Route K: West of England Route Plans are generally published on an annual basis including the most up-to-date position at that point in time. In 2011 we will be publishing information on a route basis as part of our Initial Industry Plan in the Autumn covering CP5 and beyond. In the meantime we have retained the 2010 Route Plans, updated where appropriate with current information including our plans to the end of CP4. This document, therefore, should be read in conjunction with the equivalent 2010 Route Plan. Should you require any further information, please contact the Route Plan 2011 mailbox at routeplans@networkrail.co.uk. Summary of alterations Reference Data Location in Change Route Plan Page 3 Route Map Page 3 Labels updated to match Appendix B. Figure 11 Forecast end of year PPM Page 12 First Great Western 90.1% CrossCountry 88.3% Stagecoach South West Trains 93.9% Arriva Trains Wales 94.1% The above is based on 2010/2011 Period 11 data. Appendix A: Updated Route Map Appendix B: Updated list of CP4 enhancements Appendix C: Constraints and issues on the route ] Network Rail 2010 Route Plans Update Route K
2 Appendix A: Updated Route Map Key to diagrams
Route K West of England BIRMINGHAM NEW STREET Route M Route L Stoke Works DROITWICH SPA WORCESTER FOREGATE STREET Route M WORCESTER SHRUB HILL HEREFORD Abbotswood A Route L Ashchurch B CHELTENHAM SPA NEWPORT GLOUCESTER Tytherington branch Patchway 98 St Andrews Road Avonmouth AVONMOUTH Filton DOCKS 18 Shirehampton Redland Sea Mills Clifton Montpelier Down G Dr. Days Bristol East BRISTOL TEMPLE MEADS Bedminster Meldon Quarry Key Primary Secondary Rural Freight only The line shading indicates strategic route sections which are numbered on the map GUNNISLAKE Calstock NEWQUAY ST IVES St Erth PENZANCE Bere Alston Moorswater branch Bere Ferrers St Budeaux Victoria Road 2 EXETER ST DAVIDS B Totnes Ivybridge Treviscoe branch Bugle Keynsham Oldfield Park J Melksham Bathampton Freshford Avoncliff Bradford-on-Avon Bradford Trowbridge Hawkeridge 04 06 Westbury North WESTBURY Westbury South CASTLE CARY St James Park Exeter Central Dilton Marsh Castle Cary Warminster Exmouth 11 Polsloe Bridge Pen Mill YEOVIL JUNCTION Yeovil Pen Mill Digby & Sowton Thornford 02 Topsham Yetminster Exton Lympstone Commando Lympstone Village Wilton SALISBURY 05 D 3 Newton Abbot West Westbury East Loop Tiverton Parkway Cowley Bridge NEWTON ABBOT BATH SPA Feeder Bridge F Chippenham 15 Nailsea & Backwell TAUNTON Newton St Cyres Heathfield branch Newton Abbot East Narroways Hill Stapleton Road Lawrence Hill Bristol West Thingley 1 Torre St Budeaux Bodmin E LISKEARD EXMOUTH 07 Menheniot Saltash Keyham Devonport Lostwithiel Parkway G Torquay Luxulyan Par Loop D F PLYMOUTH Coombe 03 St Blazey St Germans St Budeaux Dockyard B Coombe PAIGNTON Penwithers Cattewater Burngullow Ferry Road 09 Par branch Redruth St Keyne Fowey Harbour branch Truro St Austell Camborne Causeland Par 10 Perranwell Harbour branch Hayle 12 Penryn Sandplace St Erth Penmere Falmouth Town LOOE FALMOUTH DOCKS 13 Carbis Bay Lelant Lelant Saltings Quintrel Downs St Columb Road Roche 14 Westerleigh Yard Filton Abbey Wood 01 Cogload Exeter St Thomas Starcross Dawlish Warren Dawlish Teignmouth A Uphill Highbridge & Burnham Exeter St Davids Stoke Westerleigh Gifford SWINDON Wootton Bassett 98 Worle C WESTON-SUPER-MARE Crediton Yate Yate s A Worle Weston Milton Bridgwater 16 98 Yatton 17 Parson Street PORTBURY DOCK BRANCH Chapelton Umberleigh Portsmouth Arms Kings Nympton 08 Eggesford Lapford Morchard Road Copplestone Yeoford BRISTOL PARKWAY Standish Cam & Dursley Sharpness branch SEVERN BEACH G I Gloucester Yard Route L NEWPORT BARNSTAPLE MORETON-IN-MARSH Barnwood Horton Road Chetnole Maiden Newton DORCHESTER WEST Dorchester WEYMOUTH
Appendix B: Infrastructure investment in CP4 Figure 15 Infrastructure investment in CP4 (formerly Proposed enhancements in CP4) Implementation date Project Project description Output change Funding GRIP stage 2011/12 A Earthworks renewals Embankments renewals at Dauntsey Bowds Farm and Eckington 2011/12 B Telecoms renewals CIS, PA and CCTV renewals at Exeter St Davids and Plymouth Renewal Network Rail Various Renewal Network Rail 5 2010/11 Track renewals Project complete 2010 13 D Structures renewal Structures renewal at Royal Albert Bridge Renewal Network Rail 6 2011/12 Earthworks renewals Project deferred 2011/12 F Telecoms renewals CIS, PA and CCTV renewals at Bristol Temple Meads 2011/12 G Track renewals Track renewals at Dr Days Junction and Barnwood Junction Renewal Network Rail 5 Renewal Network Rail Various 2012/13 Track renewals Project deferred 2013/14 I Westerleigh Junction Barnt Green line upgrade Options for linespeed increases up to 100mph Improved reliability and additional capacity and journey time savings between Bristol and Birmingham Periodic Review 2008 4 6 2011/12 Signalling renewals Bristol TDM renewals Renewal Network Rail 5/6 2012/13 Plant renewals Renewal of signalling power distribution cables in the Gloucester area Renewal Network Rail 5 2013/14 Track renewals Track renewals at Patchway Junction Renewal Network Rail 3 On-going until 2015/16 On-going until 2017 Signalling renewals Great Western Main Line electrification Signalling renewal of the Bristol Signalling Centre area Electrification from London Paddington to Bristol and Cardiff Renewal Network Rail 3 Electrified network Department for Transport 3 3
4 NRDF candidate schemes in CP4 Figure 16 Candidate NRDF schemes in CP4 Implementation date Project Project description Output change Funding GRIP stage 2011/12 J Bath Spa capacity enhancement Repositioning of signals Improved reliability, additional capacity and reduced platform reoccupation times. Facilitates enhanced cross-bristol service Network Rail Discretionary Fund GRIP stages: 1 Output definition, 2 Pre-feasibility, 3 Option selection, 4 Single option selection, 5 Detailed design, 6 Construction, test and commission, 7 Scheme hand back, 8 Project close out 6
5 Appendix C Constraints and issues on the route Capacity and operational constraints A Westerleigh Junction Bristol Parkway: two track section on highly utilised converging route B 5 AHB level crossings north of Cheltenham restrict linespeed to 100mph C Weston-super-Mare loop: single line restricts capacity and flexibility D Dorchester West Castle Cary: single line sections prevent significant increases in train service frequency E Signalling headways between Newton Abbot and Plymouth F Royal Albert Bridge: single line section linking Devon and Cornwall G St Pinnock and East Largin viaducts: single line sections Other Issues on Route 1 Somerset Levels flooding 2 Flood plain to the north of Exeter requires constant monitoring 3 Dawlish Sea Wall defences require constant monitoring and enhanced maintenance