POLOKWANE MUNICIPALITY



Similar documents
KZN SMALL TOWN REHABILITATION PROGRAMME PRESENTATION BY MRS BARBARA MGUTSHINI ACTING GENERAL MANAGER : SPECIAL INITIATIVES

22.01 SETTLEMENT 24/04/2014 C73

21.04 LAND USE. Managing amenity through land use strategies

From Mobility to Accessibility: Addressing the Barrier Effect of Railway Infrastructure in Urban South Africa

HUMAN SETTLEMENTS PRIORITIES (MTSF)

TRAFFIC MANAGEMENT PLAN

Growth Management in the City of Brampton

6. Social & Community Facilities

Urban Renewal: Social Aspects in Planning. Summary

2010 Salida Community Priorities Survey Summary Results

STAFF REPORT. December 20, North District Community Council. Director of Community Planning - North

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

think inside the Box

REMUNERATION : POST LEVEL 8(R164, R190, basic salary per annum, excl benefits)

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)

CITY OF CAPE TOWN ZONING SCHEME REGULATIONS

Proposed Planning Incentives to Support the Replacement of Office Space in New Mixed Use Developments Draft Zoning By-law Amendments

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009

Capturing Value Uplift Benefiting from the Private Sector

21.03 SETTLEMENT AND HOUSING

MIDVAAL LOCAL MUNICIPALITY

Volume II Recommendations January 2006 City of Madison Comprehensive Plan

AMENDED OUTLINE DEVELOPMENT PLAN, VILLAGE DOCKLANDS PRECINCT, 2-46 BATMANS HILL DRIVE, DOCKLANDS

CASE STUDY: Mdantsane CBD

Services Department A009/08 April 28, 2008

Attachment B Policy Audit Template

Part F South East Queensland Regional Plan State planning regulatory provisions

Planning and Analysis Tools of Transportation Demand and Investment Development of Formal Transportation Planning Process

Making Homes Affordable Labour s Plan for Housing

NOTICE OF COMPLETE APPLICATION AND PUBLIC MEETING DRAFT PLAN OF SUBDIVISION AND ZONING BY-LAW AMENDMENT APPLICATIONS PUBLIC MEETING

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:

Public works. Introduction

Registered at the Post Offıce as a Newspaper CONTENTS

FEDERAL REHABILITATION TAX INCENTIVES FOR HERITAGE PROPERTIES IN CANADA. A brief submitted to the Federal Standing Committee on Finance

Policy recommendations on urban strategic planning

Technical Memorandum: Land Use Study

Downtown Core Sub-district

Department of Economic Development City of Johannesburg JBF : 7 November 2008

In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section:

Implementation of Regional Planning Guidelines Best Practice Guidance

Smart Settlement Investment Case: Key Findings

05 AREA/SITE SPECIFIC GUIDELINES

Development of the Railway Station Area in Sopot. 2 February 2010

SUBDIVISION AND DEVELOPMENT REGULATION

Investment Partnership for South Leeds

Re/Max Acclaimed Realty Commercial Division Industry Specific Training Program

Assessing equity in the distribution of community pharmacies in South Africa in preparation for the National Health Insurance scheme

think ahead CITY CENTER

Rapid Transit Backgrounder

ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation (CCR Title )

1 To review the office market in Bakewell in the light of pressures for change from office to residential in town centre sites.

The NSS - Rural Development and Rural Settlement

Deep Ellum Crossroads Redevelopment Project

SECTION 5 RESIDENTIAL R1 ZONE

''The construction of the Public Urban Centre in Sikorskiego St. and Legionów Ave. in Łomża

Provincial Policy Statement

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

R esidential intensification

Victoria City 2010 Community Energy and Emissions Inventory Monitoring and reporting on progress towards greenhouse gas emissions reduction targets

Financing urban renewal, conservation of cultural heritage and tourism development

Property Development: Comparison of Municipal Services Costs: REPORT 2013

Dar es Salaam Masterplan Ministry of Lands, Housing and Human Settlements Development

Spatial planning - Apartheid (pre-1965 to early 1990s)

The Role of Land Use and Transportation in Building Successful Sustainable Cities City of Vancouver

FUTURE LAND USE ELEMENT

DRAFT POLICIES COUNTY OF HALIBURTON OFFICIAL PLAN UPDATE

Amendment No. 38. Civic Centre Cnr Sandgate Street and South Terrace SOUTH PERTH WA 6151

Vulture Mine Rd & US60, Wickenburg, AZ. I $1,299,000

CITY OF FLORENCE NEIGHBORHOOD REVITALIZATION STRATEGY SECOND PUBLIC MEETING

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

Electricity PART I: ENERGY, DEMAND AND FIXED DEMAND CHARGES

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

The Economic Impacts of Reducing. Natural Gas and Electricity Use in Ontario

O U R P L A N, O U R C I T Y

AGENDA PLANNING AND ECONOMIC DEVELOPMENT COMMITTEE MEETING. [Chairperson: Councillor J Serdyn (Ms)]

Disposal of Surplus Property. A Roadmap to Establishing Effective Surplus Property Procedures

Georgian College Neighbourhood Strategy Page 2

Central Core Vacant Land Inventory Report GROWTH ANALYSIS TECHNICAL SERIES

Economic Impact and Development Analysis. Proposed Sports Entertainment District

How To Improve Housing In Seminole County

COTO TRH 26. South African Road Classification and Access Management Manual. Version 1. 0 August C ommittee of Transport Officials.

