Machine Foundation Design

Similar documents
SECTION SHEETING, SHORING AND BRACING

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SECTION EARTH MOVING

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements

Proposed Minimum Subterranean Termite Treatment Standards

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

How To Retaining Wall Guide

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Buildings Construction Procurement Strategy

Chapter 3 Pre-Installation, Foundations and Piers

Fire Pump Plan Review March 2010

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

Unit Price Averages Reports

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Page & Turnbull imagining change in historic environments through design, research, and technology

High Strain Dynamic Load Testing of Drilled Shafts

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

DENVER MODEL 30 X 30 SPECIFICATIONS

Professional Engineers Providing Structural Engineering Services In Buildings

CHAPTER 2 QUANTITY TAKE-OFF

C. Section TESTING LABORATORY SERVICE.

Hanna delivers the technical and marketing expertise needed to produce a car wash that meets the car wash customer's expectations.

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No May 15, 2013

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

SECTION 1 GENERAL REQUIREMENTS

U.S. ARMY CORPS OF ENGINEERS MIDDLE EAST DISTRICT WINCHESTER, VIRGINIA DESIGN CHECKLIST

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

The ACR : Advanced Design Features for a Short Construction Schedule

SECTION GROUND WATER STORAGE TANKS

METHOD OF STATEMENT FOR STATIC LOADING TEST

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

MOBILE HOME SERVICE REQUIREMENTS GAS

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

SECTION SUPPORT OF EXCAVATION

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

ATLANTA MODEL SPECIFICATIONS

Mechanical Installation

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Stormwater/Wetland Pond Construction Inspection Checklist

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

Operating Instructions

Welcome: What is U Drain? Drain Materials. Flow

Minnesota Department of Transportation Best Management Practices (BMP) for Concrete Washout May 2009, v5

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

LOADING DOCK EQUIPMENT. A. Section Concrete Forms and Accessories: Placement of anchors into concrete.

SECTION GUARDRAILS

COMPACT. Drilling COMPACT

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

Transformer Deluge Systems

6 RETROFITTING POST & PIER HOUSES

International Greenhouse Company

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

SECTION FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

LS 2540 SEWER LATERALS AND INSPECTION TEES

SKT-SP Tangent Terminal

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC October 27, 2015 Session 26

CHAPTER 6 - SANITARY SEWER

MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

Excavation & Trenching Procedure

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

INSPECTION PROPERTY ADDRESS: Fort Bend County, Texas

ATLAS RESISTANCE Pier Foundation Systems

(B613) VERTICAL PLATFORM LIFT PLANNING GUIDE

National Archives and Record Administration

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

DIE CASTING AUTOMATION AN INTEGRATED ENGINEERING APPROACH

AIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM):

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

COLORADO MODEL. 35 x 65 SPECIFICATIONS

SECTION UNDERGROUND ELECTRIC SERVICE

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

Transcription:

Machine Foundation Design As the structural engineer who recently designed the machine foundation for one of the largest vertical turning and milling centers in the country, in addition to over 250 other machine foundations worldwide, Bill Waldorf is an expert in his field. Mr. Waldorf, both a licensed structural engineer and architect, serves as the CEO of Larson & Darby Group a full-service architectural and engineering firm based in Rockford, Illinois, located 60 miles northwest of O Hare Airport. In the following blog, Bill shares valuable information for an owner to consider when selecting an engineer to design a machine foundation, as well as offers detailed information on the foundation design process itself: When an owner selects a specific machine to meet the milling needs of their company, it is paramount to construct a foundation that properly supports the machine. Without a properly designed and built foundation, the machine will not function properly. Machine tool suppliers request the foundation to maintain deflections measured in microns, and with the cost of some foundations exceeding a million dollars, the design process needs to be carefully and precisely worked out. Utility layouts, trenches, pits, safety railings and numerous other items need to be planned for a complete foundation package. Larson & Darby Group has worked with industrial clients and machine tool suppliers worldwide for 30 years, designing foundations for large milling machines. Over that time span, we have developed a checklist to ensure the foundation design meets the needs of the owner and also meets the requirements of the machine tool supplier. The following is a partial checklist of items for the owner, machine tool supplier and foundation designer to consider: I. OWNER REQUIREMENTS A. Assign a specific contact person who can answer questions dealing with the owner s requirements and a specific contact for the machine tool supplier to answer engineering foundation design questions. B. Approved layout within the facility, including these items: Machine location - Pits for tanks - SU changer

