PRESENTATION SPECIALBAU LTD



Similar documents
COMPANY INFO Petrov & Társa Petrov & Co.

Workers. There are many different jobs in a steel mill. As with most industries, the main jobs fall into a list of categories, such as:

rbital Fields of application Variants

Hungary s Fair Calendar for 2008

Hungary Fair & Exhibition Calendar 2009

GLT Delta Kft. www. glt.hu

Frequently Asked Questions About OHP Lamps

heat treatment equipment & accessories

Rába Automotive Holding Plc.

Glass Melting Technology

ROYAL REHAB COLLEGE AND THE ENTOURAGE EDUCATION GROUP. UPDATED SCHEDULE OF VET UNITS OF STUDY AND VET TUITION FEES Course Aug 1/2015

Originators of the Flexible Water Tube design

Integrated Services Workshop Services

2007 Rába Rt. Rába Automotive Holding

HOW CAST GOLD BARS ARE MANUFACTURED

Rába Automotive Holding Plc. Rába Rt.

GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications

Oxy-Fuel Gas Welding. Given a functional oxy-fuel gas unit, instruction and demonstration of use, each student will be able to:

Factory owners must ensure the boiler is:

EVELYN TRADE PLASTIC MOLDING AND TRADING LTD COMPANY INTRODUCTION

Outlook for the construction industry. Part One: BETA monitoring report Joinery ITO August 2013

Product planning, tool production, plastic injection moulding, lease-work, used machines

How To Cool Down A Furnace

Dear Customer, We offer products with outstanding quality and service performed with excellence.

HIGH STANDARD VALVES FOR NON-STANDARD CONDITIONS.

ENERGY EFFICIENCY ENHANCEMENT IN THE HOT ROLLING MILL

Solar Hot Water Heaters

Steel production. Furnace linings made from carbon and graphite are applied for the production of primary iron.

Our references. Direct-Line Ltd. H-2330-Dunaharaszti Jedlik Ányos str homepage:

Kumera Equipment for Non-Ferrous Metal Smelters

Bay Zoltán Foundation for Applied Research. Bay Zoltán Foundation for Applied Research

Final Event - Webinar October 6, Waste Heat Recovery in Energy Intensive Industries Project Results

Customer Place of Installation 0,4 kv AC System

Effective from: 15 January Page 1 / 7

Choosing Planning & Scheduling solutions for Metals

Quality Expertise Affordable prices

Troubleshooting Draft Problems in Chimneys

GE Oil & Gas. Air Cooled Heat Exchangers. Robust and reliable for all loads and applications

FRIULFORGIA Srl COMPANY PRESENTATION. We shape your world

Optimising Glass Melting Processes with Energy & Mass Balance Calculations


Advanced automation solutions for cokemaking

Lecture 3: Basics of industrial glass melting furnaces

Dear Clients, List of Conditions Name of service Modification

Our main goal is: Quality Procedures and Outstanding Service

REFERENCE LIST / 6. DEVA HOLDİNG A.Ş. ( 2 months ) / TP Workshop. Modification of Pilot reactor and complete piping

Introduction FRIGERIO ETTORE spa Lecco (Italy) Rev.09 1 / 19

Passenger transport. Traction service. Vehicle maintenance

BOILER OPERATORS HANDBOOK

Buildings Construction Procurement Strategy

Specification Approval Sheet

Jim Harris Continuous Improvement Leader

Rába Automotive Holding Plc.

Short introduction of the services of Millenia Zrt.

DIETRISOL SOLAR WATER HEATING SYSTEMS ENERGY SAVINGS AND ECOLOGICAL BENEFITS SUSTAINED COMFORT SIMPLICITY AND RELIABILITY INNOVATIVE, MODULAR SYSTEMS

EN Insulating glass units, intended to be used in buildings and construction works

Fluidized Bed Based CO 2 Capture by Carbonate Looping

MAILING BOCEDI FB 2000 AND FTB INSULATION MATERIALS Pagina 2 di 20

List of bonds issued by Raiffeisen Bank Zrt. Effective as from 21st June 2016.

