East Anglia Construction Safety Group. Tower Crane Safety Update



Similar documents
A Review of Recent Tower Crane Accidents and the Lessons Learned

Network Rail. Presentation to Tower Crane Interest Group Open Meeting. Bob Watts, Outside Parties Manager Network Rail (High Speed) 21 March 2013

Requirements for Tower Cranes Alongside Railways Controlled by Network Rail

TÜV Middle East W.L.L. Welcome

Management of Lifting with Mobile Cranes

Tower crane incidents worldwide

GUIDE TO TOWER CRANES 1

Integrating Risk Assessments, People and Processes

Tower cranes collapsing on construction sites. A guide to loss prevention

Good Practice Guide. The Selection of Access Methods to Install and Dismantle Safety Netting

WOLFFKRAN. 1 Schedule drawing. 1.1 Schedule drawing, WOLFF clear. max. hook height above ground. Data WOLFF clear

Tower crane stability

FATAL CRANE INCIDENT 22 nd nd October 2007

Guidance on Lifting Operations in Construction When Using Excavators

Tower crane. Code of Practice Workplace Health and Safety Queensland Department of Justice and Attorney-General

Level 1 Award in Health and Safety in a Construction Environment

WORK AT HEIGHT UNIT 4

Technical Advisory for Safe Operation of Lifting Equipment. Programme-Based Engagement

INTERNATIONAL LABOUR ORGANISATION. REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR

THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY

UNIT 7 Crane safety. Engineering CASE STUDY. Cambridge English for. Professional English. Part 1. Part 2

Purchasing Managers Index (PMI ) series are monthly economic surveys of carefully selected companies compiled by Markit.

Thorough examination of lifting equipment

RESPONSIBILITIES IN MOBILE CRANE OPERATIONS CONSTRUCTION SAFETY ASSOCIATION OF ONTARIO

tower crane Is this compliant with European legislation? A brief guide for identification of non-compliant construction machinery

Financing and insuring tower cranes

Chapter 3: Fall Protection/ Scaffolding Safety

PreventING falls from height Introduction How will worksites be targeted? Approach Who will be targeted?

Grove RT. Igo and Igo M Range. Many building sites, one solution. Features and benefits. Rough Terrain Crane

FALL PREVENTION PLAN FPP. Sharing of Safe Work at Height

A report about the HSE investigation into the collapse of a tower crane in Canada Square London E14, on 21 May 2000

METHOD STATEMENT CRANE HIRE PROVIDING A CONTRACT LIFT SERVICE IN COMPLIANCE WITH BS7121 PARTS 1 & 3 AND LOLER REGULATIONS

Global AML Resource Map Over 2000 AML professionals

Sulfuric Acid 2013 World Market Outlook and Forecast up to 2017

Work at Height on Construction Hoists

Construction OS&H Working at height

A Casebook of Fatal Accidents Related to Work-at-Height

Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab

Health and safety. in road haulage

DRILLING & FOUNDATION EQUIPMENT SAFETY INSTITUTION OF ENGINEERS AUSTRALIA MECHANICAL

Tremline Pty Ltd trading as The Hills Bark Blower

Introducing GlobalStar Travel Management

Sample Fall Rescue Plan for Bridge Work

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

S/N MOM Accredited Courses Relevancy Reference

Working at height A brief guide

Building on +60 GW of experience. Track record as of 31 December 2013

The Work at Height Regulations 2005 (as amended) A brief guide

The face of consistent global performance

Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008

Safe Use of Lifting Equipment and Lifting Accessories

OSHA Scaffold Standard for Construction. 29 CFR 1926 Subpart L

Warehousing and storage Keep it safe

How the Lifting Operations and Lifting Equipment Regulations apply to health and social care

Mobile (Truck) Cranes

Work at Height / Falling Objects

BT Premium Event Call and Web Rate Card

Guidebook for Lifting Supervisors

A: SIGNIFICANT RISKS Initial Risk Rating H/M/L B: KEY CONTROL MEASURES ACTION

WEEKLY SAFETY MEETING

Report on Government Information Requests

Potain Igo 42. Product Guide. Features kg (8818 lb) maximum capacity kg (2425 lb) capacity at 36 m (118 ft)

Work at Height on Mobile Cranes

Does this topic relate to the work the crew is doing? If not, choose another topic.

WORK AT HEIGHT. STFC Safety Code No 9. Rev. 1.4, Issued April, 2015

Work at Height. John Frontczak Construction Manager Facilities Engineering Chevron Corporation. All rights reserved.

