UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0



Similar documents
Itemized RAI Responses

The entire document shall be read and understood before proceeding with a test. ISTA 3B Page 1 of 35

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

Solid shape molding is not desired in injection molding due to following reasons.

Testing Packaged Products Weighing up to 150 Lbs.

Packaged-Products for Parcel Delivery System Shipment 70 kg (150 lb) or Less

Guide for SOLID CONCRETE BLOCK SEALS

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Proper use of the Rebound Hammer Updated to reflect the changes to ASTM C805

TEST REPORT. Report No.: A Rendered to: BAMCO INC. Middlesex, New Jersey. PRODUCT TYPE: Wall Cladding System SERIES/MODEL: Dry Concept

PERFORMANCE TEST REPORT. Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall

AST M F /GSA TS01 T EST R EPO R T. Rendered to: UNI T E D ST A T ES A L U M INU M

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

International Forum on Pressure Vessels for Hydrogen and Natural Gas Vehicles

Fiberglas, Exterior Wall Thermal Insulation

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

Chapter 3 Pre-Installation, Foundations and Piers

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos.

Residential Deck Safety, Construction, and Repair

SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 *

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

Detailing of Reinforcment in Concrete Structures

EVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.

pdi PLASTIC DRUM INSTITUTE Plastic Drum Paneling Issues

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

Field Application Note

Lab 1 Concrete Proportioning, Mixing, and Testing

METHOD OF TEST FOR UNIT WEIGHT OF FRESH CONCRETE

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

SECTION STORM DRAIN SYSTEM

Excerpts from the Canadian National Building Code (NBC)

UNITED NATIONS / DOT PERFORMANCE CERTIFICATION 31HA1 PERIODIC DESIGN REQUALIFICATION

James M. Pleasants Company

Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes

High Pressure Equipment Pressure Vessels and Reactors Index

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark

Drum Dispensing Stations

Architectural Testing

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Double Coated Urethane Foam Tapes

CEEN Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

Rehabilitation of an Aging Concrete Reservoir Adit Tower

PANELIZED HOME INSTALLATION GUIDELINE

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS

High Performance PSA in Sheet Membrane in Water Protection

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Project Report. Structural Investigations Hotel del Sol Yuma, Arizona

MATERIALS AND MECHANICS OF BENDING

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation

GreenGuard Housewrap Installation Guide

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES

Tex-421-A, Splitting Tensile Strength of Cylindrical Concrete Specimens

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

THERMAL BARRIERS FOR THE SPRAY POLYURETHANE FOAM INDUSTRY

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

INTERNATIONAL HOCKEY FEDERATION PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR HOCKEY BALLS. Published: April 1999

BLADDER SURGE CONTROL SYSTEM

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

FedEx s Fire Suppression System

Flanged and Butt-= Weld Type

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

FLAMMABILITY REQUIREMENTS FOR AIRCRAFT SEAT CUSHIONS

Type D3 PROTECTOSPRAY Directional Spray Nozzles, Open, Medium Velocity General Description

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Caps STANDARD WEIGHT Inches / Pounds

A Guide to Thermoform Processing of Polypropylene. Introduction

R-VALUES AND U-FACTORS OF SINGLE WYTHE CONCRETE MASONRY WALLS. TEK 6-2B Energy & IAQ (2009) Related TEK: 6-1B, 6-11, 6-12C INTRODUCTION

Flexible Spill Containment Protecting You And The Environment

SURFACE TREATMENT BOND TEST

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide:

This will also provide you with the knowledge to insure long life for your Investment

AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels

Technical Report Example (1) Chartered (CEng) Membership

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

Agilent X/P/K281C Adapters

SECTION SHEETING, SHORING AND BRACING

External Visual Inspection Form

JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes

SPECIFICATION Aluminum Module Frames. Allowed anodization before fabrication for clear frames.

