(T indicates a Tropicalised version with extended workability. No change has been made to the formulation)



Similar documents
CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

SPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

FIVE STAR PRODUCTS, INC. (800)

cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement

Resurfacing Concrete. Page 1 of 5

Wastewater Capital Projects Management Standard Construction Specification

SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC)

1.5 Concrete (Part I)

Chockfast Red HF Epoxy Grout

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Strength and Workability Characteristics of Concrete by Using Different Super Plasticizers

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

FACT SHEET: HYDRATED LIME FOR MASONRY PURPOSES

Construction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

Fosroc Construction Grouting Solutions. constructive solutions

LAYING BLOCK AND BRICK

High-performance, 2-part epoxy anchoring adhesive

ELASTOCEM. Technical features. Applications. Two-component flexible, waterproofing and protective cementitious grout.

Site sampling and testing of concrete

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

GigaCrete Specification PlasterMax

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

Construction. Pre-Bagged Structural Waterproofing System. Product Description. Product Data. Tests. Form

A Professional s Handbook on Grouting and Concrete Repair

SECTION NONREINFORCED CONCRETE SEWER PIPE

Black epoxy paste adhesive system

PROPERTIES AND MIX DESIGNATIONS

Installation PowerPoint for Grasscrete Formers

LATICRETE 290 Premium Floor and Wall Thin-set Adhesive PRODUCT DESCRIPTION

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

Solvent Cementing Instructions For Plastic Pipe & Fittings

Temperature C Cure time to reach hours LSS > 1MPa minutes

Two component epoxy paste adhesive. Ideal for bonding GRP, SMC and dissimilar substrates

Construction Specifications for Keyhole Pavement Coring and Reinstatement

Minor Cracks in Horizontal Surfaces

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

Example Specification for Concrete using Current Building Code Requirements

Concrete Waterproofing Systems. Integral Protection.

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

CA-48 TECHNICAL SPECIFICATION

Two component epoxy paste adhesive

OVERVIEW. 1 Intent: Applicability: Referenced Standards Invert Repair Mortar... 3

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

Ironwork in Highways -Whole Life Cost Perspective. Reducing cost through collaboration

LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS

Mineral waterproof coating PCI Dichtschlämme

SikaProof A Technology

TECHNICAL DATA SHEET. TOPECA, Lda Rua do Mosqueiro Cercal Ourém PORTUGAL. Tel.: Fax.:

kalox-pool draft 231 repairing refurbishing and finishing KALOX-POOL Waterproof cement-based mortar for protecting and finishing concrete.

Division 2 Section Section 02795

Sika Membran System For Sealing and Waterproofing Construction Gaps in Building Façades

Epoxy Crack Injection (the basics)

weber.floor 4660 Marine Elastic (EN)

Araldite AV 170. Advanced Materials. One component epoxy adhesive. Structural Adhesives. Key properties. Description. Product data.

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

PRODUCT DATA SHEET Sika Cable System

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

Guide Specification Precast Concrete Products

These recommendations generally follow the Construction Specifications Institute (CSI) Master Format.

EXPERIMENTAL INVESTIGATION ON BEHAVIOUR OF NANO CONCRETE

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

Operations and Instruction Manual Might Swivel - Part # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

PC-Concrete Injectable Concrete Anchoring and Repair System

Dubai Municipality Standard DMS 1: Part 5: 2004

SECTION PRECAST CONCRETE UTILITY STRUCTURES

Embedded Parts Introduction - Anchors

Concrete Repair. Applications and Procedures

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING

Study of durability of sprayed concrete

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

GUIDELINES FOR TESTING FRESH SELF-COMPACTING CONCRETE

Araldite LY 3505* / Hardeners XB 3403* / Hardener XB * / Aradur 3405*

Proper use of the Rebound Hammer Updated to reflect the changes to ASTM C805

Hardened Concrete. Lecture No. 14

High Performance Building Materials SCREEDS REPAIR MORTARS LEVELLING & SMOOTHING WATERPROOFING TILE ADHESIVES & GROUTS PRIMERS & ADDITIVES

Chapter 2 Basis of design and materials

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products

2-part Epoxy primer, levelling mortar and intermediate layer

LABORATORY DETERMINATION OF CALIFORNIA BEARING RATIO

BLACK JACK ALL WEATHER ROOF COATING

SEE HOW TO MAKE LIME PLASTER WHY USE LIME? PATTI STOUTER, BUILD SIMPLE INC. FEBRUARY 2013

KALPANA INDUSTRIES LTD. TECHNICAL DATA SHEET

Material Product Data Sheet Sealers for Thermal Spray Coatings

Low viscosity, solvent free elastic adhesive for wood flooring

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Mapei systems for radiating floor heating with high thermal efficiency

THORO. Waterproofing Systems

Surface Engineering Solutions Rebuild, Repair and Protect Industrial Equipment

Transcription:

