ENGINEERING COMPETENCY CLAIMS



Similar documents
COST EFFECTIVE APPROACHES FOR PRESCRIBED DAM ASSET MANAGEMENT

ENGINEERING COMPETENCY REPORT

aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO

Release: 1. BSBPMG510A Manage projects

NATIONAL COMPETENCY STANDARDS FOR QUANTITY SURVEYORS - CONSTRUCTION ECONOMISTS

How the Ministry of Education managed the 2008 national school bus transport tender process. Report to the Ministry of Education October 2009

Underground Storage Tanks

Chartered Status COMPETENT PRACTICE. engineersaustralia.org.au/chartered

Information Commissioner's Office

Part B1: Business case developing the business case

SECTION 22 LIGHTNING PROTECTION SYSTEM

Civil Contractors :Interview case study Industry: Construction

Statement of Procurement Conduct

Practical Experience Requirements Initial Professional Development for Professional Accountants

Covance Construction Management Staffing Plan Chandler, Arizona

Client Skills: Skills required by Government as the Construction Industry Client

Prepared by David Willson, OCIO in consultation with Marc Buchalter, Procurement Please send comments to David Willson at

Position Description

QTC Training & Education. Certificate IV of Project Management BSB41507 Study by Correspondence

BLADDER SURGE CONTROL SYSTEM

PIPELINE INSPECTION UTILIZING ULTRASOUND TECHNOLOGY: ON THE ISSUE OF RESOLUTION By, M. Beller, NDT Systems & Services AG, Stutensee, Germany

Options for the Council s Debit & Credit Card (Merchant Acquirer) Contract Not a Key Decision

POSITION INFORMATION DOCUMENT

Job Description and Person Specification. Post Number: HCI.C24 JE Ref: JE028

Guide for Performing a Wireless Site Survey. 2.4 GHz IEEE g/802.11b/

LSB Procurement Framework

TfNSW Standard Requirements TSR T Technical Management

POSITION DESCRIPTION Number: PD:

City of Winooski. Request for Proposals Department of Public Works ASSET MANAGEMENT SOFTWARE, IMPLEMENTATION AND TRAINING

Flow Like An Egyptian: The Basics of Open channel flow

Quality Assurance. Policy P7

Sound Transit Internal Audit Report - No

BSBMKG506B Plan market research

Superseded by T MU AM PL v2.0

Project Assessment Framework Establish service capability

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?

UNSOLICITED PROPOSALS

Application for College Membership

2.24. Pump Controller 704. Data Sheet

ACG Commissioning Guideline

ISO :2005 Requirements Summary

Multidisciplinary Palliative Care Team Meeting

Adequate Records Management - Implementation Plan

Track and Track Drainage Renewals Programme

COMMISSION REGULATION (EU)

Department of Infrastructure and Planning: Governance Framework for Infrastructure Delivery Special Purpose Vehicles

Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier

Release: 1. FNSILF302A Process a life insurance application

Request for Proposal. Study: Site Plan Approval Process in Ontario. This Request for Proposal Closes at 16:00:00 EST on Monday, November 5, 2012

PRIMAVERA CONTRACT MANAGEMENT

Permits to Dig / Permits to Excavate / Permits to work near underground services

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A TREATED WATER STORAGE POINT ON THE WATER NETWORK

Streamlining Control Valve Selection & Evaluation Process Using Electronic Data Exchange. Introduction

QUEENSLAND CENTRE FOR PROFESSIONAL DEVELOPMENT (QCPD) TENDERING SERVICE: TENDER BID DECISION, PREPARATION AND SUBMISSION PROCEDURES

Fire Alarm System Monitoring - CAN/ULC-S561-03

These guidelines can help you in taking the first step and adopt a sustainability policy as well as plan your further sustainability communication.

