Information Packet SOLAR ENERGY SYSTEM (SES) WHEN IS A SOLAR ENERGY SYSTEM ZONEING PERMIT NECESSARY? Application for Solar Energy System

Similar documents
SOLAR ENERGY FACILITIES ZONING AMENDMENTS

FILING REQUIREMENTS EXCERPTS FROM THE ZONING ORDINANCE SOLAR ENERGY SYSTEMS

HARDWICK TOWNSHIP WARREN COUNTY, NEW JERSEY

#1258. WHEREAS, the Board of Commissioners of the Township of Haddon has determined the following:

Commercial Mobile Radio Service Facilities (CMRS) For Cellular Phone Service Providers

Application for Tax Abatement for Rehabilitation of Property in a Local Historic District

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

SOLAR POWER IN SANTA CLARA COUNTY MARKETS AND DEVELOPMENT TRENDS

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

Anne Arundel County s Watershed Protection and Restoration Program STORMWATER REMEDIATION FEE CREDIT POLICY AND GUIDANCE (Multi-Family,

Definition of Tower from the Bradley County Zoning Resolution

PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS

Solar Photovoltaic Installation Bylaw Mount Washington, Massachusetts

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

DELAWARE TOWNSHIP ORDINANCE # LU

Floodplain Development Land Use Review

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

December Purpose

PRE APPLICATION CONFERENCE - INTRODUCTION

Application Packet Planning Board Site Plan Review (Tier 2)

REQUESTS FOR ANY INSPECTION MUST BE 24 HOURS IN ADVANCE.

State of Vermont Public Service Board

APPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT

Preliminary Plan Application and Checklist

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

SOLAR ENERGY PERMIT. 1. Two (2) page Building Permit Application (signed and notarized); 2. Disclosure Affidavit (signed and notarized);

Solar and Wind Energy for Greenhouses. A.J. Both 1 and Tom Manning 2

Edgecombe County Solar Energy Development Ordinance

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT

MOBILE HOME LAW. Revised November 2001

City of Valdosta Land Development Regulations. Table of Contents

Package Treatment Plant Policy and Procedure

DEPARTMENT OF PLANNING AND DEVELOPMENT

MEDICAL MARIJUANA ZONING VERIFICATION APPLICATION

NEVADA COUNTY COMMUNITY DEVELOPMENT AGENCY

DATE STAMP RECEIVED BY OFFICE OF PLANNING

Application Package for License for Sidewalk Dining Adjacent to Eating Establishment

City of Douglas Commercial Building Permit Site Application

TOWN OF MONSON CERTIFICATIONS-SPECIAL TOWN MEETING MAY 11, 2015

This material is based upon work supported by the U.S. Department of Energy under Award Number DE-

BUSINESS USE PERMIT APPLICATION

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

NEW CONSTRUCTION FINANCING PROGRAM

Retail Marijuana Establishment License Application

Solar Friendly Best Planning Practices for New Hampshire Communities

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

CHAPTER 14. SOLAR RIGHTS.

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330

KERN COUNTY PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT INSTRUCTIONS TO APPLICANT FILING MINISTERIAL OIL AND GAS CONFORMITY REVIEW

APPLICATION FOR TENTATIVE MAPS

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

CITY OF FERNDALE EAGLE Checklist

SITE PLAN REVIEW APPLICATION

OWNERS NAME PHONE OWNERS ADDRESS APPLICANTS NAME PHONE APPLICANTS ADDRESS

COUNTY OF ELBERT. 18 September, 2014 For the Planning Commission meeting of 25 September, 2014 ELBERT COUNTY PLANNING COMMISSION

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

PROPERTY LINE ADJUSTMENT APPLICATION

Zoning for Solar Energy: Resource Guide

Wireless Communication Facilities (WCF)

Submit a copy of your license issued by the Department of Social and Health Services.

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Catawba County Application for a Wireless Communication New Tower or Combination New Tower/Collocation (Quasi-Judicial Hearing - Board of Adjustment)

Draft ARTICLE 20A "AO" ANTIETAM OVERLAY DISTRICT

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

CHAPTER 3 page 69 LOCAL FLOODPLAIN REGULATIONS AND NFIP STANDARDS

Application No.: Steve Rush, representing Rocky Mountain Power Rocky Mountain Power Project Location: approximately 1600 N E.