REFERENCE LIST / 6. Manufacturing stainless steel ducts and supports for tissue machine

SHAIYO TRIPLE A GROUP. Hochiminh City, 16 September 2013

2006 Bachelor s of Fine Arts: Glass & Ceramics, Bowling Green State University, Bowling Green, OH. EXPERIENCE

Practical Examples of Heat Regenerative System at Steelmaking Works

Residential and Commercial Gas and Oil Furnaces

Building Permit, Fire Inspection and Operating Permit Fee Schedule

DUNAPACK MAGYARORSZÁG ANNUAL REPORT P A C K A G I N G

Current Measurement of Resistance Spot Welding Using DSP

1.3 Properties of Coal

Response: The combi boiler. Response: The fit anywhere combi

Iron and Steel Manufacturing

Szolnok. Towards Moscow and Shanghai. Towards Western- Europe. Towards port of Constanca in Romania, Bulgaria and Turkey. Towards port of Koper M30

CABINET. A Clean Burn Heat Exchanger provides approximately 200% more surface area for capturing combustion heat. You get more heat from less oil.

One company - infinite possibilities

Mission 9: Recycling

EN Insulating glass units, intended to be used in buildings and construction works

Depreciation Rate Chart as per Part "C" of Schedule II of The Companies Act 2013

Laddomat 21. For accumulation when using a wood-fired boiler. Picture 1. The wood-fired boiler is is connected to to. accumulator tank with bypass

Overview of Waste Heat Recovery for Power and Heat

GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY

Secondary Lead Smelting

A Study on the Flexural and Split Tensile Strengths of Steel Fibre Reinforced Concrete at High Temperatures

ENERGY COSTS A LOT, DON T WASTE IT. Professer. O.Courant SAVE UP TO 15% ON YOUR MONTHLY ELECTRICITY BILL. Konn servi lénerzi, ou ki pou sorti gagnan

Spare Parts List M96A.24SM/B M96A.28SM/B

Chapter 5 - Aircraft Welding

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

N o.11. engineering BOX OVENS OVENS OVENS OVENS OVENS. The definitive guide to industrial ovens MINI WALK IN EXTRA HEIGHT TUNNEL CONVEYOR.

The creation of tooling using the selective laser sintering process. Scott Schermer S.C. Johnson

Electric heat tracing

Rural Road Maintenance Handbook Module 16 Rural Road Maintenance Cost Estimate

CHP Plant based on a Hybrid Biomass and Solar System of the Next Generation EU project No. ENER/FP7/249800/"SUNSTORE 4" Dipl.-Ing. Alfred Hammerschmid

A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour.

BAHAUDDIN ZAKARIYA UNIVERSITY, MULTAN.

Linux Extension for AIDA64

Transcription:

PRESENTATION of SPECIALBAU LTD Budapest, 16/09/2010. Csíksomlyó u. 4/B, Budapest, 1048, Hungary VAT Nr. HU10619647 Page 1 of 10

The Company Name: SPECIALBAU LTD Founded: 1991 Capital: VAT Nr.: Seat: Manufacturing hall: 20 000 000,- HUF HU10619647 Csíksomlyó utca 4/B. I/5., 1048, Budapest, Hungary 3515 Csány, Központi Major Management: Imre LASKA managing director Balázs CSİKE leader of bricklayers István SÁPI leader of steel constructions Zoltán MOLNÁR leader of quality assurance István KOHÁNYI leader of designing Csíksomlyó u. 4/B, Budapest, 1048, Hungary VAT Nr. HU10619647 Page 2 of 10

