GRASS PITCHES FOR RUGBY



Similar documents
MAINTENANCE OF GRASS PITCHES & GROUNDSMANSHIP

Developing a Project

Woodley Sports Football Club

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

LAND AT MANOR HOUSE FARM WIGHILL, TADCASTER TO LET. on a Farm Business Tenancy for a term of up to 5 years *********

IRFU Age Grade Mini Rugby

Guidelines to Green Roofing

Drainage Solutions in Modern Sports Field Applications presented by Hank Bell Sales Manager/Airfield Systems, LLC. Edmond, OK

VEHICLE CROSSOVER INFORMATION PACK

SPORTS. 3G playing surface providing the arena to deliver growth

MOBILE HOME LAW. Revised November 2001

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

GUIDE TO THE ARTIFICIAL LIGHTING OF HOCKEY PITCHES

A guide to preventing structural damage

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

Drainage A Crucial Component for Athletic Field Performance. Part Three: Sub-Surface Installed Drainage Systems

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

RULE 1. The Field of Play

November General Notes. Tree Protection. Tree Protection and New Development Guidance Note

building on success Trees and Basements Partial Review of the Core Strategy February 2014

Sample Punch List. Garth Ruffner Landscape Architect (916) Page 1 of 5

Garden Project Proposal

Guide to Procedure for Competitive Tendering March 2003

piles of debris that accumulate after a rain such as leaves, trash, twigs, etc., water stains on fences and buildings, or salts extruded on bricks,

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330

Underground Injection Control Storm Water Information

Sports and Flood Pitches - Issues to Consider

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL

Please describe the proposal accurately and concisely. State the number of storeys proposed and the position of any extensions.

GENERAL WATERING & CARE GUIDE

SUSTAINABLE URBAN DRAINAGE SYSTEMS

CONSTRUCTION SEQUENCE & PROGRAMME

Application for a water connection to a commercial or mixed use development

agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed.

SECTION EARTH MOVING

Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:

Project Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services

The Society of Garden Designers

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

Guide to Conservatory Installation and Sewers

Project manager services

Appendix C. Municipal Planning and Site Restoration Considerations

Your guide to sewer flooding

Utilities and existing services

LAND AT BROW NELSON DALSTON, CARLISLE CA5 7LE

First, determine the scope of your. Second, determine who will provide. An attractive landscape can add considerable value to a home.

3. QUALITY ASSURANCE REQUIREMENTS

secondary Intra-school/Level 1 Resource football - 9 v 9

WATERING OF STREET TREES: THEORY AND PRACTICE For Presentation at Irrigation Australia 2008 Conference Tuesday 20 May 2008

Developer s/consultants Field Services Guidelines

For all turfgrass areas. Now you can test soil reaction at different levels in the soil profile. Check Soil ph on:

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

GROUNDS MAINTENANCE-WATER USE DFC Environmental Management System

Installation PowerPoint for Grasscrete Formers

Home page Previous Next

Council Policy for New Telecommunication Facilities

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate

Highway Asset Management Strategy

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

2 Costing and Funding. Project Costs and Funding a Cautionary Note. Preparatory Costs. Project Overheads

PART 4: SITE INFORMATION

B. Improve the appearance and character of areas surrounding new development.

Household waste & recycling storage requirements

DESIGNING STRUCTURES IN EXPANSIVE CLAY

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

Unit Price Averages Reports

ROAD OPENING LICENCE APPLICATION FORM PLEASE READ ALL PARTS AND SECTIONS OF THIS FORM IN ADVANCE OF COMPLETING THE APPLICATION

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

IALN / FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

STANDARD PLUMBING AND DRAINAGE REGULATION 2003

environment briefing02

RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com

Recommendations for future developments

Building over or close to a public sewer

Heat Networks Delivery Unit

Measuring Soil Moisture for Irrigation Water Management

Permeable Pavement Construction Guide

Transcription:

