SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS



Similar documents
First Article Inspection (FAI) Training

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added

First Article Inspection 9102B Updated FAQs Page 1 Revision Date: 19-FEB-2015

Q2A First Article Inspection (FAI) AS9102

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

Purchase Order Clauses and Conditions

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance Requirements Manual

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements

Bogue Machine Company, Inc. Business Instruction

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

Helical Products Co., Inc.

How To Ensure Quality Assurance

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts

Quality Assurance Provisions

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

0. 0 TABLE OF CONTENTS

Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011

Pacific Gas and Electric Company

Product Order Quality Requirements Meggitt (Orange County), Inc.

Quality Management System General

Quality Control Procedures QCP 13.0 Page 1 of 6

Distributors In addition to the requirements noted herein, Distributors shall have a Quality System

Quality Management System and Procedures

QUALITY MANUAL ISO Quality Management System

ISO 9001:2008 Audit Checklist

Supplier Quality System Requirements

Supplier Requirements Manual M M 0 3

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Self-Audit Checklist

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

Camar Aircraft Parts Co. Procedures Manual

QUALITY MANUAL REVISION RECORD

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

Quality Management System Manual Revision L

ENERGY BUSINESS QUALITY REQUIREMENTS (EBQR)

How To Manage A Plant

Camar Aircraft Products Co. QUALITY MANUAL Revision D

ONTIC UK SUPPLIER QUALITY SURVEY

SABRe. Supplier Management System Requirements. Revision 1 1 July 2012 Edition 2. Rolls-Royce plc 2012 Page 1 of 40

Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1

AEROSPACE QUALITY MANAGEMENT SYSTEM

Supplier Quality Assurance

SUPPLIER QUALITY PROGRAM, V (U)

Chandler-Arrow Division Arrow Supplier Quality Requirements

PRODUCTION PART APPROVAL PROCESS (PPAP) Section 2

Gulfstream Production Certificate Operations

SUPPLIER QUALITY ASSURANCE REQUIREMENTS

Fokker Aerostructures B.V. Quality Procurement department

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

NIST HANDBOOK CHECKLIST CONSTRUCTION MATERIALS TESTING

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014

1) CERTIFICATE OF COMPLIANCE/CONFORMANCE

Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE

Configuration Management ISO 10007

SUPPLIER QUALITY SYSTEM AUDIT CHECKLIST

Quality System Manual

REFERENTIEL- SODERN. Autre référence / Other reference :

Quality Assurance QUALITY ASSURANCE PLAN

PRODUCT CERTIFICATION REQUIREMENTS

Cartel Electronics. AS 9100 Quality Systems Manual

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

Quality Control Procedures QCP 5.4 Page 1 of 5

CORPORATE QUALITY MANUAL

Supplier Quality Management Handbook

LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003

Quality Manual. DuraTech Industries, Inc Commerce Street La Crosse, WI MANUAL SERIAL NUMBER 1

Rockwell Automation Quality Management System

Quality Management System Manual

Supplier Quality Management Production Part Approval Process (PPAP) Manual

Surgi Manufacturing Quality Manual

ISO 9000 Introduction and Support Package: Guidance on the Documentation Requirements of ISO 9001:2008

Quality Requirements for Suppliers

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

Chapter 4: Contractor Quality Control

QP-740. Supplier Management Handbook

THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632

CHANGES, DEVIATIONS & WAIVERS PROCESSES

ATTACHMENT "Q" PURCHASE ORDER QUALITY CLAUSES

NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document

U. S. Department of Energy Consolidated Audit Program Checklist 5 Laboratory Information Management Systems Electronic Data Management

Checklist. Standard for Medical Laboratory

QCI Counterfeit Avoidance and Mitigation Procedure

Purchase Order Attachment 1600 Revision 02 June Raytheon Aircraft Company Supplier Quality Requirements Document

AS9100 Quality Manual

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL

REV G D Boeing Partner Network REFERENCE ONLY Copy 1 of 15

Supplier Quality Manual

QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER

Quality Management System Manual

DEC STD ISO Quality Systems - Model for Quality Assurance in Production and Installation

QUALITY MANAGEMENT SYSTEM

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility

Transcription:

SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS 1-4.10-FM-35, Rev. A Page 1 of 5

