WEST AFRICAN POWER POOL



Similar documents
IAEA's Tools and Capacity Building for Energy Planning in Africa

ECONOMIC AND POLITICAL INTEGRATION IN WEST AFRICA PRESENTED BY DR. NELSON MAGBAGBEOLA ECOWAS COMMISSION. Ouagadougou, 28 October 2009

(EORE) Considerations May 2012

The Ohada and Ecowas Treaties as Tools for Regional Integration and Regulatory Reforms

The West Africa Quality System

Ms. Ifeyinwa Ikeonu Council Member ECOWAS Regional Electricity Regulatory Authority (ERERA) Accra, Ghana

How To Track Trade Flow Of Agricultural Products In West Africa

TERMS OF REFERENCE FOR PREPARING A STRATEGY AND PROCEDURES FOR INTERVENTION IN THE PRIVATE SECTOR

Baseline Report for the ECOWAS Renewable Energy Policy (EREP)

MAPPING AND SCOPING OF CAPACITY DEVELOPMENT INITIATIVES AND INTERVENTIONS OF AFRICA S REGIONAL ECONOMIC COMMUNITIES

TERMS OF REFERENCE FOR THE DEVELOPMENT OF RESOURCE MOBILZATION STRATEGY AND PROCEDURES FOR EBID

Financing Agro-Business and Food Processing in Nigeria. Oti Ikomi Head, Corporate Banking Products Ecobank Group, South Africa March 8, 2011

CONTRACT SPECIFICATION

TRANSBOUNDARY WATER RESOURCES MANAGEMENT IN THE VOLTA BASIN

The EU's Technical Assistance Facility (TAF) for the SE4ALL initiative

CROSS-BORDER TRADE FLOW IN AGRICULTURAL PRODUCTS IN WEST AFRICA December, 2013

ECOWAS COUNTER-TERRORISM STRATEGY AND IMPLEMENTATION PLAN Draft Dr Deo Barakamfitiye

STRENGTHENING MARITIME SECURITY IN WEST AND CENTRAL AFRICA

Stakeholders participation in the Volta River Basin is there a need for a stronger legal framework?

I. SECTOR OVERVIEW SUPPLY STRUCTURES II. POWER SYSTEM III. SUPPLY/DEMAND BALANCE IV. V. LOSSES IN THE DISTRIBUTION NETWORK

UNFCCC initiatives: CDM and DNA Help Desks, the CDM Loan Scheme, Regional Collaboration Centres

Corporate Overview Creating Business Advantage

WATRA/ECOWAS 1 ST MOBILE ROAMING CONFERENCE AND EXHIBITION

TARIFF AND GOVERNANCE ASSESSMENT

WEST AFRICA ENERGY SECURITY REPORT

Solar Energy in Africa Experiences from Ghana

Migration and Development in Africa: Implications for Data Collection and Research

Trade Development through Quality. The West Africa Quality Programme

Regulatory Environment and Electricity Tariff Design in Nigeria. Nigerian Electricity Regulatory Commission June, 2013

Agricultural Development Young Professionals Internship Program Call for Applications

Investment Brief for the Electricity Sector in Ghana

Regional Interconnection: Presenting the Business Case for African Operators. Densu Richard Ag. Executive, MTN Business

Fiscal Space & Public Expenditure on the Social Sectors

Investment Brief for the Electricity Sector in Liberia

Future Role of Distribution Companies Deployment of Smart Systems. Dr. Sam Amadi Chairman/CEO

DEFINITION OF THE CHILD: THE INTERNATIONAL/REGIONAL LEGAL FRAMEWORK. The African Charter on the Rights and Welfare of the Child, 1990

The AFRISTAT Newsletter Information Bulletin Economic and Statistical Observatory for Sub Saharan Africa

Update on the Continental Free Trade Area (CFTA)

RECRUITMENT ANNOUNCEMENT

LOGISTICAL INFORMATION FOR DELEGATES

Internet Society (ISOC)

STRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) ELECTRICITY COMPANY OF GHANA

Indian Lines of Credit: An Instrument to Enhance India-Africa Partnership. November 22, 2011 New Delhi

SUPPORT TO VOLTA BASIN AUTHORITY ON THE VOLTA HYCOS PROJECT. Dr. Jacob W. TUMBULTO (Volta Basin Authority)

In 2003, African heads of state made a commitment to

ARSO President Forum. Introduction. ARSO Presidents.

