ASX Announcement 10 May 2016



Similar documents
For personal use only

Investor Pack for Half Year Results. 20 February 2015

Manulife Financial Corporation The Manufacturers Life Insurance Company. Annual Meeting May 4, 2006

Market Outlook. Arvid Moss and Erik Fossum. Capital Markets Day 2012 (1)

Debt investor presentation 2015 financial year

The market and China s role

AVINO SILVER & GOLD MINES LTD.

Tabcorp Holdings Limited (ABN ) Tabcorp Holdings Limited (ABN )

ASX Announcement 20 May 2014

Meridian Energy broker presentation

Aluminium Supply & Demand Dynamics. Eoin Dinsmore Principal Consultant, CRU The AFSA International Aluminium Conference, Cape Town, March 2016

Economic Data. International Market Recap. September 21, September 18, 2015

Hitachi Transfers Hard Disk Drive Business to Western Digital

Supply, Logistics, Marketing and Information Technology. Executive General Manager Commercial and West Africa

Oil & Gas Market Outlook. 6 th Norwegian Finance Day Marianne Kah, Chief Economist March 2, 2016

Iron Ore: Industry Outlook. Tony Ottaviano Vice President Planning March 2011

Hitachi Completes Transfer of Hard Disk Drive Business to Western Digital

Confirmation Code:

EQUITY RAISING ANNOUNCEMENT

PACIFIC ENERGY LIMITED POWER GENERATION

Yara International ASA Second quarter results 2014

Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September Successful Share Issue Raises A$5.6 Million

Building a World Class Resources Group

Q2-14 Financial Results. July 30, 2014

The Sherwin-Williams Company Reports 2016 First Quarter Financial Results

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

Feasibility Study shows low cost battery grade lithium hydroxide production possible using ELi Technology

Yara International ASA Fourth quarter results February 2012

Weiqiao Textile Announces its 2015 Interim Results

Fourth quarter February 19, 2008 (1)

Research Commodities El Niño returns grains and soft commodities at risk

Second Quarter and First Half 2015 Trading Update

CODELCO UPDATE April Copyrights 2014 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights 2014 by CODELCO-CHILE. All Rights Reserved.

Change of Company Name to Neometals Ltd (ASX: NMT)

IFGL REFRACTORIES LTD. RESULT UPDATE PRESENTATION, February 2016

Tabcorp Holdings Limited 2011/12

Short-Term Fertilizer Outlook

BIOX ANNOUNCES 2016 FIRST QUARTER RESULTS

Monetary Policy and Mortgage Interest rates

TD Securities Mining Conference JANUARY 26-27, Developing the third-largest copper mine

RAJESH EXPORTS LIMITED GLOBAL PRESENCE IN GOLD AND GOLD PRODUCTS. Earnings Presentation Q2 FY16

Ferro-nickel / NPI Production from Laterite Nickel Ore in China. Jiang Xinfang Tsingshan Holding Group

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

Makita Corporation. Consolidated Financial Results for the nine months ended December 31, 2007 (U.S. GAAP Financial Information)

Oil and Natural Gas Outlook: Implications for Alaska The Alliance Meet Alaska. Remarks by Marianne Kah Chief Economist

SAP Debt Investor Presentation Second Quarter 2014 Update Call Walldorf, Germany Thursday, July 24, 2014

NORDEN RESULTS. 1 st quarter of Hellerup, Denmark 15 May Our business is global tramp shipping. NORDEN 1st quarter of 2013 results 1

Adelaide Brighton Ltd ACN

August 2, 2013 Crude Palm Oil Recap

FRANKLIN ELECTRIC REPORTS RECORD SECOND QUARTER 2013 SALES AND EARNINGS

Q Results Analyst Presentation Henk van Dalen, CFO 3 May 2010

Result up on higher volumes and prices

Third Quarter 2014 Earnings Conference Call. 13 August 2014

Recap of Recent Announcements

UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C FORM 8 K

Market Monitor Number 3 November 2012

RHI AG. May 12, 2016

2015/16 Q1 Results. August 12, 2015 New York August 13, 2015 Hong Kong

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

Urban Planning and Development Systems Business Strategy

Accrual and Exercise of Option to Redeem 130% Call Option Attached Unsecured Convertible Bond Type Bonds with Stock Acquisition Rights (8th Series)