50 Bloor Street West Zoning Amendment Application - Preliminary Report

Statistical release P4001

Transcription:

POLOKWANE MUNICIPALITY URBAN RENEWAL & INNER CITY REGENERATION: TAX INCENTIVES PROGRAMME : POLOKWANE MUNICIPALITY PRESENTER; MABOTJA M.S

Contents PART A 1. Purpose 2. Polokwane in Context 3. Why the Tax Incentive 3.1 Demarcated Area 4. Conclusion PART B 5. Progress Implementation 6. Institutional arrangements 7.CBD plans (Framework) 8.Pictures of CBD buildings under construction 9. Challenges

Purpose To provide opportunity for extension on proposed demarcation of an area within the city as an Urban Development Zone as introduced in the city.

Polokwane in Context Jurisdiction Area: 377 529 ha(3% of the provincial area) with 170 settlements. Population: 508 277, which constitutes 9.4% of the provincial Population

Regional and Provincial Context Economic Hub of Limpopo Province Sporting Hub and venue for major conferences and events in the Province Shopping, trade and industrial centre Educational and health node

Regional and Provincial Context Trans-Africa corridor Of the four Provincial Spatial Development Initiatives(development corridors); three converge in Polokwane

Polokwane in Context Significance within the provincial context Significance within the national context: Classified as a high capacity municipality Participation in the UDZ tax incentive programme.

Main Drivers of the local economy Sector Government and professional services Trade and catering Finance & real estate Manufacturing Transport Percentage 30,3% 18% 14% 12,4% 9,2%

4. Why the tax incentive extension? Decay setting in as a result of poor planning that separated residences and places of work. Since it was introduced significant buildings have undergone renovations or totally new buildings were erected Encourage investment within the areas that contribute significantly to the local economy.

Why the tax incentive..cont d Encourage investments and thereby leading to : Job Creation Economic growth Increased revenue for the municipality

3.1. DEMARCATED UDZ FOR POLOKWANE Polokwane CBD; Identified in SDF as Primary Activity Node (P1); Highest order activity node in Regional & municipal context. Proposed UDZ (Option 1). Whole CBD - Covers 186ha (including roads); Proposed UDZ [Fig 10]. Proposed UDZ (Option 2). Requirements of Nat. Treasury = 150ha Proposed UDZ of 150ha [Fig 11];

# 288696 OPTION? FIGURE 11

CBD SPATIAL STRUCTURE AND DEVELOPMENT ZONES GROBLER STREET GROBLER STREET THABO MBEKI STREET THABO MBEKI STREET 6

Economic growth & role of CBD Government & proff. services: >30%.(Office accommodation) Trade & commercial: >18%. The largest remuneration to labour force in this sector. (Shops accommodation) Financial & real estate: 14%. Also large contributions to labour remuneration. (Office accommodation) (NB: R1,00 increase in trading activities in Polokwane R1,40 increase in output in total provincial economy).

CBD Precinct Areas Zone 1 2 3 4 5 6 7 8 Other TOT: Precincts within CBD Low density office zone Institutional zone Trading zone Eastern office/retail zone Motor town/accommodation zone Western office/trading zone Transitional zone Infill zone Roads, open space Area 8,6680ha 27,4690ha 58,2923ha 15,3980ha 7,7653ha 10,2780ha 10,2780ha 12,2394ha 35,4638ha 185,8518ha

Leasable floor area in CBD Offices only Trading only (Retail, service indust., wholesale) Offices & trading Other TOTAL: 31% 44% 15% 10% 100% 224 257m² 315 971m² 111 111m² 69 983m² 721 324m²

POLOKWANE CBD BUILDING FLOOR AREA BY FUNCTIONAL ZONE 300000 250000 200000 150000 100000 50000 0 1 2 3 4 5 6 7 8 Retail Offices / Services / Medical Motor Industry Storage Dwelling Flats Hotel / Overnight Accommodation Other