E-Line and Braided Line. E-Line Open Hole wireline

Tentative Interim Amendment NFPA 59A. Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) 2016 Edition

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards

Flygt Ball Check Valves

AD-A DODPOPHM/USA/DOD/NADTR9 1107

METHOD OF STATEMENT FOR STATIC LOADING TEST

Ergo-Pro Single Line Solar Station Installation and Operating Instructions

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

THERMAL INSULATION MATERIALS TEST METHOD SELECTION LIST

Transcription:

UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0 Prepared By: Patrick L. Paquin, EnergySolutions Date Reviewed By: Mirza I. Baig, EnergySolutions Date Approved By: Thomas F. Dougherty, Columbiana Hi Tech Date

Table of Contents Section Page 1.0 Introduction... 3 1.1 General Approach... 3 1.2 Test Pad... 3 1.3 Cylinder Preparation... 4 2.0 Drop Test Observations... 4 2.1 Free Drop No. 1: Side Drop onto UX-30 Cradle... 4 2.2 Free Drop No. 2 Puncture Test... 5 2.3 Free Drop No. 3 Center of Gravity over Cylinder Plug... 6 2.4 Free Drop No. 4 Side Drop onto UX-30 Closure Pins... 6 2.5 Free Drop No. 5 Center of Gravity over Parting Plane... 7 2.6 Post Drop Test Inspections and Testing... 8 3.0 Thermal... 8 Page 2 of 30

1.0 Introduction The UX-30 Overpack is licensed for domestic use in the US by the Nuclear Regulatory Commission (NRC) under Certificate of Compliance No. 9196, USA/9196/B(U)F-96 for the transport of unirradiated or reprocessed uranium in the form of UF 6. Multiple regulatory drop tests have been performed on full-scale UX-30 overpacks with both 30B and 30C compliant cylinders. The testing performed in these tests was performed to address specific questions raised in a Request for Additional Information (RAI) issued by the French Competent Authority, ASN, regarding UX-30 validation, USA/9196/B(U)F-96. The testing is used to: Demonstrate the effectiveness of the UX-30 at -40 C (-40 F) and at the maximum evaluated internal cylinder temperature of 62.94 C (145.3 F). Demonstrate the leak tightness of the cylinder s plug during the prescribed 1 m and 9 m drop tests. Evaluate the consequences of any outer shell damage resulting from the prescribed 1 m puncture and 9 m drop tests and the possible effect on the polyurethane foam and the UX- 30 thermal analysis. Evaluate the consequences of any polyurethane foam deformation resulting from the prescribed drop tests and the possible effect on the UX-30 thermal analysis. Evaluate the consequences of any outer shell damage resulting from the UX-30 transport cradle during the prescribed 9 m drop test. Demonstrate the effectiveness UX-30 closure system during the prescribed 9 m drop test. 1.1 General Approach Five separate Drop Tests (two Puncture and three Free Drop Tests) were performed. Each test used a full-scale production unit UX-30 overpack along with a full size ANSI compliant Model 30B cylinder (the same overpack and cylinder were used for two or more tests) as the Test Unit. One of the free drop tests included attaching the UX-30 transport cradle to the Test Unit. All testing was performed with a cylinder containing sufficient material (steel shot) to properly simulate payload mass. In all five tests, the cylinder sustained no deformation and was shown to meet the required leak criteria after being subjected to three 30- foot drops and two 40-inch puncture tests. 1.2 Test Pad The test pad used was designed to simulate an unyielding surface. Reinforced Concrete 3,000 psi: Type I Portland cement with maximum aggregate size of 25 mm (1 inch) Concrete reinforced with ASTM A-615 Gr. 60 steel rebar Pad Dimensions: 2,438 mm wide x 7,315 mm long x 1,372 mm thick (8 x 24 x 4-6 ) Pad Weight: approximately 129,600 pounds (exclusive of a 1-1/4 thick A36 carbon steel plate covering the pad). Weight Ratio of Test Pad to Test Unit: greater than 10:1 (129,600/8,300). Page 3 of 30