Refinery Evaluation Model

October 1, Contents. 1. Recap. 2. Physical Market Rates. 3. Arrivals. 4. Weather. 5. Charts and Outlook. 6. Disclaimer

Second Quarter 2015 Investor Conference Call

CROSS RELEASE PXUPA ASX RELEASE

FOR IMMEDIATE RELEASE

Economic Data. October 01, September 30, October 01, 2015

Global wage projections to 2030 September 2013

Acquisition of SAIT Communications. 28 July 2015

OUTLOOK FOR METALS AND MINERALS. Half Year Results August Rio Tinto Economics & Markets

Detour Gold Provides New Life of Mine Plan for Detour Lake

Baader Investment Conference

Pathway to Production

NATIONAL STORAGE REIT

March 5, First Quarter Conference Call

ACQUISITION OF HYPE DC PTY LTD

A X A L T A C O A T I N G S Y S T E M S. Q FINANCIAL RESULTS April 28, 2016

How To Invest In Panin Life

North American Steel Industry: Recent Market Developments and Key Challenges Going Forward

How To Mine And Treat Ore From Castle Hill Stage 1

Alunorte improvements, seasonality and lower power production

Caucasus and Central Asia: Oil Price Decline and Regional Spillovers Darken the Outlook

For Immediate Release: January 30, Occidental Petroleum Announces 4 th Quarter and Twelve Months of 2013 Net Income

Contents (Click on the topics)

N E W S R E L E A S E

Yara International ASA Third Quarter results 2012

Adelaide Brighton Ltd Morgan Stanley Emerging Companies Conference 14 June Presented by: Mark Chellew Managing Director & CEO.

FOCUS MINERALS LIMITED

Transcription:

ASX Announcement 10 May 2016 Presentation at CRU 2016 World Aluminium Conference Attached is a copy of a presentation prepared by Mr Andrew Wood, Group Executive Strategy & Development, for the CRU 2016 World Aluminium Conference held in Shanghai China. Neither Alumina nor any other person warrants or guarantees the future performance of Alumina or any return on any investment made in Alumina securities. This document may contain certain forward-looking statements, including forward-looking statements within the meaning of the US Private Securities Litigation Reform Act of 1995. The words anticipate, "aim", "believe", "expect", "project", estimate, "forecast", "intend", "likely", should, "could", "will", "may", "target", "plan and other similar expressions (including indications of "objectives") are intended to identify forward-looking statements. Indications of, and guidance on, future financial position and performance and distributions, and statements regarding Alumina's future developments and the market outlook, are also forward-looking statements. Any forward-looking statements contained in this document are not guarantees of future performance. Such forward-looking statements involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Alumina and its directors, officers, employees and agents that may cause actual results to differ materially from those expressed or implied in such statements. Those risks, uncertainties and other factors include (without limitation): (a) material adverse changes in global economic conditions, alumina or aluminium industry conditions or the markets served by AWAC; (b) changes in production or development costs, production levels or sales agreements; (c) changes in laws, regulations or policies; (d) changes in alumina or aluminium prices or currency exchange rates; (e) Alumina Limited does not hold a majority interest in AWAC and decisions made by majority vote may not be in the best interests of Alumina Limited; and (f) the other risk factors summarised in Alumina's Annual Report 2014. Readers should not place undue reliance on forward-looking statements. Except as required by law, Alumina disclaims any responsibility to update or revise any forward-looking statements to reflect any new information or any change in the events, conditions or circumstances on which a statement is based or to which it relates. This presentation contains certain non-ifrs financial information. This information is presented to assist in making appropriate comparisons with prior year and to assess the operating performance of the business. Where non-ifrs measures are used, definition of the measure, calculation method and/or reconciliation to IFRS financial information is provided as appropriate or can be found in the Alumina Limited s ASX Full-Year Report for the period ended 31 December 2015. Stephen Foster Company Secretary 10 May 2016 For investor enquiries: For media enquiries: Chris Thiris Charles Smitheram Nerida Mossop Chief Financial Officer Manager Treasury & Investor Relations Hinton and Associates Phone: +61 3 8699 2607 Phone: +61 3 8699 2613 Phone: +61 3 9600 1979 chris.thiris@aluminalimited.com charles.smitheram@aluminalimited.com Mobile: +61 437 361 433

Bauxite & Alumina an increasing social and environmental focus Andrew Wood, Group Executive Strategy & Development Alumina Limited andrew.wood@aluminalimited.com 1

