26.3.3 The Ship/Shore Safety Check-List



Similar documents
TANKER - SHORE SAFETY CHECK-LIST

25.4 The Bunkering Safety Check-List

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING

Port information and safety regulations for oil terminals in the Port of Aarhus. Revised

Ship to Ship Transfer Training (3 days)

Tanker Officer Training Standards (TOTS) 4B Chemical Tanker Simulator Verification Course

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components

FUEL TRANSFERS OIL SPILL PREVENTION WORKSHOP. WAINWRIGHT 9 th July. Shell Exploration & Production Restricted

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

To: All Shipowners, Ship Managers, Ship Masters and Classification Societies

Port Information and Safety Regulations

DRY CLEANING PLANTS REQUIREMENTS FOR INSTALLATION AND OPERATION

PORT REGULATIONS EMERGENCY PROCEDURES PORT WASTE MANAGEMENT

Good practice steel coils. Cargo stowage. It s your ship and equipment look after them and they will look after you GOOD PRACTICE

OVERSEAS MARINE CERTIFICATION SERVICES (OMCS)

ST. VINCENT AND THE GRENADINES

Element D Services Plumbing

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

SCBA Frequently Asked Questions

VESSEL SAFETY INSPECTION

Bunkers Regulatory and Practical Considerations. Piraeus, 8 November 2012 Capt. Simon Rapley

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

Regulation of 15 September 1992 No. 693 concerning the Form and Keeping of Log Books for Ships and Mobile Offshore Units

How to prevent tanker cargo shortage claims

5 OIL TANKER DESIGN AND EQUIPMENT

DET NORSKE VERITAS TM

EUROPEAN INDUSTRIAL GASES ASSOCIATION

Fire Safety Risk Assessment Checklist for Residential Care Premises

How To Prevent Over Water Activities

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

Guide for the prevention of shipsourced pollution and for the safe transfer of bunkers in Queensland waters

GAS FLAWLESS - FORM C

Survey Guidelines for MARPOL Annex I under the Harmonized System of Survey and Certification (HSSC), 2011

Control of Hazardous Energy (Lockout / Tagout)

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG

Performance Condition When asked by a qualified assessor, On board ship or in an approved training program,

Introduction to the CD ROM Edition of ISGOTT

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

Oil and Coolant Circulating Heating System. Model - OCSM

ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) FOR PRINOS OFFSHORE DEVELOPMENT PROJECT ANNEX 15: TRAFFIC MANAGEMENT PLAN

Isle of Man Regulations implementing the STCW Manila Amendments

Final Sentence in a nocturnal Oil Spill Case

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL. EudraLex The Rules Governing Medicinal Products in the European Union.

Course Title: Safety Issues in Electronics Engineering Technology Number of Credits: 3 B.A. B.S. B.A.S A.A. A.S. Degree Type

Sample Checklist for Permit Required Confined Spaces Program

Technical Bulletin. Oil Record Book entries: Machinery space operations (Part 1) Including January 2011 amendments to Technical Bulletin 24

GUIDELINE FOR SAFETY IN THE HANDLING OF FLAMMABLE LIQUIDS

Fire Alarm System Standpipes Sprinkler Systems Fire Drills Commercial Cooking Hood and more

Syllabus. for. Dangerous Goods Safety Adviser. Examinations

M-20.2 SOLAS II-2. The latest IMO Briefing (IMO 29,2000) offered the following description of the 73rd Meeting of the Maritime Safety Committee:

Good practice. Enclosed lifeboat launching. It s your ship and equipment look after them and they will look after you GOOD PRACTICE

Declaration by the Management Representative (Quality Management System)

Inspection Location Standards

WORK IN CONFINED SPACES

Marine pollution prevention pocket checklist Revision 3

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013

Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations

MTBE / ETBE Transport over inland waterways

Recharge Procedure for Telemark TVP-2000 and TVP-3500

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR

ANNEX 3. RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE)

LOCKOUT/TAGOUT PROGRAM ENERGY CONTROL PLAN

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

HUMAN ELEMENT CONSIDERATIONS

Department of Environmental Health & Safety. Lock Out/Tag Out Program. Date Effective: November 2010

C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES. Leader s Guide. 2005, CLMI Training

Safety of Life at Sea, 1974 (SOLAS)

ISM & ISPS pocket checklist

Occupational Health Program Safety Training Series. Lockout/Tagout Safety Awareness Training

MARINE FIRE SAFETY POCKET CHECKLIST

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

STATUTORY INSTRUMENT. No. of Merchant Shipping (Safe Ship Management Systems) Regulation ARRANGEMENT OF SECTIONS.