CHECKLIST FOR TELECOMMUNICATION TOWER CO-LOCATION APPLICATIONS. Conditional Use Permit Approved by Board of Supervisors Date of approval:

Conservation Tax Credit Regulations Chapter A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER

To assist you with getting started with the SRECs program, find enclosed a copy of the following:

Solar Energy Engineering, Consulting & Permitting Services

Welcome to the Inland Wetlands Commission Town of Barkhamsted, CT

Board of Zoning Appeals Variance/Special Exception/Appeal Application City Hall, 1 North Locust Street, Greencastle, IN 46135

APPLICATION FOR CONDITIONAL USE PERMIT PROPOSED USES WITHIN EXISTING BUILDING

Chesapeake Bay Preservation Ordinance Waiver and Exception Process Guidance for Activities in the Resource Protection Area (RPA)

CITY OF WEST PALM BEACH HISTORIC PRESERVATION AD VALOREM TAX EXEMPTION APPLICATION

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

ENVIRONMENTAL REVIEW SCREENING QUESTIONS

FREQUENTLY ASKED QUESTIONS. New Subsurface Sewage Treatment System (SSTS) Ordinance

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

COMP PLAN SUBMITTAL CHECKLIST

CHAPTER 23 Wireless Communication Facilities

SEEKING COMPLETENESS WAIVERS AND PRELIMINARY & FINAL SITE PLAN APPROVAL

TOWN OF HILLSBOROUGH BUILDING & PLANNING DEPARTMENT DESIGN, CONSTRUCTION AND LANDSCAPE PROFESSIONAL NEWSLETTER Fall Greetings 2013

Town of Barnstable Stable Permit Application Stable Regulations Town Code 376

Connecticut Standardized Municipal Instructions for Solar Photovoltaic (PV) Permitting Process Town of Pomfret

SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS

New Electric Connection Application Packet Commercial and Industrial. City of Plummer P.O. Box B, Plummer, ID (208)

Solar Solutions and Large PV Power Plants. Oscar Araujo Business Development Director - Americas

CITY OF ELBERTON, GEORGIA REQUEST FOR PROPOSAL

Environmental Guidelines for Preparation of an Environmental Management Plan

Corona Department of Water & Power (DWP) Solar Partnership Program Guidelines and Application

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

INTRODUCTION TO ZONING DISTRICT REGULATIONS

WIND ENERGY UNIT INFORMATION PACKET

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

OCCUPATIONAL TAX CERTIFICATE

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33, Mile: Population: 80,200 Median HH Income: $34,900

Transcription:

1 Information Packet Land Use Management 509 W 5th Street Suite 103 Red Wing, MN 55066 s could require more than one application approval: Residential-Building Permit Commercial-SES Zoning Permit and Building Permit Utility Scale and all reflective-conditional or Interim Use Permit and Building Permit Land Use Management Department staff are available to advise you in the preparation of this application. Call (651) 385-3104 for further information. T: 651-385-3104 F: 651-385-3106 *SES permit type determined by staff *All fees are in addition to building permit fees SOLAR ENERGY SYSTEM (SES) A device set of devices, or structural design feature, a substantial purpose of which is to provide for the collection, storage and distribution of sunlight for space heating or cooling, generation of electricity, water heating, or providing daylight for interior lighting. A. Residential SES. Accessory to the primary use of the land, designed to supply energy for onsite residential use; excess energy produced may be sold back to the grid through net metering. B. Commercial SES. Accessory to a permitted farm or business use of the land, designed to generate energy to offset utility costs or as an additional revenue stream. C. Utility Scale SES. An energy system that is the primary use of the land, designed to provide energy primarily to off-site uses or export to the wholesale market. WHEN IS A SOLAR ENERGY SYSTEM ZONEING PERMIT NECESSARY? Approval Required: All Solar energy systems greater than 200 watt (2 kw) capacity shall require a building permit and a zoning approval in the form of an administrative review, SES Zoning Permit, or a Conditional /Interim Use Permit (see Section 7 of this Article). A. Residential SES may be approved administratively with a Building Permit. B. Commercial SES may be approved through a SES Zoning Permit or a Conditional/Interim Use Permit. C. Utility Scale Photovoltaic (PV) SES Systems require a conditional/interim use permit

