PUBLIC NOTICE. Federal Aid Project MO F-54-D-20 May 1, 2016 December 31, 2019. Project Description



From this document you will learn the answers to the following questions:

What material was used to build the water control structure in the Hunnewell Fish Hatchery?

What is being renovated in the Hunnewell Fish Hatchery?

What is the purpose of the project?

Similar documents
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY08 SEWER POINT REPAIRS BID TABULATION

STORM DRAIN PIPE MAINTENANCE. a. Develop standard operating procedures for maintaining storm drain pipes.

Lodge Grass Creek Add-on Project Overview

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

City of Shelbyville Site Inspection Checklist

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

SANITARY SEWER BACKUP. Causes & Prevention

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION EARTH MOVING

Sanitary Sewer Smoke Testing

VILLAS OF TRADITIONS AT GREY OAKS

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

Table 4.9 Storm Drain Inlet Protetion Applicable for

Homeowner s Guide to Drainage

SECTION 5 DRAFTING STANDARDS

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Stormwater/Wetland Pond Construction Inspection Checklist

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

Block and Gravel Inlet Protection (BIP)

Protect Your Home From Flooding. A guide for Lethbridge Residents

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

2012 Program Report. Agricultural Group Drainage Program

Outlet stabilization structure

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

EDUCATION * ENERGY * ENVIRONMENT GUIDELINES AND PROCEDURES FOR CONSTRUCTION OF SCHOOL LANDSCAPE PROJECTS

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

What Causes Foundation Leaking?

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.:

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

SECTION INLETS INLET LOCATIONS

CITY UTILITIES DESIGN STANDARDS MANUAL

TREE # 3 CRITICAL ROOT ZONE = 4,536 SF AREA IMPACTED = 50 SF % IMPACTED = 1 % ' BL VALVE IN BOX POP-UP EMITTER 74.7 CLEAN OUT BACKWATER

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

CHAPTER 5. Storm Sewer

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

Section I - General. Page 1 of 5

PROPERTY EVALUATION AND RESERVE FUND STUDY

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts

How To Build A Backwater Valve

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

Mine Plan of Operations Reclamation Bond Checklist

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION ABANDONMENT OF SEWER MAINS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

SECTION SITE PREPARATION

A Century of Progress with Pride

Building Foundation and Structure

Bond Release Process for New Subdivision Developments in Fairfax County

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

Engineering Major Service Actual Budget Projected Request Executive Adopted

Porous Pavement Alternatives Cost Analysis

Description Quantity Cost Total Cost

MEMORANDUM. General: Foundation:

CITYPLEX TOWERS BOILER INSTALLATION ORU RFP-1138

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

SECTION STORM DRAINAGE TABLE OF CONTENTS

SECTION PRECAST CONCRETE UTILITY STRUCTURES

Downspout to storm sewer. Leaky laterals

Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant

Post Construction Stormwater Management Inspection & Maintenance PROGRAM MANUAL

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

Storm Drain Inlet Protection - IP

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

Session 7: Retrofitted Edge Drains 7.1

Local Road Assessment and Improvement Drainage Manual

This work can be done as part of routine concrete maintenance or scheduled out of cycle within 6-8 weeks, weather and crew availability permitting.

How To Check For A Deficiency

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

SECTION GRAVITY SANITARY SEWERS

HEDDERMAN ENGINEERING, INC Carrie Cove Ct., Spring, TX , fax

SECTION SELECTIVE DEMOLITION

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

DEPARTMENT OF ENVIRONMENTAL QUALITY

SECTION 13 REPLACEMENT AND CLEANUP SCOPE OF WORK

14 October Home Ownership Services Islington Council Highbury House 4-5 Highbury Crescent London N5 1RN

Oakland Macomb Interceptor Drain Rehabilitation State Revolving Fund Project Plan Overview. Public Meeting June 10, 2009

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Koser Field. 7th St SE 2.25

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

Inspection of Water Storage Facilities

SECTION 202. REMOVAL Of ROADWAYS AND BUILDINGS

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

COPPER BEECH TOWNHOME DEVELOPMENT

Transcription:

PUBLIC NOTICE Federal Aid Project MO F-54-D-20 May 1, 2016 December 31, 2019 Project Description Project Name: Hunnewell Fish Hatchery Production Pond Renovation (Phases 2 and 3) Location: Hunnewell Fish Hatchery in Shelby County, Missouri (see attached vicinity map) Purpose: The purpose of this project is to renovate 16 fish production ponds (ponds 1, 2 and 11-24; 0.37-0.60 acres) by replacing the concrete harvesting kettles and shallow end water supply valves, replacing the water supply line, and replacing the sewer line with the addition of manholes. Hunnewell Fish Hatchery has 24 fish production ponds -- eight large ponds (ponds 3-10; 0.95-1.21 acres) and 16 small ponds (ponds 1, 2 and 11-24; 0.37-0.60 acres). These ponds were constructed in the late 1950s, and many of the water supply, water drainage and fish harvesting structures and fixtures are deteriorating or in need of improvement. Construction on Phase 1 of the project was completed in 2015 under Federal Aid Project MO F-54-D-16, and the final report is being compiled. Each pond is equipped with a reinforced concrete water control structure (known as a stack) and a connecting harvest kettle. The stacks, which contain screens for both inflow and out-flow as well as valves used for controlling water flow and level, pose a safety hazard. There are no safety rails to prevent staff from falling off the structures on ponds 1, 2 and 11-24. Concrete has deteriorated on these small ponds, and the stairs leading into the ponds are cracking and shifting. The structures, in their current condition, do not have the ability to mechanically maintain a constant water level within the harvest kettle as the fish are held and harvested. Because of this, one staff member is always dedicated to operating the water control valves during a harvest. The water supply line to the ponds is deteriorated and needs to be replaced. The valves for the water supply line at the shallow ends of the fish production ponds that control segments of the hatchery s water supply system are also deteriorating and leaking. The existing sewer line that services the northeastern ponds (ponds 11, 13, 15, 17, 19 and 21) is deteriorated and difficult to maintain. Phase 1 of our effort to renovate all 24 fish production ponds was completed in 2015 and focused on renovation of the eight largest ponds (ponds 3-10). Phases 2 and 3 of the project will focus on the renovation of the 16 smaller ponds (ponds 1, 2 and 11-24) where 8-12 channel catfish are commonly reared. The project will replace the concrete harvesting kettles and shallow end water supply valves of the ponds. The kettles will be reoriented on the northeastern ponds to allow for more efficient harvesting and maintenance. The new kettles will make fish harvest and maintenance more efficient, and improve the condition and survival of harvested fish. The kettles will have wider and deeper steps on both sides of the structures, making harvest operations safer and more efficient. The new design also eliminates the need for suspended walkways and includes safety railings around the tops of the structures, making work safer for employees. Associated with the kettle replacement, replacement of the water supply line and valves will give us the ability to maintain a constant water level within the kettles during fish harvest. The sewer line that services the northeastern ponds will also be replaced to allow for reorientation of the kettles in these 1

ponds, such that a future addition of aerators would have little impact to the facility if desired. Three new manholes will be installed in the sewer line to allow easier access for maintenance. Description of Work: Construction plans and specifications for both Phases 2 and 3 were developed by a Department engineer (see attached construction plans). A full set of bid specifications is available upon request. The work will be performed by a single prime contractor under the supervision of the Department. The following work will be performed under Phases 2 and 3 -- Construction survey and staking will be performed. Existing concrete kettles and shallow end valves and aprons in pools 1, 2 and 11-24 will be demolished and removed. New concrete kettles will be installed in pools 1, 2 and 11-24. This will include: connecting the kettles to the new water supply lines, existing drain pipes, new drain pipes, furnishing and installing clean rock under stairs and sidewalks to act as a flow path to drains in kettle walls, dewatering the construction footprint, furnishing and placing riprap at specified locations, furnishing and placing mud slab for the kettle footings/footprint, furnishing and installing canal gate, furnishing and installing screens, furnishing and installing grates and handrails, and placing concrete sidewalks and stairs. Existing shallow end fill valves will be replaced, including valve covers, valve boxes, erosion protection pads and any associated miscellaneous items as indicated on the construction plans. The existing 12 water supply line will be replaced. Portions of the existing water supply line will be left in place and grouted, while other portions will be removed. The existing sewer line that services ponds 11, 13, 15, 17, 19 and 21 will be replaced. Portions of the existing sewer line will be left in place and grouted, while other portions will be removed. Three manholes will be installed in the new sewer line. The bottoms of the production ponds will be graded as needed to ensure that the ponds drain completely into the newly constructed kettles. Service roads affected by construction activities will be repaired (as needed), and any disturbed grass areas will be seeded and mulched. For additional information or to provide comments, please contact: Laura Ruman Missouri Department of Conservation PO Box 180 Jefferson City, MO 65102 Laura.Ruman@mdc.mo.gov 573-522-4115, #3164 2

Hunnewell Fish Hatchery Vicinity Map # Project Site Shelby County ± 0 1 2 Miles

Federal Aid Project MO F-54-D-20 Hunnewell Fish Hatchery Production Pond Renovation (Phases 2 & 3) Aerial View of the Project Site Phase 2 (Ponds 1 & 2) Phase 2 (Ponds 11, 13, 15, 17, 19, 21) ± Phase 3 (Ponds 12, 14, 16, 18, 20, 22-24) 0 260 520 Feet Hunnewell Lake CA Boundary 2014 2014