IMO REQUIREMENTS FROM JULY 2015 TO JULY 2018 INCLUSIVE

ANALYSIS OF FIRE HAZARD AND SAFETY REQUIREMENTS OF A SEA VESSEL ENGINE ROOMS

IMO WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES

GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS

Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program

Electrical Shore Connections / Cold Ironing

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

CATERING CONTRACTORS General Code of Safety Practice

Western Plant Health Association DOT MC 330 & 331 NH3 Cargo Tank Inspection Checklist Form

PANAMA MARITIME AUTHORITY

USER MANUAL OPERATION AND USE OF CAR WITH. Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Example Confined Space Entry Programs

Fire Pump Plan Review March 2010

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

LIQUEFIED PETROLEUM GASES

An inventory of hazardous materials used in your workplace will prove useful.

SECTION 5. Action for Emergency Response

terms and conditions of transport Tank-barge

contractors, etc. and establish relationships with lease and rental companies.

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

Labour and Workforce Development. Confined Space Entry

1.0 Purpose Definitions Hot Work Operations. 5

Transcription:

International Safety Guide for Oil Tankers and Terminal Fifth Edition 2006-12-05 26.3.3 The Ship/Shore Safety Check-List Ship's Name Berth Date of Arrival Port Time of Arrival Part `A' - Bulk Liquid General - Physical Checks Bulk Liquid - General Ship Terminal Code emarks 1. There is safe access between the ship and shore. 2. The ship is securely moored. 3. The agreed ship/shore communication system is operative. 4. Emergency towing-off pennants are Correctly rigged and positioned. 5. The ship's fire hoses and fire-fighting equipment are positioned and ready for immediate use. 6. The terminal's fire-fighting equipment is positioned and ready for immediate use. 7. The ship's cargo and bunker hoses, pipelines and manifolds are in good condition, properly rigged and appropriate for the service intended. 8. The terminal's cargo and bunker hoses or arms are in good condition, properly rigged and appropriate for the service intended. 9. The cargo transfer system is sufficiently isolated and drained to allow safe removal of blank flanges prior to connection. 10. Scuppers and save-alls on board are effectively plugged and drip trays are in position and empty. 11. Temporarily removed scupper plugs will be constantly monitored. 12. Shore spill containment and sumps are correctly managed. 13. The ship's unused cargo and bunker connections are properly secured with blank flanges fully bolted. 14. The terminal's unused cargo and bunker connections are properly secured with blank flanges fully bolted. A System: UHF Channel no: Backup system: Voice Jetty Ship The design of the connection flange(s) on the vessel has to correspond to the following standards: Manual QCDC / 12 /150 lbs Exception: Gasoline MLA, jetty 1003: 10 /150 Version 2.00 1

Bulk Liquid - General Ship Terminal Code emarks 15. All cargo, ballast and bunker tank lids are closed. 16. Sea and overboard discharge valves, when not in use, are closed and visibly secured. 17. All external doors, ports and windows in the accommodation, stores and machinery spaces are closed. Engine room vents may be open. 18. The ship's emergency fire control plans are located externally. Location: If the ship is fitted, or is required to be fitted, with an inert gas system (IGS), the following points should be physically checked: Inert Gas System Ship Terminal Code emarks 19. Fixed IGS pressure and oxygen content recorders are working. 20. All cargo tank atmospheres are at positive pressure with oxygen content of 8% or less by volume. P Part `B' - Bulk Liquid General - Verbal Verification Bulk Liquid - General Ship Terminal Code emarks 21. The ship is ready to move under its own power. 22. There is an effective deck watch in attendance on board and adequate supervision of operations on the ship and in the terminal. 23. There are sufficient personnel on board and ashore to deal with an emergency. 24. The procedures for cargo, bunker and ballast handling have been agreed. 25. The emergency signal and shutdown procedure to be used by the ship and shore have been explained and understood. 26. Material Safety Data Sheets (MSDS) for the cargo transfer have been exchanged where requested. P A A P UHF Channel no: Tyfon Version 2.00 2