928 T (T indicates a Tropicalised version with extended workability. No change has been made to the formulation) High strength, non-shrink cementitious grout Description 928 T is a ready to use product in powder form, which requires only the on-site addition of water to produce a non-shrink grout of predictable performance. Applications 928 T is formulated for use at any consistency from fluid to damp-pack, and may be used with confidence for bedding, grouting and precision bearing operations such as: Gas or steam turbines Generators Presses Crane rails Milling machines Precast elements Anchor bolts Suitable for use in bridge bearing applications Advantages Non shrink. Adjustable consistency. Proven and predictable performance. Excellent workability retention even at high ambient temperatures. High bond strength to steel and concrete. Early strength development even at fluid consistency. Good fatigue and impact resistance. Micro silica content enhances strength and durability. Impermeable. Packaging 928 T is supplied in 25kg moisture-resistant bags. Standards Complies with CRD-C 621 ASTM C1107 - Grade C Application procedure Preparation: The surface onto which the grout is to be applied should be scabbled to remove laitance and expose aggregate. Do not use bush hammers or similar preparation equipment that can crush the aggregate but leave it in place. The surface must be free of oil, dust, dirt, paint, curing compounds, etc. Soak area to be grouted with water for 24 hours prior to grouting to minimise localised absorption and to assist in the free flow of the grout. Surfaces should be damp but free of standing water. Particular attention should be paid to bolt holes to ensure that these are water-free. Use oil free compressed air to blow out bolt holes and pockets as necessary. Base plate, bolts, etc. must be clean and free of oil, grease and paint etc. Set and align equipment. If shims are to be removed after the grout has set; lightly grease them for easy removal. Ensure formwork is secure and watertight to prevent movement and leaking during the placing and curing of the grout. The area should be free

928 T of excessive vibration. Shut down adjacent machinery until the grout has hardened. In hot weather, base plates and foundations must be shaded from direct sunlight. Bags of grout should be stored in the shade prior to use. In cold weather, the temperature of base plates and foundations should be raised to >10 C. Mixing: In hot weather use cool water to bring the mixed grout temperature to <30 C. In cold weather use warm water to raise the mixed grout temperature to >10 C. Damp down the inside of the grout mixer with water prior to mixing the initial batch of 928 T. Ensure the mixer is damp but free of standing water. Add the pre-measured quantity of water. Slowly add the 928 T, mixing continuously. Mix for at least five minutes until a smooth, uniform, lump free consistency is achieved. Placing: Lengths of metal strapping laid in the formwork prior to placing may be necessary to assist grout flow over large areas and in compacting and eliminating air pockets. Pour the grout continuously. Maintain a constant hydrostatic head, preferably of at least 15 cm. On the side where the grout has been poured, allow 10 cm clearance between the side of the form and the base plate of the machine. Immediately after 928 T grout is placed, cover all exposed grout with clean damp hessian, and keep moist until grout is firm enough to accept a curing membrane. Should the grout shoulders require finishing work, this should be carried out prior to application of the curing membrane. We recommend the use of a curing membrane from our MASTERKURE range. Shoulders Due to differences in temperature between the grout under the base plate, and exposed shoulders that are subject to more rapid temperature changes, debonding and / or cracking can occur. Avoid shoulders wherever possible. If shoulders are required they should be firmly anchored with reinforcing to the substrate to prevent debonding. Typical water requirements Table 1 Application Consistency Flow Cone* Grouting machinery Mix Water litres/ 25kg min max Fluid 20-30 4.5 5 * ASTM C939 (formerly CRD-C 79) On the opposite side allow 5-10 cm clearance between the formwork and the base plate. grouts are suitable for use with most types of pumping equipment.

928 T Flowable grouting techniques Time Compressive Strength Fluid N/mm² Flexural Strength Fluid N/mm² 1 day 20 4.0 3 days 35 6.0 7 days 45 8.0 28 days 60 9.0 Wet density : approx. 2220kg/m³ Bleed water: No bleed water is apparent (ASTM C-232) at recommended water addition rates. Diagram A illustrates the use of grout surcharge to ensure complete filling under a base. Diagram B shows that straps can be used to aid grout flow under a wider base. A gentle sawing action with the strap allows the grout to flow without segregation for greater distances. #Typical properties Strength development: The strength of grout is dependent on many factors which include mixing, water addition, curing, temperature and humidity. The table below gives typical average strengths of 928 T at 25 C, when mixed with 4.5 litres (fluid) per 25kg bag. Expansion: Tests were made following both ASTM Standard C-878, on the use of expansive cements and Corps of Engineers Standard for grout. Tests made as prescribed by ASTM standard C-878 show an expansion value of about 0.05%. Tests in conformity with Corps of Engineers show an expansion value of 0.3% that is lower than the maximum value (0.4%) fixed by the same standards. Moreover, 928 T expansion occurs both in the plastic and in the early hardened state. However, the expansion action of 928 T exhausts mainly during the first 12 hours of curing. Modulus of elasticity: The static modulus of elasticity, measured by 1 applying a load corresponding to / 3 of the strength, is approximately 28,000 N/mm² at 28 days. For compressive strength 100mm cubes and flexural strength 40 x 40 x 160mm prisms were used.