Page 2 of 5

SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS Document Name: Supplier First Article Inspection Instructions and Forms Revision: A Document No.: 1-4.10-FM-35 1.0 APPLICABILITY This procedure applies to production products, assemblies, subassemblies, and purchased parts. This procedure does not apply to standard catalog components, commercially available hardware and deliverable software. 2.0 PROCESS First Article Inspection, (FAI) is required when: 5) Part Revision Level: Latest part revision that affects the part being first article inspected. If there is no revision, indicate as such. Note: The latest drawing revision (Field 7) does not always affect all parts contained on a drawing. 6) Drawing Number: Drawing number associated with the FAI part. 7) Drawing Revision Level: The revision level of the engineering drawing. If there is no revision, indicate as such. 1. New parts/products released to production. 2. A change in the design affecting form, fit or function. 3. A change in manufacturing source, process, inspection method, location of manufacture, tooling or materials that can potentially affect form, fit or function. 4. A change in a CNC program or translation to another media that can potentially affect form, fit or function. 5. A natural or man-made event, which may adversely affect the manufacturing process. 6. A lapse in production for two or more years or as specified by contract. A partial FAI is acceptable under the following circumstances: (1) In response to an Engineering Change Order, only the changes need to be addressed, and (2) when a variation of a part is created and manufactured using the same process as the parent part. The FAI for the parent part and the FAI for the delta of the variation may be used. Please note that the box numbers on page 4 are not always contiguous intentionally because they are the same numbers as on the full FAI forms. Each section represents an AS9102 compliant form. Part Number Accountability (form is on page 4) 1) Part Number: Number of the part (FAI part). 2) Part Name: Name of the part as shown on the drawing. 3) Serial Number: Serial number of the part if required 4) FAI Report Number: Reference number that identified the FAI. 8) Additional Changes: Provide reference number(s) of any changes that are incorporated in the product but not reflected in referenced drawing/part revision level (e.g., change in design, engineering changes, manufacturing changes, deviation or exclusion from certain drawing requirement, etc.). 9) Manufacturing Process Reference: A reference number that provides traceability to the manufacturing record of the FAI part (e.g., router number, manufacturing plan number, etc.). 10) Organization Name: Name of the Organization performing this FAI. 12) P.O. Number: Enter Customer Purchase Order Number, if applicable or required. 13) Detail part or an Assembly FAI: Check as appropriate. 14) Full FAI or Partial FAI: Check as appropriate. For a partial FAI, provide the baseline part number (including revision level) to which this partial FAI is performed and the reason for it. For example, changes in design, process, manufacturing location, etc. 15) 16) 17) and 18): This section is required only if the part number in Field 1 is an assembly requiring lower level parts to be installed into the assembly. 15) (CR) Part Number: Detail or next level sub-assembly part number to be included in the assembly. 16) (CR) Part Name, as shown on the drawing. 17) (CR) Part Serial Number of the part that is installed in the assembly, when applicable. 18) (CR) FAI Report Number for detail part. Enter N/A if not used. *(CR)- Conditionally Required This field must be completed when applicable. This field is shown in Bold Italic font. Page 3 of 5

SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTION Document Name: Supplier First Article Inspection Instructions and Forms Revision: A Document No.: 1-4.10-FM-35 Product Accountability Raw Materials, Specifications, and Special Process(es)Functional Testing 5) (CR) Material or Process: Enter the name of material or process. 6) (CR) Specification: Enter material or process specifications number (include permitted alternates, if used), class, and material form (e.g., sheet, bar, etc.). Include all Make From materials that are incorporated into the FAI part. For raw materials, include all materials that are incorporated into the FAI part, (e.g. unique identifier that will enable traceability back to the Certificate of Conformance, weld/braze filler materials, balls for ball brazing, etc.), and Standard Catalog hardware (e.g., AN, MS fasteners); but do not include processing materials such as acid etchants. 10) (CR) Certificate of Conformance number: Number of the certificate (e.g., special process completion certification, raw material test report number, Standard Catalog hardware compliance report number, traceability number.) 11) (CR) Test Procedure Number: Functional Test Procedure called out as Design Requirement. 12) (CR) Acceptance Report Number: The functional test certification indicating that test requirements have been met. Signature Requirements 19) Signature: name and signature of the person who prepared FAI Form. Also check appropriate box if the FAI is complete. Note: The signature box on this form certifies the following two things: 1) That all characteristics are accounted for; meet drawing requirements or are properly documented for disposition, 2) Indicate FAI is complete or partial. 20) Date when this FAI Form was prepared. 21) Name of the person signing the form. FAI Characteristics Accountability, Verification and Compatibility Evaluation (Form is on page 5) 5) Characteristic Number: Unique assigned number for each Design Characteristic. 8) Requirement: Specified requirement for the Design Characteristic (e.g., drawing dimensional characteristics with nominal and tolerances included, drawing notes, specification requirements, etc.) 9) Results: List measurement(s) obtained for the Design Characteristics. For Multiple Characteristics list each characteristic as individual values or list once with the minimum and maximum or measured values attained. If a characteristic is found to be non-conforming then that characteristic must be listed separately with the measured value noted. If a Design Requirement requires verification testing, then the actual results will be recorded on the form. If a laboratory report or certificate of test is included in the FAIR, then these results need not be written on the form, record the reference number in this field. The laboratory report or certificate of test must show specific values for requirements and actual results. For metallurgical characteristics with visual verification requirement that are rated against standard photographs, list the photo number of the closest comparison. A statement of conformance is acceptable (record the reference number in this field). For processes that require verification per Design Characteristic, include statement of compliance (e.g. certification of compliance, verification indicator such as accept, etc.) For part marking, ensure that marking is legible, correct in content and size and properly located, per applicable specification. 9a) (CR) Accept/Reject: Use A or R to denote if the inspection is acceptable or unacceptable. 10) (CR) Designed Tooling: If a specially designed tooling (including NC programming) is used as a media of inspection, record the tool identification number. 11) (CR) Non-Conformance Number: Record a non-conformance document reference number if the characteristic is found to be non-conforming. Records The original FAI documents will remain on file at the supplier s facility for seven years, unless otherwise specified by contract. Submittal Submit First Article Inspection (Pages 4 and 5) with the First Article sample to Kollsman Inc. Reference Kollsman Product Assurance Provisions Clause Code number 1. Page 4 of 5

SUPPLIER FIRST ARTICLE INSPECTION REPORT (Pages 4 & 5 shall be submitted with FAI sample to Kollsman, Inc.) Part Number Accountability 1. Part Number 2. Part Name 3. Serial Number (CR) 4. FAI Report Number 5. Part Revision Level (CR) 6. Drawing Number (CR) 7. Drawing Revision Level (CR) 8. Additional Changes (CR) 9. Manufacturing Process Reference 10. Organization/Supplier Name (R) 12. P.O. Number 13. Detail FAI Assembly FAI 14. Full FAI Partial FAI Reason for Partial FAI: Baseline Part Number Including Revision Level (for partial FAI) a) if above part number is a detail part only, go to Field 5 below. b) if above part number is an assembly, go to the Field 15 below. Index of part numbers or sub-assembly numbers required to make the assembly noted above. 15. Part Number 16. Part Name 17. Part Serial Number 18. FAI Report Number Product Accountability for Requirements for Form Raw Materials, Specifications and Special Process(es), Functional Testing 5. Material or Process Name 6. Specification Number 10. Certificate of Conformance Number 11. Functional Test Procedure Number 12. Acceptance Report Number, if Applicable Supplier Signature and Approval 1) Signature indicates that all characteristics are accounted for; meet drawing requirements or are properly documented for disposition. 2) Also indicate if the FAI is complete: FAI complete FAI not complete 19. Signature 20. Date 21. Name (print) Form 1-4.10-FM-35, Rev. A Page 5 of 5

FAI CHARACTERISTICS ACCOUNTABILITY, VERIFICATION AND COMPATIBILITY EVALUATION (Supplier to make additional copies of this form, as required, to record and measure all drawing characteristics) 1. Part Number & Rev. 2. Part Name 3. Serial Number 1a. Program Name: 2a. WO No. (CR) (CR) 4. FAI Report Number (R) Part No. Part Rev. Meth.. Rev. Characteristic Accountability Inspection/Test Results 5. Char No. 6.Reference Location (CR) 7. Characteristic Designator (CR) 8. Requirement 9. Results 9a.Accept/Reject 10. Designed Tooling 11. Non-conformance No. NOTE: SHADED AREAS ARE NOT REQUIRED TO BE FILLED IN. Form 1-4.10-FM-35, Rev. A Page 6 of 5