Disclaimer Summary Information This Presentation contains summary information about the current activities of Alumina Limited (ACN 004 820 419) (Alumina) and its subsidiaries as at the date of this Presentation. The information in this Presentation should not be considered to be comprehensive nor to comprise all the information that a reader may require in order to make an investment decision regarding Alumina securities. This Presentation should be read in conjunction with Alumina's other periodic and continuous disclosure announcements lodged with the ASX, which are available at www.asx.com.au. No Offer, Recommendation or Advice This Presentation is for information purposes only and is not a prospectus, product disclosure statement or other disclosure or offering document under Australian or any other law. It does not constitute an offer, invitation or recommendation to acquire Alumina securities in any jurisdiction and neither this Presentation nor anything contained in it will form the basis of any contract or commitment. The information contained in this Presentation is not financial product advice, or any other advice, and has been prepared without taking into account any reader's investment objectives, financial circumstances or particular needs. Forward-Looking Statements Neither Alumina nor any other person warrants or guarantees the future performance of Alumina or any return on any investment made in Alumina securities. This Presentation may contain certain forward-looking statements, including forward-looking statements within the meaning of the US Private Securities Litigation Reform Act of 1995. The words anticipate, "aim", "believe", "expect", "project", estimate, "forecast", "intend", "likely", should, "could", "will", "may", "target", "plan and other similar expressions (including indications of "objectives") are intended to identify forward-looking statements. Indications of, and guidance on, future financial position and performance and distributions, and statements regarding Alumina's future developments and the market outlook, are also forward-looking statements. Any forward-looking statements contained in this Presentation are not guarantees of future performance. Such forward-looking statements involve known and unknown risks (including the key risks referred to below), uncertainties and other factors, many of which are beyond the control of Alumina and its directors, officers, employees and agents, that may cause actual results to differ materially from those expressed or implied in such statements. Readers should not place undue reliance on forward-looking statements. Except as required by law, Alumina disclaims any responsibility to update or revise any forward-looking statements to reflect any new information or any change in the events, conditions or circumstances on which a statement is based or to which it relates. Key Risks Certain key risks that may affect Alumina, its financial and operating performance and the accuracy of any forward-looking statements contained in this Presentation include (without limitation): (a) material adverse changes in global economic conditions, alumina or aluminium industry conditions or the markets served by AWAC; (b) changes in production or development costs, production levels or sales agreements; (c) changes in laws, regulations or policies; (d) changes in alumina or aluminium prices or currency exchange rates; (e) Alumina Limited does not hold a majority interest in AWAC and decisions made by majority vote may not be in the best interests of Alumina Limited; and (f) the other risk factors summarised in Alumina s Annual Report 2014. Past Performance Past performance information contained in this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of future performance. Financial Data All dollar values in this Presentation are in United States dollars (US$) unless otherwise stated. Certain financial data included in this Presentation is "non-ifrs financial information" under Australian Securities and Investments Commission Regulatory Guide 230: "Disclosing non-ifrs financial information". Alumina believes the non-ifrs financial information provides useful information to users in comparing prior periods and in assessing the financial performance and condition of Alumina. The non-ifrs financial information does not have a standardised meaning prescribed by Australian Accounting Standards and, therefore, may not be comparable to similarly titled measures presented by other entities, nor should the information be construed as an alternative to other financial measures determined in accordance with Australian Accounting Standards. Readers are cautioned, therefore, not to place undue reliance on any non-ifrs financial information contained in this Presentation. Where non-ifrs financial measures are contained in this Presentation, the definition of the relevant measure, its calculation method and/or a reconciliation to IFRS financial information is provided in this Presentation as appropriate or can be found in Alumina's ASX Half-Year Report (Appendix 4D). No Liability The information contained in this Presentation has been prepared in good faith and with due care but no representation or warranty, express or implied, is provided as to the currency, accuracy, reliability or completeness of that information. To the maximum extent permitted by law, Alumina and its directors, officers, employees and agents, and any other person involved in the preparation of this Presentation, exclude and disclaim all liability for any expenses, losses or costs incurred by any person arising out of or in connection with the information contained in this Presentation being inaccurate or incomplete in any way for any reason, whether by negligence or otherwise. 2