Joint Statement of Principles for Professional Accreditation

The Scottish Wide Area Network Programme

Resource Manager Service for provision of ICT contractors CPO

Provision of Accounts Payable Service

Specifying Laser Scanning Services. A Quantapoint White Paper

Page 1 of 7 TENDER EVALUATION REPORT: 3380 MEDIA MONITORING SERVICES

PROJECT DESIGN DELIVERABLES SEQUENCE (PDD)

STATE TRANSIT POSITION DESCRIPTION

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting

Corporate Governance Report

SAP Product Stewardship Network Supplier Enablement Service Description (English)

Information Bulletin. Sprinkler System Component Fault Monitoring. Version 1.1 Approved for release September 2013

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

Water Mains Rehabilitation Framework (NI) Northern Ireland Water

Housing Association Regulatory Assessment

To be used in conjunction with the Invitation to Tender for Consultancy template.

8.7 DRAINAGE MAINTENANCE SERVICES CONTRACT AMENITY JAMES LENIHAN, DRAINAGE MAINTENANCE ENGINEER

Management and Retention of Pension Plan Records by the Administrator - PBA ss. 19, 22 and 23 - Regulation 909 s. 45

TECHNICALS LEVEL BUSINESS

Improving the ACT Building Regulatory System

Erasmus for Young Entrepreneurs Registration guide for New Entrepreneurs

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES. Level III Content Outline

Registration Guide- New entrepreneurs

Gateway review guidebook. for project owners and review teams

Procurement guidance Complaints management

Plug IT In 5 Project management

Procurement, Contracting and Contract Management Policy

Job Description. Supply Chain Development Manager

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

Erasmus for Young Entrepreneurs Registration guide for new entrepreneurs

Quality Assurance Checklist

Rail Network Configuration Management

Transcription:

ENGINEERING COMPETENCY CLAIMS EXAMPLE B 20 June 2013

Table of Contents Table of Contents... 2 About this example... 3 Claim 1. Deal with Ethical Issues... 4 Claim 10. Taking action... 5 Claim 14. Problem analysis... 7

About this example This report is part of a set of example reports that is being developed to provide examples of Engineering Competency Claims and the Engineering Experience Record (EER). These Examples are for use by participants on the echartered system to guide them. Before reviewing the example reports applicants should refer to the appropriate 2012 Australian Engineering Competency Standards Stage 2 Professional Engineer or Engineering Technologist or Engineering Associate available in the Resources section of the echartered website. Participants should also refer to Section 5 of the Online Participant Guide, Submission, paying particular attention to Section 5.3. Writing Engineering Competency Claims (ECCs). The Thought Starters for Preparing Engineering Competency Claims in echartered available in the Examples section also provides guidance and is recommended reading along with the example reports. This participant on echartered had most of their competencies already endorsed on the epdp system using the 2004 Competency Standards (CER method). Therefore, there are only three Engineering Competency Claims in this report. The following reports were submitted by an electrical engineer who successfully achieved Chartered Membership following their Professional Interview, as well as registration on the National Professional Engineers Register (NPER), and the Stage 2 Assessment for the application to become a Registered Professional Engineer of Queensland (RPEQ). The author was prepared to meet the requirements of the Australian Engineering Competency Standards Stage 2. Each of their claims and their Engineering Experience Record were verified by a responsible senior engineer. Identifying information has been removed to protect the confidentiality of the author, their employers, their Verifiers, and the projects covered. All Verfication has been removed for the purpose of maintaining confidentiality. As the new echartered process develops, Engineers Australia will be able to build a repository of examples. This example is from one of the first Members to use the echartered system and successfully complete their Professional Interview. Engineers Australia expresses its sincere thanks to the engineer who provided these reports to be used to assist others seeking Chartered Membership and/or registration. These reports are made available as examples only. Engineers Australia is not the author and thus makes no claims as to the reports accuracy. No part of these reports may be reproduced in any form for any purpose without the permission of Engineers Australia. No part of these reports may otherwise be replicated or used by others for the purpose of claiming it or them as their own.