VACANCY SENIOR IT CONSULTANT

African Elephant (Loxondonta africana)

FFEM Fonds Français pour l Environnement Mondial French Global Environment Facility. PROGRAMME PETITES INITIATIVES Small-Scale Initiatives PROGRAMME

OUR SUPPORT TO THE DEVELOPMENT OF SMALL AND MEDIUM SIZED BUSINESSES IN WAEMU

The Africa-EU Energy Partnership

Specific amendments to the Capacity Allocation and Congestion Management Network Code

The Trade Finance Bank for Africa

RENEWABLE ENERGY FINANCING. Challenges, Opportunities & prospects The Ecobank experience. Sunkanmi Olowo

Nigeria s Power Privatisation Process: Learning Curves. Chijioke Okonkwo Senior Consultant June 2015

COMUNIDADE ECONOMICA DOS ESTADOS DA AFRICA OCIDENTAL

Overview of the Nigerian Electricity Industry (Roles, Responsibilities,

The Education for All Fast Track Initiative

WAPIS PROGRAMME. West African Police Information System. This Programme is funded by the European Union

Distance to frontier

REQUEST FOR EXPRESSIONS OF INTEREST (Individual Consultant) AFRICAN DEVELOPMENT BANK (AfDB) Energy, Environment and Climate Change Department (ONEC)

The role of parliaments in the implementation of international and regional human rights instruments

The Effective Vaccine Management Initiative Past, Present and Future

Manufacturing & Reproducing Magnetic & Optical Media Africa Report

Africa Energy. Transformative Impact, Lessons Learned, and the Way Forward. Zayra Romo. Energy Unit - Africa Region World Bank November 2013

Crisis Management Centre - Animal Health (CMC-AH)

Presentation to 38th General Assembly of FANAF Ouagadougou, February Thierry Tanoh- Group CEO

National Center of Specialization for Livestock (NCOS) Dr. Abdoulaye ALIO, NCOS Coordinator

FAO E-learning Center

PROCEEDINGS KIGALI 3-4 NOVEMBRE,

Impact of Renewable generation

LOGISTICS EXPERIENCE CUTTING EDGE EXPERTISE

Call for Application Graduate Research Program on Climate Change and Agriculture

Pathways from Stagnation in the West African Electricity Sector. Patrick Gilmartin Master of Law & Diplomacy, 2013

Climate Parliament Climate Change & Energy Access for the Poor March 26-28, 2010, Limbe, Cameroun

Global Fuel Economy Initiative Africa Auto Club Event Discussion and Background Paper Venue TBA. Draft not for circulation

MEMORANDUM OF UNDERSTANDING

Raising Capital for Oil & Gas:

Completion of the Internal Energy Market. Transport, Telecommunications and ENERGY Council meeting Brussels, 9 December 2014

Sector: Renewable Energies Based in Geneva. Founders: Clément Lagalice Cintia Dantas Eduardo Fujikawa Andrea Martinez Marta Seu

Transmission Pricing. Donald Hertzmark July 2008

KEY CONSIDERATIONS IN POWER PURCHASE AGREEMENT (PPA) RISK ALLOCATION AND COMMON CLAUSES WHICH FORM PART OF A PPA

Geneva, March 2009 COUNTRY REPORT: MALAWI

REQUEST FOR EXPRESSIONS OF INTEREST

Over 620 million Africans are living without the benefits of an electricity connection, a situation that

Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan

GENe Software Suite. GENe-at-a-glance. GE Energy Digital Energy

Comparison of Electricity Supply and Tariff Rates in South Asian Countries

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

UNAIDS 2013 AIDS by the numbers

Profile: Dr. Sulley Gariba

Transcription:

WEST AFRICAN POWER POOL South Asia Regional Workshop on Competitive Electricity Markets Colombo, SriLanka: March 18, 2014 Babatunde Adeyemo Director, Information & Coordination Center

PLAN DE PRESENTATION A. LEGAL & STRUCTURE, VISION & MISSION B. CONSTRAINTS C. OPERATION MANUAL D. MASTER PLAN AND IMPLEMENTATION STRATEGY E. DEVELOPMENT OF THE REGIONAL ELECTRICITY MARKET F. CONCLUSION

