BOP PRESSURE TESTING PROCEDURE



Similar documents
Well control equipment. Matanović Davorin, professor

API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Last update: August 12, 2015

Fire Hydrant Troubleshooting

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES

The cylinder head bolts tightening stages have been updated as listed in Table 1.

Float and Thermostatic Traps Series H, C and X

ENGINE FUEL FUEL FILTER... FUEL HEATER... INJECTOR... SUPPLY PUMP... COMMON RAIL... FUEL PRESSURE LIMITTER...

PBX Series Quick Fit Connector Bimetallic Steam Traps


TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

Cooling system components, removing and installing

Instructions For SF 6 Refill Kit

Stainless Steel Single and Dual Circulation Kits

COMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA GEOTHERMAL FIELDS.

Cooling system components, removing and installing

Drilling Rigs, Equipment & Parts

Flat Bottom Long Ram Hydraulic Jack

2" & 3" Poly Wet Seal Pump Instruction Manual

2100 AD Mirror Elevator Ball Nut Replacement Procedure

Cooling system components, removing and installing

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Service Bulletin No. SB MANDATORY SERVICE BULLETIN. Safetying of standard and flop-type fuel pickup tubes.

TRAINING AND EQUIPMENT MANUAL HOSE PRACTICES EFFECTIVE: OCTOBER 2007

10 Wireline operations

Section 7 Adjustment, Repair and Replacement

1998½-2007 Dodge Ram 5.9L Cummins

Sample Career Ladder/Lattice for Energy (Petroleum Sector)

BOP Basic Safety Functions. Katrine Harsem Lund Principal Engineer, Department Manager Scandpower AS

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

11. COOLING SYSTEM 11-0 COOLING SYSTEM BET & WIN 50

Standard Hydraulic Piping Flushing Procedure

Step-by-step instructions:

»Product» Safety Warning

Oregon Fuel Injection

USER MANUAL. 10 GPM Small Single Line Cryogenic Coupling

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards

Pressure Testing Procedures for Building Services Piping

Topics of the Presentation

P7100 PUMP INSTALLATION INSTRUCTIONS Diesel Care & Performance Inc

Universal Installation and Maintenance Instructions 71CD-1212 Spill Containment Bucket

Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines

OPERATION AND MAINTENANCE MANUAL 5-1/4 B-84-B-5 FIRE HYDRANT

Volkswagen Jetta, Golf, GTI 1999, Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Air Sleeve Maintenance

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification...

Overview PARTS LIST. B. Lever mounting base C. Flush handle assembly D. Grey/Blue float stop E. Grey float (Full Flush) F. Flush valve washer

TECHNICAL DATA. Dry 122a. November 12, 2013

Dive Rite 200 & 300 Bar Isolator Manifold Service Manual

Fuel Injection Pump, Rotary ( )

MODEL G300 BRAKE BLEEDER

HYDRAULIC TABLE CART 500-LB.

SELF-STEERING AXLE TABLE OF CONTENTS

GB Tubulars RECOMMENDED PRACTICE For CASING on LOCATION

BOWIE PUMPS OPERATION - MAINTENANCE

Owner s Manual Gantry Cranes

DO NOT attempt to repair hub and wheel bearing assembly.

HEAD HARNESS & BUCKELS

Oil and Coolant Circulating Heating System. Model - OCSM

Deepwater Horizon Summary of Critical Events, Human Factors Issues and Implications

Cylinder head, removing and replacing

Chapter 7 Hydraulic System Troubleshooting

Turbocharger system components, servicing

NUMBER: 08 DD15-10 S.M. REF.: 3.2 ENGINE: DD15 DATE: September 2008

ENGINEERED & PROCESS VALVES. Installation, Operation and Maintenance Manual GENERAL VALVE. Twin Seal Double Block and Bleed Plug Valve GENERAL VALVE