Building glass melting furnaces Building all types of glass melting furnaces including building new furnaces, repairing, rebuilding and modernizing existing furnaces. Building and demolishing chimneys. Hot sealing works on furnaces. electrostatic precipitators. Assembling and installing dust collectors and Designing, assembling and modernizing batch houses. Designing, manufacturing and installing machines and equipments (batch chargers, firing changers). Designing and building special furnaces for laboratories. Csíksomlyó u. 4/B, Budapest, 1048, Hungary VAT Nr. HU10619647 Page 3 of 10

References Building and modernizing of glass furnaces of GE Hungary Kft: o RIBBON furnace (Nagykanizsa): 1992, 1996, 2000 o Lead-free furnace (Vác): 1995, 1999 o VELLO furnace (Vác): 1996, 2000, 2004 o Borosilicate (Budapest): 2001, 2005, 2009 o Special glass melting furnace (Zalaegerszeg): 1999, 2004 o Hot sealing works on furnaces o Glass drainage o Installing electronic boosting o Heating up with flue gas generators Rebuilding glass melting furnace, Tokodi Üveggyár Kft 2000 Building glass melting furnace, FALORNI Spa, Napoli, 2001 Building, heating up and hot sealing works 2 glass melting furnaces, LIGHTTECH Lámpatechnológiai KFT, Dunakeszi, 2001 and 2002 Building and heating up oxy-fuel glass melting furnace with electric boosting, PFLEIDERER Salgótarján RT, 2002 Rebuilding glass melting furnace, URSA Salgótarján Zrt, 2008 Repairing enamel furnace, ZALAKERÁMIA RT Tófej, 2002 Rebuilding coke oven, Alti Forni Trieste, Italy, 1991 Building coke oven, Thyssen, Duisburg, 1991-1992 Building pusher-type furnace, Hüttenheim, 1992. Repairing cupola furnace, Winter-Werke, Stadtallendorf, 1991 Csíksomlyó u. 4/B, Budapest, 1048, Hungary VAT Nr. HU10619647 Page 4 of 10

Manufacturing and assembling steel constructions SPECIALBAU Ltd has great experiences and specialized knowledge about manufacturing and assembling and welding steel constructions. Our main activity is creating whole furnace steel constructions. It is manufactured and pre-assembled in our manufacturing hall and then final assembling at site. Beyond that we are able to produce batch house steel constructions of glass industry and cement industry, manufacture, assembly and install specialized unique machines and equipments of glass industry, fabricate and install steel chimneys and other industrial steel constructions. We have a lot of experiences in regular upkeeping and repairing machines and equipments of glass industry. We have ISO 9001 certification since 1999. It is very important to us working in the highest quality as possible. All of our partners have been fully contented with our services. Csíksomlyó u. 4/B, Budapest, 1048, Hungary VAT Nr. HU10619647 Page 5 of 10

References Steel constructions of all glass melting furnaces of GE Hungary Kft o RIBBON furnace (Nagykanizsa): 1992, 1996, 2000 o Lead-free furnace (Vác): 1995, 1999 o VELLO furnace (Vác): 1996, 2000, 2004 o Borosilicate (Budapest): 2001, 2005, 2009 o Special glass melting furnace (Zalaegerszeg): 1999, 2004 Pipeline works on modernized furnaces (cooling and soft water pipelines) Installation an Electrostatic Precipitator on borosiliate furnace of GE Hungary Kft, Budapest, 1998 Manufacturing and installing batch charger machine in GE Hungary Kft Manufacturing and installing batch charger machine in PFLEIDERER Salgótarján RT, 2002 Manufacturing damper for General Electric Chile Glass Factory Manufacturing and installing steel chimney, GE Hungary RT Vác 2001. Manufacturing and assembling steel constructions of the whole glass factory, Lighttech Kft Dunakeszi, 2000-2002. Manufacturing 800 tons steel constructions for Mordow 3 cement factory through Metálszer 2004 Kft, 2008-2009 Installation an Electrostatic Precipitator at LightTech Kft, Dunakeszi, 2010 Csíksomlyó u. 4/B, Budapest, 1048, Hungary VAT Nr. HU10619647 Page 6 of 10

