MONITORING AND MODEL CALIBRATION FOR THE SEWER NETWORK IN OSLO



Similar documents
Risk and vulnerability assessment of the build environment in a dynamic changing society


Modelling of Urban Flooding in Dhaka City

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.

Stormwater Control Measures for Tokyo

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

Sewer Infiltration Monitoring SWIG Sensing in Water 2015

Severn Trent Water Ltd has undergone a massive investment programme in the River Tame catchment over the

Thames Water key Messages for London Borough of Ealing 25 th October 2005

UDG Spring Conference Birmingham 2016

Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

PRSENTATION ON DRAINAGE SYSTEM DELHI EAST DELHI MUNICIPAL CORPORATION

Havnepromenade 9, DK-9000 Aalborg, Denmark. Denmark. Sohngaardsholmsvej 57, DK-9000 Aalborg, Denmark

Action plans for hotspot locations - Ash Study

Kansas City s Overflow Control Program

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

MagneW 3000 PLUS Flowmeter for Open Channel

Application of InfoWorks CS Software for the Hydraulic Design of HATS Stage 2 Sewage Conveyance System in Hong Kong, China

CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung 2,3, H. Kainz 3 and K.

16. Storm water drainage

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

Sewerage Management System for Reduction of River Pollution

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

Drainage. Information for those with problem drains

Lars-Göran Gustafsson, DHI Water and Environment, Box 3287, S Växjö, Sweden

Type of Sewer Systems. Solomon Seyoum

East Riding of Yorkshire Council

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Peeling the Onion of Meter Accuracy Two Steps to Evaluating Flow Meter Data

General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet

SANITARY SEWER BACKUP. Causes & Prevention

Guidelines for Performing Infiltration/Inflow Analyses And Sewer System Evaluation Survey

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water

Fire Suppression Systems for Your Home

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator

Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM

AVOIDING THE PITFALLS OF DYNAMIC HYDRAULIC CONDITIONS WITH REAL-TIME DATA

Vital Earth Composting Facility Flood Risk and Drainage Statement

Application and results of automatic validation of sewer monitoring data


COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

Urban Flood Modelling

4 Water supply description

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Chapter 3 : Reservoir models

Water management and challenges in Norway

Configuring the HydroRanger 200 to measure open channel flow. Specific parameter setting to configure the following primary measurement devices:

List of Figures List of Abbreviations Executive Report

Flood Mitigation and Management in Bangkok Metropolitan Area

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

FLOOD RISKS IN LONDON

6. FLOW MEASUREMENT. A. Evaluation of Permittee's Flow Measurement

Household customer. Wastewater flooding guidelines.

BANGKOK FLOOD PROTECTION SYSTEM Bangkok Metropolitan Administration (BMA)

Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding

LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION

Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems

Creating the environment for business

Sanitary Sewer Overflows Leave Telltale Signs in Depth-Velocity Scattergraphs

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

The Clean Water Project What Is The Stormwater Impact?

Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS

Tracking the Flow: Meeting the Challenge of Open- Channel Flow Measurement in Municipal Applications

Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Home Drainage & Causes of Basement Flooding. Water

Assessment of hydropower resources

Foul Drainage, systems and responsibility. Environmental Protection

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

PREVENTING WET OR FLO ODED BASEMENTS

Executive Summary Consent Decree

GIS in Wastewater Collection System Master Planning

Open channel & partially filled pipe Ultrasonic flow meters

CHAPTER 2 HYDRAULICS OF SEWERS

Burnt River Black River and Gull River Flood Contingency Plan

foundation designed to keep water out of the basement.

Sanitary Sewer Overflow (SSO) Incident Report Form

Sewer Flooding Alleviation in the Counters Creek Catchment

Climate vulnerability assessment Risks from urban flooding Interactive science and policy assessment

CODE OF REGULATIONS OF THE NORTHEAST OHIO REGIONAL SEWER DISTRICT TITLE III SEPARATE SANITARY SEWER CODE

Sewerage Operation and Maintenance. Tokyo Metropolitan Government Bureau of Sewerage Facilities Management Division, Pipeline Management Section

Recommendations for future developments

Instrumentation for remote-monitoring and telemetry solutions in environmental sector: sensors - data loggers - web services

Transcription:

MONITORING AND MODEL CALIBRATION FOR THE SEWER NETWORK IN OSLO Authors: Ulf E. Roysted 1, Marit Melhuus 1 and Geir J. Lindholm 2 1. Oslo Water and Sewage Works(VAV), Herslebs gate 5, N-0561 Oslo e-mail: ulf.roysted@vav.oslo.kommune.no marit.melhuus@vav.oslo.kommune.no 2. ROSIM AS, Schleppegrellsgt. 2b, N-0556 Oslo e-mail: geir@rosim.no 1 Introduction The City of Oslo is situated between the woods and hills of Nordmarka and Oslo Fjord. Between Nordmarka and the fjord, seven main watercourses pass through the city. These rivers and the fjord itself are popular recreation areas for the city's population of some 500,000 persons distributed over an area of 140 km 2. Figure 1: Regional map Oslo's sewer system has developed over a period of 150 years. Up to the mid-fifties combined systems were mainly used. Subsequently an effort has been made to develop a separate system. The sewer system includes 2,200 km of sewers and 45,000 manholes. 800 km of sewers is combined. The main interceptors in the sewerage network consist of 300 km of pipes with dimensions of 600 mm and over. The sewer system is relieved by a total of 240 overflows, of which three are main overflows from the tunnel system. 1