Fifteen countries Population 340 million (4th) Area: 5,112,903 km 2 (7th) Density 49.2/km 2 Total available generation 10,000MW Av. Electricity Access: 70%

Legal and Governance

Date December 1999 January 2003 January 2003 January 2005 January 2006 Policies / Decisions Creation of WAPP by the ECOWAS Heads of State and Government Adoption of Energy Protocol by the ECOWAS Heads of State and Government Creation of Energy Observatory by the ECOWAS Heads of State and Government Adoption of Revised Master Plan by the ECOWAS Heads of State and Government Adoption of Articles of Agreement for the establishment of WAPP by the ECOWAS Heads of State and Government ECOWAS Heads of State and Government establish WAPP as a specialized institution of ECOWAS

Date July 2006 January 2008 January 2008 Policies / Decisions National utilities in West Africa sign the Articles of Agreement thereby creating the General Assembly of the WAPP Organization WAPP General Assembly establish Executive Board and adopt 2006-2009 Business Plan for WAPP ECOWAS Heads of State and Government create the ECOWAS Regional Electricity Regulatory Authority ECOWAS Heads of State and Government adopt through Supplementary Act, the WAPP Transmission Line Implementation Strategy that approves the establishment of Special Purpose Companies under the frame work of public- public and public-private partnerships ECOWAS Heads of State and Government

1. Vision of WAPP: To integrate the national power systems into an unified regional electricity market with the expectation that such mechanism would over the medium to long term, ensure the citizens of ECOWAS Member States with a stable and reliable electricity supply at competitive costs Mission of WAPP: To promote and develop infrastructure for power generation and transmission, as well as, to assure the coordination of electric power exchanges between ECOWAS Member States

GENERAL ASSEMBLY MDs of WAPP Member utilities Supreme decisional organ EXECUTIVE BOARD Responsible for execution of WAPP policies and decisions 12 Members - eight (8) permanent members, three (3) rotating members, 2 observing members EOC SPEC FC HRGC DCC ORGANISATIONAL COMMITTEES GENERAL SECRETARIAT WAPP Donors Coordination Committee Information & Coordination Centre Administration & Finance Department Planning, Investment Programming & Environmental Safeguards Department

Members of WAPP in 2013 (26#) TOGO BENIN MALI NIGER THE GAMBIA SENEGAL GUINEE BISSAU GUINEE BURKINA FASO SIERRA LEONE CÔTE D IVOIRE GHANA NIGERIA 10

Constraints

40,000 GWh Thermal 64% Import + Others 5% Hydro 31% 30,000 20,000 10,000 Thermal Import + Others Hydro - Benin Burkina Faso Cote d'ivoire Gambia Ghana Guinea Guinea Bissau Liberia Mali Nigeria Senegal Sierra Leone Togo 12

GWh 50,000 Met 54% Unmet 46% 40,000 30,000 20,000 Met Unmet 38,370 10,000-661 688 3,004 170 7,773 860 16 16 841 1,800 56 674 Benin Burkina Faso Cote d'ivoire Gambia Ghana Guinea Guinea Bissau Liberia Mali Nigeria Senegal Sierra Leone Togo 13

TOGO BENIN Ghana and Nigeria trade excess capacity NIGER BURKINA FASO NIGERIA CÔTE D IVOIRE GHAN A

BENIN TOGO Cote d Ivoire doubled required national generation capacity and export excess to Ghana NIGER BURKINA FASO NIGERIA CÔTE D IVOIRE GHAN A

TOGO BENIN Cross Border Flow (2007 - ) Merged inteconnections NIGER BURKINA FASO NIGERIA CÔTE D IVOIRE GHAN A

Inadequate generation Old aged generators Weak national transmission network Limited interconnection for cross-border electricity trade Low capacity diesel generators in the network Supply three land locked countries Lack of funding

Market Development Strategy

WAPP PRIORITY PROJECTS WAPP OPERATIONAL MANUAL ICC PROJECTS REGIONAL ELECTRICITY MARKET MARKET DESIGN & MARKET RULES M&E REPORTING SYSTEM

WAPP Priority Projects

Mobilise resources for the preparation of Priority Projects; Ensure the preparation of the priority projects for financing; Mobilise resources for the implementation of the priority projects; Coordinate and monitor the implementation of the priority projects during their realisation;