Claim 1. Deal with Ethical Issues As an electrical engineer in a major consultancy in Adelaide, I am responsible for electrical design works encompassing pre feasibility studies through to construction support. This responsibility includes project support at the back end, namely responding to request for information (RFI) documents and technical evaluation of tender documentation. The timing of the response to these documents is often essential, as any delay could potentially hold up the procurement or construction process. While I was working on a major water project, a tender evaluation request was presented to me for approval, prior to the procurement of an electrically actuated isolation valve. The project that I was working on at that time had a very tight turnaround period for the documentation in order to meet construction deadlines. When I evaluated the actuator datasheet, I found that the equipment offered did not meet the client's requirements as it was not fitted with external position switches which were required to properly monitor the fully opened and closed positions of the valve. However, when I raised the non compliance with the contractor, I was told that the procurement of the actuated valve was part of critical path project activities, and that it was imperative that the datasheet was approved. I immediately brought up the issue with the design manager, as I knew that there were potential safety issues if the equipment did not perform as expected. I consulted the Code of Ethics, and decided that I not should approve the datasheet for order, as the safety and wellbeing of maintenance personnel would be affected in the event where the actuated valve did not fully isolate the pipeline. I then organised a meeting with the relevant project stakeholders, during which I explained the need for valve proximity switches and highlighted the risks associated with the failure of an isolation valve. As a result, the contractor was instructed to re tender for an electrically actuated isolated valve that fitted with the project requirements. Later in the project, I received a RFI (with a short turnaround period) from an equipment supplier requesting additional information to aid them in the tender process. I realised that I could not provide the information requested without prior approval, as all tenderers were expected to submit their tender based on the same level of documentation. I knew that any additional information would provide one supplier with an advantage over the others, and would challenge the transparency and integrity of the tender process. I discussed the issue with the design manager and lead engineers, and came to an agreement that I was to provide all the tenderers with the information requested. By providing the same information to all parties, none of the tenderers would be disadvantaged. As the internal discussions occurred over a few days, during that time the RFI turnaround period had expired and I was receiving numerous phone calls from the supplier requesting the information. I made sure that I clearly updated them with the status of the resolution for the probity issue at hand, while being firm about the fact that I was not releasing the information to them until a decision was made. After sending through the requested information, I followed up with a phone call to the supplier, explaining the decision and the rationale behind it. I then discussed the issue with senior electrical engineers within my department, in order to obtain their opinions on the matter and how it could be better handled in the future. From the discussion, I concluded that I had handled the issue correctly and in accordance with the Code of Ethics.

Claim 10. Taking action I was the electrical design lead for a package of works on a major water project undertaken in Adelaide. Before I assumed the role, I was responsible for compiling a budget estimate for electrical resourcing on the project. To prepare the proposal, I produced a deliverables list containing all the documentation required for the design. I then held discussions with my team manager regarding resource availability and associated charge out rates, before allocating hours to the resources based on the deliverables. Once I had completed the proposal, I sent it to the client for review. I followed this up with a client meeting to discuss the proposed deliverables and resources. As I had a good understanding of the project based on previous work that I had done with the client and deadlines that needed to be met for the design, the proposal was accepted, with the agreement that the electrical design would be completed external to the client's project office. As part of my role, I was responsible for coordinating the power, controls and communications requirements for the site. There were complications in this respect as there were different contractors who were responsible for the different disciplines. I arranged for a meeting with the relevant project stakeholders to discuss the site requirements, during which I ensured that all important points were minuted. After the meeting, I sent out official meeting minutes to the project stakeholders to confirm their acceptance. I also made sure that any electrical design changes were immediately communicated to the relevant stakeholders through the official channels. I provided technical guidance to a graduate engineer who was working under me throughout the development of the design. To do this, I organised short, informal meetings with him daily, during which we discussed issues that he was facing at that time and issues that could possibly arise during future design activities. During the meeting, I mapped out the tasks that he needed to complete to avoid any delays to the proposed deliverables. I also ensured that I reviewed his design documentation, and discussed with him potential changes and improvements that could be made to the design. One of the electrical deliverables was a site plan showing the proposed electrical alignment for conduit and cable runs. A site visit was required to be undertaken in order to finalise the plan. I realised that visiting the site unsupervised could result in complaints from local residents, as this had happened previously on the project. I spoke to the stakeholder management team and explained the exact time and reason for the site visit. This provided the stakeholder team with sufficient information to field any queries from the local residents. Midway through the project, I was informed by the design package lead that a few electrical deliverables were required ahead of schedule in order for the project to be properly costed. This in turn resulted in the need to meet a very tight deadline. I knew, however, that any design that had to be transmitted to the client needed to be reviewed by a more experienced engineer for quality management purposes. I therefore negotiated for a minor extension to the deadline with the design package lead to allow this to occur. Throughout the design process, I made sure that all review comments made by internal reviewers and stakeholders were appropriately addressed and closed out. I assigned an electrical resource with the task of scanning of the comments and associated action taken for close out into the project directory. I then uploaded the scanned comments into the client's document management system in line with the project's quality management plan.