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

JABATAN KESELAMATAN DAN KESIHATAN PEKERJAAN MALAYSIA (JKKP)

RT100 ROUGH TERRAIN CRANE DATASHEET - IMPERIAL. Features:

Survey and Examination of Ships Lifting Appliances. In conjunction with:

Reported Road Accident Statistics

International Call Services

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment

MAUVE GROUP GLOBAL EMPLOYMENT SOLUTIONS PORTFOLIO

Agilent Mobile WiMAX R&D Test Set Solutions: Software and Technical Support Contract

Integrated Building Information Model to Identify Possible Crane Instability caused by Strong Winds

The big pay turnaround: Eurozone recovering, emerging markets falter in 2015

Global Expatriates: Size, Segmentation and Forecast for the Worldwide Market

Rescue operations - Rescue from cranes

Mobile cranes overturning on construction sites. A guide to loss prevention

RT 780. RT USt Lifting Capacity Rough Terrain Cranes Datasheet Imperial. Features

360 o View of. Global Immigration

HP Technology Services HP NonStop Server Support

FALLING OBJECTS EXCESSIVE NOISE CHAINSAW & CHIPPER WORK AT HEIGHTS MANUAL HANDLING

Why fall for it? Preventing falls in agriculture

TOXIC AND FLAMMABLE GAS CLOUD DETECTORS LAYOUT OPTIMIZATION USING CFD

Working at height - Practical Guidance for Schools

UK Television Exports FY 2014/2015

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

INTER PLANT STANDARD STEEL INDUSTRY

Four steps to improving cloud security and compliance

SECTION 11: EQUIPMENT MAINTENANCE

Reporting practices for domestic and total debt securities

Australia s position in global and bilateral foreign direct investment

The VAT & Invoicing Requirements Update March 2012

ERIKKILA INDUSTRIAL CRANES

Names and Contact Numbers of Competent Rescuers Assigned to Job (Please print)

Transcription:

East Anglia Construction Safety Group Health and Safety Day 22 nd April 2010 Tower Crane Safety Update Tim Watson Tim Watson Consulting

Topics An overview of the latest advances in tower crane standards and design Some recent accidents and the lessons learned Planning for the safe and effective installation and use of tower cranes on site The Tower Crane Register

Latest Advances in Tower Crane Standards and Design

Old and New Standards National Standards DIN 15018 NF E 52-081 FEM 1.001 EN 14439:2006 + A1:2010 One standard across Europe Adopted by manufacturers from January 2010

What's New in EN14439 Improved Safety in Service Compulsory anemometer Anti-collision and zoning devices Improved cab visibility Improved Operator Comfort Requirements for cab heating and control station layout Improved Safety for Erection and Maintenance Personnel Reduction of crushing hazards Improved access Specifications for climbing systems Increased Requirements for Out-of-service Wind

Out-of-service Wind European Storm Wind Map CPA TIN 027

Example

Out-of-service Wind Accidents

Common Requirements for Access EN 13586

Common Requirements for Access Ladders

Zoning Systems

Standardised Minimum Requirements

Requirements for Operator s Cabs

Some Recent Tower Crane Accidents and the Lessons Learned

Tower Crane Accident Survey May 2000 July 2009 At least 51 Serious incidents 8 in the UK 1 in Israel 6 in China 1 in Malaysia 5 in the USA 1 in Philippines 4 in Russia 1 in Poland 4 in Netherlands 1 in Qatar 3 in South Africa 1 in Saudi Arabia 2 in Germany 1 in Spain 2 in Malta 1 in Singapore 2 in Switzerland 1 in South Korea 1 in Bahrain 1 in Taiwan 1 in Canada 1 in Tokyo 1 in Irish Republic 1 in Vietnam

Service Condition Service Condition Quantity In-service 22 Climbing 7 Dismantling 6 Erection 6 Out-of-service 6 Not known 3 Under test 1

Failure Area Failure Area Quantity Foundation/Base 11 Jib 7 Tower /Base 5 Slew section 4 Tower 4 Crane top and climbing frame 3 Falling tower section 2 Jib pendant & luffing ropes 2 Suddenly moving jib section 1 Tower tie 1 Not known 11

Causes 3 8 19 Erection/Dismatling/Exten ding Extreme Weather Foundation Problems 5 Mechanical Issues Misuse 7 Not Known 9 Total 51

Canary Wharf May 2000

Canary Wharf May 2000 Crane was being climbed by a six man crew Collapse occurred as the last mast section was being added on the Sunday Three men fatally injured as result of the 120m fall Debris over wide area of Canada Square Issues: Training Long hours of work Inadequate planning Faulty equipment Manufacturer s instructions not being followed

Worthing February 2005 Two men killed One seriously injured

Worthing February 2005 De-rigging prior to dismantling The two erectors fatally injured working on the jib removing hoist and trolley ropes Third Erector had de-torqued tower bolts on one side of the mast Jib was slewed Slackened bolts failed and crane collapsed Crane owner prosecuted and fined 389,000 for not managing the dismantling process effectively Issues Training Planning

Battersea September 2006 BPR 222 Crane Crane had been in use for a number of weeks Joint below slew ring failed Jib fell across site into an adjacent road Crane Driver + Member of public killed Slew ring bolts had been replaced shortly after erection Investigation concentrating on method used to replace bolts.