Traditional Model : Implementation Committe to coordinate the activities in each concerned country Regional Model: Creation of Special Purpose Company (SPC): The Authority of ECOWAS Heads of State and Government adopted in January 2008 two (2) Supplementary Acts that govern the implementation of WAPP Priority Projects: Transmission Lines Special Purpose Company jointly owned by ECOWAS Member States/WAPP Member Utilities; Regional Power Generation Facilities Special Purpose Company to be jointly owned by Private Partners and ECOWAS Member States/WAPP Member Utilities

The first Master Plan for WAPP adopted by ECOWAS Council of Ministers in 1999 through Regulation C/REG.7/12/99 Master Plan was revised in 2005 and adopted by the ECOWAS Heads of State and Government through Decision A/DEC.7/01/05 The Revised Master Plan is being implemented as WAPP Priority Projects (Generation and Transmission) Utilizing diverse energy source in the region for generation Construct transmission lines to interconnect countries of West Africa

Huge Water Resource Huge Oil and Gas Resources c GAMBIA GUINEA BISSAU SENEGAL Huge Coal Resource GUINEA SIERRA LEONE LIBERIA CÔTE D IVOIRE MALI BURKINA FASO GHANA TOGO BENIN NIGER NIGERIA West Africa Gas Pipeline (WAGP) Project

1. Coastal Transmission Backbone Subprogram (Côte d Ivoire, Ghana, Benin/Togo, Nigeria). 2. Inter-zonal Transmission Hub Sub-program (Burkina Faso, OMVS via Mali, Mali via Côte d Ivoire, LSG via Côte d Ivoire). 3. North-core Transmission Sub-program (Nigeria, Niger, Burkina Faso, Benin). 4. OMVG/OMVS Power System Development Subprogram (The Gambia, Guinea, Guinea Bissau, Mali, Senegal) 5. Côte d Ivoire-Liberia-Sierra Leone-Guinea Power System Re-development Subprogram (Côte d Ivoire, Liberia, Sierra Leone, Guinea). 6. WAPP Strategic Generation Subprogram (Emergency Power Supply Security Plan). 26

Inter Zonal Hub North-Core OMVG-OMVS MALI SENEGAL NIGER GAMBIE GUINEE BISSAU GUINEE SIERRA LEONE CÔTE D IVOIRE BURKINA FASO GHANA BENIN TOG O NIGERIA CLSG LIBERIA Coastal Backbone

Project Commissioning Coastal Transmission Backbone Sub-program 330 kv Aboadze (Ghana) Volta (Ghana) - Operational 2010 330 kv Volta (Ghana) Lomé C (Togo) Sakété (Benin) Implementation 2014 330 kv Riviera (Cote d Ivoire) Prestea (Ghana) Pre-investment 2016 330 kv Nigeria Benin Interconnection Reinforcement Project FINANCING REQUIRED for Preinvestment Studies ( 2.9 million) 2017 330 kv Sakété (Benin) Ikeja West (Nigeria) Operational 2007 Interzonal Transmission Hub Subprogram 330 kv Aboadze (Ghana) Prestea (Ghana) Kumasi (Ghana) Han (Ghana Preinvestment 2016 161 kv Tumu (Ghana) Han (Ghana) Wa (Ghana); Implementation 2014 225 kv Bolgatanga (Ghana) Ouagadougou (Burkina Faso) - Implementation Han (Ghana) Bobo (Burkina Faso) Sikasso (Mali) Bamako (Mali) - Mobilisation of Financing ( 172 million) 2016 225 kv Bobo Dioulasso (Burkina Faso) Ouagadougou (Burkina Faso) Operational 2009 Ferkéssedougou (Cote d Ivoire) Sikasso (Mali) Ségou (Mali) Operational 2012 Northcore Subprogram 2016 330 kv Birnin Kebbi (Nigeria) Bembéréké (Benin) Niamey (Niger) Ouagadougou (Burkina Faso) FINANCING REQUIRED for Pre-investment Studies (( 5.3 million) 2017