2 APPLICATION FOR Application 1. Owner/Applicant Information PROPERTY OWNER S NAME: PROPERTY OWNER S ADDRESS: TELEPHONE: ( ) EMAIL: APPLICANT OR AUTHORIZED AGENT S NAME: Same as Above APPLICANT S ADDRESS: TELEPHONE: ( ) EMAIL: CONTACT FOR PROJECT INFORMATION: Same as Above ADDRESS: TELEPHONE: ( ) EMAIL: 2. Location and Classification STREET ADDRESS OF PROJECT: ZIP CODE: LEGAL DESCRIPTION: Attached 3. Supporting information NUMBER OF SOLAR COLLECTORS TO BE INSTALLED TOTAL SIZE OF PROJECT DESCRIBE METHOD OF CONNECTING THE ARRAY TO A BUILDING OR SUBSTATION Attach signed interconnection agreement 4. Applicant s Affidavit Under penalty of perjury the following declarations are made: 1. The undersigned is the owner or authorized agent of the owner of this property. 2. The information presented is true and correct to the best of my knowledge. 3. Other information or applications may be required. Signature: Date: Print name: owner or authorized agent (circle one)

3 Application Submittal Checklist Applications listed below submitted to the Planning Department must be accompanied by this checklist and all required materials. The checklist is to be completed and signed by a Land Use Management department staff person. APPLICATION MATERIALS Application, with all blanks completed Township approval form completed with township signature Site Plan (as defined in Art 10, Section 2 with additional information listed below): Location and spacing of solar panels If ground mounted, identify existing vegetation on installation site Location of underground or overhead electric lines connecting SES to building, substation or other electric load New electrical equipment other than at the existing building or substation that is the connection point for the SES Existing and proposed (if altering grade) topography at 2 foot contours Manufacturer s specifications and recommended installation methods for all major equipment including solar panels, mounting systems and foundations for poles or racks Additional information if Commercial or Utility Scale Roof or Ground Mounted, and all reflective solar energy systems Commercial Scale as determined by Planning and Zoning Office Utility Scale as determined by Planning and Zoning Office Visual Impact Analysis: Potential visual effects Storm water management measures Identify specific erosion control, sedimentation control or stabilization measures to address soil limitations during and after project construction Screening or buffering plan include site grading and/or landscape plantings proposed along public roads or abutting residential properties Maintenance plan for grounds surrounding the systems A plan outlining the use, storage and disposal of chemicals used in the cleaning of the collectors and/or reflectors unless certified organic cleaning products are used CHECKLIST CHECKLIST Determination* Residential Commercial Utility Ground Roof Reflective *As determined by Zoning Administrator or designee Identify the onsite location and measures that will be taken to avoid, minimize, or mitigate adverse effects to existing historical, cultural, and archeological features identified by SHPO, the county's databases, and those discovered onsite

4 Additional information if Utility Scale roof or ground mounted, and all reflective solar energy systems Criteria to determine potential impacts on agricultural production Number of acres of Prime Agricultural Soils to be impacted Number of acres in A-1 District to be impacted Proposed duration of SES Criteria to evaluate potential environmental impacts EAW determination if required Review of Goodhue County Environmental Constraints Land Use Model Proximity to existing Electric Utility Lines and Substations for grid-intertie and existing SES projects CHECKLI ST Township Information Township Zoning Permit Attached? If no please have township complete below: By signing this form, the Township acknowledges being made aware of the request stated above. In no way does signing this application indicate the Township s official approval or denial of the variance request. Signature Title Date Comments: County Section SES Application Fee SES Residential: $50 SES Zoning Permit: $200 SES CUP/IUP: $1000 Receipt Number Date What is the formal wording of the request? Shoreland Lake/Stream Name Zoning District Date Received Date of Public Hearing DNR Notice City Notice Action Taken: Approve Deny Conditions: Zoning Administrator Signature