1.3 Cylinder Preparation Two 30 inch (model 30B) uranium hexafluoride cylinders were used for free drop testing. The cylinders were verified to be compliant with ANSI N14.1 and fabricated in accordance with Section VIII, Division I of the American Society of Mechanical Engineers Boiler and Pressure Code and were ASME Code Stamped. The 30B Cylinders were loaded with over 5,400 lbs of steel shot, 400 lbs more than the maximum allowable payload weight. Prior to the test, the UX-30 and cylinders were visually inspected for damage, including dents, creases, weld flaws, and corrosion. After adding the steel shot and prior to drop testing, each 30B cylinder was pressurized with helium to a pressure of 16.7 psia. Each cylinder was placed into a test chamber and the chamber evacuated to approximately 100 milli-torr. An integrated helium leak test was performed on the cylinder per ANSI N14.5-1997 (test sensitivity of at least 5 x 10-8 refcm 3 /sec). Each cylinder was verified to have a measured leak rate of less than 1 x 10-7 cm 3 /sec. 1.4 Test Unit Heating and Cooling (See photos Heating & Cooling Enclosure) To perform the elevated temperature tests, the Test Unit (Cylinder and Overpack) was placed inside of a large reinforced wooden structure covered with insulating material. The Test Unit was heated until all temperature labels read greater than 63 C (145 F). To perform the reduced temperature tests, the Test Unit (Cylinder and Overpack) was placed inside of a large reinforced wooden structure covered with insulating material. Cooling of the Test Unit was accomplished by introducing liquid nitrogen through holes within the structure. The Test Unit was be cooled until all temperature labels read less than - 40 C (-40 F). 2.0 Drop Test Observations 2.1 Free Drop No. 1: Side Drop onto UX-30 Cradle A free drop slap down (See Fig. 1) was performed with Test Unit 1 through a distance of 9 m (30 ft) onto the test pad, striking the surface in a position for which maximum damage is expected. Overpack orientation: Horizontal with Test Unit 1 Parting Plane axis at 7 to the drop test pad, bottom half down with transport cradle attached in its normal orientation for transport. Cylinder type and orientation: Model 30B with its plug end down (normal orientation for transport) so as to be nearest to contact point from the transport cradle. Test Unit Temperature: Minimum of 62.94 C (145.3 F). Page 4 of 30

The test was performed at an elevated temperature condition, since foam strength decreases with increasing temperature, yielding maximum foam deformation and maximum outer shell damage. After the drop, Test Unit 1 was removed from the cradle. The following observations were made (see photos Drop Test 1-1 through 1-7): The overpack remained closed and the parting plane gap remained within tolerance. Nine of 10 locking pins remained engaged. One locking pin at the plug end of the overpack sheared. There were no observed tears in the package. The lower half of the overpack deformed in the shape of the cradle supports, but did not tear. The deformation on the plug end of the overpack, making initial contact, measured approximately 44 mm (1-3/4 inches) deep. The deformation on the opposite end of the overpack (slap-down end) was approximately 51 mm (2 inches) deep. 2.2 Free Drop No. 2 Puncture Test A free drop (See Figure 2) of Test Unit 2 was performed through a distance of 1 m (40 in) onto the upper end of a solid, vertical, cylindrical, mild steel bar mounted on the test pad with a drop angle that maximized the damage to the shell of the overpack. Overpack orientation: Center of Gravity over cylinder plug, with Test Unit 2 Parting Plane axis at 17 to the pin. Initial contact of puncture bar was on the Test Unit 2 end plate, ~9 inches from the corner of the overpack. Model 30B Cylinder orientation: Plug end down (normal orientation for transport) so as to be nearest to the contact point from the puncture bar. Test Unit Temperature: Minimum of 62.94 C (145.3 F). The test was performed at an elevated temperature condition, since foam strength decreases with increasing temperature, yielding maximum foam deformation and maximum outer shell damage. After the drop, the following observations were made (see photos Drop Test 2-1 through 2-4): The overpack remained closed and the parting plane gap remained within tolerance. All 10 locking pins remained engaged. The puncture pin indented the package outer skin at an angle with plug end of the overpack. The maximum depth of the indent was 76 mm (3 inches). The elongated indent was approximately 178 mm (7 inches) wide. All welds remained intact, and, with the exception of the puncture pin tear, the package outer skin was not breached. Page 5 of 30