928 T Fatigue resistance: Cube samples, produced with 928 T and cured for a month, underwent fatigue tests of 2,000,000 pulsing stresses ranging between 20 and 50 N/mm² at a frequency of 500 cycles/min. Tested specimens were undamaged and their compressive strength was higher than that of similar specimens that were not subjected to fatigue tests. Bond to concrete: After a 28-day curing period, the concrete bond was determined (about 6.5 N/mm²) by the load applied to cause the disbondment from the contact surface. Bond to steel: The bond of 928 T to steel, calculated by applying loads to the bars undergoing pull-out tests and by the grout steel contact surface, is 3 N/mm² at 7 days and 4 N/mm² at 28 days for plain bars; 20 N/mm² at 7 days and 30 N/mm² at 28 days for deformed bars. Workability: Tests at the fluid consistency performed according to ASTM C939, show compliance with the requirements of CRD-C 621-82. Capillary pores and permeability: Even under a pressure of 20 atm, water does not penetrate 928 T specimens. The permeability factor is calculated to be therefore lower than 1.10-12 cm/sec. Resistance to high temperature: 928 T grouts can withstand high temperature (+400 C) for very long periods without deteriorating substantially. Resistance to low temperature: After 300 freezing and thawing cycles, the modulus of elasticity decreases only 5%. This indicates that 928 T is highly resistant to the edisrupting action of frost. Storage Store out of direct sunlight, clear of the ground on pallets protected from rainfall. Avoid excessive compaction. Storage life is approximately 12 months when stored as above in original sealed bags. Failure to comply with the recommended storage conditions may result in premature deterioration of the product or packaging. For specific storage advice consult BASF's Technical Services Department. Precautions The temperature of both the grout and elements coming into contact with the grout should be in the range of >10 C to >35 C. Do not use water in an amount or at a temperature that will produce a consistency more than fluid or cause mixed grout to bleed or segregate. 928 T should be laid at a minimum thickness of 10mm and to a maximum depth of 80mm. Resistance to chemical attack: Thanks to its watertightness, 928 T grout is protected against environmental aggressive agents in solution.

928 T For applications above 80mm consider the use of 980 T. For applications below 10mm consult BASF's Technical Services Department for advice. To simulate on-site conditions it is necessary to restrain cubes for the first 24 hours immediately after casting. DO NOT OVERWORK AND AVOID USING MECHANICAL VIBRATION. UNDER NO CIRCUMSTANCES SHOULD 928 T BE RETEMPERED BY THE LATER ADDITION OF WATER. It is essential that a mechanically powered grout mixer is used to obtain the optimum properties. Yield / consumption 13.8 litres/25kg bag at 5 litres water addition rate. 73 x 25kg bags / m³ Warning As with other products containing Portland cement, the cementitious material in 928 T grout may cause irritation. Avoid contact with eyes and prolonged irritation. In case of contact with eyes, immediately flush with plenty of water for at least 15 minutes. Call a physician. In case of contact with skin, wash skin thoroughly. Note The fatigue and impact resistance of 928 T grout is exceeded only by the metallic reinforced, non-catalysed 885 grout. The specially prepared metallic aggregate in this product contributes to impact resistance, a desirable property of grout to be subjected to severe dynamic operating forces and repetitive loading such as found in steel and aluminium rolling mills, crane rails, heavy presses, etc. When a very rapid set is required in areas subject to chemical spillage or contamination, use epoxy grouts 400/410. For additional information on 928 T grout or other non-shrink grouting materials, contact your local BASF representative. Quality and care All products originating from BASF s Dubai, UAE facility are manufactured under a management system independently certified to conform to the requirements of the quality, environmental and occupational health & safety standards ISO 9001, ISO 14001 and OHSAS 18001. 02/94 BASF_CC-UAE revised 12/2009 REQUEST AND REFER TO RECOMMENDED INSTALLATION PROCEDURES FOR GROUTS PRIOR TO USE # Properties listed are based on laboratory controlled tests. Whilst any information contained herein is true, accurate and represents our best knowledge and experience, no warranty is given or implied with any recommendations made by us, our representatives or distributors, as the conditions of use and the competence of any labour involved in the application are beyond our control. As all BASF technical datasheets are updated on a regular basis it is the user's responsibility to obtain the most recent issue. BASF Construction Chemicals UAE LLC P.O. Box 37127, Dubai, UAE Tel: +971 4 8090800 Fax: +971 4 8851002 www.basf-cc.ae e-mail: marketingcc.mideast@basf.com Certificate No. Certificate No. Certificate No. 963680 945787 772556