1

INTRODUCTION An essential part of the WRU club development programme is the provision of well constructed and maintained grass pitches, either through improvement and upgrading or new installations. The purpose of this guidance note is to assist rugby clubs in carrying out this type of project. It identifies the process and key issues. This includes the initial feasibility study, performance and playing standards, design and construction. The maintenance and upkeep of grass pitches is covered in Facilities Guidance Note 6. THE CLIENT BRIEF It is recommended that, except for the smallest projects, qualified, experienced and independent professionals are appointed to carry out your project. There are a number of agencies and organisations that can provide lists of suitably experienced consultants (refer to page 8 for further details). Prior to the selection and appointment of your professional advisors, a steering group of club or committee members should be brought together to provide an initial client brief and point of contact for the professional advisors, throughout the various project stages. The terms of engagement and scope of their services should be formally agreed at the time of the appointment. The initial client brief should include: the likely programme of use (number of games to be played) and types of usage, e.g. matches, training and mini rugby floodlighting possible phasing and long term development plan other sports use, e.g. summer season usage and events maintenance arrangements and current maintenance budget funding sources and initial capital cost budget other new facilities, e.g. spectator accommodation, changing rooms and clubhouse. Site information and background information should also be assembled if applicable and available, including: a site plan showing the club s land ownership and any additional land that may be purchased, legal agreements, way leaves, covenants and rights of way location and layout of existing buildings, main services, irrigation, water storage, existing pitch layouts and orientation, land surveys including levels, trees, hedgerows and any special features local knowledge of ground conditions and site factors, e.g. history of the site, especially any knowledge of tipping and existing water courses any initial consultations with the Local Planning Authority, including land designation and permitted use. FEASIBILITY STUDY Your appointed consultants or specialist advisors should undertake a feasibility study. Each project will have different issues, site factors, constraints and opportunities. The following lists, whilst not exhaustive, identify key areas and considerations that may need to be addressed. Site information Information assembled by the client steering group Site history, in particular any knowledge of tipping on, or adjacent to, the site Levels, trees, adjacent buildings and adjoining owners Ground conditions, soil surveys and hydraulic conductivity (rate at which water permeates through the soil) Existing services Existing watercourses 2

Town planning issues and consultations Consultations with other agencies, e.g. the Environment Agency and Local Authority regarding floodplain and surface water drainage proposals Access for construction and future maintenance. Pitch layouts Critical site factors Possible locations, pitch layouts and safety margins (options appraisal) Pitch size, levels and any adjustments required Orientation Surface water drainage proposals Existing trees and shrubs New tree planting and landscaping Ecological and environmental issues Relationships with clubhouse, including viewing Access for spectators and people with disabilities Safety, possible fencing, etc Other sports users activities Player and spectator shelters Irrigation proposals and water storage Capital costs Programme of works Maintenance access routes/machinery and equipment storage Upon completion of the feasibility study, your steering group should be able to make informed decisions before proceeding to the next stages of your project. ORIENTATION AND SITING Wherever possible, the pitch should be laid out (end to end) within the orientation limits shown in Diagram 1. PITCH DIMENSIONS IRB Law 1 - The Ground Definitions The ground is the total area shown on the plan. The ground includes the following: The field of play is the area (as shown in Diagram 2) between the goal lines and the touchlines. These lines are not part of the field of play. The playing area is the field of play and the in-goal areas. The touchlines, touch ingoal lines and dead ball lines are not part of the playing area. The playing enclosure is the playing area and a space around it, not less than 5 metres where practicable, which is known as the perimeter area. The in-goal is the area between the goal line and the dead ball line, and between the touch in-goal areas. It includes the goal line but it does not include the dead ball line or the touch in-goal lines. 3