2.3 Free Drop No. 3 Center of Gravity over Cylinder Plug A free drop (See Figure 3) of Test Unit 2 (second sequential drop of this unit) through a distance of 9 m (30 ft) onto the test pad, striking the surface in a position for which maximum damage is expected. Overpack orientation: Center of Gravity over cylinder plug, with the Test Unit Parting Plane axis at 17 to the drop test pad. Model 30B Cylinder orientation: Plug end down (normal orientation for transport) so as to be nearest to contact point from the drop test pad. Test Unit Temperature: Minimum of 62.94 C (145.3 F). The test was performed at an elevated temperature condition, since foam strength decreases with increasing temperature, yielding maximum foam deformation and maximum outer shell damage. After the drop, the following observations were made (see photos Drop Test 3-1 through 3-6): The overpack remained closed and the parting plane gap remained within tolerance. All 10 locking pins remained engaged. There was deformation of the outer skin at the plug end of the overpack along the area of impact with the test pad. The maximum deformation was approximately 100 mm (4 inches). As a result of the impact, the outer skin compressed the foam in the area of the puncture pin indent such that indent depth was reduced to a maximum of 25 mm (1 inch). All welds remained intact, and, with the exception of the puncture pin tear, the package outer skin was not breached. 2.4 Free Drop No. 4 Side Drop onto UX-30 Closure Pins A free drop (See Figure 4) of Test Unit 1 (second sequential drop of this unit) through a distance of 9 m (30 ft) onto the test pad, striking the surface in a position for which maximum damage is expected. Overpack orientation: Horizontal with Test Unit 1 Parting Plane axis rotated 90 from normal condition of transport such that closure pins will make contact with drop test pad. Model 30B Cylinder orientation: Plug end down (cylinder was rotated within the UX-30 90 from its normal orientation for transport) so as to have the plug nearest to contact point from the drop test pad. Test Unit Temperature: Maximum of -40 C (-40 F). The test was performed at a reduced temperature condition, since maximum foam strength occurs at the minimum temperature condition, since foam strength increases with decreasing Page 6 of 30

temperature. Maximum structural effects due to impact reaction loading are generally expected at minimum temperature conditions, where loads will be greatest relative to closure component structural strength. The following observations were made after the drop (see photos Drop Test 4-1 through 4-7): The overpack remained closed and the parting plane gap remained within tolerance at the valve end of the overpack. At the plug end of the overpack the parting plane separated slightly in the area where the locking pin had sheared in Free Drop No. 1, measuring approximately 16 mm (5/8 inch). The gap decreased down to within tolerance at the opposite end of the overpack. The gap was on the side of the overpack 180 away from the side of the overpack that impacted the test pad. Nine of 10 locking pins remained engaged. The one locking pin at the very end of the overpack which sheared in Free Drop No. 1 was not replaced for this test. There was deformation and some buckling of the outer skin of the overpack along the parting plane which impacted the test pad. There were no observed tears in the package. 2.5 Free Drop No. 5 Center of Gravity over Parting Plane A free drop (See Figure 5) of Test Unit 1 (third sequential drop of this unit) through a distance of 1 m (40 in) onto the upper end of a solid, vertical, cylindrical, mild steel bar mounted on the test pad, with a drop angle that maximizes the damage to the shell of the overpack caused by Free Drop No. 4. Overpack orientation: Impact orientation (Center of Gravity over parting plane) was determined following Drop Test No. 4. Model 30B Cylinder orientation: As oriented for Drop Test No. 4. Test Unit Temperature: Ambient. The test was performed at ambient temperature condition. The following observations were made after the drop (see photos Drop Test 5-1 through 5-5): The overpack remained closed and the parting plane gap remained within tolerance at the valve end of the overpack, except at the area of contact with the steel bar that deformed the skin at the parting plane. The parting plane at the plug end of the overpack did not change from Free Drop No. 4. Nine of 10 locking pins remained engaged. The one locking pin at the very end of the overpack which sheared in Free Drop No. 1 was not replaced for this test. The puncture pin indented the package outer skin at an angle with valve end of the overpack. One side of the indent penetrated to a depth of approximately 51 mm (2 inches) and the other side to a maximum depth of 114 mm (4.5 inches). The elongated indent was approximately 178 mm (7 inches) wide. All welds remained intact, and, with the exception of the puncture pin tear, the package outer skin was not breached. Page 7 of 30