- Tool changer - Transformer cabinet - AC control cabinet - DC control cabinet - NC cabinet - Troughs C. Factory standards - Piping standards - Electrical standards - Floor plate standards - Type - Load capacity - Chip/coolant systems - Pit locations - Trough locations D. Design information, including these items: Codes required Geotechnical considerations Seismic design considerations Vibration design considerations Plant engineering drawings showing site conditions - Underground piping - Compressed air - Water supply for chip/coolant system - Electrical supply - Building column and foundation layout - Existing foundations within area Environmental standards for pits, troughs, and piping Finish standards for surfaces - Paint specifications (concrete surfaces, floor plate, guarding, and misc. metals) Approval of the concrete and steel design standards - Concrete - ACI 301

- Steel - AISC 1989 edition - Welding - ASW D1.1-92 Adjacent floor surface match requirements - Concrete to concrete - Concrete to floor block Plant grounding scheme Safety standards E. Architectural registration requirements F. Design approval process between machine tool supplier and owner G. Documentation requirements: - Paper size - Title block format - Drawing number system - Approval drawings, type and quantity - Final drawings II. GEOTECHNICAL (supplied by owner) A. Recommendations: Foundation designer will recommend the number, location and depth of the soil borings necessary to complete the design process. B. Geotechnical investigation information - Detailed description of the soil profile - Foreign materials within the soil - Condition of the excavated material - Recommendations during excavation - Backfill and compaction requirements - Ground water elevations - Estimated settlement - Allowable bearing pressure

- Modules of elasticity "E" - Modules of sub-grade reaction "K" - Values for "E" & "K" for depths 10', 15' & 20' - If rock is encountered: profile of stratum and bearing capacity of rock III. FOUNDATION DESIGN A. Approval of all information from the owner to machine supplier B. Machine tool supplier/owner recommendation of the maximum work piece weight expected to be loaded on the machine C. Deflection criteria for all components D. Individual component weights for both static and dynamic conditions E. Monument locations to identify centerlines F. Foundation drawings for machine tool supplier (machine, accessories and chip/coolant system) - Cell layout plan with all items located and measurements shown - Machine plan (machine accessories located with dimensions) - Machine front and side views (minimum clearances noted) - Foundation plan Anchor locations, machine and accessories Trough locations and pitch Concrete elevation and dimensions Piping and conduit size and location Grounding specification and location - Foundation sections Anchor detail Foundation sections Floor slopes

Machine/accessories/foundation relationship - Foundation load diagram All component weights Deflection criteria (static, dynamic, deflection by areas) Seismic criteria Vibration criteria Cutting forces Special conditions (torsional, bending and combination requirements) G. Guard and shielding drawings - Guards and shields elevations Chip deflectors Hinged gratings Fencing & railings - Guards and shields plans Special conditions Safety switch requirements H. Utility requirements of machine, accessories and chip/coolant system - Main disconnect size in amps - Type of metal being machined - Chip load - Coolant specifications - Coolant GPM required - machine and flushing - Coolant pressure required - machine and flushing - Water specifications - Compressed air specifications scfm dew point pressure - Piping, conduit and fitting specifications. I. Team listing of all machine tool supplier personnel for each discipline

IV. CONSTRUCTION REQUIREMENTS A. Foundation impact on existing structure - Under pin, lower or move existing column footings - Shore excavation B. Crane loads during construction or when machine is in use C. Environmental - Dust barriers - Exhaust flumes D. Soil removal - Is it contaminated? - Soil stockpiled on site or removed - Can soil be reused for fill? E. Site access - Truck routes in and outside of plant - Workers access and security clearance - Lay down area and construction trailers - Wash-out area for concrete trucks F. Procedure for pouring concrete - Back-up procedure for concrete plant, pumpers, delivery - Proper mix design and delivery method - Hot or cold weather considerations for mass concrete - Proper curing procedures - Form work standards The above outline is an excellent starting point for items to be discussed in the beginning stages of the foundation design for a milling machine. With this information, the foundation designer will be able to produce a set of drawings and specifications that a contractor can use to accurately bid and build the base. With the proper information from all parties, the owner will have a foundation that is

correctly constructed to precise measures, and thus have the right foundation on which to place the new milling machine. For more information on machine foundations from a leader in this unique industry, please contact William J. Waldorf, SE, Chief Executive Officer of Larson & Darby Group at 815-484-0739 or via email at bwaldorf@larsondarby.com.