Turnkey solutions. Design & Consultancy Services



Similar documents
Subject: Magnet Safety. Overview: Environmental Health & Safety Policy/Procedure Effective Date: July 29, 2011

4000 Series 4008TAG2A Diesel Engine ElectropaK rpm

aseries A13B Mini Bullet Camera User Manual

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL. EudraLex The Rules Governing Medicinal Products in the European Union.

Unit Rules / Work Instructions for MRI facility. MRI-08 Emergency Procedures. Name: Last reviewed: 4th July 2011

SunMaxx Solar Filling Station Operating Instructions

STARKSTROM. clinical pendants. Excellence & Innovation in Medical Engineering

Baxi Combi 80e & 105e

Frequently Asked Questions Generators

Baxi Combi 130 HE. User s Operating Instructions. Gas Fired Wall Mounted Condensing Combination Boiler

Transformers from 25va to 500kva. Standard despatch in days not weeks

Custom Engineered Design Custom Engineered Design

Data Centre Services. JT Rue Des Pres Data Centre Facility Product Description

Installation Instructions for Alarm Module Kit A043F059

Integrated Power Systems for Data Centers

Cooking at the Speed of light!

PBX Series Quick Fit Connector Bimetallic Steam Traps

Nokia Bluetooth Headset BH-110 User Guide

Nokia Bluetooth Headset BH-102. Issue 1

1 Introduction. 2 Hazards From Electricity

Data Centre Services. JT First Tower Lane Data Centre Facility Product Description

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Metering and Monitoring. Basis of Design

The impact of the New EMC Directive 2004/108/EC

Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering

GAS EXTINGUISHING SYSTEMS INERT GAS EXTINGUISHING SYSTEMS. Argotec Liquid Argon Gas Extinguishing Technology (LAR)

Guidance produced jointly by BIS, the UK Association of Notified Bodies and. March 2014

PELLEXIA COMFORT ENVIRONMENT COMPATIBLE

Baxi Combi Instant 80e & 105e. User s Operating Instructions. Gas Fired Wall Mounted Combination Boiler

Element D Services Plumbing

Element D Services Plumbing

Fire Pump Plan Review March 2010

Fire Alarm System Monitoring - CAN/ULC-S561-03

Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier

Daker DK 1, 2, 3 kva. Manuel d installation Installation manual. Part. LE05334AC-07/13-01 GF

EVC40 EMERGENCY VOICE COMMUNICATION SYSTEM

Nokia Bluetooth Headset BH-118 User Guide

1. Description. 2. List of Accessories included A B C F G H

BERMAD Fire Protection

THE INTELLIGENT AUTOMATIC STOPCOCK

Basic Safety Examination instructions

Evolion Li-ion battery. Saft s proven ultra-compact solution for telecom applications

Chemistry Department

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

BERMAD Fire Protection

Liquid helium. Safetygram 22

Your safety and the safety of others are very important.

1. Product Description. 2. Product Overview

Process Safety Management of Highly Hazardous & Explosive Chemicals. Safe Work Practices

Bluetooth Stereo Headphone. User Guide. Hive

The Role of Fire Doors. BWF-Certifire Fire Door and Doorset Scheme

INNOVATIVE SOLUTION OF DOMESTIC HEATING SPLIT TYPE SPLIT DHW INTEGRATED TYPE MONOBLOC TYPE

WIRELESS STATUS MONITOR

Key. ➍ Micro USB Port ➎ Operating System Toggle Keys ➏ Foam Screen Protectors. ➊ On/Off switch ➋ Bluetooth Connect Button (flashes when searching)

Title: Confined Space Procedure

SALES SPECIFICATION. SC7640 Auto/Manual High Resolution Sputter Coater

The kva RAnge

OxySense Portable Series Instrument Quick Start Guide

NOTE: Additional user information for your printer may be available in the "Manuals" section at support.dell.com.

Commercial Gas Water Heaters

Nokia Bluetooth Headset BH-101. Issue 1

Lead & Magnet Wire Connection Methods Using the Tin Fusing Method Joyal A Division of AWE, Inc.

P 602. This generator set has been designed to meet ISO 8528 regulation. This generator set is manufactured in facilities certified to ISO 9001.

Mechanical shaft seal types and sealing systems

Equipment Information

Spare Parts List M96A.24SM/B M96A.28SM/B

Constant Voltage Charger Selection for VRLA Batteries

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2

Introduction. Section 2. Introduction 2-1

User Guide Nokia Bluetooth Headset BH-222

THE NEWCASTLE UPON TYNE HOSPITALS NHS FOUNDATION TRUST SAFE USE AND STORAGE OF LIQUID NITROGEN AND SOLID CARBON DIOXIDE (DRY ICE)

VIESMANN. Installation and service instructions VITOTROL 100. for contractors

Pressure Relief and Regulating Valves

Morco House Riverview Road Beverley HU17 0LD. Retrofit or Upgrade a Water Heater in a Caravan Holiday home

USER MANUAL. 2. Get started 2.1 Overview The headset contains the following parts as shown in the figure:

WHAT IS INFRARED (IR) THERMOGRAPHY

Electrical Contractors Association

CHAPTER 5 PHOTOVOLTAIC SYSTEM DESIGN

Requirements for Hydrogen Storage and Use

The right. LEDtube. every time. LEDlamps

Scalable. Affordable. Flexible. Fast.