AWAC: world s largest bauxite and alumina producer Geographically diversified, long-life, tier 1 bauxite mines and alumina refineries San Ciprian Guinea Ma aden Kwinana Huntly Pinjarra Willowdale Wagerup Portland Point Comfort Suralco MRN Juruti Alumar Bauxite Mines Refineries Smelter Location 2015 production: 15.1 million t alumina 43 million (bone dry) t bauxite (including equity interests) 163,000 t aluminium Most refineries integrated with mines New bauxite business supply to customers in China, Europe and Brazil (around 5 million t in 2016 from existing mines) Suriname fully curtailed 2015, Point Comfort to be fully curtailed in Q2 2016 Saudi refinery around 80% nameplate capacity 3

Recent growth by industry majors has been mainly in China Estimated Alumina Production 2008-2015 Estimated Aluminium Production 2008-2015 20,000 ktpa 5,000 ktpa 15,000 4,000 3,000 10,000 2,000 5,000 1,000 0 2008 2009 2010 2011 2012 2013 2014 2015 Alcoa/Alumina Ltd Chalco Rio Tinto UC RUSAL Shandong Xinfa Hangzhou Jinjiang Weiqiao/Hongqiao Source: AME Group 0 2008 2009 2010 2011 2012 2013 2014 2015 UC RUSAL Alcoa Rio Tinto CHALCO Weiqiao/Hongqiao Shandong Xinfa Source: AME Group Source: AME Group, April 2016 4

Forecast demand for alumina has reduced but remains solid Solid growth forecast for aluminium demand drives alumina and bauxite demand 150 Alumina market in millions of tonnes 100 50 RoW OTHER ASIA 15% CAGR MIDDLE EAST 4% CAGR CHINA 0 2015 2016f 2017f 2018f 2019f 2020f Growth requires additional ~58m tonnes per annum of bauxite by 2020 (1) Source: Global Alumina demand, Harbor Aluminium, April 2016 (1) Alumina Limited estimate based on average 2.5 tonnes of bauxite per tonne of alumina 5

Modest new alumina supply forecast outside China Upcoming Alumina Projects REGION COUNTRY COMPANY LOCATION 2016 2017 2018 2019 2020 TYPE COMMENTS INTEGRATED UAE Emirates Global Aluminum KIZAD, Al Taweelah 2,000 Greenfield Project feasibility studies were done last year. First phase of 2.0 million tpa to be ready by 2018. Phase II could double capacity to 4.0 million tpa. NO Asia exc China Indonesia Hongqiao Well Harvest Winning Alumina Ketapang, West Kalimatan 1,000 Greenfield First 1mt phase scheduled to start in 2016. Second 1mt phase scheduled for 2017 YES Inalum/Antam/Chalco West Kalimatan 1,000 1,000 Greenfield Construction set to begin in 2016. YES Eastern Europe Russia UC Rusal Kamensk Uralsky 125 Brownfield YES China China Various Greenfield Various 800 1,100 0 0 0 Greenfield Various Brownfield Various 7,400 0 7,200 800 0 Brownfield TOTAL WORLD 8,325 2,100 9,200 1,800 1,000 TOTAL CHINA 8,200 1,100 7,200 800 0 TOTAL ROW 125 1,000 2,000 1,000 1,000 Source: HARBOR Aluminum, April 2016 6

Chinese refineries alumina cash costs new capacity high end of cost curve Existing refinery 350 300 New refinery in 2015 2016 1 MTPA Production 250 200 US$/t 150 100 50 0 0% 25% 50% 75% 100% Chalco Zuiyi and Huajin refineries (Guizhou) expanded in 2015 and sit in 2 nd and 3 rd cost quartiles Weiqiao expanded two refineries in Shandong in 2015, both in 4 th quartile New refineries generally enter higher on cost curve in China than new smelters, mainly due to 1) standard modular design (quick payback but not optimal opex), 2) generally higher bauxite costs and 3) limited access to best bauxite deposits in Guangxi Source CM Group April 2016 7

