Summary

Energy Efficient Data Centre at Imperial College. M. Okan Kibaroglu IT Production Services Manager Imperial College London.

Electrical Engineering

USING KPI S FOR PEAK EFFICIENCY

A Cover HVAC ENERGY EFFICIENT

Columbus State Community College. Climate Action Plan

THE WEST NIPISSING GENERAL HOSPITAL STRATEGIC ENERGY MANAGEMENT PLAN 2014

Switching Energy Providers and PECO Smart Ideas. March 23, 2011

Efficient and reliable fans, compressors and blowers

PARTNERING. in Energy. Solutions A PROGRAM TO PROMOTE BUSINESS ENERGY EFFICIENCY

Georgian Bay General Hospital Strategic Energy Management Plan 2014

The. Brendan P. Sheehan, Honeywell Process Solutions, USA, and Xin Zhu, UOP, a Honeywell Company, USA, explore energy optimisation in plant processes.

Resources for School Energy Managers

UNDIP TEAM TECHNICAL WORKING GROUP III : ANALYSIS OF ENERGY SAVING ELECTRICITY IN CENTRAL JAVA. Grand Legi Hotel Mataram, NTB 26 Feb 2 March 2011

Case Studies: Infrared Heating in Industrial Applications

Opportunity of Energy Saving in electrical path is lesser as compared to other areas

Data Center RD&D at EPRI

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

Transcription:

P R I S M C E M E N T PRISM LTD. WORKS MANKAHARI, SATNA ENERGY EFFICIENCY : A GIZMO MK JHA BN SINGH NP SINGHAI

U-II : 3.5 MTPA Cement Commissioned : Jan 2011 U-I : 3 MTPA Cement Commissioned : 1997

Energy Conservation call of Time, World and Forthcoming Generations For Sustainability of Quality Life. Presentation recites success story at Prism Cement Ltd, wherein turn around at energy front happened due to able guidance and zeal to excel, without much of investment.

Plant Capacity SECTION UNIT-I UNIT-II Clinkerisation 6000 TPD (Guaranteed) 7200 TPD (Guaranteed) 7200 TPD (Potential) 8000 TPD (Potential) Cement Grinding 3.0 MTPA (PPC) 3.6 MTPA (PPC) Core Equipment Capacity SECTION Lime stone Crusher Raw Mills Kiln Coal mill Cement Mills UNIT-I 1200 TPH 275 TPH x 2 nos. 6000 TPD / 7200 TPD 65 TPH 180 TPH x 2 nos. UNIT-II 750 TPH x 2 nos 300 TPH x 2 nos 7200 TPD / 8000 TPD 74 TPH 275 TPH x 2 nos Packers 120 TPH x 6 nos. 240 TPH x 5 nos

PURSUIT TO ENERGY EFFICIENCY PAT is an activity that encourages conservation through rewards. We created energy forum to comply with PAT requirements. Baseline SEC as 783 kcal/kg of equivalent product. Target SEC as 749 kcal/kg of equivalent product. Arrived at way forward suiting plant condition, on following Base: preventing losses adopting innovative methods of operation, re-visiting the equipment design & specifications with respect to operational needs modifying the equipment to fit in operation point. Process optimisation, Intensive monitoring to avoid idling, effective use of industrial waste materials, alternate sources of cheaper electricity, grass-root level involvement through awareness campaigns

We planned a systematic energy audit arrived at a job list based approach, as described below: Sl Job Description Expected Saving kw/hr. Achieved Saving kw/hr. JOB LIST FOR UNIT-I 1 Identify the list of under loaded motors ( < 50% loading). 35 37.5 2 Identify the motor having poor power factor. 35 21 3 Study of process fans efficiency and plan for retrofit 917 110 4 Study for optimisation of bag filters purging sequence and time 30 15.5 5 Compressor monitoring with CCR 50 65 6 Proposal of bag filter fan VFD in Unit-I 10 12.5 7 VFD requirement in P&V system to control the fan speed 87 55 8 PID loops optimisation & new PID 40 70 Remarks U-I Cooler ESP Fan being changed, rest planned in phased manner during this FY

Sl Job Description Expected Saving kw/hr. Achieved Saving kw/hr. 9 Cooling tower fan optimisation with temp control 10 11 10 Idle running of Unit-1 (Crusher -U1) 250 By 2 Shift operation Scope of power less exhaust fan, LED light & 11 control switch scheme in plant and building 50 45 (U-1) Power saving of changing booster pump from 12 37 kw to 18 kw and others saving scope in DG 5 6 Solar lighting system for guest house, ADM. 13 building, CCR and school building. 18 15 Welding transformer auto on/off system for 14 saving the power. 20 22 15 Day light/ optimisation by switching off lights 28 35 Water pump VFD required to control the 16 pressure (U-1 pump house) 20 15 Transparent sheet on workshop/dg/bc 17 galleries 10 8 Energy saving in lighting by concept of 18 separate transformer scheme for lighting Remarks under implementation 100 23 under evaluation