Projects Commissioning OMVG-OMVS System Development Subprogram Projet Hydro-électrique de Félou (60MW) Implementation ( 205 million) Projet Hydro-électrique Gouina (95MW) + 225kV Doublement de la ligne de transport - Pre-investment 2016 Projets hydroélectriques Kaléta (240MW), Sambagalou(128MW) + 225 kv Ligne d interconnexion Implementation, mobilisation of financing ( 748 million) 2015, 2018 2015 Development of Souapiti Hydropower Facility in Guinea (515MW) - Pre-investment Cote d Ivoire - Liberia Sierra Leone Guinée (CLSG) System Re-development Subprogram 2018 Côte d Ivoire Liberia Sierra Leone Guinea Interconnection Project - Implementation ( 323 million) 2017 Redevelopment of Mount Coffee Hydropower Facility in Liberia (64MW) Implementation (US$225 million) 2017 Development of 118 MW Kassa B Hydropower Facility in Guinea Pre-investment 2019 Development of 86 MW Bikongor Hydropower Facility in Sierra Leone Pre-investment 2019 Development of 270 MW Tiboto Hydropower Facility in Guinea FINANCING REQUIRED for Pre-investment Studies ( 0.5 million) 2020

Projets Mis en service Strategic Generation Subprogram 450 MW WAPP Maria Gleta Regional Power Generation Facility in Benin Mobilisation of Financing (US$652 million) 2017 450 MW WAPP Domunli Regional Power Generation Facility in Ghana - Mobilisation of Financing (US$652 million) 2017 450 MW WAPP Regional Power Generation Facility within OMVS Zone - Conception 2018 PRIORITY PROJECTS

Energy For The Poor Medium Voltage Cross Border Electrification Sub-program Côte d Ivoire Liberia: ( Electrification of 18 rural communities (131,000 habitants) in Liberia from Côte d Ivoire Implementation ( 9.65 million) JULY 2013 Ghana Togo: (Electrification of12 rural communities (42,500 habitants) in Togo from Ghana Commissioned ( 3.6 million) 2012 Ghana Burkina Faso: (Electrification of 7 rural communities(32 000 habitants) in Burkina from Ghana Commissioned ( 1.5 million) 2011

Energy For The Poor Medium Voltage Cross Border Electrification Sub-program Southern Togo Ghana: (Electrification of 9 rural communities (16,141inhabitants) in Southern Togo from Ghana Implementation ( 2.32 million) 2015 Northern Togo - Benin: (Electrification of6 rural communities (15,778 habitants) in Togo from Benin Implementation ( 2.14 million) 2015

Energy For The Poor Medium Voltage Cross Border Electrification Sub-program Burkina Faso and Niger : Under Development Ghana - Burkina Faso: Under Development Côte d Ivoire - Burkina Faso: Under Development Senegal and The Gambia: Under Development 15 million Mali - Guinea: Under Development Côte d Ivoire and Guinea: Under Development

Adopted by ECOWAS Heads of State and Government in February 2012 through Supplementary Act A/SA. 12/02/12 Outcomes (2012-2025): A Total Investment Requirement = US$26.416 billion

REALISATION OF THE ECOWAS REVISED MASTER PLAN SHALL RESULT IN AN ENERGY MIX WITH 10% 35

27/08/11 36

27/08/11 37

Felou (Mali) 66MW Maria Gleta (Benin) 450MW - WAPP Program Domunli (Ghana) 450MW - WAPP Program OMVS Region 450MW - WAPP Program Souapiti Hydro 515 MW Kassa B Hydro 118 MW Charbon (Senegal) 875MW Sambangalou (Senegal/ Guinea) 433MW Biu Hydro (Ghana) 600MW NIPP (Nigeria) 6,000MW Mount Coffee (Liberia) 66MW Adjarala (CEB) 147MW Expected Additional Generation by 2017 10,170MW

WAPP Operation Manual

WAPP Operation Manual was developed with the support of a consultant from EDF under USAID Technical Assistant in 2008. The WAPP Operation Manual contains policies for operations security and mitigation plan. The WAPP Operation Manual governs the operation of WAPP interconnected network (Grid Code) A Gap Analysis of the Manual identified programs required for unified regional integration

P1: Load Frequency Control P2: Interchange Scheduling and Accounting between Control Areas P3: Security of Interconnected System P4: System Operational Planning P5: Emergency Procedures and Measures P6: Communication Infrastructures P7: Information Exchange between Control Areas P8: Training of Operators of the Interconnected Systems