Bulk Liquid - General Ship Terminal Code emarks 27. The hazards associated with toxic substances in the cargo being handled have been identified and understood. 28. An International Shore Fire Connection has been provided. 29. The agreed tank venting system will be used. 30. The requirements for closed operations have been agreed. 31. The operation of the P/V system has been verified. 32. Where a vapour return line is connected, operating parameters have been agreed. 33. Independent high level alarms, if fitted, are operational and have been tested. 34. Adequate electrical insulating means are in place in the ship/shore connection. 35. Shore lines are fitted with a non-return valve, or procedures to avoid back filling have been discussed 36. Smoking rooms have been identified and smoking requirements are being observed. 37. Naked light regulations are being observed. 38. Ship/shore telephones, mobile phones and pager requirements are being observed. 39. Hand torches (flashlights) are of an approved type. 40. Fixed VHF/UHF transceivers and AIS equipment are on the correct power mode or switched off. 41. Portable VHF/UHF transceivers are of an approved type. 42. The ship's main radio transmitter aerials are earthed and radars are switched off. 43. Electric cables to portable electrical equipment within the hazardous areas are disconnected from power. 44. Window type air conditioning units are disconnected. A A A P A A A H2S Content: Benzene Content: Method: Nominated smoking rooms: Mess room Version 2.00 3

Bulk Liquid - General Ship Terminal Code emarks 45. Positive pressure is being maintained inside the accommodation, and air conditioning intakes, which may permit the entry of cargo vapours, are closed. 46. Measures have been taken to ensure sufficient mechanical ventilation in the pumproom. 47. There is provision for an emergency escape. 48. The maximum wind and swell criteria for operations have been agreed. 49. Security protocols have been agreed between the Ship Security Officer and the Port Facility Security Officer, if appropriate. 50. Where appropriate, procedures have been agreed for receiving nitrogen supplied from shore, either for inerting or purging ship's tanks, or for line clearing into the ship. A A A P Stop cargo at: 25 m/s (MLA) Warning: Do not unlock Marine Loading Arms in case of higher wind velocities! If the ship is fitted, or is required to be fitted, with an inert gas system (IGS) the following statements should be addressed: Inert Gas System Ship Terminal Code emarks 51. The IGS is fully operational and in good working order. 52. Deck seals, or equivalent, are in good working order. 53. Liquid levels in pressure/vacuum breakers are correct. 54. The fixed and portable oxygen analysers have been calibrated and are working properly. 55. All the individual tank IG valves (if fitted) are correctly set and locked. 56. All personnel in charge of cargo operations are aware that, in the case of failure of the inert gas plant, discharge operations should cease and the terminal be advised. If the ship is planning to tank clean alongside, the following statements should be addressed: Tank Cleaning Ship Terminal Code emarks 59. Tank cleaning operations are planned during the ship's stay alongside the shore installation. 60. If `yes', the procedures and approvals for tank cleaning have been agreed. 61. Permission has been granted for gas freeing operations. * Delete Yes or No as appropriate Version 2.00 4

DECLAATION We, the undersigned, have checked the above items in Parts A and B, and where appropriate Part C or D, in accordance with the instructions, and have satisfied ourselves that the entries we have made are correct to the best of our knowledge. We have also made arrangements to carry out repetitive checks as necessary and agreed that those items with code `' in the Check-List should be re-checked at intervals not exceeding hours. If to our knowledge the status of any item changes, we will immediately inform the other party. For Ship Name ank Signature Date Time For Shore Name Position or Title _Terminal epresentative Signature Date Time ecord of repetitive checks: Date: Time: Initials for Ship: Initials for Shore: Version 2.00 5

26.3.4 Safety Letter Company Terminal Date The Master SS/MV Dear Sir Port esponsibility for the safe conduct of operations while your ship is at this terminal rests jointly with you, as Master of the ship, and with the responsible Terminal epresentative. We wish, therefore, before operations start, to seek your full co-operation and understanding on the safety requirements set out in the Ship/Shore Safety Check-List, which are based on safe practices that are widely accepted by the oil and tanker industries. We expect you, and all under your command, to adhere strictly to these requirements throughout your ship's stay alongside this terminal and we, for our part, will ensure that our personnel do likewise, and co-operate fully with you in the mutual interest of safe and efficient operations. Before the start of operations, and from time to time thereafter, for our mutual safety, a member of the terminal staff, where appropriate together with a esponsible Officer, will make a routine inspection of your ship to ensure that elements addressed within the scope of the Ship/Shore Safety Check-List are being managed in an acceptable manner. Where corrective action is needed, we will not agree to operations commencing or, should they have been started, we will require them to be stopped. Similarly, if you consider that safety is being endangered by any action on the part of our staff or by any equipment under our control, you should demand immediate cessation of operations. There can be no compromise with safety. Please acknowledge receipt of this letter by countersigning and returning the attached copy. Signed Terminal epresentative Terminal epresentative on duty is: Position or Title: _Loading master Contact Details: UHF Channel no: Signed Master SS/MV Date/Time Version 2.00 6