7 million t of Chinese alumina curtailed; nearly 3 million t has resumed in Q1 2016 Province Curtailed Capacity (ktpa) Comment Henan 500 Curtailed capacity typically older, higher cost refineries. Unlikely to be restarted without a price increase above RMB2,000/t. Jinjiang s 400ktpa (Kaiman) refinery, Wanji s new 600ktpa and Yixiang s 100kt have resumed production after price recovered in Q1 2016 Shanxi 950 Shandong 1,900 Chongqing 200 Guizhou 600 Capacity curtailed is mostly Chalco Shanxi, given the new strategy of Chalco to divest high-cost assets. Capacity is unlikely to be restarted in the short term 1,200 ktpa from Xinfa is unlikely to restart, given it is one of the highest cost, non-integrated refineries in China. Weiqiao s announced capacity cut is yet to be implemented Bosai s 200ktpa capacity based on high-cost imported bauxite is unlikely to restart Curtailed capacity in Guizhou driven by limited access to higher bauxite grades in the short term (higher cost alumina). Once more high grade bauxite becomes available, the capacity is expected to re-start Total 4,150 Source: CM Group, April 2016 8

Alumina forecast shortfall, nearing balance with recent curtailments and re-starts Global alumina supply/demand balance 2015-2020 300 200 100 - (100) (200) (300) (400) (500) (600) 2015 2016 2017 2018 2019 2020 Balance in world ex. China Balance in China Global balance Source: CRU, April 2016 Risks for a tighter market More high cost refiners curtailing production or abandoning industry amid negative economics Alumina project delays/cancellations in Indonesia, Guinea amid low prices, tough financing conditions Reducing alumina production in USA (Point Comfort curtailing fully, other refineries in Chapter 11) Risks for well supplied market Slower demand growth amid smelting curtailments Chinese refiners resuming more of curtailed production if price rises 9

Australian alumina price indices reflect fundamentals of alumina (US$/t, nominal) $400 $350 $300 $250 $200 $150 $100 Jan-15 Mar-15 May-15 Jul-15 Sep-15 Nov-15 Jan-16 Mar-16 June 2015 Acute global longs, further destocking by consumers (including India, Malaysia) Chinese domestic prices fall: lower imported bauxite costs particularly from Malaysia reduce Chinese alumina costs July 2015 SHFE, LME al at 6- year lows Depressed global aluminum prices, poor smelting margins Low Chinese domestic prices drag on Aus mkt (Aust more than Yuan 100/mt above Chinese supply in import parity terms) Uncertainty over Chinese smelting cuts dampen alumina demand Source: Platts, April 2016 Aug, Sep 2015 Low freight prices (fleet overcapacity) Oil prices at 10-year low China share, financial market turbulence Steep Yuan devaluation China cuts imports Oct, Nov, Dec 2015 Aust alumina discounted to Chinese domestic Global alumina longs, low aluminum prices, poor smelting margins. Weak yuan, strong dollar raises cost of imports, deters imports Jan 2016 Margins led refining cuts China, Americas Low oil prices, freight rates Consumers traders restock/ opportunistic buys Bauxite prices remain lows Feb 2016 Noranda, Sherwin Chapter 11, future uncertain Consumer restocking, opportunistic buying Growing alumina supply concerns Chinese domestic alumina, al prices rise Depressed freight rates Aust alumina regains premium to Chinese alumina China idles 4-5 mil loss-making smelting capacity, 8-9 mil refining capacity Mar 2016 Australia increases exports to Canada, Iceland; cuts shipments to China Saudi refinery slow ramp up Malaysia, India ramp up smelting rates, boost alumina imports Apr 2016 SHFE, LME al at 9-10-month highs Consumers restock alumina China economic stimulus measures fuel aluminum demand China restarts some idled refining capacity Chinese smelters switch output to molten mode (rather than ingots) 10

China imported bauxite Atlantic sources at much higher landed prices Landed Prices of Imported Bauxite 100 80 60 40 Jan 14 Jul 14 Jan 15 Jul 15 Jan 16 MARCH 2016 GHANA $68.5 BRAZIL $61.3 DOM. REPUBLIC $58.0 INDIA $56.5 GUINEA 50.3 AUSTRALIA $44.3 MALAYSIA $40.7 Chinese Imported Bauxite Prices CIF, HARBOR Aluminum with China Customs Data, March 2016 11

China s longer term domestic bauxite issues Declining bauxite quality in key alumina producing provinces Value in Use (VIU) adjusted bauxite prices rising 9.00 100 8.00 80 A/S of Bauxite 7.00 6.00 5.00 4.00 3.00 Henan Shanxi US$/t 60 40 20 0 Years Henan Shanxi Indonesian Shandong Australian Shandong Historical pure Bayer process economic limit above 5.0 Feed grade increased marginally in 2014 as refineries started to use allocated bauxite (rather than domestic traded) Mining costs are increasing as deposits go deeper Limited access to high quality bauxite deposits (allocations) ViU reflects grade, logistics & processing costs ViU rising faster than costs to mine, reflecting deteriorating A/S ratio ViU prices rising, even though non-value adjusted delivered prices have been falling Source: Left hand side: CM Group, April 2016 Right hand side: Chinese Imported Bauxite Cost, CM Group with China Customs Data, April 2016 12