REMOVAL AND INSTALLATION

WAVELET WATER QUALITY MONITORING KIT

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 47 Brakes - Hydraulic Components (Page GR-47)

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

Grade Level Spill Containment Manholes

Auto-belay Cable Replacement Process

PALLET JACK TON

FPU SYSTEMS OPERATION MANUAL BOH OFFICE MODULE (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH FPU Field Pack/up Units CHAPTER 5

SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

REPAIR AND MAINTENANCE MANUAL

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)

Operating Instructions Parts List Manual Scissor Lift Pallet Truck

Volkswagen Golf > VW Rabbit GTI 2006->

Aker Drilling Riser Brazil

Pallet Jack. OWNER S MANUAL Model MH1230. Important Safety Instructions Assembly Instructions Parts and Hardware Identification

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3

Below Grade Spill Containment Manholes Gallon Gallon Gallon. Installation Instructions

Front axle components, overview

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

Operations and Instruction Manual Might Swivel - Part # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Drilling Problems. pull

FIBERGLASS UNDERGROUND STORAGE TANKS Special Installation Instructions for New York City Gasoline and Diesel Motor Fuels

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Trash Pumps Models: 56200, , 56201, , 56300, , 56301,

Subsea wellhead systems. Advanced solutions for extreme conditions

Instructions cover both:

Instructions and precautions. Fork Height. Visit our website at:

Instruction Manual. Please read the manual carefully before installing and using this product. This product is for off road use only.

Rear wheel brakes, servicing. Стр. 1 из 45. Note:

MODEL 565E - 22 TON AIR/HYDRAULIC AXLE JACK

Foam Wiping Technology

INSTALLATION INSTRUCTIONS

Transcription:

0 Discuss Operator BOP requirements WITH RIG MANAGER. Insure that all Romfor's BOP equipment is tested consistent with Romfor's policy. This may require Nabors to incur the cost for the testing subcontractor as well as provide rig time to the Operator for the test. PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, and Anti-Fall Protection. Fit for Duty check on all hands. Review JSA for Pressure Testing BOP. Rig Manager to discuss procedures with pressure testers. This is to include: -Stack design (Class II, IV, etc.) BE AWARE OF CONTRACT AND PERMIT REQUIREMENTS. All Full Body Harnesses are to be inspected prior to any use. Include all third party personnel. Refer to Romfor's Drilling Policy BOPE testing requirements. -The proper size and type of test plug to fit the casing head. -Position, size and pressure rating of choke manifold and valves. -Wellhead rated working pressure. -The drill pipe grade and operating pressure of the drill pipe. -Casing burst pressure. -Ensure testers have the 50 model unions. -The use of methanol-water for testing in freezing weather. -Outline the overall testing and the specific valves that are to be tested. -BOP test will be noted on the IADC Daily Drilling Report form. -Inform testers of low-high test requirements. Check condition of the test plug. Use Romfor's drill pipe design criteria of 80% of Used Drillpipe Burst. Cellar area is clean and cleared of obstacles. All BOP equipment pressure tests are to be recorded on a chart and maintained by the testing subcontractor for 6 months. Verify the following items are ready or available, as required: -Adequate tie off points are in place to assure 00% tie off. -Fluorescent vest. -Designate qualified man to be flagger. -Two way communication., -Proper API ring gasket is used if repairing a leak. -Proper size hammer wrenches and hammers, if required. Use antifall protection devices. Do Not reuse old API ring gaskets. All bolts, wrenches, hammers and API rings are cleaned and in good condition.