WAPP Board Resolution 51/RES.20/20/04/09 Defined and adopted the modalities for the implementation of WAPP Operation Manual for the WAPP interconnected system. During the eighth meeting of WAPP Executive Board held in Cotonou on April 26th, 2009 REGULATORY APPROVAL Submitted to ERERA for review and approval ERERA Consultant has presented draft final report to EOC ERERA final approval expected in the first quarter of 2014

World Bank Grant Synchronization of the interconnected systems and to the implementation of the Operation Manual. Supply and Installation of equipment to ensure secure and safe operation

OSMP Manual Identified Projects Capacity Building Operating Instruction & Procedure Market Design & Rules ICC Project Synchronization Project

Justification for Regional Market

Political Willingness Regional Planning There is a political decision and instruments for the development of the regional market Resources are complementary in the region which suggests strongly the benefits of an integration in a regional market (oil and gas in the east mainly and hydro in the west) There are trades already ongoing in the region which demonstrates the capacity and willingness of countries to trade There is infrastructure being developed for regional trading

Economic Cooperation The ECOWAS Treaty Energy Act Reforms The ECOWAS Energy Protocol Establish legal framework for securing competitive market Unbundling of the large Utilities: Nigeria, Ghana, Senegal Regulation ERERA established by Supplementary Act A/SA.2/1/08 Regional Planning ECOWAS Master Plan implemented as WAPP Priority Projects

Minimum Requirement for Regional Market Technical Requirement Open access to the spare capacity in the transmission systems Electricity exchange between WAPP Utilities Agreement on a method for payment of wheeling services Power Purchase Agreement (PPA) between WAPP Utilities Market Governance Operation Rules Trading Rules Regional Regulations

Develop a Road Map required to transit from the present technical and commercial status to a regional electricity market and competitive wholesale market including time frame, resources. Appropriate model for actualizing the WAPP Regional Electricity Market. Develop electricity market rules such as: bidding process, physical spot market, financial market, clearing and settlement, and power balance mechanisms, including roles, responsibilities and interfaces between organizations.

WAPP Market Design

Market Development is phased in accordance with Implementation Road Map that include condition precedent for the next Market Phase Phase 1: From now and 2015 approximately when most regional generation and transmission infrastructure are expected to be commissioned. Appoint System Market Operator: which will begin developing market operation functions Phase 2: Formalized market - Short & Medium term electricity exchanges through day ahead market (DAM) Phase 3: a long term vision of a liquid and competitive market

WAPP Market Rules

9 Chapters & 72 Articles Containing Technical Commercial Financial Settlement Regulation Legal Role & Responsibilities: WAPP ICC- > Control Area Center -> National Control Chapter I: Introduction and Objectives Chapter II: General Conditions Chapter III: The SMO Chapter IV: The Control Areas Chapter V: The Domestic TSOs Chapter VI: Market Phase 1 Chapter VII: Market Phase 2 Chapter VIII: Governance Chapter IX: Miscellaneous

WAPP Board Resolution 120/RES/.04/10/12 Adopted the WAPP Market Design and WAPP Market Rules, Implementation Road Map Directive to submit the documents to ERERA for approval During WAPP Executive Board Meeting held in Cotonou on October 4th, 2012 REGULATORY APPROVAL WAPP Market Design and WAPP Market Rules Implementation Road Map have submitted to ERERA for review and approval ERERA has approved the Market documents ERERA has presented the Implementation Road Map to ECOWAS Ministers of Energy Meeting held in Yamoussoukro, May 2013

WAPP Board Resolution 120/RES/.04/10/12 Adopted Resolution relating to Transition of WAPP Information & Coordination Centre to Regional System Market Operator At nineteenth WAPP Executive Board Meeting held in Abuja on November 2, 2012 General Assembly Decision WAPP/45/DEC.02/11/12 Made a Decision relating to Transition of WAPP Information & Coordination Centre to Regional System Market Operator At the Seventh Session of General Assembly held in Abuja on 2nd November, 2012

ECOWAS Ministers of Energy a Resolution No 6 Council of Ministers Directive C/DIR.1/06/13 Resolution to commence organization of the ECOWAS Electricity Market Gave a Directive to commence organization of the ECOWAS Electricity Market At the eighth meeting of ECOWAS Ministers of Energy held in Yamoussoukro on 24th May, 2012. At the seventh Session of Council of Ministers of ECOWAS held in Abidjan on 21st June 2012 Recommended to Council of Ministers