Heating ups and drainages We have great experiences in heating ups (including holding and scheduled cooling downs). Our expert team has been developing unique heat up generators. We already heated up different types of furnaces as you can see in our reference list. Also we accomplished several scheduled cooling downs and drainage successfully. Our labours are totally qualified in glass drainage. We do drainage in all Hungarian GE Hungary Kft factory, LightTech Ltd and URSA Salgótarján Zrt (Pfleiderer earlier). Specialbau Ltd designed and manufactured drag chains in several size regarding to customers requirements. We have several special tools and equipments for drainage. Our company is able to do heating up and cooling down schedules, too. Csíksomlyó u. 4/B, Budapest, 1048, Hungary VAT Nr. HU10619647 Page 7 of 10

References of heating ups Date site/factory what generators 1999. june GE Hungary RT Zalaegerszeg glass melting furnace 1 1999. sept EURAL Bloom furnace 1 1999. october EURAL Bloom furnace 2 2000. january LIGHTTECH Kft 18 sqm furnace heating up 1 and fulfilling 2000. march PFLEIDERER Rt. furnace heating up and 1 fulfilling 2000. aug. GE Hungary RT Nagykanizsa furnace heating up and 3 fulfilling 2001. june GE Hungary RT Zalaegerszeg furnace holding (1200 C) 1 2001. july GE Hungary RT Vác VELLO-furnace heating up 3 and fulfilling 2001. sept. GE Hungary RT Budapest hard glass furnace heating 2 up and fulfilling 2001. oct. Tokodi Üveggyár furnace heating up 1 2001. nov. LIGHTTECH Kft experimental furnace 1 heating up 2002. april PFLEIDERER RT furnace heating up and 1 fulfilling 2003. june EURAL Alu delivery crucible 1 heating up (1 db) 2003. july EURAL Alu delivery crucible 2 heating up (2 db) 2003. july GE Hungary RT Zalaegerszeg heating up and fulfilling 1 2003. aug. EURAL Bloom furnace heating up 2 2004. may HUNGUARD furnace WE holding (1100 C) and 2 scheduled cooling down (7 C/h) till 170 C 2004. aug. EURAL Tatabánya BLOOM furnace heating 2 up 2004. sept. GE Hungary Rt Nagykanizsa RIBBON furnace heating up 4 Csíksomlyó u. 4/B, Budapest, 1048, Hungary VAT Nr. HU10619647 Page 8 of 10

Designing Specialbau LTD can design: Glass melting furnaces Glass melting furnace modernization Chimneys Steel constructions of glass melting furnaces Machines for glass industry, dampers Power engineering, statica and aero calculations and stressing Batch houses Dust control Burning systems Feasibility studies Expert opinion, consultations Csíksomlyó u. 4/B, Budapest, 1048, Hungary VAT Nr. HU10619647 Page 9 of 10

References Modernizations of glass melting furnaces in GE Hungary Ltd o RIBBON glass melting furnace, Nagykanizsa o VELLO furnace, Vác o Fritt melting furnace, Zalaegerszeg o Hard glass furnace, Budapest o Electric heating lead-free glass furnace, Vác Whole glass factory, Lighttech Lámpatechnológiai Kft 2000-2001 Recuperator, Lighttech Lámpatechnológiai KFT, 2001 Batch house rebuilding, GE Hungary Kft, Vác, 2000 Batch charger machine, 1998 Damper, 1998 Steel chimney, GE Hungary Kft, Vác, 2000 Glass melting furnace, SORG GmbH Oxy-fuel furnace, PFLEIDERER Salgótarján Rt. Csíksomlyó u. 4/B, Budapest, 1048, Hungary VAT Nr. HU10619647 Page 10 of 10