In order to keep track of the project budget, at the end of each week I requested the number of hours billed to the project by the electrical resources. Using this data, I populated an internal spreadsheet containing the original number of hours allocated to each resource and compared it with the status of the electrical deliverables. This allowed me to report the progress of the electrical design in a weekly coordination meeting with the other engineering disciplines, and enabled me to report any budgetary issues that arose.

Claim 14. Problem analysis As an electrical engineer on a major water project in Adelaide, my role was to produce electrical and instrumentation concept design documentation for various sites around the Adelaide metropolitan region. This responsibility included specifying new instrumentation equipment and instrument installation details to allow for control and monitoring of sites remotely. One of the sites consisted of a new pumping station, an inlet valve building and a reservoir for water storage. Part of the requirements for overall site control involved the measurement of the reservoir water level. I identified that the current method of level measurement involved the use of an ultrasonic level transmitter mounted on top of a concrete pillar, which contained a pipe that was installed vertically and connected to the outflow of the reservoir. I knew that the current method of level measurement would need to be changed, as according to the local residents, the concrete pillar had a negative effect on the aesthetics of the site. I also identified that the current installation resulted in maintenance personnel having to work at heights, which contradicted the client's OH&S policies. I conducted a site visit around the reservoir in order to formulate level measurement options to present to the client. I then arranged a meeting with the relevant stakeholders to discuss the issue. During the meeting, it was agreed that analogue level measurement of the reservoir would be required, with digital signals required for extra high level and extra low water level. It was proposed that an ultrasonic level transmitter and float level switches would be used to provide the signals. The ultrasonic level transmitter was to be installed on a 100mm diameter stilling tube sloping from the top to the base of the reservoir, which enabled the instrument to be located at the reservoir walkway level to allow for ease of maintenance. After analysing the proposed option, I realised that the use of ultrasonics and level switches would not be suitable for the application, as the beam angle required for accurate ultrasonic level measurement could not be achieved due to the combination of the stilling tube diameter and the proposed angled installation method. I also identified that as the cables connected to the float switches were unrestrained, it would be difficult to measure the extra low water level using a float switch. I then contacted an instrumentation supplier with my concerns and to discuss potential solutions. The supplier proceeded to put forward a recommendation of using laser level transmitters, which measures the level at a single point, thus eliminating the problem related to the beam angle. The proposal included the installation of two transmitters, one providing continuous level measurement and the other providing the extra high/low level signals. I investigated this option and found out that the disadvantages included the need to introduce a reflective surface on the water, and the high upfront cost in comparison to the use of ultrasonics. I discussed the viability of the laser level transmitter with a client representative, who indicated that the use of reflective surfaces would not be preferable. He suggested replacing the laser transmitters with hydrostatic pressure transmitters installed at the bottom of the tank, as this configuration had been used previously at another of the client's sites. I forwarded this option to the instrumentation supplier, who agreed that this option was viable and would result in accurate level measurement. I concluded that the hydrostatic pressure transmitter would be the preferred option due to the low cost and high reliability of the instrument. In order to ensure that the pressure transmitters were installed at the bottom of the reservoir, I decided to specify a pulley system, installed within the stilling tube. I designed the system such that a suitable

length of rope was used to ensure that the pressure transmitter would be able to be located at the bottom of the reservoir. The increased weight of the pressure transmitter compared to float switches would ensure minimal drift as well. I captured all these requirements on an instrument datasheet and an installation drawing, which were then reviewed and approved by the client.

Prepared by Fiona Tregoning Engineering House 11 National Circuit Barton ACT 2600 Phone: (02) 6270 6571 Fax: (02) 6273 2354 Email: ftregoning@engineersaustralia.org.au Web: www.engineersaustralia.org.au/echartered