Development of Infrastructure N

EU has approved 30 million euro grant Supply and install equipment and software necessary for Coordination of system operation, Electricity market operation Ensuring a reliable communication with Control Centers, WAMS equipment and actors of the electricity market Installed in a new building to be erected in Calavi - Cotonou

Supply and install communication equipment and software necessary for the market Communication network based on an optic fiber network Ensuring the proper communication rate between the different control centers Redundancy ensured with the realization of the future interconnections included in the WAPP Master Plan Including a technical assistance to the ICC and to the regional and national control centers.

ICC Project Mimic Board 6x2.5m Operator Workstations Historical Servers Network Time Servers (GPS) Back-up Archiving Server Mainteance Workstation Market Application Servers Video Controler Printers Com. LAN SCADA LAN Com. Servers Scada EMS Servers ICCP Servers Firewall Firewall E.mail Servers Router Metering Servers Local RTU xdsl Modem VPN Router WAPP LAN GPRS modem Web Server Internet Connexion Or separate LAN GSM PSTN GPRS Server (Telecom.Operator) GPRS Network VPN Router RTU NIGELEC GPRS modem GPRS modem GPRS modem GPRS modem VPN VPN VPN VPN Router Router RTU Router RTU Router NAWEC LEC ICC Main System RTU NPA Meter with GSM modem

Implementation of Market Road Map

Gencos IPP CROSS- BORDER ELECTRICITY TRADING RSMO Large Consumers DISCOs

Roles and Responsibilities N

Support national and control area centres in operation of interconnected system Coordination Centre Information Centre Centre for simulation Act as transparent and independent regional electricity market operator Coordination between the differents actors in the region Monitor and dispatch the exchanges Manage financial transactions Put in place Market Rules Missions du CIC

Mission 1- Coordination of Operation Centre of simulation Verify the global interconnected network : Criteria N-1, critical Incident, Evaluate maximum capacity transfer (J-1, W-1, M-1) Share the results with other company Centre de Coordination Coordination and monitor the reserve capacity et sa répartition Monitoring of the network (WAMS - Wide Area Monitoring System) and analyse of incident Coordination of maintenance of interconnections Coordination and monitor the harmonisation defense plans Monitor application of WAPP Operation Manual Coordination of medium and long term plan Centre of Information Centralize and put place database Develop Network Model Archive and share data and system information

SENELEC EDG EDM EAGB NAWEC WAPP Information & Coordination Center NPA LEC CIE TCN Legend VRA WAPP Information & Coordination Center SONABEL NIGELEC Control Area Center National Control Center CEB Communication Link

Regional Markets Participant Register WAPP Datacenter Technical Standard Contracts Billing & Financial Systems c Scheduling & Dispatching System Coordination Settlements Market Reports Metering System Emergency Procedure System Reserve

Data Collection and Processing Scheduling Contracting Dispatching Billing and Settlement Market Reports Info from Discos, Matching and Confirmation of Transmission of Verification of actual Generation of periodic Gencos, Bulk Buyers tabulating offers Agreements from by market contract requirements transactions followed activity reports on market participants participants to Control Area by invoicing and market performance Centers for execution payments by market participants

Challenges

Transition to the Regional Electricity Market Put in place a Market Governance Structure Appoint of System Market Operator for implementation of the Regional Electricity Market Construct building to house WAPP Information & Coordination Center. Construct Communication and Data Communication infrastructure. Improve reliability of WAPP Interconnected network Capacity Building in Pool Operation and real-time Electricity Trading

ICC has been appointed as the Regional Market Operator EU Grant secured to develop Infrastructure Building, Communication & Data Employ additional to strengthen Human Resources required GIZ Funds secured to implement Training Plan - Develop Contract templates Develop procedures for : for administration of contracts registering of market participants allocation of transmission capacity Synchronization of interconnections

Contact WEST AFRICAN POWER POOL WAPP Secretariat 06 BP 2907 Cotonou, Benin Tel. + 229 21 37 41 95 Fax + 229 21 37 41 96 E-mail info@ecowapp.org