Chinese bauxite imports forecast to rise sharply Refiners in some provinces which today rely mainly on domestic bauxite are forecast to reduce their use of domestic bauxite (due to a lower A:S ratio and higher mining cost) and either: - import bauxite at an increased freight cost, well inland or, more likely - relocate/build new refining capacity in coastal regions to reduce freight (and may buy gibbsitic bauxite) 180.0 160.0 140.0 Existing Merchant Refineries New Importing Refineries 120.0 Mln t 100.0 80.0 60.0 40.0 20.0 Source: CM Group, February 2016 13

Significant, large greenfields projects are needed to avoid a bauxite gap in 4 or 5 years Global Bauxite Supply and Demand, 2013-2040 Source: CRU, February 2015 14

Social licence lost, Malaysia extends ban: lessons for other countries? Malaysian mining ban extended to July Requirement to fully clear stocks and review position Environmental, safety: water pollution from wash plants, dust, overloading, heavy traffic, poor rehabilitation Illegal mining licensing issues, royalty gaps Lessons if Indonesia resumes (or Vietnam starts) exports? West Kalimantan, Indonesia, 2014 Kuantan, Malaysia, 2015 15

Social licence and downstream sustainability issues Increasing needs for miners and refiners to focus on legitimate community expectations Social licence in indigenous communities requires environmentally, safe and socially sustainable practices Examples of recent problems: Samarco dam failure, Brazil Community related restrictions on access to bauxite in India Malaysian community issues At the other end of the product chain, increasing expectations of some aluminium product consumers and producers: Want to see a complete chain of ethical, environmental and social responsibility (in choice of supplies) 16

AWAC s rehabilitation best practices implemented in Australia and Amazon Nucleation: pioneering Project to recover the mined areas in Juruti (Amazon) Community seedlings used for reforestation. Phase 3 (5-15 years): plants for sustainable use and conservation Returning a self-sustaining jarrah forest ecosystem in Western Australia to enhance or maintain water, timber, recreation, and conservation values Phase 1 (1-2 years): plants - fast growing Phase 2 (3-5 years): plants - functional 17

AWAC s Juruti mine, Brazil social investments Projects within communities with direct influence and 35 programs on social and environmental control (PCAs) Program to support family production 38k 227k Kilograms of vegetables have been produced generating R$ 322 thousand Seedlings used for reforestation the mined areas 18

AWAC pillars of sustainability environmental, social and economic Sustainability Fundamentals Mutual - but different responsibilities among companies, Government and communities to achieve Sustainable Development AWAC supports our communities with local development Developing the local supply chain and human capital is important to a sustainable operation and post-mining lifetime 19

Summary: medium to long term bauxite and alumina fundamentals are positive Industry context Short term challenges with low prices Medium term fundamentals intact AWAC has a leading position Primary aluminium demand growth strong: 3% for 2016 and 7% for 2017 Approximately 23 million tonnes of new alumina capacity and nearly 60 million tonnes of extra bauxite production required by 2020 Bauxite well supplied currently but potential steepening of demand growth Alumina near balance expected over next 5 years Refining issues in medium term China: Design/opex, bauxite cost/availability - domestic and imported RoW: Long lead times and no financial incentive for new capacity Largest alumina producer and third party supplier and in lowest cost quartile Largest and first quartile of cost bauxite miner: record production, abundant resource, optionality of brownfields expansions to match market AWAC s strategy De-link alumina pricing from LME: 85% of 3 rd party sales on spot/api in 2016 Medium to long term developing challenges Fully curtailing Suriname/Pt Comfort, low cost Saudi refinery nearing capacity Commencing bauxite export business Legitimate social needs growing: licence to operate from local communities Responsible performers likely to have a competitive advantage if can show transparent sustainability chain (downstream producers and consumers) Risk poor performers sink all boats in the region e.g. Malaysia, other Asian Increasing costs for and demands on producers and Governments 20 20