Seattle November 2006

Seattle November 2006 Official enquiry blamed inadequate design of foundation Fatigue failure Lack of maintenance and inspection Issues: Planning Base design Maintenance Thorough examination

Liverpool - January 2007 JASO Luffer 3 years old CE marked DOC to EN 14439 Crane was in use Light load Close to minimum radius Wind near maximum inservice limit Jib fell backwards across the site during a lifting operation 1 Construction worker killed

Liverpool Investigation Findings Jib at small angle to the vertical Wind from the front held the jib up and caused the luffing rope to go slack Luffing rope jammed in the sheaves Operator tried to lower off and paid out rope from the luffing winch, which looped down the back of the crane Luffing rope became free allowing the jib to drop until the slack rope arrested its fall Large dynamic load caused the jib to fail and the slewing section and counter jib became detached from the top of the tower at the slew ring One of the counterweights fell on a construction worker causing fatal injuries Issues: Crane design standard

Liverpool Animation

Croydon June 2007

Croydon June 2007 Climbing team had not used the equipment before and had not had any specific training on its use Crane owner fined 100,000 + 33,196 costs Issues Training Planning Not following manufacturer s instructions

New York March 2008 Favelle Favco Luffing Jib Tower Crane 3 Fatalities Being climbed Fabric lifting sling failed, causing tie to fall Top of crane demolished building two blocks away Issues Planning Selection of equipment

Miami March 2008 Libeherr luffing jib crane Climbing operation Tower section fell 2 Fatalities Issues:- Planning Selection of equipment

Miami March 2008

New York May 2008 Kodiak luffing tower crane In-service but not lifting 2 Fatalities Slew ring support failed Said to be 24 years old Same owner as March incident Issues:- Maintenance Thorough examination

Rotterdam July 2008 The crane was lifting a heavy load within its rated capacity close to the mast. It was required to slew the crane & manoeuvre the load along the jib such that the load was very close to the maximum permitted at the required radius During final positioning of the load it ran away down the jib, overloading the crane and causing it to fail at the mast section Failure due to incorrect setting of the PLC/Inverter trolley motor control system

Common Issues Inadequate Planning Inadequate Training Maintenance Issues Through Examination Issues Not Following Manufacturer's Instructions Poor Selection of Equipment Poor Base Design Design Standard Issues

Planning for the Safe and Effective Installation and Use of Tower Cranes on Site

Planning for Installation Choose your tower crane supplier with care Maintain same key personnel from Crane Provider and Principal Contractor/Hirer throughout the process from initial enquiry to dismantling Initial meeting on site to establish Site restrictions and hazards Temporary works requirements Responsibilities for liaison Detailed risk assessments and method statements Method statement sign off Pre activity site inspection and meeting Checks on day of operation Permits to erect, climb or dismantle Keep Talking!!

Guidance on the Management of Installation Process

Guidance on the Management of Installation Process

Guidance on the Management of Installation Process

Guidance on Design of Foundations

Guidance on the Management of use of Tower Cranes

Guidance on the Management of use of Tower Cranes

Guidance on the Management of use of Tower Cranes

Guidance on Maintenance, Inspection and Thorough Examination

All Construction Plant-hire Association (CPA) and Strategic Forum Plant Safety Group Guidance Documents can be downloaded free at http://www.cpa.uk.net/p/tower-crane-interest-group

The Tower Crane Register

The Tower Crane Register Aims to improve tower crane safety and public confidence in their safety Register required by the Notification of Conventional Tower Crane Regulations 2010 Came into effect 6 th April 2010 Only affects conventional top slew tower cranes on construction sites Not SETCs or Truck Mounted Responsibility for ensuring notification is made rests with the user (hirer) of the crane

The Tower Crane Register When Notification must be Made Notification must be carried out with 14 days of the date of any through examination:- following the crane s installation and before being put into use for the first time on a particular site; when the crane is reconfigured on site, eg when the height of the mast is altered; when the crane stays on-site long enough for the existing thorough examination to expire; if exceptional circumstances liable to jeopardise the safety of the crane have occurred.

The Tower Crane Register Information to be Notified The name and address of the company providing the crane for use on the site. The address of the construction site at which the crane has been installed; Information sufficient to identify the crane including, where known, its date of manufacture. The date of the thorough examination; The name and address of the employer for whom the thorough examination was made; Whether the thorough examination revealed any defects involving imminent risk of serious personal injury.

The Tower Crane Register Method of Notification and Cost Two ways to notify HSE Online at http://www.cranesregister.org.uk; By post by completing a form which can either be downloaded from the above website, or by contacting HSE s Infoline for a form and returning it to: Cost HSE Cranes Register, Health and Safety Executive, Field Operations Division, London Divisional Administrative Office, Rose Court, 2 Southwark Bridge, London SE1 9HS 20 per Notification

Further Information The Crane Register Website www.craneregister.org.uk HSE Guidance Leaflet INDG 437

Thank You