Sl 19 20 21 22 23 24 25 26 Job Description Rewind motor efficiency check and replacement with suitable one. Concept of permanent magnet in place of mag. Separator. Potential of saving to be calculated Power saving by providing starvation switch to prevent idle run in unit 1. Power saving in exhaust fan by new interlocking provided in cement mill section Power saving in cement mill section by introducing software interlocking for Optimisation of lighting load in Packing plant and cement mill unit 1 Power saving in crusher area Unit 1 by new software interlocking provided for aux. drive running time after stop of HT drive. Bag House U1 - Power saving scope through V/F Drive Expected Saving kw/hr. Achieved Saving kw/hr. 25 15 Remarks 75 35 being procured 25 27 2 5 25 15 26.52 74 40 45 120 proposal being finalised

Sl Job Description JOB LIST FOR UNIT-II Power saving by PID loops optimisation and 27 implementation in U-II Expected Saving kw/hr. 28 RABH dust transport through bulker 31 Plant lighting optimisation by providing on-off 29 controls at accessible locations in U-II Bag filter rotary airlock modification to 30 prevent idle run Achieved Saving kw/hr. 450 215 27.4 47 2.9 4 31 Cooling tower fan VFD 25 23 Air conditioner optimisation in cement mill 32 and RABH load centres 33.25 35 33 Bag filter fan VFD in crusher 54.9 57 34 Idle run avoiding in crusher aux 285 225 35 Crusher 2 shift operation 200 36 Welding machine optimisation 28.2 21 37 Compressors run hour control through DCS 50 45 Remarks scheme under implementation being planned for execution

Sl Job Description Expected Saving kw/hr. Achieved Saving kw/hr. Remarks 38 Kiln shell cooling fan automation with temp 90 75 Energy saving by Solar water Heater in G. 39 House 30 25 40 Provision of false sealing at RABH L/C 27 25 41 VFD in coal firing blowers in U2 18 21 42 VFD in reverse air fan in RABH SYSTEM 70.93 being procured Apart from above, described next are few major initiatives, which paved way for mechanism to reap out the advantages:

Adopting EnMS ISO 50001 : One amongst pioneers in Indian cement industry to adopt prestigious EnMS ISO:50001 system. It orchestrated entire organisation towards movement. Structured steps of monitoring and awareness sourced novel ideas for implementation, which yielded coveted results. Distribution Transformers Load Rationalisation: Re-visiting loading pattern on distribution and power transformers of entire network suggested enough scope for rationalisation. 06 transformers switched off in entire plant, which helped in reducing losses ~ 35 kwh * 24 = 840 units/day. Planned schedule to switch on in a month time to avoid any degradation.

Utilities Load Optimisation: Re-view of plant area illumination as per Lux level and provision of onoff switches at accessible points. BC galleries, loading platforms and desolate equipment areas yielded maximum saving opportunities. Intense monitoring of compressors' utilisation & run-hours through DCS, equipment cooling and process water consumption, optimisation of HVAC with false ceiling provisions, use of VFD in P&V systems. Daylight utilisation wherever possible, use of transparent sheets in warehouses and workshops. LED lights replacing conventional ones for area & offices, Solar lights. Power less exhaust fans, switching off welding machines when not is use. Optimisation of auxiliary power consumption in DG House.

508,305 555,528 465,837 697,701 PRISM Improvement due to actions taken in utilities consumption: 800000 700000 Utilities Consumption (kwh) 600000 500000 400000 300000 200000 100000 0 Jan-15 Feb-15 Mar-15 Apr-15

Opportunity in Motors Efficiency: Identification of under loaded motors and arranging suitable replacement from available stock. Benefit ~ 37.5 kw. Replacement of Cooler ESP Fan SRIM motor (SPRS driven, limitation of operation above 70% rpm) with DC motor, which helped operation of fan below 50% rpm as per process requirement. Power factor improvement at motors' side. Process Optimisation: Plenty of scope was identified and worked out at different fronts for process optimisation to reduce specific power consumption. These are mentioned in above list. Resulted reduction in Sp. Power Consumption ~ 1.5 kwh/t of cement.

Time of Day Tariff (TOD) Utilisation: As per applicable MPERC tariff structure Peak hour surcharge - 5% surcharge Off peak rebate - 15% rebate Stopping equipment during peak hour and maximizing equipment run during off- peak hours results in reduced bills. Calculations and experience indicate ~ 03-04 paisa/kwh on total day wise energy bills reduction, if plant operational requirement is met with production plan. Implemented the practice with participation of cross functional team. SOP prepared and circulated to all for awareness and controls. Actual monetary benefit ranges ~ Rs. 9 to 10 lac/month, depending upon capacity utilisation of plant.

RESULT Month Savings due to TOD tariff Remarks utilisation (Rs.) January 3,53,592 Experiment started February 10,54,302 March 11,05,545 April 5,04,841 One plant under shut down Plan reduced MD of U-II to ~36 MVA from 40 MVA, and for U-I 28.9 MVA from 32 MVA. Also helped to improve predictive maintenance and improve upon MTBF and MTTR.