4 5 -Cellar covers are to be reinstalled as soon as practical. -All wellhead, Blowout Preventers, valves, and fail-safes shall be pressure tested from the direction they would be exposed to well pressure. -All BOP equipment should be tested every 4 days or when the integrity of the BOP stack has been compromised (i.e. changing rams, seals, or lifting the stack.) -Casing head wear bushing is not installed. -Have correct wear bushing retrieval tool on location. READY TO TEST BOP STACK This procedure is based on a three ram BOP stack that is nippled up. Refer to the rig specific JSA. Before the test, the Rig Manager and the Tester will ensure that all personnel are fully aware of their required assistance, including any needed emergency actions. Ensure the testing area is secure with caution tape. All blowout prevention equipment, except annular BOP s, will be pressure tested to the minimum of the following criteria. Ensure rotary bushings are locked if left in-place. Where HS is present all personnel must possess a HS certificate. PRIOR to any work, a Job Safety Analysis (JSA) shall be conducted in the presence of the rig crew, tool pusher, company representative and any service company which may be impacted by the test. Attendance of the JSA shall be documented. Remain outside of the barricade tape while testing procedures are in progress. 4 Maximum anticipated wellhead pressure (if known). 80% of casing burst pressure. Working pressure rating of the wellhead. Working pressure rating of the BOP stack. 6 7 8 Annular BOP s should be tested to 70% of rated working pressure. All BOP equipment tests must include a low-pressure test of 50 psi before proceeding to the full pressure test. Test pressure held (and recorded) for a minimum of five minutes after full pressure has been established represents a satisfactory pressure test. NO PERSONNEL ARE TO BE IN THE VICINITY OF PRESSURE TESTING OPERATIONS OR EQUIPMENT. UTILIZE CAUTION TAPE OR A FLASHING LIGHT TO SECURE THE AREA..

9 All high-pressure connections associated with the well control equipment (i.e. choke & kill line valves, choke manifold valves, TIW valves, floor safety valves, inside BOP (Gray) valves) are to be isolated and pressure tested during each BOP test. 0 When the integrity of the BOP stack has been compromised (i.e. changing rams or lifting the stack), the compromised component must be re-tested. This includes testing the ram and associated bonnet seals, or body testing a flange connection. The possibility of test pressure leaking past a packoff or test plug and being applied to a weaker element (i.e. casing collapse, lower rated ring gasket, etc.) must always be considered. All reasonable steps should be taken to monitor and eliminate this event. START TESTING BOPE Ensure that the casing valve is open and not plugged. 4 5 The Testing Technician will then check the wellhead to ensure the right test plug for that particular wellhead is available (Size, Type, and working pressure) and ensure all lockdown bolts are retracted. The Testing Technician will then check the drill pipe connection taking his tie-in-connection (called a top head & kelly sub) and screw it on a joint of pipe to check the connections. The Testing Technician will connect the pressure recorder, fill his tank with water, and pre-test pump, hose, and recorder. The Testing Technician will communicate with the Rig Manager and Company Representative to see if the choke manifold can be tested while tripping pipe. If not, the choke manifold shall be tested during BOP testing procedures. TEST THE CHOKE MANIFOLD 6 The choke manifold is then tested by: Closing the manual valve next to the BOP on the choke line. Attach test line to choke manifold. Test all valves in the proper sequence.

4 5 Make sure header (watermelon, etc.) is open-ended. Once a test is achieved, close the next set of valves, open valves behind the set that was closed and continue this process until all valves have been tested. TEST THE LOWER BOP STACK When filling stack, ensure that the choke manifold can be pumped through. 7 8 9 0 4 Once drill crew is ready for Testing Technician, the technician will then check inside of BOP stack to make sure wear bushing is out of hole, hole is clear of any debris and is full of fluid up to wellhead. The Driller will pick-up test joint and put it into the mousehole. Screw pump-in-sub into the box connection of the test joint. The driller will then torque up the pump-insub to the desired torque for that connection. The Driller will then pick up the test joint and the technician will screw on the test plug to the bottom or pin end of the test joint (handy not tight). The Testing Technician will then dope the seal area of the test plug. The driller will set the test plug in the wellhead. Rig crew fills stack with water and the Driller checks the seat of the test plug. The Testing Technician will then hook up his test hose from the test pump to the pump-in sub. The Driller will close the bottom pipe rams. After bottom pipe rams are closed - the Testing Technician will then fill up the joint of pipe and pressure up to,000 and bleed off (to release air out of pipe). He will repeat this procedure a second time to release remaining air in the test joint. This needs to be done before BOP testing starts to remove air from entire system. This should only be required on first test. After air is released, the technician will then put the pen on the pressure recorder and pressure up for the low test (for example - 50 low). After the time span required by the company representative, the Testing Technician will then go to the high test (required by the company man) (for example - 0,000 high). When the test is complete, the Testing Technician will then log in a tally book the first test information. Then bleed down the pressure to zero. Refer to rig specific JSA. Check casing valve to ensure in open position and not plugged. ENSURE no fluid leaks out of casing valve. During testing, the rig floor will be clear of all personnel. Romfor's policy is a minimum of five minutes of test on the chart.. 4