The waste water is collected and transported to two treatment plants plant by an extensive system of tunnels. VEAS treatment plant accepts waste water from the western part of the Oslo region and Bekkelaget treatment plant from the eastern part of the region. Within the Oslo City boundary the tunnels amount to 41 km. A 24 km long tunnel extends from the city boundary to VEAS. In 1997 a systematic work began on monitoring and calibration of a city-wide MOUSE model. This work is a long-term undertaking and is regarded more as on-going work than as a project. The monitoring and calibration is performed for three types of MOUSE models. i. Tunnel model ii. Environmental models iii. Capacity models This paper describes the monitoring and calibration of the environmental models. The Environmental models will together cover all the overflow discharges from the Oslo sewer system and will be established sequentially for each watercourse. Some overflows will prove suitable for elimination, others will be moved, renovated or otherwise improved. VAV sees monitoring and calibration of a MOUSE model as a necessary part of this work. Rivers: Progress of monitoring Hovinbekken 1998 Alna 1999 Akerselva 2000 Western rivers Eastern rivers Table 1: Progress of monitoring Photo 1: Fishing in Akerselva 2

2 Monitoring Network of permanent rain gauge stations During 1998 the existing network of permanent rain gauge stations in Oslo has been upgraded and increased from five to seven. The stations are of type Lambrecht and has been linked to VAV's remote control system. All stations have a temperature gauge and a heated bulb for round-the-year measurements. Photo 2 Mobile rain gauges Mobile rain gauges are placed on roof of buildings or pumping stations. The rain gauges are of type Newlog Casella. Photo 3 Flow monitoring ADS flow monitoring equipment is used to measure flow in main interceptors. The ADS concept with a quadredundant ultrasonic level sensor combined with a pressure sensor and a peak velocity sensor has proven to give very accurate results. Installation and operation of the ADS flow monitors is carried out in cooperation with the supplier, DHI Sweden. Photo 4 3

ISCO - Flow monitoring The Western and Central part of the Oslo tunnel system includes 36 discharge point structures, most fitted with a Parshall or Khafagi venturi measurement channel. For flow monitoring at this points VAV has available 10 ISCO monitors with ultrasonic level sensors. The monitoring equipment is linked to VAV's remote control system and is moved to a new discharge point structure every second year. Overflow monitoring Photo 5 The overflow loggers are sited in locations identified by the Masterplan as primary overflows, i.e. overflows expected to come into use more than once each year. At overflow weirs with a relatively high crest level we use Overflow loggers of type DT 2000. This measuring equipment is very easy to use and is logging date and time for start and stop of the overflow event. At overflow weirs with a relatively low crest Photo 6 level we use ISCO monitoring equipment with a ultrasonic level sensor. Monitoring Number equipment of LAMBRECHT 7 rain gauge stations CASELLA 9 Mobile rain gauge ADS FLOWMETERS 8 ISCO Ultrasonic 10 level gauges (flow) ISCO Ultrasonic 5 level gauges (Overflow) DT-2000 Overflow loggers 26 Table 2 Photo 7 4

3 Calibration Figure 2 illustrates the area of Hovinbekken and the flow monitoring programme 1998. In the period June to November we used 6 ADS flow monitors for seasonal campaign monitoring, covering Hovinbekken as the figure illustrates. Additionally we use 1 ADS flow monitor for long-time monitoring, covering the total drainage area for the period September 1997 to September 1999. For each area we are calibrating a MOUSE NAM model against the results from the ADS flow monitor. For each area the NAM model will be distributed to each subcatchment illustrated in figure 2. Figure 2 The long time monitoring results and the Overflow monitoring results is used for verification of the calibrated model. Figure 3 shows measured flow for the long time monitoring ADS versus an ADS campaign monitor installed upstream at the same main interceptor. The period is random chosen. The figure illustrates the accuracy of the ADS equipm ent Figure 3 5

Figure 4 Figure 4 shows measured flow versus calculated flow for a calibration attempt with a single box MOUSE NAM model for an area in Hovinbekken. This is the calibration result before we use the MOUSE-Pipe model and before we have added the diurnal foul flow. The MOUSE-NAM model is thoroughly verified from calibration against measured flow from larger catchment areas. Our experience is that the MOUSE-NAM model generally gives a good calibration result also for small catchment areas. We would tough like to forward some small user frustrations: As figure 4 illustrates the first part of the calibration process would have been easier if it had been possible to add foul flow and a constant flow during calibration with the MOUSE- NAM model. It is usually difficult to calibrate MOUSE-NAM for the drainage and infiltration water from non-connected houses and roads 1/2-2 hours after rainfall during the dry summer season. It is difficult to get a good result both for periods with rainfall of extreme intensity and "normal" intensity periods for the same set of calibration parameters. The degree day snowmelt routine usually melts the snow to early in the winter season. Most discrepancies we have between calculated and measured flow can however bee related to the distance from the rain gauge to the centre of the drainage area for the flow monitor. REFERENCES: Work group, VAV, Note, Computer modelling, Oslo, Outline (1997) 6

7