Staggered Run of Equipment to Reduce Maximum Demand: Improvement in MTBF/MTTR helped to improve Overall Equipment Efficiency (OEE). This improvement invoked thought of staggered run of equipment as production requirement were now being met by even reduced run factor. Analysis of the process capabilities w.r.t. required production plan allowed staggered running of all sections except Kiln.

Contract Demand Reduction: Staggered run of sections, TOD tariff utilisation tends to reduce overall LF, which can affect unit rate, unless MD and CD of plant are in tandem. Energy efficiency measures, coupled with equipment efficiency improvement and process optimisation, created opportunity to reduce the Contract Demand (CD) of both Units. In U-I we could restrict the Contract Demand from 32 to 30 MVA and in U-II it was done from 40 MVA to 37 MVA. Reducing the CD not only improves upon Load Factor, but also has impact on the fixed cost, demand side reduction on load and overall GHG emissions.

31.5 31 30.5 30 29.5 29 28.5 U-I : Max Demand MVA 31.0 30.1 29.8 29.4 Jan-15 Feb-15 Mar-15 Apr-15 45 40 35 30 25 20 15 10 5 0 40.8 40.16 39.6 PLANT SHUTDOWN 19.61 11.24 20.37 20.36 U-II : Max Demand (MVA) 34.18 34.18 33.97 33.97 31.51 32.46 34.512 33.3833.14 33.96 33.2 34.14 30.79 31.41 31.8431.63 31.92 30.03 28.97 30.71 30.72 29.27 28.12 31.53 26.44 Maximum Demand

Optimisation of shutdown power: - Switched OFF 7 Nos of Distribution transformers out of 10 and one Power transformer out of 02. - Compressors running reduced by on demand run, as compressed air required for Girth Gear Lubrication system of Kiln Aux. only while brick lining. - Bag House fan power reduced by lowering the minimum speed limit from 110 to 50 RPM for shutdown period. - RABH dust transport circuit switched OFF immediately after plant shutdown. - PA Fan switched OFF and smaller size Emergency air fan taken into operation for cooling.

POST IMPLEMENTATION - RESULTS Measures taken showed up astonishing results. Few of them: - Clinkerisation power ~ 48 kwh/t of clinker, frequently touches even 45.5 kwh/t. - Cement grinding power ~ 24.2 kwh/t of cement, often comes as even 21.5 kwh/t. - Sp. Power Consumption ~ 63.5 kwh/t of cement, comes as low as 55.4 kwh/t of cement.

PAT SUCCESS BEE had given a tough target to achieve w.r.t. baseline study for PAT Cycle-I. Apparently extremely difficult to achieve the target, as projects, which PCL had intended & declared for execution, failed to realise due to unexpected failures & constraints. Estimated penalty due to non-achievement was looming around Rs. 15 crore.

PCL marched ahead with above explained energy saving measures and firm determination. Turnaround happened! Appointed Accredited Empanelled Energy Auditor TERI conducted M&V audit during May'15 and came up with following results: 790 780 770 760 750 740 730 720 710 783 SEC : kcal/kg of equivalent product 749 737 Baseline Target Achieved Implemented measures suggest issuance of E-Certs equivalent to ~ Rs 4cr. instead of penalty ~ Rs. 15 cr! Data submitted to BEE for review. This turn around happened for out of box measures implementation.

FORTHCOMING MEASURES - Process Fans Retrofitting: Study indicates that scope of ~ 900 kw saving is there with payback of < 1 year. -Small Projects on Process Optimisation: Areas have been identified for further load reduction to the tune of ~ 1.3 MW (both Units combined). These are under implementation & observation stage. -Cheaper Power purchase through Open Access: In quest of cheaper power, we have applied to our discom for allowing us power purchase through Open Access mechanism. Through IEX we can get cheaper power as & when available. Other feasibility of group captive mode is under evaluation, which may benefit us intensively.

FORTHCOMING MEASURES -Power generation from Waste Heat Recovery System: Plant has potential to generate power ~ 14 MW through WHRS. It is under evaluation and expect to implement in coming FY. -Unit -I Clinker Cooler Upgradation: Upgradation of U-I clinker cooler has not only potential to save ~ 2 kwh/t of clinker, but also can result benefit of ~25 kcal/kg of clinker. It is under evaluation for implementation.

WRAP UP Effective guidance and will full execution reaped out the benefits! Coming out of blues, once again PCL is on the path of being NUMERO UNO of Indian Cement Industry, in all respects. With implemented measures, continuous monitoring & analysis, corrections to meet desired results and forthcoming projects, we are sure to achieve < 55 kwh/t of cement on consistent basis. Truly said... " One Unit Saved = Two Units Generated".

THANKS For further information, please contact: Mr. B N Singh, Sr. G M (Tech), Prism Cement Ltd, bnsingh@prismcement.com Mr. N. P. Singhai, Jt. G M (E&I), Prism Cement Ltd, npsinghai@prismcement.com