2.6 Post Drop Test Inspections and Testing Following completion of the drop tests, the cylinders were removed from the overpacks and inspected. Test Unit 2 was wedged closed and had to be pried open (see Test Unit 2 Post Drop Test photos). There was no discernible damage to the interior of Test Unit 1 or Test Unit 2 UX-30 overpacks or to either of the 30B cylinders from any of the drop tests. Glazing material applied to the end of the cylinder plug showed no deformation, indicating that the plug did not contact the inner shell of the UX-30 at any time during the testing. Following the overpack and cylinder inspections, both cylinders were leak tested and the post-drop test measured integrated leakage rates were 4.3x10-7 atm-cc/sec. and 6.3x10-8 atmcc/sec. The damage sustained to the UX-30s was consistent with previous drop tests for the same model, and no damage was sustained by the Test Units from any of the drop tests which would compromise the package's ability to meet the requirements of 10 CFR 71. 3.0 Thermal The effect of the hypothetical accident fire event is examined in Section 3.5 of the UX-30 Safety Analysis Report (SAR). The results of the UX-30 fire test scenario and associated thermal analysis models, used to correct for deviations between test conditions and initial conditions required for the hypothetical accident, are discussed in detail in Appendix 3.6.3 of the UX-30 Safety Analysis Report (SAR). The drop tests addressed in this report show that the effect of these drops is a local crushing of the foam, and possible rupture of the impact limiter skin. The puncture drop tests also show the crushing of the foam and rupture of the skin in the vicinity of the impact location. The local crushing of the foam during the drop and puncture tests will increase the foam density. The effect of the local density increase of the foam is addressed in Section 3.5.3 of the SAR. The rupture of the impact limiter skin after the drop and puncture tests may minimally expose the polyurethane foam material to the fire. However, the polyurethane fire retardant characteristics will mitigate the effect of the direct exposure to fire due to formation of intumescent char. The following is a quote from the General Plastics sales brochure. The primary fire retardant mechanism of FR-3700 is the production of an intumescent char when thermally degraded. The foam acts much like the small pallets children light on the fourth of July which grows a long worm when burning. The intumescent char has the ability to seal large voids which could be caused by the impact damage. The char also provides a secondary thermal barrier which breaks down very slowly at 2000 to 2200 F. Tests performed by General Plastics where the open face of a foam filled 5-gallon bucket is exposed to direct fire show the formation of the char that prevents the fire from extending into the underlying foam. These tests also indicate that for the 11¾ foam thickness in the test, the effect of 30-minute fire has a minimal effect on the end opposite the exposed end. Page 8 of 30

These tests were performed for various density foams and it was shown that the effectiveness of the foam is enhanced with the increasing foam density. With 7.8 9.8 lb/ft 3 foam nominal density and a nominal thickness of 6 inches in the UX-30 overpack, the effect of exposure of a small portion of foam due to rupture during the drop and puncture test will not have a significant effect on the impact limiter performance during the fire. Page 9 of 30

FIGURE 1 30 Foot Drop Slap Down onto UX-30 Cradle Page 10 of 30

FIGURE 2 Puncture CG over 30B cylinder plug Pin below plug Page 11 of 30

FIGURE 3 30 Foot Drop - CG over 30B cylinder plug Plug end down Page 12 of 30

FIGURE 4 30 Foot Drop - Side Drop onto UX-30 Closure Pins Page 13 of 30

FIGURE 5 Puncture CG over Parting Plane Page 14 of 30

PHOTOS Page 15 of 30

HEATING/COOLING ENCLOSURE Page 16 of 30

CYLINDER LEAK TEST CHAMBER Page 17 of 30

TEST 1 Drop Test 1-1 Drop Test 1-2 Page 18 of 30

Drop Test 1-3 Drop Test 1-4 Page 19 of 30

Drop Test 1-5 Drop Test 1-6 Drop Test 1-7 Page 20 of 30

TEST 2 Drop Test 2-1 Drop Test 2-2 Page 21 of 30

Drop Test 2-3 Drop Test 2-4 Page 22 of 30

TEST 3 Drop Test 3-1 Drop Test 3-2 Drop Test 3-3 Page 23 of 30

Drop Test 3-4 Drop Test 3-5 Drop Test 3-6 Page 24 of 30

TEST 4 Drop Test 4-1 Drop Test 4-2 Drop Test 4-4 Drop Test 4-3 Page 25 of 30

Drop Test 4-5 Drop Test 4-6 Drop Test 4-7 Page 26 of 30

TEST 5 Drop Test 5-1 Drop Test 5-2 Drop Test 5-3 Page 27 of 30

Drop Test 5-4 Drop Test 5-5 Page 28 of 30

Test Unit 2 POST DROP TESTS Page 29 of 30

Page 30 of 30