Building Permit & Plan Check Fees



Similar documents
CHARTER TOWNSHIP OF NORTHVILLE DEPARTMENT OF PUBLIC SERVICES

Building and Other Permits Fee Schedule Effective Date: July 1, 2016 BUILDING PERMIT FEE

Total Cost of the Building Permit. Total Valuation*

APPLICATION FOR BUILDING PERMIT. Date of Birth: City: State: Zip: City: State: Zip: Asbestos Removal Vacant Non-Residential

Commercial Fee estimate The Building department will provide the actual fees at the time the permit is issued.

CHAPTER 15 - BUILDING, PLUMBING, ELECTRIAL AND HOUSING CODES

CHAPTER MECHANICAL CODE HEATING, AIR CONDITIONING, VENTILATING AND REFRIGERATION DIVISION 2 - APPEALS

City of Beacon Building Department

CITY OF MIAMI FEE ORDINANCE

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

CITY OF BAYTOWN Building Inspections

ORDINANCE NO AN ORDINANCE AMENDING AND ESTABLISHING THE FEE SCHEDULE FOR SERVICES PROVIDED BY THE ELKHART COUNTY BUILDING DEPARTMENT

BUILDING DIVISION CONSTRUCTION PERMIT FEES

THE CORPORATION OF THE TOWNSHIP OF SEVERN BY-LAW NO

QUEEN ANNE'S COUNTY BUILDING CODE TECHNICAL ASSISTANCE BULLETIN

LAND USE PLANNING FEES EFFECTIVE July 1, 2014 Adopted May 20, 2014 by Council Resolution No. 66,598-N.S.

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference

a. A person whose sole function in the work is to perform labor under the supervision or direction of a building contractor.

ALBEMARLE COUNTY CODE CHAPTER 5 BUILDING REGULATIONS ARTICLE I. ADMINISTRATION

SECTION 105 PERMITS. Gas:

PUBLIC WORKS DEPARTMENT Resource Recovery & Recycling Division. CONSTRUCTION & DEMOLITION (C&D) WASTE MANAGEMENT PLAN Instructions/General Information

ARTICLE 22: FEE SCHEDULE

Chapter 5. Code Enforcement

County of San Diego, Planning & Development Services BUILDING CONSTRUCTION PERMIT FEES BUILDING DIVISION

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Charter Township of Lansing Fee Schedule. (Civil Infraction Fines are listed on Page 8)

BUILDING PERMITS. Santa Rosa County Building Inspection

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

Guide for Opening Child Care and Day Care Facilities

Chapter 52: Administrative Procedures for the Construction Codes. City of Dallas

Ordinance Number 564 Page 2

TOWN OF BRIDGEWATER INSPECTIONAL SERVICES DEPARTMENT Phone: (508) Fax: (508)

CHAPTER 7 BUILDING. 7-4 Adoption of the International Plumbing Code and International Fuel Gas Code

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

9. Does the County of San Diego keep home plans on file for existing homes?

Town of Clinton MECHANICAL/SHEET METAL PERMIT 242 Church Street, Clinton MA Tel: (978) Fax: (978)

SCC NO AN ORDINANCE OF THE SACRAMENTO COUNTY CODE RELATING TO CONSTRUCTION PERMIT FEES

BUILDING INSPECTION DEPARTMENT FEE SCHEDULE CHAPTER 30 ARTICLE XV. Effective October 1, 2011

BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF. Amendments to Chapter 9, In General. Chapter 9 of the Orange County

GWINNETT COUNTY Department of Planning and Development Development Inspection Section Phone: Fax:

PITT COUNTY BUILDING CODES ENFORCEMENT ORDINANCE

Building Codes and Code Enforcement

FEES BUILDING DEPARTMENT

Development Services Guidelines

Special Inspection/Re Inspection, all Divisions $ per hour, one hour minimum

Check Off (Below) Information That Is Submitted With Permit

Building Permit, Fire Inspection and Operating Permit Fee Schedule

BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10

C. Development Permit Requirement in Flood Hazard Areas

Table of Contents Rules Governing Installation of Heating, Ventilation, and Air Conditioning Systems, Division of Building Safety

Placement of Manufactured Homes on Private Property

STATE OF OKLAHOMA. 2nd Session of the 44th Legislature (1994) AS INTRODUCED An Act relating to professions and occupations;