5 6 7 8 9 0 Open bottom rams. The technician will have the crew remove the insides of the kill line check valve and re-install the cap on the valve securely. Note: This must be done to detect any leaks on the kill side. TEST THE UPPER BOP STACK Once the check valve s internal parts are removed and the cap reinstalled, close the top rams, the HCR valve and the outside kill line valve. Pressure up to recommended test pressures. After the test is complete, the technician will bleed down to zero and log information concerning test. Close inside or primary choke line valve and inside or primary kill line valve. Open HCR valve and outside kill line valve. Pressure up to recommended test pressures; hold for desired time and bleed down to zero. Then log information concerning test. Crew must install parts back into the check valve. With the inside choke line closed and top pipe rams still closed, the Testing Technician will then open the inside kill line valve and test to the recommended test pressure. Once held for the desired time, bleed to zero and log information. Note: If test for blind rams and choke are done from kill line, then inside parts of check cannot be installed at this time. TEST THE ANNULAR PREVENTOR all personnel. all personnel. Romfor s policy is a minimum of five minutes of test on the chart. all personnel. all personnel. Romfor's policy is a minimum of five minutes of test on the chart. The Testing Technician will have the Driller close the hydril first, then open the TOP pipe rams. (This will prevent the test plug from becoming unseated in the wellhead.) Close a kill line valve and a choke line valve and test to the recommended test pressure. Once held for the desired time, bleed to zero and log information. The technician will remove his test hose from the top of the test joint and unscrew the test joint from the test plug and remove it from the hole. all personnel. Annular BOP s should be tested to 70% of rated working pressure. 5

TEST THE BLIND RAMS 4 5 6 7 8 The technician will then tie into the choke manifold and open all choke line valves leading to stack. Keeping a kill line valve closed, have the driller close the blind rams and test to the recommended test pressure. Once held for the desired time, bleed to zero and log information. The Driller picks up the test joint, opens the blind rams and runs the test joint down to the test plug to retrieve it. TEST THE KELLY, MUD LINE AND STANDPIPE The Driller picks up the Kelly and screws the Lower Well Control valve onto the bottom of the Kelly. Make sure all Kelly valves are open and all the valves on the standpipe are open. Fill the Kelly and all Standpipe at this time. Once full, close the Standpipe valve and pressure up to recommended test pressure. Hold for desired time, then bleed to zero and log information. Test all Valves from the Lower Well Control Valve to the rig pump in proper sequence. All surface valve equipment can be tested at this time with adequate connections (i.e. Kelly subs, pipe plugs, and subs.) After testing is complete, the technician will rig down all equipment, fill out all appropriate paperwork, note any leaks or discrepancies and forward to company representative for approval. END OF PROCEDURE all personnel. STAND CLEAR while pressuring up on BOPE. Testing Technician is to signal when testing is complete. Refer to rig specific JSA. BE AWARE of the pressure rating of the standpipe, standpipe valves and Kelly hose. All surface valves are to be tested to their rated pressure.. 6