The 22 is the area between the goal line and the 22-metre line, including the 22-metre line but excluding the goal line. The plan, including all the words and figures on it, is part of the Laws. The dimensions for a 15-a-side pitch are shown in Diagram 2. These exclude line markings, which should not exceed 100mm. Mini/Midi rugby Under 7 and Under 8 Mini rugby - 60m x 30m maximum. Under 9 and Under 10 Mini rugby - 60m x 35m maximum. Under 11 and Under 12 Midi rugby - 60m x 43m maximum + 5m for each ingoal. PERIMETER AREA Minimum end and side recommended safety areas (perimeter area) should be not less than 5m where practicable. Where floodlighting columns have been erected on the side(s) of the pitch within the recommended safety area, clubs should carry out a risk assessment and take the appropriate action. The perimeter area is defined as within the playing enclosure. Goal Touchline Goal 15m Dead Ball Line Not exceeding 70 m 5m In Goal 22 metre line 10 metre line Halfway Line 10 metre line 22 metre line Dead Ball Line 10m 10m The dots are the goal posts and the line is the crossbar Not exceeding Not exceeding 100m Not exceeding GOAL POSTS Minimum sizes are shown in Diagram 3. The supply and installation of goal posts, sockets and post protectors should only be arranged through a reputable and recognised firm. Protection, maintenance and inspections should be carried out in accordance with the supplier s instruction. (Refer also to Facilities Guidance Note 6). PERFORMANCE AND PLAYING STANDARDS Your appointed consultant will provide detailed advice and information on the design, construction and maintenance of playing surfaces. All of these aspects will be reflected and taken into account in the tender specifications and documentation PITCH CONSTRUCTION Generally, depending upon the standard of facility required, the playing surface should be no steeper than 1:80-100 along the line of play and 1:40-50 across the line of play. PITCH DRAINAGE Diagram 2: The playing area Most grass pitches will require an effective drainage system to allow regular use throughout the playing season. The lateral drain spacing for each pitch should be calculated using the hydraulic conductivity findings from the soil surveys. Sport England s publication Natural Turf for Sport identifies four types of pitch drainage. Undrained - unlikely to be adequate for regular usage unless the subsoil is naturally well drained. Pipe drained pitches (see Diagram 4) - most common system, using perforated plastic pipes at 1:200 minimum fall laid approximately 600mm below the surface in lateral gravel filled trenches. The pipes must connect to a surface water drainage system or watercourse. This system requires aeration and appropriate sand dressing to maintain its performance. Pipe and slit drained pitches (see Diagram 5) - uses the pipe drained system with additional slit drains laid across the top of the pipes. The slits are commonly 200mm to 300mm deep, filled with gravel and dressed with minimum 75mm sand. This system requires regular maintenance with frequent sand dressing to maintain the safety and quality of the surface. The surface may be uneven during the first season and may be susceptible to shrinkage in summer. Suspended water table (see Diagram 6) - the entire playing surface is constructed over a gravel base with a lateral piped drainage system. Water is held in the sand/soil root zone and this moisture helps to sustain the grass during dry weather. 4