ORDINANCE NO (NEW SERIES) AN ORDINANCE REPEALING AND REENACTING THE COUNTY ELECTRICAL CODE

City of Brisbane, CA Business License Tax Fee Schedule

Moving a House in Pasadena

FLOOD HAZARD MANAGEMENT SPECIFIC PLAN GUIDELINES

EXHIBIT A LA PLATA COUNTY CODE CHAPTER 18 BUILDINGS AND BUILDING REGULATIONS

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

ENVIRONMENTAL PROTECTION AGENCY

WEST VIRGINIA CODE CHAPTER 21. LABOR ARTICLE 16. REGULATION OF HEATING, VENTILATING AND COOLING WORK.

City of Mandeville. Guidelines for Construction and Development

CHAPTER 20. Building (Construction) Regulations ARTICLE I. General Provisions ARTICLE II. Adoption of and Amendments to Technical Codes

ORDINANCE NO

CHESTERFIELD COUNTY DEPARTMENT OF BUILDING INSPECTION RESIDENTIAL FEE SCHEDULE SUMMARY 7/1/2016-6/30/2017

Town of Clinton. TRENCH PERMIT 242 Church St.Clinton Ma Telephone# Office (978) FAX (978) This Section for Official use only

Ferry County Out Building Application

City of Valdosta Land Development Regulations. Table of Contents

BASE PERMIT FEE x.80 = PLAN CHECK FEE*: $ BASE PERMIT FEE x.10 = MECHANICAL INSPECTION FEE: $ BASE PERMIT FEE x.12 = ENERGY CODE REVIEW FEE: $

BUILDNG PERMIT FEES Resolution # Effective October 1, 2011

dpd 316 Seattle Permits Tip Subject-to-Field-Inspection (STFI) Permits Projects that Qualify as STFI

ATTACHMENT A Town of Lakeside Fee Schedule. ANIMALS Annual pet registration fee per animal limit 4 animals $ 8.00 each

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

CHAPTER 26 HEATING, AIR CONDITIONING AND REFRIGERATION COMMISSION AND CONTRACTORS

In an effort to improve the city s building permit and inspection processes the building permit fee schedule has been revised and updated.

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks.

C I T Y O F P E A R S A L L

COMMERCIAL BUILDING PERMIT INFORMATION

(ix) Interstate recognition of supervisor certificate issued 360/- by other states (x) Late fee for renewal after grace period 60/-

ORDINANCE NO O-01

ARLINGTON COUNTY CODE. Chapter 18 PLUMBING AND GAS CODES

BROKERS MANUAL GENERAL INFORMATION. Coverages Available

Model Legislation for Short-Term Online Rentals. Menu

Boulder County Building Code Amendments. Resolution : Amendments to Boulder County Building Code Effective January 1, 2013

The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity

Annual Registration of Vacant or Abandoned Commercial Storefront [San Francisco Ordinance , effective ]

EAST BAY REGIONAL SEWER PROGRAM

NEW JERSEY. Uniform Construction Code. Municipal Procedures Manual

FREQUENTLY ASKED QUESTIONS: 1) Q: When is a building permit required?

Development Services Guidelines

City of Miramar Building Division

ACCREDITATION CRITERIA FOR THIRD-PARTY PERMITTING, PLAN REVIEW AND INSPECTION SERVICE PROVIDERS. AC402 November 2015 (Effective January 1, 2016)

AB 715 COVERS: Toilets and Urinals CHAPTERED AS: Health and Safety Code

ALABAMA BOARD OF HEATING, AIR CONDITIONING AND REFRIGERATION CONTRACTORS ADMINISTRATIVE CODE CHAPTER 440-X-3 LICENSING AND FEES TABLE OF CONTENTS

2013 BUILDING ENERGY EFFICIENCY STANDARDS

Shed Application Package

4. New $ Minimum Plumbing, HVAC, Alarms, Sprinklers, and any permanent systems 5. Replacement $ Minimum

CHAPTER 67.2 RESIDENTIAL BUILDING CODE

Chapter 4-01 PLUMBING CODE

Transcription:

Building Permit & Plan Check Fees Fee Changes to be Effective 10/01/15 Last Updated: 09/30/15 Fee & Description Fee Plan Check Fees Standard Plan check of building or structure reviewed by staff within the established Standard turnaround time. 85% of Building Permit fee per plan check, but not less than $112.58 Combination Plan Check Plan check fee for building or structure of a Group R, Division 3 or Group U-1 occupancy, or additions or alterations thereto, which includes all building, electrical, plumbing, heating, ventilating, and air conditioning work 85% of Building Permit fee, but not less than $112.58 Express Plan check of building or structure reviewed by staff in half the time of Standard service - cutting the plan check turnaround time by 50%. 2x the Standard Plan Check fee or the Standard Building Plan Check fee plus $172,694.00 / plan check, whichever is less. Additional Building Plan Check for National Pollutant Discharge Elimination System (NPDES) (Required for most projects) Plan review of projects regulated under chapter 18.95 of this municipal code 85% of NPDES permit fee / plan check Additional Building Plan Check for Flood Regulation Plan review for all construction or work required to comply with the Flood Damage Prevention regulations of Chapter 21.62 $226.25 / plan check Additional Building Plan Check for Title 24 Accessibility Plan review of all construction or work required to comply with Title 24, Part 2, of the CCR, Section 101.17, et seq., the state's disabled access and adaptability requirements 10% of the Building Plan Check fee / plan check Additional Building Plan Check for Title 24 Energy Plan review of all construction or work required to comply with Title 24 -- the rules and regulations of the California state energy resources conservation and development commission 5% of the Building Plan Check fee / plan check

Grading Plan Check Sign Plan Check Miscellaneous Plan Check Plan Rechecking Geologic / Soils Report Review 85% of Grading Permit fee / plan check 85% of Sign Permit fees per plan check, but not less than $112.58 / plan check plus 100% of Zoning Sign Permit fee. $226.25 / hour 50% of the Building Permit fee, but not less than $226.25 / plan check. 115% of consultant costs billed to the City or $226.25 / hour per report, if reviewed by City staff Building Permit Fees (By valuations) By Valuations up to $500 $501 to $2,000 $2001 to $20,000 $20,001 to $50,000 $50,001 to $100,000 $100,001 and up $97.28 / permit $97.28 for the first $500 plus $3.13 / addt'l $100 or fraction thereof to and including $2,000 $143.07 for the first $2,000 plus $16.27 / addt'l $1,000 or fraction thereof to and including $20,000 $436.02 for the first $20,000 plus $11.53 / addt'l $1,000 or fraction thereof to and including $50,000 $781.95 for the first $50,000 plus $9.59 / addt'l $1,000 or fraction thereof to and including $100,000 $1261.23 for the first $100,000 plus $5.85 / addt'l $1,000 or fraction thereof Combination Building Permit Permit fee for building or structure of a Group R, Division 3 or Group U-1 occupancy, or additions or alterations thereto, which includes all building, electrical, plumbing, heating, ventilating, and air conditioning work 150% of Building Permit fee per permit, but not less than $145.37 Additional Building Permit for National Pollutant Discharge Elimination System (NPDES) (Required for most projects) Permit fee for projects regulated under chapter 18.95 of this code $2.02 for each $1,000, or fraction thereof, of construction valuation

Additional Building Permit for Title 24 Accessibility (Required for most multi-family and non-residential projects) Permit fee for all construction or work required to comply with Title 24, Part 2, of the CCR, Section 101.17, et seq., the state's disabled access and adaptability requirements 10% of the Building Permit fee / permit Grading Permit 50 cubic yards or less $97.28 / permit 51 to 100 cubic yards $193.46 / permit 101 to 1,000 cubic yards 1,001 to 10,000 cubic yards 10,001 to 100,000 cubic yards 100,001 cubic yards or more Sign Permit Combination Sign Permit Expired Permit Structural Observation Report Verification $193.46 for the first 100 cubic yards, plus $59.62 addt'l 100 cubic yards or fraction thereof. $730.07 for the first 1,000 cubic yards, plus $118.30/ addt'l 1,000 cubic yards or fraction thereof. $1,794.73 for the first 10,000 cubic yards, plus $236.45 / addt'l 10,000 cubic yards or fraction thereof. $3,922.77 for the first 100,000 cubic yards, plus $58.60 / addt'l 10,000 cubic yards or fraction thereof. 100% of Building Permit fee per permit 125% of the Sign Permit fee per permit 50% of a new Permit fee, but not less than $97.28 $145.37 / permit to verify that all reports have been received Moving Building Permit Fee (Structure or House) Within the City From Outside City Limits to Within the City Within or Outside of the City to Outside the City $1,967.40 posting and examination and $99.46 permit fee $1,967.40 posting and examination and $99.46 permit fee $99.46 / permit