5 PERMITTED USES, CONDITIONAL USES OR INTERIM USES FOR SOLAR ENERGY SYSTEMS s will be permitted, conditionally permitted or not permitted based on the generating capacity and land use district as established in the table below (P=Permitted, ZP= Zoning Permit, C=Conditionally Permitted, I=Interim Permitted, NP=Not Permitted): District Utility Scale Solar SES Commercial Scale SES Residential Scale SES Agriculture Protection (A-1) C or I ZP P Agriculture (A-2) C or I ZP P Urban Fringe (A-3) C or I ZP P Suburban Residence (R-1) NP ZP P General Business (B-1) C or I ZP P Mixed Use Hamlet (MXH) NP ZP P Highway Business (B-2) C or I ZP P Industry (I) C or I ZP P Wild and Scenic River (WS) NP C or I P Commercial Recreation (CR) NP C or I P Shoreland (S) NP C or I P Floodplain Management (FP) NP C or I* ZP* Wetlands (W) NP NP NP *All provisions of Article 31 (Floodplain Regulations) must be met. INSTRUCTIONS: First: What zoning district is the property located in. Visit http://www.co.goodhue.mn.us/524/maps to find out or call Goodhue County Land Use Management Department Building Planning Zoning Telephone: 651/385-3104. Next: Please review the instructions in this application and ask Zoning staff if you have any questions. After filling out the application and collecting the required materials and plans, please contact the Land Use Management Department for an intake appointment to process your application. At this appointment staff will review your application to ensure that it is complete. The assigned staff will review the application in accordance with the Goodhue County Comprehensive Plan, the Ordinance, and department policies. P: HOW DOES THE SES ADMINSTRAVE ZONING APPROVAL PERMITTING PROCESS WORK? Please review and complete the Goodhue County building permit application. ZP: HOW DOES THE SES ZONING PERMITTING PROCESS WORK? Please review and complete the Goodhue County SESZP which includes the building permit application. C or I: HOW DOES THE SES CONDITIONAL /INTERIM USE PERMITTING PROCESS WORK? Please review and complete the Goodhue County

6 Please provide the following materials with this application: 1. SESZP Application: Completed application form with all required fees. Please refer to the Goodhue County Land Use Management Department Fee Schedule available at http://www.co.goodhue.mn.us or at the Land Use Management offices Located in the Government center at 509 West 5 th Street Suite 103, Red Wing, MN 55066. 2. Drawings: The application must be accompanied by plans sufficient for proper determination of the request. In most cases a site plan will be required, as defined in Article 10 Section 2 Subd. 95, showing all pertinent dimensions, buildings and significant natural features having an influence on the CUP; The application may be accompanied by un-mounted photographs, large enough to show the nature of the property but not over 11 X 17 inches; 3. Township: Township signature of acknowledgment and awareness of the request.. 8. Additional Criteria: For certain types of SES, the Planning Code sets out additional criteria for approval in the Code section under which authorization is sought. If any such criteria apply in this case, state in detail the manner in which you believe they will be met. The referenced Code sections are available on-line and may be explained to you at the Land Use Management counter or by phone. 9. grid-tied (interconnected) systems: Although it is not required to be submitted with the initial application, city staff will need to have a copy of a signed interconnection agreement, in hand, prior to issuing a Zoning Permit. For thermal (non-electric) systems, this requirement does not apply. All plans and other exhibits submitted with this application will be retained as part of the permanent record in this case. 4. Manufacturer s information: Provide Specifications sheet, including industry certifications and wattage capacity and manufacturer photographs or renderings 5. Zoning: Provide written responses to questions about the proposal s compliance with the county zoning ordinance to which the application relates; 6. Performance Standards: a. Letter from a professional engineer indicating the roof is able to support the load of the system b. Plan/drawing showing where the system is located on the roof c. A cost and control affidavit, which is generally completed by a licensed construction professional and attests that they will oversee and verify system construction in accordance with local engineering and code specifications d. Drawings of the mounting system, which are typically provided by the manufacturer e. Proof of workman s compensation insurance f. A copy of the contract with the building owner 7. Septic Compliance: When the septic system of the parcel on which the request was made is located within the shoreland overlay district, a septic system certification must be completed. (Note: Noncompliant septic systems are required to be upgraded regardless of the outcome of application proceedings).