Services Enclosures and Protected Shafts - Maintaining Compartmentation

User Guide for the Wireless Headset (HS-11W) Issue 1

RIGOL. Quick Guide. DS1000CA Series Oscilloscope. Aug RIGOL Technologies, Inc.

Data Centres A complete solution to noise control and acoustic packages

Oil and Coolant Circulating Heating System. Model - OCSM

R22. K Control. Indoor Unit. Nomenclature. Compatibility PL H 3 G K H B. Unit style Heat Pump Horse Power

Runtastic rechargeable battery for iphone 4, 4S

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

An Uninterruptible Power Supply Topology to Manage the Arrival of Big Data Kenny Green

CG PTFE Diaphragm Liquid Transfer Pump

Operating Instructions Bedienungsanleitung Mode d'emploi Instrucciones de manejo Istruzioni d'uso

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink.

Nokia Bluetooth Headset BH-104

Building Regulations P.4. Socket Outlets P.6. Other Considerations P.10. Training Seminars P.24

Wireless Alarm System. Window/Door Sensor. User s Manual. Choice ALERT. Control all Sensors & accessories from one location

Air Sensor. SAC Ex. Manual ATEX. AQ Elteknik AB

Improving resilience to weather and climate change for our customers. The importance of adaptation

Transcription:

Turnkey solutions Design & Consultancy Services Over 25 Years RF, Magnetic and X Ray Shielding Design Expertise. Single Turn Key Design Solutions. Recognised by all Major MRI Manufacturers included Siemens, Phillips, GEC. Our Services include:- MRI Chamber Design & Consultancy. Magnetic Shielding. Cryogenic Quench Systems. MRI Chambers LED Dimmable Lighting Supply & Installation Services. RF Shielding. RF Testing. X Ray Shielding. Radiation Protection Services.

All your Shielding requirements from a single source of supply; Cryogenic Quench Systems Magnetic Field Shielding Modular MRI Chambers MRI Doors & Frames Internal Lining RF Shielded Windows

Magnetic Field Shielding The magnetic fields from the MRI scanner frequently extend beyond the controlled area of the examination room into adjacent rooms, above, below and along the scanner. The shielding of DC magnetic fields in medical environments is necessary to guarantee the operation of health critical equipment in adjacent spaces as well as the safe exposure levels for staff, patients and members of the public. Why Choose Starkstrom for your Magnetic Field Shielding Solution? Over 25 years Industry Experience. Bespoke Design, Manufacture, Installation and On Site Testing. Developed in conjunction with the National Physics Laboratory. The Most Effective Magnetic Field Shielding System on the Market Today. Modular Construction. Easy to Remove Sections for Installation of Scanner.

Cryogenic Quench Systems Liquid helium, the most commonly used cryogen in MRI, undergoes near explosive expansion as it changes from liquid to a gaseous state. There have been multiple failures of cryogen vent systems stemming from a variety of sources such as improper design, construction failures, and inadequate maintenance. If the cryogen vent system fails, hundreds of thousands of liters of gaseous helium can be vented into the magnet room. This super-cold helium, in addition to posing a direct risk of severe cold burns, displaces the oxygen in the room creating an asphyxiation hazard. Starkstrom provides complete Quench system solutions. The Starkstrom quench pipe is designed to remove the gas from the magnet and take it to a safe, external to the building, discharge point.

Why choose Starkstrom for your quench installation? Starkstrom can provide a full Survey, Design, Installation and Testing Service. Our Quench Systems:- Conform to All Known Scanner Manufacturer Specifications. Complies with UK Building Controls. Complies with The Pressure Systems Safety Regulations 2000. Fully Compliant with the UK Medical Devices Agency Guidelines. Designed to withstand temperatures down to -263 C Designed to safely cope with up to 2500lbs Thrust Recent Installations include:- The Royal London Hospital. St Bartholomew s, Royal Victoria Infirmary Newcastle The Freeman Hospital Newcastle. Queens medical Centre, Nottingham. Frenchay Hospital, Bristol. Meets All Known Scanner Manufacturer Specifications. Complies with UK Building Controls. Complies with The Pressure Systems Safety Regulations 2000. Fully Compliant with the UK Medical Devices Agency Guidelines.

MRI Chambers Full Survey, Design, Installation and Testing Service. Modular Panel Construction. Strong Durable Materials. Fully Lined to Customers Specification. Can be supplied in Kit form for customer assembly & installation Compatible with all Scanner Systems.

RF Shielded MRI Chamber Doors & Windows. Ensuring the Highest Standards in Performance through our Continuous Commitment to Research & Development L.E.D Dimmable Lighting System Designed to meet SELV requirements. 30min Emergency Standby. 60% More Efficient than other LED Lighting Systems. Eliminates Strobe Effects.

Testing Services Starkstrom provides a solution to your MRI Attenuation Testing Requirements.

Electrical To meet national guidelines, the electrical power to an MRI chamber needs to be isolated. Starkstrom specialise in isolated and uninterruptible power systems. A typical power system for a standard MRI chamber would be; 1 off 4kVA 4 way Floor standing Single isolated Power system. 1 off 6kVA UPS 230V/230V with 15 mins autonomy, BS60896 10 year VRLA battery. 1 off External maintenance by-pass panel No break, 3 switch, non Castell type by pass panel, 1MCB 2 off MEIGaN compliant Earth Reference Bar Type 1 Single patient Area Flush mount. 2 off MEIGaN compliant Blue (clean earth) twin socket 1 off Single Channel room Status illuminare.