State Mandated Fees Strong-Motion Instrumentation & Seismic Hazard Mapping Fee (1 to 3 Story Residential) State mandated fee applied to each Building Permit application. Fee amount is based on valuation. Strong-Motion Instrumentation & Seismic Hazard Mapping Fee (Over 3 Story Residential and all Commercial) State mandated fee applied to each Building Permit application. Fee amount is based on valuation. Green Building Standards Fee State mandated fee applied to each Building Permit application. Fee amount is based on valuation. $0.13 per each $1,000 of valuation or fraction thereof with a minimum of $0.50 $0.28 per each $1,000 of valuation or fraction thereof with a minimum of $0.50 $1 per each $25,000 of valuation or fraction thereof with a minimum of $1 Special Services & Inspection Fees Off-Hour Inspections (At the discretion of the Building Official) Special Inspection Fee $289.65 / hour, or a fraction thereof per inspection $192.37 / hour or fraction thereof for each individual inspection that occurs Business License Building Permit Review Condominium Conversion Inspection Fee $24.54 / per review $385.83 / inspection in addition to $10.93 / converted unit Construction & Demolition Debris Recycling Processing of Construction and Demolition Debris Recycling application Deposit for Construction and Demolition Debris Recycling program.25% of project valuation with a minimum fee of $141.00 and a maximum of $2,898.64 3% of total project valuation, with a minimum fee not less than $1,545.00 and a maximum fee of $51,500.00 / application Deputy Inspection Examination Certification Examination & Certification Renewal Any person desiring to be a registered inspector shall make application and pay $192.37 Every applicant passing such examination shall pay $97.28 Renewal Fee $97.28. If expired certificates (more than 60 days less than 1-year), then $192.37

Deputy Inspector Supervision Re-inspection Fee Change of Address Request Change of Contractor $145.37 / trade, to be paid at permit issuance $192.37 / re-inspection to be paid before any additional inspection will occur $196.74 / request $49.08 / application Oil & Gas Oil and Gas Records Search Oil or Gas Well Abandonment Oil Well Drilling Annual Oil Well Permit Oil Well Delinquency Penalty (for fees not paid within 30 days from due date) Oil Well Appeal (to Planning Commission or City Council) Oil Well Exemption (from idle well provision) Penalty Fee for Work Without a Permit Temporary Certificate of Occupancy Renewal of Temporary Certificate of Occupancy $99.46 / lot or parcel in an oil zone $393.48 / inspections required to abandon an oil or gas well $1,180.44 / well $256.86 / well 25% of the fee due / permit See Appeal Fees $120.23 / exemption In addition to the permit fee, 100% of permit fee but no less than $393.48 for Investigation Fee $45.91 / each $100,000 of valuation or fraction thereof with a minimum of $209.86 25% of the initial fee with a minimum of $97.28 Temporary Utility Releases for Gas $17.49 / request, but not less than $97.28 Temporary Utility Releases for Electric $17.49 / request, but not less than $97.28 Code Modifications/Alternate Methods and Materials Appeal to Board of Examiners, Appeals and Condemnation Refund Processing Fee Fee to Establish / Re-Establish Internet Transaction Account $241.55 / hour or fraction thereof per request $241.55 / hour or fraction thereof for each appeal, but not less than $483.11 20% of the refundable fees paid $34.54 / account

Reproduction, Records Management and Processing Fees Map Reproduction Fees (Request for printed copies of City maps) Maps - Standard Maps - Customized (per hour) $84.16 / standard map $163.95 / hour or fraction thereof for a customized map Document Reproduction Fees Black & White Copies Color Copies Digital (i.e., compact disc) Microfiche Permit and Inspection Document Verification Fee Plan Reproduction Fee $.20 / page $.60 / page $93.00 / compact disc $0.93 / page $99.46 / permit plus the Reproduction of Records fee $99.46 / request in addition to the costs for duplicating the plans Records Management and Processing Fees Processing Fee (Plans, permits, applications, etc.) Records Management and Retention Fee (of plans by microfilming or digitizing) Special Projects (which have no fee otherwise identified) $49.08 / application 2% of the permit fee per plan but not less than $49.08, and no greater than $590.22 $163.95 - $240.46 / hour