ZONING 2005 14

% SOLD AND R/m² (BUILDINGS) 2003-2004 8 Precinct 7 18.70% land sold R870/m 2 (buildings) 7 3 4 6 Precinct 4 18.33% land sold R1,222/m 2 (buildings) Precinct 6 19.42% land sold R1,349/m 2 (buildings) Precinct 5 36.92% land sold R1,412/m 2 (buildings) 5 Precinct 3 38.15% land sold R1,159/m 2 (buildings) Precinct 2 14.98% land sold R1,806/m 2 (buildings) 2 Precinct 1 1 34.56% land sold R1,239/m 2 (buildings) 34

Development potential on vacant land & econ.opportunities in CBD * Precinct within CBD Area (m²) Increase in local econ. production 1 Low density office zone 10 144m² R25mil. 2 Institutional zone 19 835m² R10,2mil. 3 Trading zone 8 566m² R47,5mil. 4 Eastern office/retail zone 20 413m² Part of 1. 5 Motor town zone 19 417m² Part of 3. 6 Western office/trading zone 49 134m² Part of 1;2;3 7 Transitional zone 112 470m² - 8 Infill zone 33 465m² - TOTAL: 273 444m²

VACANT ERVEN 15

Trends to consider Decay in certain parts of CBD already setting in Urban renewal, investor confidence & development is critical to maintain viability of CBD & municipal tax base; Urban renewal within other parts of the CBD well underway Municipality strict on uncontrolled decentralisationattempts to prevent urban sprawl and promote compact city/clusters; Polokwane/Mankweng Complex as medical training/academic hospital (Medunsa & UNIN);

Demarcated Area cont d Polokwane Municipality s initiatives: Provision of infrastructure- widening of major streets within the CBD to ease traffic flow, Provision of secure parking space within the CBD, Hawker Management: African Market and Limpopo Mall Projects to provide location and infrastructure for hawkers within the CBD. Second Electricity supply line at a cost of R25 million to ensure reliable electricity supply

Other projects which will impact on the CBD Itsoseng Entrepreneurial/Bus Terminus Complex Adjacent to the CBD on the western part Forms a great link between the CBD, industrial area and residential area More than R5 million committed

Projects..cont African Market and Limpopo Hawkers Mall Land identified within the CBD for the provision of infrastructure as part of hawker management and support programme; R5, 8 million committed during 2004/05

Projects..cont for development R500 000 set aside for review of CBD Development Plan (2004/05 budget), which will inter alia address additional dditional measures to re- vitalize inner city and determine incentives.

Other projects which will impact on CBD Development of an Industrial Development Zone (IDZ); 2010 Soccer World Cup. Development of an integrated transport hub(an international coach centre) Development of an International Convention Centre

Subsection (6) (cont.) (e): Fiscal measures in support of regeneration, namely: Funds committed for infrastructure development and maintenance

Fiscal measures: Infrastructure Development Budget 2004/05 2005/06 2006/07 R146 million R188 million R208 million Electricity 9.47% 7.29% 0.57% Roads 1.02% 1.06% 0.96 Water and Sanitation 6.82% 6.94% 16.55%

CAPITAL PROJECTS 2007/8 ELECTRICITY CBD Developments = R500 00 Upgrading of Voortrekker park = R500 000 Buite Street feeder cable = R500 000 Replacement of 2 circuit breakers = R500 000 40% Second Eskom supply = R17 000 000 40% kv line Eskom 2 nd supply R500 000

CAPITAL PROJECTS 2007/8 ROADS AND STORMWATER Council Chamber paving = R200 000 Bus terminus (Retarring, paving and repairs of driveways)= 500 000 Public Transport Infrastructure System (Widening of Dorp Street) = R10 500 000 Multi Storey parking (Design)

Legisl. Compliance (cont.) Subsection (7): (a)(i): Hectare limitation: Census 2001 Population 508 277 people; Limitation i.t.o. population = 150ha; Current CBD covers 186ha (incl. roads); CBD excluding some areas/zones= 150ha; TOT. AREA PROPOSED UDZ = 150ha (Incl. roads)

4. Conclusion Polokwane is the economic hub of the Limpopo Province. Identified as a provincial growth point. Major investments will therefore benefit the entire Province. Main drivers of the local economy located within the CBD South Eastern parts of the CBD developing The Western and North Western Part decaying

PROGRESS IMPLEMENTATION Total number of enquiries- 46 Total number of applications- 20 Total number of completed projects- 5 Total value of development (i.e. value of approved applications)future projects on the pipeline (nature and value)challenges/constraints R245 430 000

Institutional arrangement Marketing through media done by LED SBU investment promotion section Application for rezoning is handled by Spatial planning SBU Building plans approved by Building section Building section provides statistical information to SARS & LED for evaluation Reports are submitted to Council on a quarterly basis

Challenges/Constraints Funding for marketing Process needs a lot of administration Exclusion of other areas within the CBD

Conclusion A need to encourage both renewal and new investments is imminent. Polokwane Municipality has started with implementation of various projects to counteract decay and encourage investments. Review of the CBD Plan during 2004/05 will look at other initiatives necessary to encourage growth within the CBD.