A fully automatic irrigation system is needed and some form of reinforcement is likely to be incorporated in the root zone. This type of construction is advisable where the subsoil is unsuitable and where a very high standard of pitch performance (including high levels of play) is required, for example at professional clubs. A suspended water table form of construction will be demanding of both management and grounds maintenance staff. IRRIGATION Well-drained pitches will require intensive irrigation to prevent drying out during periods of dry weather and to enable rapid grass establishment. Consideration should be given to a pumped water supply and hydrant points located near the pitches. Automatic pop-up irrigation systems are recommended for higher levels of play. Wherever possible and feasible, clubs should investigate and provide water storage arrangements and recycling surface water collection. EQUIPMENT AND MACHINERY Facilities Guidance Note 6 lists equipment that is fundamental to successful maintenance. STORAGE AND GROUND COMPOUND Depending upon the scale and extent of a club s sports ground, equipment and facilities, both secure storage and support facilities may be required. PROCUREMENT AND TENDERS This process should include: Pre-tender shortlist of contractors visits to similar completed installations financial standing and liability of the contractor references. Tenders Tender documents should include the following: role and responsibility of client consultants outline scheme drawings planning permission and conditions (if applicable) contractual preliminaries, form of contract, defects maintenance period detailed specification of works, performance and playing standards requirement for as constructed drawings and layouts programme maintenance requirements/schedule equipment and machinery schedule supply and installation of goal posts, protectors, sockets and flexible corner 7flags fencing details other associated works. Goal posts Minimum sizes are shown in Diagram 3. The supply and installation of goal posts, sockets and post protectors should only be arranged through a reputable and recognized firm. Protection, maintenance and inspections should be carried out in accordance with supplier s instruction. NSAI Standard IS 357:2007 applies for all goal posts. 5.6 metres Surface requires aeration and repeated applications of sand top dressing 50mm blinding layer Pipe-drains at 5-10m centres Minimum height 3.4 metres 3 metres to top edge of bar 50mm blinding layer Surface requires aeration and repeated applications of sand top dressing Porous backfill material ensures high percolation rates brought to within 150-200mm of the surface Diagram 3 Generally 450-600mm below ground level Pipe-drains at 5-10m centres Minimum fall 1:200 Diagram 4: Pipe-drainage construction Gravel 75mm sand Slit-drain normally 250-300mm deep Connection between slit-drain and backfill above pipe drain essential Diagram 5: Pipe-and slit drainage construction Sand/soil rootzone mix 250-300mm Aggregate drainage layer 100mm 50mm building layer Lateral drain Diagram 6: Suspended water table construction. High standards of pitch performance require high levels of reliable maintenance. 5

An Introduction to IOG Performance Quality Standards Institute of Groundmanship 28 Stratford Office Village Walker Avenue Wolverton Mill East Milton Keynes MK12 5TW Tel: 01908 312511 www.iog.org Performance Quality Standards - Rugby Institute of Groundmanship (as above) PUBLICATIONS Pitch Dimensions International Rugby Board Huguenot House 35-38 St Stephen's Green Dublin 2 Ireland Tel: 00 353 1 240 9200 www.irb.com Natural Turf for Sport - Design Guidance Note Sport England Publications PO Box 255 Wetherby LS23 7LZ www.sportengland.org Institute of Groundmanship (IOG) (as above) Sports and Play Construction Association (SAPCA) Federation House Stoneleigh Park Warwickshire CV8 2RF Tel: 024 7641 6316 www.sapca.org.uk National Playing Fields Association (NPFA) Stanley House St Chad's Place London WC1X 9HH Tel: 020 7833 5360 www.npfa.co.uk Inscapes Wyndham Close Brackla Industrial Estate Bridgend CF31 2AN Tel: 01656 650460 Fax: 01656 659112 Email: info@inscapesonline.co.uk www.inscapesonline.com USEFUL CONTACTS CONTRACTORS Pitchcare.com Limited The Technology Centre Wolverhampton Science Park Wolverhampton West Midlands WV10 9RU Tel: 01902 824 392 www.pitchcare.com International Rugby Board (IRB) Huguenot House 35-38 St Stephen's Green Dublin 2 Ireland Tel: 00 353 1 240 9200 www.irb.com South Wales Sports Grounds Summerleaze Acres Magor Monmouthshire NP26 3DE Tel: 01633 880493 Fax: 01633 880001 Email: julie@swsgl.co.uk www.southwalessportsgrounds.co.uk For further information contact WRU Club Development officers: Nicola Smith nsmith@wru.co.uk Nick Rose nrose@wru.co.uk The WRU shall not be liable for any loss or damage whatsoever arising from the use of or reliance on the information contained in this Guidance Note. The WRU reserves the right to amend or withdraw the information contained in this Guidance Note. Clubs should also refer to WRU entry and license criteria where appropriate. Produced in association with the RFU. 6